Loading...
HomeMy WebLinkAbout20001137 Ver 2_401 Application_20080815I August 15, 2008 US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive Suite 105 Wake Forest, North Carolina 27587 And North Carolina Department of Environment and Natural Resources Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1786 RE: Laurel Hills Dam Spillway Upgrade Project To Whom It May Concern: P? IT Pf-? The City of Raleigh would like to submit a revised Pre-Construction Notification Application form per the North Carolina Division of Water Quality's request for a previously approved Pre-Construction Notification (PCN) Application for the Laurel Hills Dam Spillway Upgrade in the City of Raleigh, Wake County, North Carolina. The City of Raleigh proposes to make improvements to the dam and spillway in order to meet current Dam Safety design standards. Recently, a Section 404 Nationwide Permit #3 was re-issued for this project and is dated May 8, 2008 and we are now requesting 401 Water Quality Certification and Riparian Buffer Rule approvals. The Laurel Hills Dam Spillway Upgrade Project has been modified from our previous PCN approval (DWQ ID #001137) which has since expired. Modifications were made to the plans and specifications to incorporate changes requested as a part of the Dam Safety review and property owner plan requests. These changes are itemized below: OFF-CFS HAF;GFTT 01_F_1(_[ HO X RALEIGH. NORTH C,\[,()1 NA ACC-;' r.? - . I ir, Fe,I'I R f F,r ? !S A U G ' 5 2008 WE') uVdDS A.h! SYQRtJ f' EF•. t?FcAi?l;li p0 -1137v? Laurel Hills Dam Spillway Upgrade Project August 15, 2008 City of Raleigh PCN Application Page 2 o The City of Raleigh has asked our consultant MACTEC Engineering to include a water control plan for the project. In the past, our construction contractor was tasked with devising a plan for water control that would meet criteria established by the City and conforming to State requirements. The City decided to incorporate a water control plan as a part of these construction drawings. The water control plan consists of a temporary cofferdam and temporary drain pipe. o The downstream property owner enjoyed the small, tranquil flow that currently exists in the downstream channel section. The property owner was concerned that the size of the weir length of the new riser would prevent much base flow from flowing through the existing 24-inch diameter culvert which currently has a small "waterfall-like effect" near the right end of the dam, as the flow discharges along the right abutment contact which is located in natural rock. The normal pool elevation that was approved by your office on March 23, 2000, is at an elevation of 91.82' and is controlled by the 24-inch diameter culvert near the right end of the dam. That elevation has not changed with the revised drawings. The top of the riser structure shown on the previously approved drawings were at the same elevation as normal pool. In response to the property owner's concerns, we have raised the riser by 3 inches (0.25') in order to accommodate his request and to alleviate his concerns. The City has also shown on the plans a requirement to install a 21-inch restrictor plate over the opening of the 24-inch diameter culvert inlet such that only 3 inches of flow depth can discharge through the culvert. In this way, the inlet invert of the 24-inch diameter culvert will continue to control the normal pool (with a maximum depth of flow of 3 inches at the inlet), but the new riser to be constructed will still accommodate the required design storm event without overtopping of the dam. o The plans have also been revised to include additional information on shoring that would be required in order to construct the project. Our engineering consultant has proposed the use of bentonite clay type geomembrane along the sheet piling to be used for shoring during construction of the dam. A detail illustrating the location of this geomembrane is shown on construction plan sheet U-2 and referenced in the technical specifications in section 2.4. LF Principal Spillway Materials, Seepage Seal. If you have any questions regarding the use of this geomembrane, our engineering consultant, J. Allen Tice, PE, with MACTEC Engineering would be able to provide you with additional information if necessary. Please contact me and I will arrange a meeting or phone call with Mr. Tice to address your questions. o The technical specifications have been modified to reflect changes listed above. Laurel Hills Dam Spillway Upgrade Project August 15, 2008 City of Raleigh PCN Application Page 3 Please find enclosed copies of the Dam Safety permit for Approval to Repair and our U.S. Army Corps of Engineers Nationwide Permit Number 3, and NC Erosion and Sediment Control approval for the Laurel Hills Dam for your files. This project is a part of the City of Raleigh's Bond Program and will have funds available for construction of this project September 2008. The City of Raleigh will submit five (5) copies of this application package to the Division of Water Quality for processing of our 401 permit and Riparian Buffer Rules request and one (1) copy of this application package to the US Army Corps Regulatory Field Office to update their files since a permit was already re-issued for this project. Please review the attached permit package, construction plans, and review fee in the amount of $570.00 (check number 00667950). Should you require additional information, please do not hesitate contacting me so that this additional information can be sent to you as quick as possible. I can be reached at veronica.highgci.ralei h.nc.us or by phone directly at (919) 890-3801. Thank you in advance for your review of this permit request. Sincerely, ?l Veronica L. High, E.I. Stormwater Project Engineer 11 City of Raleigh Public Works Department, Stormwater Management Division Cc: file < V,"I 1 fMichael F. Fa;lcv. Governor Q? R yQG William (. Ross h . Secretary QU4 North Carolina Department of Environment and Natual Resources Coleen H. Sullins. Director Dirisionof ?katerQualm, June 16, 2008 DWQ Project # 00-1137 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED City of Raleigh Attn: Veronica High P.O. Box 590 Raleigh, North Carolina 27602` Jtag r?t' ? Subject Property: City of Raleigh - Laurel Hills Dam Renewal of Issued 401 Permit ?08 PERMITTING FEE MISSING VJ Dear Ms. High: On June 12, 2008 the Division of Water Quality (DWQ) received your letter dated June 10, 2004 for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The project has been placed on hold as incomplete until we receive the additional information and/or fee. Please provide the following so that we may continue to review your project. Additional Information Requested: ® A request for renewal/modification of an issued permit requires re-submission of five (5) application sets and appropriate fee. The fee for applications is $240 for projects impacting less than an acre of wetland and less than 150 linear feet of streams whether intermittent or perennial). For projects impacting one or more acres of wetland or 150 or more feet of streams (whether intermittent or perennial), the fee is $570_ Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or me at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. 101 Oversight/Express Review Permittin_ knit I6?0 Mail Service Center, Raleigh, North Carolina -17699-1650 '311 Crahnee Boulevard. Suite -1i0. Raleteh. North ( amltna 27604 Phonc 919-733-1796 / FAX 90-1-:3-681 - Internet o c On, NorihCarohua , Yalm--ally An Lqual Opportunity/Aftirmauye Action I mplwei - ?0 S, Recycledi I11"4, Foss ( nnAUmer Paper CBKh-n j SHi erelY Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit cc: Lauren Witherspoon. DWQ Raleigh Regional Office US Army Corps of Engineers Raleigh Regulatory Field Office File Copy Central Files Filename- 0011371-am'elHillsDam(Wake) Hold Fee Modtoh.oedPemn Office Use Only: Form Version March 08 USACE Action ID No. DWQ No. (It any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested 3 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? ?Pl 11. Applicant Information s_. t q 20 108 N,?J?a i 4 1. Owner/Applicant Information Name: City of Raleigh Attn: Mr. Carl Dawson Jr PE Public Workjg ='"? ` Mailing Address: City of Raleigh Public Works Department PO Box 590 Raleigh NC 27602 Telephone Number:_ (919) 890-3030 Fax Number: _ (919) 890-3786 E-mail Address: carl.dawsongci.raleigh.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Veronica High El Company Affiliation: City of Raleigh Mailing Address: Public Works Department Stormwater Management Division PO Box 590 Raleigh NC 27602 Telephone Number: (919) 890-3940 Fax Number:_ (919) 890-3179 E-mail Address: veronica.high@ci.raleigh.nc.us Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Laurel Hills Dam Spillway Upgrade 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN):0785895587 (3909 Rhododendron),0785893872 (3905 Rhododendron), 0785892984 (4401 Laurel Hills), 0785799725 (4300 Laurel Hills) 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): Laurel Hills Directions to site (include road numbers, landmarks, etc.): US 70 West (Glenwood Avenue) to Edwards Mill Road south, right onto Laurel Hills Drive, Laurel Hills lake is located on the left near 4300 block 5. Site coordinates (Lat/Long or decimal degrees): 35° 50' 12.26"N, 78° 42' 07.58"W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): I 1 7. Name of nearest receiving body of water: Unnamed Tributary into Crabtree Creek 8. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) Page 6 of 13 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Laurel Hills Lake is located in a fairly developed residential community. There is an existing public roadway along the top of the dam During several large rain events, the dam has been overtopped and damaged due to an inadequate spillway. 