Apri13, 2017
Ms. Lori Beckwith
US Army Corps of Engineers
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
Subject: Nationwide Permit #14
Bridge 580011, SR 1798 Tater Town Road
State Project No. 17BP.13.R.119
McDowell County, NC
Dear Ms. Beckwith:
JAMES H. TROGDON, III
SecaernRr
I have enclosed a set of plans, a PCN application for N WP # 14, and a vicinity map relative to the
proposed bridge replacement project on SR 1798 Tater Town Road, McDowell County, NC.
Please replace the Wetlattd Permit Impact Summary Table included in the plan sheets with the
attached Amended Impact Summary Table.
We propose to replace the existing single span 20' 7" long timber bridge with an aluminum box
culvert (20' 7" wide x 5' 3" high x 3T 6" Iong) with a low flow banel with sills and batlles.
Current stream slope at the site is 1.66%; the proposed slope is 1.75%. Culvert installation will
result in permanent impact to 38 linear feet (LF) of Katy Creek with an additional 52 LF of bank
stabilization. Temporary impacts to 150 LF of the stream are necessary for dewatering/diversion
during construction. The stream is approximately 4' wide and 3" deep with a predominately
sand, gravel, and large cobble substrate. It is classified as Class C.
Existing channel morphology will be maintained upstream and downstream of the culvert.
Riparian vegetation will be reestablished along disturbed areas associated with the project.
Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering
streams.
This project may impact potentially suitable northern long-eared bat (Myotrs septen[rionalis)
(NLEB) summer roosting habitat via tree clearing. Following the SLOPES protocol from
Condition 3.13 Northern Long-Eared Bat—Endangered Species Act Compliance in the
Fittal Regional Conditions of the 2017 NationWide Permits the project is located outside of a red
H[JC. The bridge's underside could not be surveyed for bats; the beams were approximately 3'
above the stream and were too low to get under the bridge to look for bats or evidence of
presence/usage. Approximately seven trees will be cleared for the project. No effect on the
MailingAddress.� Telephane: (828) 251b171 Loca�ion:
NC DEPARTMENT OF TRANSPORTATION F¢x: (828) 251 b394 55 ORANGE STREET
DIVISIONTHIRTEEN Cvsmme�Service: 1-877-368-0968 ASFIEVILLE,NC 28801-2340
POST OFFICE BOX 3279
Lori Beckwith
Page —2 Bridge 58001 l, McDowell County
April 3, 2017
remaining McDowell County list of federally protected species (threatened or endangered) wi❑
occur.
As a part of the 401 Certification process, the project was processed through the DOT
Programmatic Agreement for Minor Project as required by Section 106 of the National
Historic Preservation Act of 1966 and GS 121-12(a). No Historic Resources will be affected.
These forms are attached for the Corps file.
This project does not fall within a designated trout watershed as described in Condition 2.7
Trout Waters in the Final Regional Conditions of !he 2017 NatronWide Permits. Therefore,
comments from the North Carolina Wildlife Resources Commission Westem Region Coordinator
are not necessary.
By copy of this letter, we are asking the Area Roadside Field Operations Engineer to comment
on the above project. Katy Creek is classiFed as Class C. The project will not require a trout
buffer vaziance.
By copy of this letter, I am forwarding one electronic copy of the application package to Kristi
Lynn Carpenter, NC Division of Water Resources, Transportation Permitting Unit with cc to
Kevin Barnett, NC DWR Asheville Regional Office for review and comment. Please charge the
application fee of $240.00 to WBS element # 17BP.13.R.119. Please forward comments directly
to the Corps with copy to Division 13 Environmental Officer.
Your earliest consideration for this request would be greatly appreciated. If you have any
questions or information needs, please contact me at (828) 251-6171.
Sincerely,
Roger D. Bryan
Division 13 Environmental Officer
Enclosures
cc: 7.J. Swain, Jr., P.E.
Chris Medlin, P.E.
Reid Whitehead, P.E., CPESC
Kevin Barnett
Kristi Lynn Carpenter
Corps Submittal Cover Sheet
Please provide the following info:
1. Project Name: Bridge 580011 SR 1798 Tater Town Road
2. Name of Property Owner/Applicant: NC DOT
3. Name of ConsultantJAgent:
tAgent authorization needs to be attached.
4. Related/Previous Action ID number(s):
5. Site Address: N/A
6. Subdivision Name:
7. City: Dvsartsville
8. County: McDowell
9. Lat: 35.62447 Long: -81.89627Decimal Degrees Please )
10. Quadrangle Name: Glenwood
I 1. Waterway: Katv Creek
12. Watershed: Catawba River
13. Requested Action:
X Nationwide Permit # 14
General Permit #
Jurisdictional Determination Request
_ Pre-Application Request
The following information will be completed by Corps office:
AID:
Prepare File Folder Assign ntunber in ORM Begin Date
Authorization: _ Section 10 _ Section 404
Project Description/ Nature of Activity/ Project Purpose:
Site/Waters Name:
Keywords:
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the X Section 404 Perrnit ❑ Section 10 Pertnit
Corps:
1b. Speci(y Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1 c. Has the NWP or GP number been verified by the Corps? X Yea ❑ No
1d. Type(s) of approval sought from the DWQ (check all that apply):
X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required7 Certification:
❑ Yes X No ❑ Yes X No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation X Yes ❑ No
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee progrem.
1 g. Is the project located in any of NC's lwenty coastal counties. If yes, answer 1 h ❑ Yeg X No
below.
1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes X No
2. Project Information
2a. Name of project: Bridge 580011, SR 1798
2b. County: McDowell
2c. Nearest municipality / town: Dysartsville
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state ��BP �3.R.119
project no:
3. Owner Infortnatfon
3a. Name(s) on Recorded Deed: North Carolina Department of Transportation
3b. Deed Book and Page No. N/A
3c. Responsible Party (for LLC if NIA
applicable):
3d. Strcet address: N/A
3e. City, state, zip: N/A
3f. Telephone no.: N/A
3g. Fax no.: N/A
3h. Email address: N/A
Page 1 of 10
.,�.� �....,,. . �_...:,.., , � .,,......,..�... ,� •,�,.o �......:....
4. Applicant Informatlon (if different from owner)
4a. Applicant is: North Carolina Department of Transportation
4b. Name: J.J. Swain, Jr., P.E., Division Engineer
4c. Business name N.C. Department of Transportation
(if applicable):
4d. Street address: 55 Orange Street, P.O. Box 3279
4e. City, state, zip: Asheville, NC 28802
4f. Telephone no.: 828-251-6171
4g. Faxno.: 828-251-6394
4h. Email address: rdbryanCo�ncdot.aov
5. AgenUConsultant Informatlon (if applicable)
5a. Name: N/A
5b. Business name wA
(if applicable):
Sc. SVeet address: N/A
5d. City, state, zip: N/A
5e. Telephone no.: N/A
5f. Fax no.: N/A
5g. Email address: N/A
n...... n ..s � n
B. Project Informatfon and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1 b. Site coordinates (in decimal degrees): Latitude: 35.62447° N Longitude: - 81.89627° W
1c. Property size: 0.1 acres
2. Surtace Waters
2a. Name of nearest body of water (stream, river, etc.) to Katy Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: Class C
2c. River basin: Catawba
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing bridge on SR 1798 surrounded by low density residential area, farmland, and forest.
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
80
3d. Explain the purpose of the proposed project:
Replace the existing 20' 7" long single span timber bridge with an aluminum box culvert (20' 7" wide x 5' 3" high x 37' 6"
long) with low flow sills/bafFles.
3e. Describe the overall project in detail, including the type of equipment to be used:
A permanent impact to 90 linear feet (lF) of Katy Creek will be necessary: 38 LF for culvert installation; 52 LF for
floodplain bench/stabilization. A temporary impact to 150 LF will be necessary for an impervious dike/diversion to
dewater the work area during construction. Equipment used will include excavator, crane, and trucks.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / X Yes ❑ No ❑ Unknown
project (including all prior phases) in the past?
Comments: prelim JD form attached to PCN
4b. If the Corps made the jurisdictional determination, what type � p�eliminary ❑ Final
of determination was made7
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NC DOT
Name (if known): Yates Allen Other: N/A
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
PJD completed by NC DOT on March 31, 2017 and submitted with this permit application.
5. Project History
5a. Have permits or certifications been requested or obtained for � Yes X No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes X No
6b. If yes, explain.
Page 3 of 10
nrr.i r....... � i�..,:.... n o r�.....,....�.... nn nnno v,,.,,:,_..
Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands X Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non-404, other) (acres)
Tem ora
W� � P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W2 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P 0 T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. ToWI wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on ihe site, then complete this
question for all stream sites impacted.
3a. 3 b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ — non-404, width (linear
Temporary (T) ��N�� other) (feet) feet)
S1 ❑ P X T Impervious Katy Creek X PER X Corps 4 150
Dike/Dewatering ❑ INT X DWQ
S1 X P❑ T Cuivert Katy Creek X PER X Corps 4 38
❑ INT X DWQ
Bench/Bank X PER X Corps 4 52
S1 X P❑ T Stabilization Katy Creek � �NT X DWQ
S2 ❑ P � T ❑ PER ❑ Corps
❑ INT ❑ OWQ
S3 � P 0 T ❑ PER ❑ Corps
❑ INT ❑ DWQ
S4 0 P❑ T ❑ PER ❑ Corps
❑ INT ❑ DWQ
3h. Total stream and tributary impacts 150
3i. Comments: 38 feet of permanent culvert impact, 52 feet of permanent floodplain bench, and 150 feet of temporary impacts
for dewatering. The total project footprint is 150 linear feet. Permanent impacts lie within footprint of temporary impacts.
