Loading...
HomeMy WebLinkAbout20141200 Ver 2_R-2603 sediment loss March_20170303Wanucha, Dave From: Sent: To: Subject: Dave, Slaughter, Johnathan H Friday, March 03, 2017 9:49 AM Wanucha, Dave R-2603 sediment loss March Due to recent heavy rains, EC measures were overrun at the end of this project and a small amount of sediment entered a ditch which carried about 10-15 gallons of sediment to an adjacent creek. The area is being cleaned up now. I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,