10. Describe the overall project in detail, including the type of equipment to be used: Laurel Hills Dam structure will be rehabilitated to include a new spillway structure that will meet State Dam Safety standards. Please see the attached Laurel Hills Dam Technical Suecifications. 11. Explain the purpose of the proposed work: The proposed to work will install a spillway to convey flow to meet State Dam Safety Standards. Currently, the flow from the outlet pipe discharges along the downstream slope of the dam presenting potential erosion to the dam IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. The Laurel Hills Dam Spillway Rehabilitation Project previously Re-issued a USACE NW #3 permit (ID 200620183, expiring May 8 2010) A DWQ permit was issued but since expired September 5, 2002 (ID 001137). V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. The owner of the lake parcel has indicated that he would like to remove sediment from Laurel Hills Lake that has settled into the lake due to upstream land development His proposed work is not a part of the City of Raleigh project. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Page 7 of 13 Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The City of Raleigh will limit our construction activity to approx. 120 ft upstream of the toe of the existing embankment slope, through the existing dam embankment, to approximately 100 ft downstream of the existing downstream toe of embankment. Most upstream and downstream project disturbance beyond the existing embankment is due to temporary water and erosion control measures. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, senarately list impacts due to both structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain (yes/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) None 0 Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property: Unknown 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on map) Stream Name Type of Impact Perennial Intermittent? ? Average Stream Width Before Impact Impact Length (linear feet) Area of Impact (acres) 1 Unnamed Tributary Channel Stabilization (downstream) Perennial 5 180 0.23 Total Stream Impact (by length and acreage) 180 0.23 Page 8 of 13 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill, excavation, dredaing. flooding. drainage- bulkheads. etc_ Open Water Impact Site Number (indicate on ma) Name Waterbody (if ap applicable) ) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) 2 Laurel Hill Lake Temporary Fill Lake 0.64 Total Open Water Impact (acres) 0.64 6. List the cumulative impact to all Waters of the U.S_ resulting from the nroiect- Stream Impact (acres): 0.23 Wetland Impact (acres): 0 Open Water Impact (acres): 0.64 Total Impact to Waters of the U.S. (acres) 0.87 Total Stream Impact (linear feet): 180 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. N/A 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Current land use in the vicinity of the pond: N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and Page 9 of 13 financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. This project is for the sole purpose of meeting Dam Safety requirements for this classifiction of dam Because the existing outlet device is undersized, the dam has overtopped on numerous occasions and has had to be repaired. The proposed rehabilitation work on the dam will include adding new riser and outlet pipes and upstream and downstream erosion/water control devices and energy dissipater. Disturbance to existing areas will be kept to a minimum and fencing will be used to define disturbed limits. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetlands/stn-nvide.htirii. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A; None required due to maintenance of an existing facility. Page 10 of 13 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ® No ? 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? Page l 1 of 13 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Mitigation 1 4200 3 (2 for Catawba) 12600 2 0 1.5 0 Total 4200 12600 * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. The City of Raleigh considers the work associated with this project as maintenance of an existing dam facilitv and is exempt from mitigation requirements. XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level.N/A existing proposed impervious surfaces will be the same- XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development which could impact nearby downstream water quality? Yes ? No Page 12 of 13 If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:N/A XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). The US Army Corps has re-issued a Nationwide Permit 3 for the project expiring May 8, 2010 and a NC Dam Saftety Permit has been obtained already for the project. Funding for the repairs is a Part of the Citv's Bond Program with a limited construction time period. f /Z14, &//3"/L9 $ Applicant/Agent's Sifnature 0 I:f AZ 0T bate (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 0 N OD N • OD l e ? so• 1 ? alp 3 A= d am ten, Si c y ? ? ® ??????' ? ?? ?., ? ? ? 