1'1...... A .�[ A /�
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individuall list all o en water im acts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number— (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Tem ora
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If ond or lake construction ro osed, then com lete the chart below.
5a. 5b. 5c. Sd. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded Filled Excavated Flooded Fitled Excavated Flooded
P1
P2
5f. ToWI
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project wili impact a protected riparian buffer, then compiete the chart below. If yes, then individually list all buffer impacts
below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar-Pamlico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number — Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Tem ora im act re uired?
B1 ❑P❑T ❑Yes
❑ No
62 ❑P❑T ❑Yes
❑ No
63 ❑P�T ❑Yes
❑ Na
6h. Total buffer impacts
6i. Comments:
n,...,, c ,.<,n
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specificaily describe measures taken to avoid or minimize the proposed impacts in designing project.
Minimized length of culvert and has low flow sills to maintain natural stream channel bottom within the structure.
Floodplain bench and bank stabilization will be constructed to maintain stream channel stabitity.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
N/A
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for X Yes ❑ No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this X Payment to in-lieu fee program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. X Yes
4b. Stream mitigation requested: 38 linear feet
4c. If using stream mitigation, stream temperature: ❑ warm X cool ❑ cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wettand mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigatlon Plan
5a. If using a permittee responsible mitigatio� plan, provide a description of the proposed mitigation plan.
Page 6 of 10
nrr.� r....,,, v.....:.... n o n.,,,,...,,�.... nn nnno v,....:....
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes X No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3(2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigatio� required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
6h. Comments:
Il.....��..4A/�
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes X No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Mana ement Plan
2a. What is the overall percent imperviousness of this project? N/A
2b. Does this project require a Stormwater Management Plan? X Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No.
000250 Post Construction Stormwater Program
❑ Certified Locai Government
2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certifled Local Government Stormwater Review
3a. In which local governmenYs jurisdiction is this project? N/A
❑ Phase II
3b. Which of the following locally-implemented stormwater management programs ❑ NSW
❑ USMP
apply (check all that apply): ❑ Water Supply Watershed
X Other: N/A
3c. Has the approved Stormwater Management Plan with proof of approval been N/A
attached?
4. DWQ Stormwater Pro ram Review
❑ Coastal counties
❑ HQW
4a. Which of the following state-implemented stormwater management programs apply � ORW
(check all that appiy): ❑ Session Law 2006-246
X Other: N/A
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? N/A
5. DWQ 401 Unit Stormwater Revfew
5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A
5b. Have all of the 401 Unit submittal requirements been met? N/A
Page 8 of 10
Ill�Ll C....... \/.....:.... � O Il.........M.�.. A/� il/�l�O \/.....:....
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/statellocal) funds or the � yes ❑ No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ❑ Yes � No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.) ❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ❑ Yes � No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the vio�ation(s):
3. Cumulative Impacts (DWQ Requlrement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
nrr,� r.....,. �e...,:..., e o n.....,....�...� �n nnno v...,.:....
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federaily protected species or � Yes ❑ No
habitat?
Sb. Have you checked with the USFWS conceming Endangered Species Act � Yes � No
impacts7
❑ Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Field survey of the project area and evaluation of current distribution data. With regards to Northem long-eared bats, the
project is located outside of a red HUC. The bridge could not be surveyed for bat presence/usage due to proximity to
water level. Approximately 7 trees will be removed during construction.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
Current Maps/Database
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or t�bal
governments have designated as having historic or cultural preservation � yes � No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
Coordination with NC DOT Cultural Resources personnel per 2007 Programmatic Agreement
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No
8b. If yes, exp�ain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaps.com/
Roger D. Bryan n/p 4/3I2017
�'J �J
ApplicanUAgenYs Printed Name pplicanUAgenP ignature Date
(Agent's signatur s valid only'rf an aulhorization letter from the applicant
is rovided.
n„_., n n..s n n
� ,5�,...4.-�,( /
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACT URFACE WATERIMPA
an Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (FromlTo) Size / Type Wetlands Wetlands Wetlands in Wetlantls Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (R)
1 12+OO±to13+30± Culvert 0.0085 0.01'13 38
2 12+OO±to 13+30± Riprap Banks 0.0086 52
TOTALS: 0.0171 0.0113 90 �7"
/$0
NC DEPAR'CMENT OFTRANSPORTATION
DNISION OF HIGHWAVS
MCDOWELLCOUNTY
Wgg - I�BP.13.R.119
t nc i 12/A/2014
Figure 15ite 1 Upstream
�":_i�...�. ' ..
