Loading...
HomeMy WebLinkAbout20170391 Ver 1_Bridge 542 Buncombe pcn_20170403STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATTON ROY COOPER GOVERNOR March 31, 2017 Ms. Lori Beckwith US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Nationwide Permit #14 Bridge 100542, SR 2748 Buckeye Cove Road State Project No. 17BP.13.R34 Buncombe County, NC Dear Ms. Beckwith: 7AMES H. TYtOGDON, III SECRETARY I have enclosed a set of plans, a PCN application for NWP #14, and a vicinity map relative to the proposed bridge replacement project on SR 2748 Buckeye Cove Road, Buncombe County, NC. Please replace the Wetland Permit Impact Summary Table included in the plan sheets with the attached Amended Impact Summary Table. We propose to replace the existing 19' S" long timber bridge with a corrugated aluminum arch box culvert (20' 1 P' wide x 6' 1" high x 32' long) with a low flow barrel with sills and baftles. Stream slope at the site is 2.23%. Culvert installation will result in permanent impact to 32 linear feet (LF) of Christian Creek with an additional 50 LF of bank stabilization. Temporary impacts to 86 LF of the stream are necessary for dewatering/diversion during construction. The stream is approximately 10' wide and 6" deep with predominately sand, cobble, and small boulder subshate. It is classified as Class C. An unnamed tributary to Christian Creek, measuring 3' wide and 3" deep with a sand, cobble, and small boulder substrate, will have 15 LF of impact from bank stabilization and 20 LF will be dewatered. Existing channel morphology will be maintained upstream and downstream of the culvert. Ripazian vegetation will be reestablished along disturbed areas associated with the project. Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering streams. This project may impact potentially suitable northern long-eared bat (Myotrs septentrionalis) (NLEB) summer roosting habitat via tree clearing. Following the SLOPES from NWP Regional Condition 3.13, the project is located outside of a red H[JC. The bridge was surveyed for evidence of bat presence/usage; none was found. Approximately four trees will be cleared for the project. No effect on the remaining Buncombe County list of federally protected species (threatened or endangered) will occur. MailingAddress: Telephone: (826)251-6171 Location: NC DEPARTMQd'I' OF TRANSPORTATION Far. (828) 251-6394 55 ORANGE STREET DMSIONTHIItTEEN CwtamerService: 1-877-368-4968 ASF�VILLE,NC 28801-2340 POST OFFICE BOX 3279 Lori Beckwith Page —2 Bridge 100542, Buncombe County March 31, 2017 As a part of the 401 Certification process, the project was processed through the DOT Programmatic Ageement for Minor Project as required by Section 106 of the National Historic Preservation Act of 1966 and GS 121-12(a). No Historic Resources will be affected. These forms are attached for the Corps file. This project does not fall within a designated trout watershed as described in Section 2.7 Trout Waters in the Final Regiona! Conditions of the 2017 NationWide Permits. Therefore, comments from the North Carolina Wildlife Resources Commission Western Region Coordinator are not necessary. By copy of this letter, we aze asking the Area Roadside Field Operations Engineer to comment on the above project. Christian Creek is classified as Class C. The project will not require a trout buffer variance. By copy of this letter, I am forwarding one electronic copy of the application package to Kristi Lynn Carpenter, NC Division of Water Resources, Transportation Permitting Unit with cc to Kevin Barnett, NC DWR Asheville Regional Office for review and comment. Please charge the application fee of $240.00 to WBS element # 17BP.13.R34. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer. Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs, please contact me at (828) 251-6171. Sincerely, �� � �'� Roger D. Bryan Division 13 Environmental Officer Enclosures cc: J.J. Swain, Jr., P.E. Chris Medlin, P.E. Reid Whitehead, P.E., CPESC Kevin Barnett Kristi Lynn Carpenter Corps Submittal Cover Sheet Please provide the following info: 1. Project Name: Brid�e 100542, SR 2748 Buckeve Cove Road 2. Name of Property Owner/Applicant: NC DOT 3. Name of ConsultanUAgent: *Agent authoriza[ion needs to be attached. 