1.,? rte. --> _? H n" Laurel His Dam - , 97 Spillway Upgrade Project aP In r r? Vicninity Map 1°ltiq ?9, `w A iP O G fD O 'ny I o / ? --- - ? -- 1 o W O N O O O ? C N O A p O ` 'i t ' O c? o 00 o ? m DAx rO3 r- ct zA =aw l \ o = ov * CD vD c co x i z0cn a _ z =c n ?r 4 ND D ? ° = V n n D O o? 2? vs - z 1 = A eN w?2 av? Y z 0 i\ ?? =c y = nmr y y? `. t/) x \ \ wca0 .? J W N o Nvcn -t N Q W m? = m co m c v -c CA n Q v o m Q, z c- 00 t II T = m\ \ A DOUGLAS ERIC \ \ \ ? \ 03 R HILLS RD m = RALEIG NC 2 12-5420 2 J?o \ 4403 Laure ills Rd rf N a+ ?0 ? gv 1Q D N C? 77 { xv? ? w I N o 0 O z£? C CL vc G M W c .? = t . v o o o = Z O [1 T m 7 4 m ? CD 0 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 200620183 County: Wake USGS Quad: Raleigh West. GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner / Authorized Agent: Ms. Veronica High Address: Citv of Raleigh P.O. Box 590 Raleigh, NC 27602 Telephone No.: 919-890-3030 Size and location of property (water body, road name/number, town, etc.): The project site is loc _rted on the so-Ih side of Laurel Hi II Road, between its intersections with Laurel Ridge Drive.:tnd Rhododendron Drive, \? c t of Cree'rmoor Road, south of GlenNNood Avenue. in Wake Countv, NC. Description of projects area and activity: This permit authorizes mechanized landclearing, excavation. the installation of culverts. and the placement of fill associated with the reconstruction of a dam. impacts include piping of 100LF of and unnamed tributary to Crabtree Creek. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ? Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 3 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from )-our submitted plans may subject the pennittee to a stop work order. a restoration order and/or appropriate legal action. This verification is valid until the NWP is modified, reissued, or revoked. All of the existin-, NVt'Ps are Scheduled to be modified, reissued, or revoked prior to March 18, 2007. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, Nou will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide pen-nit. If. prior to the expiration date identified below, the nationw ide pennit authorization is reissued and.'or modified. this verification will remain valid until the expiration date identified below, provided it complies with all new and-'or modified terms and conditions. The District Engineer may, at an time. exercise his discretionary authority to modify, suspend, or revoke a case specific activity's authorization under any NWP. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA). prior to beginning work %ou must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the pennittee of the responsibility to obtain any other required Federal, State or local approval s'pen-n its. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Thomas Brown at (919) 876-8431 x22. Corps Regulatory Official _Jamie Sherri Date: Mav 8, 2008 Expiration Date of Verification: May 8. 2010 C'mw 4. ?L' Determination of Jurisdiction: ? Based on preliminary infonnation, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). ? There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a chance in the lain or our published regulations, this detennination may be relied upon for a period not to exceed five years from the date of this notification. There are waters of the US and,'or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed live \ cars from the date of this notification. ? The jurisdictional areas skithin the above described project area have been identified under a previous action. Please reference jurisdictional detennination issued _. Action 1D Basis of Jurisdictional Determination: Areas on this site exhibit wetland criteria as described in the 1987 Corps Wetland Delineation Manual and are adiacent to an unnamed tributary to Crabtree Creek. The property contains stream channels that exhibit an Ordinary Hioh Water Mark as indicated by changes in soil character and absence or terrestrial yeQetation and are hydroloaicaliv connected to Cr ')tree Creek, in the Neuse Rker Basin. . Corps Regulatory Official: Date May 8. 2008 SURVEY PLATS. FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC.. MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: NVILMINGTON DISTRICT POST-CONSTRUCTION COMPLIANCE FORM Permit Number: 200620183 Permit Type. NW3 Name of County: Wake Name of Permittee: Citv of Raleigh attn:Veronica High Date of Issuance: May 8, 2008 Project Manager: Jamie Shern Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: U.S. Army Corps of Engineers Attention: CESAW-Rd-R 608 Falls of the Neuse Road Suite 120 Raleigh, North Carolina 2761 Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced pen-nit has been completed in accordance with the terms and conditions of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date e?? NCDENR North Carolina Department of Environment and Natural Resources Division of Land Resources James D. Simons, PG, PE Director and State Geologist Certificate of Approval March 6. 