F: ..
�
�i•
�
`i'��� ;.;r
F:'il�..�. ,�.:
'v',
i:>rv;
,t �. �,�:.,:F . .�.
�n''4;
..'���.
Figure 2 Site 1 Downstream
} f�'��y
i�. !R7' i 'F�.�
���_ q �'
rt d 1 � {y �..5� �� .
, � � 1 ��': � Y a r ��'� ♦"�t t�� f � - ,
I,iil
1 i ' r r ��qy 7 I �
k� � �� ;� + Ef ���i��� �
.� "� '�w�" ,ai ks�����•" I ��, �:
r � ��+d�13 ��t� t�P �
lu.s.�� w:�rr.aw�x'.e�wauva.v._.a:=sska ...: - iii��J�
�r�a�^�^ r„- '.� — _.__.._---q ..-.�_.. ._ _
1'�1� FA�III`�fI�=Flpe I vur::� r�— �
f— ..,�..��.
3e:�.. - r�• ,� _ _ � . . .
.e`
:,r
.q� � i;r`,.
i
� •. ,
�r.� i
i'Ij`..�' _ r el � �'i
�i� �:.-��" ••�1 i�\
, 'ti ' ` r � `.
/�t..;W, i�
\• `
� , f �. i 41,'.
. � �,
. f . ov.�.�,7or -Y. >V
�• tc Y y � �s��
v� , a
: �
� ��', Zy � .. �+�� ��"i ff `
� q1 a�� �175� i '�
T,J L���) � ,} 1 . � I
O�,�y � � .�Sti � � � f�
P p ` � f�
'1 i �� F �1 -.if 4
�e��;��� ' t i� 4 �i '1.���
Figure 3 Bridge il iooking downstream
En vironmentaf
Quality
ROY COOPER
cova„ear
Mr. Yates Allen
NCDOT Division 13 Environmental Specialist
North Carolina Depariment of Transportation
Post Office Box 3279
Asheville, North Carolina 28802
Dear Mr. Allen:
March 29, 2017
Subjecr. Mitigation Acceptance Letter:
Division 13 Project, Replace Bridge Number 580011 over Katy Creek on SR ll98 (Ta[er Town
Road), McDowell Counry; WBS Element 176P.13.R.119; DMS ID 24366
The purpose of this letter is to notify you that the North Carolina Department of Environmental Quality -
Division of Mitigation Services (NCDEQ-DMS) will provide the wmpensato�y stream mitigation for the suhject
projeck Based on the ittformation received from you on March 29, 2017, the impacts are located in CU 03050101 of
the CatawUa River basin in the Northern Mountains (NM) Eco-Region, and are as follows:
Catawba
03050101
NM Cold
Ln7p2CIS �
Stream
Cool
38.0
Wetlands
Warm Riparian Non-
6uFfcr
Zone 1 � Zone 2
This impactand associated mitlga[ion need were under projected by the NCDOT in the 2017 impa[t data.
Currently NCDEQ-DMS does not have cool stream mitigation credits a�•ailable in this CU. NCDEQ-0IviS will wmmit
to implement sufficient compensatury� cold stream mittgatlon credits to offset the impacts associared with this
project as determi��ed by [he regulatory agencies using [he delivery timeline listed in Sec[ion F.3.c.iii of the In-Lieu
Fee Ins[�vment da[ed �uly 28, 2010. If the above referenced impact amounts are revised, then this mitigation
accep[ance let[er will no longer be valid and a new mitigation acceptanre letter will be required frmn NCDEQ-DMS.
If you have any questions or need additional information, please contact Ms. Beth Harmon a[ 919-707-8420.
Sincerely,
����
Jamg' s 9I. Stanfill
Credi�lanagementSupervisor
cc: Ms. Lori 6eckwith, USACE - Asheville Regulatmy Field Office
Mr. Chris[opher D. Medlin, P.E., Division 13 Bridge Maintenance Mahager
Ms. Linda Fitzpatrick, NCDOT - PDEA
File: SR 1798 - Bridge 5800ll � Division 13
!`�'Nothing Compares_.-„�
Slaleo(NonhCamlina HnvironmentalQua:ily
217NhstJnnesSireet I 1607MailServiceCenter I RalclghNorfhCarolina2 769 0 4 6 01
919 70] 8600
tt±.;g�a.�AUS'Y5'&"e:s.s.5'+d£K' "'� 'S�- ....�Y`v= - - "