4. Related/Previous Action ID number(s): 5. Site Address: N/A 6. Subdivision Name: 7. City: Swannanoa 8. County: Buncombe 9. Lat: 35.57820 Long: _ 82.42782 (Decnnal Degrees Please ) 10. Quadrangle Name: Oteen 11. Waterway_:_ Christian Creek 12. Watershed: French Broad River 13. Requested Action: X Nationwide Permit # 14 General Pernut # _ Jurisdictional Determination Request _ Pre-Application Request The following information will be completed by Corps office: AID: Prepaze File Folder Assign number in ORM Begin Date Authorization: Section 10 Section 404 Project Description/ Nature of Activity/ Project Purpose: Site/Waters Name: Keywords: O�O� W AT F9�G h y > r o -~c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the X Section 404 Permit ❑ Section 10 Permit Corps: 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification - Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization te. Is this noUfication solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes X No ❑ Yes X No ----- - — - - - - - 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation X Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes X No below. 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes X No 2. ProJect Information 2a. Name of project: Bridge 100542, SR 2748 2b. Counry: Buncombe 2c. Nearest municipality / town: Swannanoa 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state 17BP.13.R.34 project no: 3. Owner Infortnation 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if N/A applicable): 3d. Streetaddress: N/A 3e. City, state, zip: N/A 3f. Telephone no.: N/A 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 11 f'1/�A1 C...... \/.....:.... A 7 11.........1.... �11 ifl�/10 \I.....i.... 4. Applicant InformaUon (if dffferent from owner) 4a. Applicant is: North Carolina Department of Transportation 4b. Name: J.J. Swain, Jr., P.E., Division Engineer 4c. Business name N.C. Department of Transportation (if applicable): 4d. Street address: 55 Orange Street, P.O. Box 3279 4e. City, state, zip: Asheville, NC 28802 4f. Telephone no.: 828-251-8171 4g. Fax no.: 828-251-6394 4h. Email address: rdbrvanCaDncdot.aov b. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name N/A (if applicable): 5c. Street address: N/A 5d. City, state, zip: N/A 5e. Telephone no.: N/A 5f. Fax no.: N/A 5g. Email address: N/A Il......�f..i�A B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): NIA 1b. Site coordinates (in decimal degrees): Latitude: 35.57820° N Longitude: - 82.42782° W 1c. Propertysize: 0.lacres 2. Surtace Waters 2a. Name of nearest body of water (stream, river, etc.) to Christian Creek proposed project: 2b. Water Quality Classificacion of nearest receiving water: Class C 2c. River basin: French Broad 3. Project DescAption 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing bridge on SR 2748 surrounded by low density residential area, farmland, and forest. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 110; 65 3d. Explain the purpose of the proposed project: Replace the existing 18' 5° long single span timber bridge with a corrugated aluminum arch box culvert (20' 11" wide x 6' 1' high x 32' long) with low flow sills/baffles. 3e. Describe the overall project in detail, including the type of equipment to be used: A permanent impact to 82 linear feet (LF) of Christian Creek will be necessary: 32 LF for culvert installation; 50 LF for bank stabilization. A temporary impact to 86 LF will be necessary for an impervious dikeldiversion to dewater the work area during construction. A UT to Christian Creek will have 15 LF of permanent impacts (bank stabilization) and 20 LF of temporary impacts (diversion). The project will permanently impact 91 LF of the 2 streams and temporarily impact 106 LF. Equipment used will include excavator, crane, and trucks. 4. Jurlsdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / X Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: prelim JD form attached to PCN 4b. If the Corps made the jurisdictional determination, what type � preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NC DOT Name (if known): Yates Allen Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentatfon. PJD completed by NC DOT on March 31, 2017 and submitted with this permit application. 5. ProJect History 5a. Have permits or certificatlons been requested or obtained for � yes X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file° instructions. 