HomeMy WebLinkAbout20081246 Ver 1_Acceptance Letter_20080818Michael F. Easley, Governor
O ll;ii? -.?'
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
August 18, 2008
Wake County
EXPRESS REVIEW ACCEPTANCE LETTER
SREE Hotels
Attn: Mr. Vinay B. Patel
51 13 Piper Station Drive, Suite 300
Charlotte, NC 28277
Project Name: Marriott Courtyard/Residence Inn
On August 15, 2008, the 401 Oversight/Express Permitting Unit of the Division of Water Quality received a
request from Mr. Kevin Yates of EcoEngineering, regarding a project known as "Marriott Courtyard/Residence
Inn" for acceptance into the Express Review Program. This letter advises you that your project will be accepted
into the Express Review Program once the following items are received:
I ) The application fee of $2,000.00 [for a Riparian Buffer Authorization ($2,000)], made payable to the North
Carolina Division of Water Quality];
2) Five (5) complete and collated copies of the PCN Application and site plan information pertaining to this
project (instead of providing 5 copies of the full size plans you may provide two copies of the full size plans
along with three copies of the 11 X 17);
3) One (1) copy of the completed PCN Addendum
(http://h2o.enr.state.ne.us/ncwetlands/documents/MicrosoftWord-
PCN Addendum 10 01 06 OOO.pdf);
4) Three (3) copies of the details for on-site diffuse flow provisions (refer to
http://h2o.enr.state.nc.us/su/bmp_forms.htm).
Additionally, a pre-application meeting (to include the property owner) is required prior to the submittal of your
completed application package. The clock for this project will not start until receipt of the completed application
package and required fee are received. If the impacts are greater than indicated on the Initial Interest Form and/or
the services are different, you may be required to remit an additional fee. If you have any questions or wish to
discuss these matters further please do not hesitate to call Lia Myott Gilleski at 919-733-9502.
Sincerely,
Cyndi Karoly, Supervisor
40I/Express Review Oversite Unit
CBK/lmg
cc: File copy
Kevin Yates, EcoEngineering, 2905 Meridian Parkway, Durham, NC 27713
401 Oversight / Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.eiir.state.nc.us/ncwet]ands
NorthCarolina
Natkra!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper