Loading...
HomeMy WebLinkAbout20081262 Ver 1_CAMA Application_200808190 8- 1 2 0 2 Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center, Raleigh, NC, 27699-1650 Aug. 18, 2008 Dear Division of Water Quality folks, The attached application form requests written Buffer Rule authorization for a project to construct steps and a path from our home (under construction) to our existing dock on our lot in the Smuggler's cove subdivision, Belhaven, NC. The footing for the steps will enter the outer edge of zone 2, and the path will cross zone 2 and zone 1 forest floor. My understanding from the instructions is that no application fee is required for this project. I have enclosed 5 copies of this application form consisting of o The PCN Application form 0 1 sheet of detailed answers to questions on the PCN form. o A marked-up copy of the survey for this property showing the area affected by the proposed project, drawn to scale o A photograph showing the path from the proposed steps to the dock. If your office has any questions or concerns, please call me at (919) 367-8941, or email to franc is c?adobe.com. Best regards, Mark E. Francis ' ; '-, Eli 3?,f" 71eq/J [ sl,iY h o 8 Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (1f any particular item is not applicable to this project, please enter "Not Applicable" or'W/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ?? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested:N/A 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: 0 II. Applicant Information 1. Owner/Applicant Information Name:Mark Francis Mailing Address: 1702 Waterclose Ct. Apex, NC 27502 Telephone Number:919-367-8941 Fax Number:919-367-8941 (do voice call first) E-mail Address:francis@adobe.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project:Dock access path 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN):Beaufort County parcel # 15-017137 4. Location County: Beaufort Nearest Town:Bath Subdivision name (include phase/lot number):Smuggler's Cove Directions to site (include road numbers/names, landmarks, etc.): 1 Alexander Drive (Smuggler's Cove lot 1). Enter Smuggler's Cove subdivision from Wheat Patch Rd. Follow Alexander Drive to the end. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): °N °W 6. Property size (acres):2.22 7. Name of nearest receiving body of water:Holiday Gut -> Ross Creek -> North Cr -> Pamlico River 8. River Basin:Tar-Pamlico (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application:Site has an existing dock (by CAMA permit #49420), a partial driveway of crushed stone, and a 2-story house under construction on 10' pilings. General use of land in the vicinity is home sites. Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: See I11.10 on attached sheet. 11. Explain the purpose of the proposed work: See 111.11 on attached sheet. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules.None. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: No impacts. Page 7 of 12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, se aratel list impacts due to both structure and flood' g. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) N/A Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number indicate on ma Stream Name Type of Impact Perennial or Intermittentr Average Stream Width Before Impact Impact Length linear feet Area of Impact acres N/A Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Site Number (indicate on ma Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact acres N/A Total Open Water Impact (acres) Page 8 of 12 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): N/A Wetland Impact (acres): Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream Impact (linear feet): 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ?? No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts.The proposed path will be slightly less than 6' in width, and will cross forest floor that is currently covered by pine straw and low grasses. No trees or shrubs will be removed or damaged, as none lie in the proposed path area. The path will be semi-permeable, of crushed stone. Please see the attached photo showing the area to be covered. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.htmi. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/w!p/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet):N/A Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): Page 10 of 12 IX. X. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No ?? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No ? 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet Mitigation 1 180 3 (2 for Catawba) 2 120 1.5 Total 300 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what Donation of Property, Riparian Buffer Restoration / Riparian Buffer Restoration Fund). Please attach all within 15A NCAC 2B.0242 or.0244, or.0260. type of mitigation is proposed (i.e., Enhancement, or Payment into the appropriate information as identified None required. Page 11 of 12 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious Ievel.Site acreage is 2.22. Proposed impervious acreage is .0068 (300 sq ft). The crushed gravel used for the 6' wide path will be slightly crowned to ensure that stormwater drains from the path into the surrounding forest floor. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No no Is this an after-the-fact permit application? Yes ? No 0 XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No R If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). None. 2?8 V is l0 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 1.5 CAMA environmental concern We have CAMA permit #49420 issued Aug. 22, 2007, authorizing construction of the dock that exists on this property. 111. 10 Description of project The proposed project includes the following: 1) Construct a set of wooden steps leading from an elevated deck (on the northwest side of our house) to the forest floor. The footing for the steps will lie just inside the outer edge of zone 2, approximately 49 feet from the CAMA line. The footing for the steps will be composed of 4"x4" posts of pressure treated lumber, set in concrete around each post (1 bag per post). 2) Dig a narrow (4") trench from the foot of the proposed set of steps to the foot of the existing dock, just deep enough to bury coax for electrical power for the dock. The trench will be refilled with soil originally removed from it, and covered by the path proposed in the following item. 3) Construct a path from our existing dock to the foot of the proposed set of steps. The path will be about 49 feet in length, and slightly less than 6 feet in width. It will cross 30' of zone 1 and 19' of zone 2. The path will be composed of a base layer of sand, with crushed gravel on top. The gravel will be rolled out to a slightly crowned profile (edges lower than the middle section) in order that stormwater will run from the path into the surrounding forest floor. 111. 11 Purpose of proposed work From the description above: 1) The steps will provide access from the house to the dock. 2) The trench will be used to run coax for electricity to the foot of the dock. 3) The path will provide access from the house to the dock.