6. Future ProJect Plans 6a. Is this a phased project? ❑ Yes X No 6b. If yes, explain. Page 3 of 11 nnr.� r....., v.....:.... , o n........,.�.... �n onno v.,...:.... Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands X Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ � ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps . ❑ No- 0 DWQ W5 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ WB � P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Tofal wetland Impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary ('� (�Nn9 other) (feet) f�t) t o' S1 ❑ P X T Dewatering Christian Creek � NT X DWQ upatream; 86 4' down 10' S1 X P❑ T Culvert Christian Creek � INT X DWQ upstream; 32 4' down 10' S1 X P❑ T Bank Stabilization Christian Creek X PER X Corps upstream; 50 ❑ INT X DWQ 4' down S2 ❑ P X T Dewatering UT to Christian X PER X Corps 3 20 Creek ❑ INT X DWQ UT to Christian X PER X Corps S2 X P❑ T Bank Stabilization Creek ❑ INT X DWQ 3 15 S3 � P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and trlbutary impacts 106 3i. Comments: 32 LF of perm culvert impact, 50 LF of perm stabilization, and 86 LF of temp impacts for dewatering in Il...... A �i � � Christian Creek; total of 86 LF. 15 LF of perm impacts (stabilization) and 20 LF of temp impacts (dewatering); total of 20 LF The total project footprint is 106 linear feet. Perm impacts lie within footprint of temp impacts on both creeks. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem ora 01 ❑POT 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4g. Comments: 5. Pond or Lake Construction Pond ID P1 P2 4f. Total ooen water 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland d use or purpose _(acresZ_ of pond Flooded Filled Excavated Flooded Filled Excavated Flooded Sf. Total 5g. Comments: 5h. Is a dam high hazard permit required? Si. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: ❑ Yes ❑ No If yes, permit ID no: n.._.. e ..o „ 6. BuNer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randlema� 6b. 6c. 6d. 6e. Bf. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ra im act re uired? 81 ❑P❑T ❑Yes ❑ No 62 ❑P❑T ❑Yes ❑ No 63 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Il...... C ..i A A D. Impact Justiflcation and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimized length of culvert and has low flow sills to maintain natural stream channel bottom within the structure. Sills, bafFles, and bank stabilization will be constructed to maintain stream channel stability. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. N/A 2. Compensatory Mltigation for Impacts to Waters of the U.S. or Wate�s of the State 2a. Does the project require Compensatory Mitigation for X Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ X Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this X Payment to in-lieu fee program project? ❑ Permittee Responsible Mitigation 3. -Complete If Using a Mltigallon 8ank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete If Making a Payment to In-Iieu Fee Program 4a. Approval letter from in-lieu fee program is attached. X Yes 4b. Stream mitigation requested: 32 linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool X cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete If Using a Pertnittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 nru r....., v.....:.... n o n.........w... �n nnno �i.....:.... 6. Buffer Mltlgation (SWte Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. Bd. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mltigatlon required: 6g. If buffer mitigation is required, discuss what type of mitiga6on is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: n...... o _s , , E. Stormwater Management and Diffuse Flow Plan (required by DWQ� 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � yes X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No. 000250 Post Construction Stormwater Program ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certifed Local Govemment Stormwater Review 3a. In which local governmenYs jurisdiction is this project? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed X Other: N/A 3c. Has the approved Stormwater Management Plan with proof of approval been N/A attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the foliowing state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 X Other: N/A 4b. Has the approved Stormwater Management Plan with proof of approval been attached? N/A 5. DWQ 401 Unit Stormwater Review Sa. Does the Stormwater Management Plan meet the appropriate requirements? N/A 5b. Have all of the 401 Unit submittal requirements been met? N/A Page 9 of 11 nrr,i c,...,,. �i,....:,... � o n.........,�.,.. en nnno v...,.:,... F. Supplementary Information 1. Environme�tal Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPAISEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Vlolatlons (DWQ Requlrement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated WeUand Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No -_ _ 2c. If you answered "yes° to one or both of the above questions, provide an exptanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality7 3b. If you answered °yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 10 of 11 n...� r....,,. ".....:.... , e ..........,.�,.._ ,n nnno .,.....:.... 5. Endangered Species and Designated Critical HabiWt (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or � Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Ashevil�e 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Fieid survey of the project area and evaluation of current distribution data. With regards to Northern long-eared bats, the project is located outside of a red HUC. The bridge was surveyed for evidence of bat presence/usage and none was found. Approximately 4 trees will be removed during construction. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Current Maps/Database 7. Historic or PrehistoNc Cultural Resources (Corps Requiremeot) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or propeAies significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Coordination with NC DOT Cultural Resources personnel per 2007 Programmaiic Agreement 8. Flood Zone Designation (Corps Requirement) 8a. Wili this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No Sb. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaps.com/ Roger D. Bryan n 3/31/2017 'l � ApplicanUAgenYs Printed Name ApplicanUAg��Ys Signature Date (AgenPs signature is valid only if an uthorization letter from the applicant is rovided. n...... � � ..� n , C�igure i Site 1 upstre�un Figure 2 Site 1 downstream �irur;�3l ul .., � i �� . �i in-:'r��i Figure 4 Junction of Christian Creek an� U7 Environmenta/ Quatity ROY COOPER Governnr Mr. Yates Allen NCDOT Division 13 Environmen[al Specialist North Carolina Department of 7'ransportatinn Post Office Box 3279 Asheville, Nor[h Carolina 28502 Dear Mr. Allen: March 29, 2017 Subject: Miti�ation Aceeptance Letter: Uivision 13 P�nject, Reylace Bridge Number 100542 over Cliristian Creek on SR 2748 (Buckeye Cove Road), Buncomhe County; W95 Rlemen[ 17BP13.R.34; DMS ID "Z43G5 The purpose of this Icttcr is to notify you that the North Carolina Deparhnent of Environmental Quality- Division of MiCigation Services (NCDEQ-DMS) will provide the compensatory sh•eam mitigation for the subject project. BaseA on the i��formation received from you on Marcl� 29, 2017, tlie impacts are located in CU 06010105 of the French �road River basin in the Soirthern Mowrtains (SMJ Eco-Region, and are as follows: Prench I3road OGO10105 SM �I11�0CI5 S[ream Cold Cool 32.0 0 Wedands Warm Rip2rian Nom Coastal n:.,....:..., n�__..i. Buffcr 7.one 1 I Zone 2 This impact and associated mitigation need were under projected by the NCDO'P in tl�e 2017 impact data. NCDEQ-DMS will commit to implement sufficient compensatoiy sh•eant mi[igation credits ro nffset the impacts associated with this project as determined by the regulatoiy agencies using the delivery timeline listed in Sec[ion F.3.ciii of the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer Ue valid and a new miligatlon acceplance Ietter will be required from NCDEQ-DMS. If you have any ques[ions or nced additional information, please contact Ms. I3eth ]iarmon at 919-707-8420. Sincerely, � James B St nfill Credit Ma a�ement Supe�visor cc: Ms. Lori Beckwidi, USACE Asheville Regulatory �ield Office Mr. Christopher D. Medlin, P.E., Division 13 Bridgc Maintenance Manager Ms. Linda Fitzpatricl<, NCDOT - PDGA �ilc: SR 274II 13ridge 100542- Division 13 �Nothing Compares����. Sta[coF�brlh Wrolina I EnvironmentalQuali�y '� ��'�->� I�=i�es Su'eei I 1601 MnilService Cemer I Raleiyh, North Camlina 2769'� Ibu i 914 %0/ A60U