2008 CERTIFIED MAIL RETURN RECEIPT Mr. James K. Leumas, PE Senior Stormwater Services Project Engineer City of Raleigh Public Works Department Post Office Box 590 Raleigh, North Carolina 27602-0590 RE: Approval to Repair Laurel Hills Dam Wake County WAKE-3181 Dear Mr. Leulnas: Michael F. Easley, Governor William G. Ross Jr., Secretary Citf of Rafe!?h MAR 1 2 2008 Stormwater Management This is in response to your submission dated November 28, 2007 and received on November 30, 2007 of plans, specifications and design data for the repair of the subject dam in compliance with the Dam Safety Law of 1967. These plans, specifications and design data were prepared under the supervision of Mr. J. Allen Tice, PE. This letter constitutes approval of the proposal to repair the subject dam according to the plans and specifications received by this Division on November 30. 2007 with the following stipulations: Mr. J. Allen Tice, PE shall provide engineering supervision. 2. During construction, the Division of Land Resources may require such progress reports as are deemed necessary. 3. Please submit two sets of sealed, signed & dated plans, specifications and design data prior to commencing repairs. Geological Survey • Land Quality • Geodetic Survey Division of Land Resources • 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 512 North Salisbury Street, Raleigh, North Carolina 27604 919-733-3833 \ FAX: 919-715-8801 \ Internet: www.dlr.enr. state.nc.us/dlr.htm An Equal Opportunity \ Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper Mr. Leumas March 6, 2008 Page 2 of 2 4. Upon completion of the project, Mr. J. Allen Tice, PE shall inspect the completed work and upon finding that the work has been done as specified and the dam is safe, shall file with the Division of Land Resources two sets of record drawings and a certificate stating that the work has been completed in accordance with approved plans, specifications and other requirements. 4. No water shall be impounded behind the dam until final approval is issued by the Division of Land Resources for operation of this dam. Also, draining of the lake shall be performed in such a manner as to preclude off-site sedimentation. 5. An emergency action plan (EAP) and an operation and maintenance (O&M) plan are required for all high hazard dams. The O&M plan should address routine maintenance, frequency of inspections by the owner or the owner's representative, and annual operation of the bottom drain to ensure that it is functional. It is strongly recommended that the EAP be submitted prior to commencing repairs to deal with problems that may arise during construction. Nevertheless, both the EAP and O&M plan must be received prior to issuance of an approval to impound. 6. You must notify Mr. John Holley, PE, Regional Engineer, Land Quality Section, 3800 Barrett Drive, Raleigh, North Carolina 27609, (919) 791-4200 ten days before the start of construction. The Army Corps of Engineers and the Water Quality Section of this Department should be contacted to determine if additional permits are required. Also, the erosion and sediment control program having jurisdiction should be contacted to determine permit requirements. In any case. sediment must be prevented from entering the waters of the state or flowing onto neighboring property. Construction of the repairs must begin within one year of the date of this letter or this approval is void. For assistance you may contact Mr. John Holley, PE, at (919) 791-4200 or a staff member of the Dam Safety Program in the Raleigh Central Office at (919) 733-4574. Sincerely, James D. Simons, PG, PE Director and State Geologist JDS/tvi cc: Mr. J. Allen Tice, PE Mr. John Holley, PE, Regional Engineer Surface Water Protection Regional Supervisor JUN-20-2008 FRI 01:16 PM DENR RRO FAX NO. 19195714718 P. 01 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Raleigh Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary DIVISION OF LAND RESOURCES April 20, 2007 LETTER OF APPROVAL City of Raleigh PO Box 590 Raleigh, NC 27602 ATTN: Veronica High, El Dear Ms. High: + r; NCDENR NoRTm CAROLINA D-PARTMENT OF ENVIRONMr-NY ANo NATURAL REsoURCk + RE: Project Name. Laurel Hills Dam County: Wake Submitted by: City of Raleigh Date Received: 4-10-07 Date Processing lnitiated:4-10-07 Watershed: Neese. New Submittal ( ) Revised (x ) This office has reviewed the subject Erosion and Sedimentation Control Plan. We find the plan to be acceptable and hereby issue this letter of approval. If any modifications, performance resen a:?ons, or recornmendations are applicable, a list is enclosed and is incorporated as a part of this letter o'approval. The enclosed Certificate of Approval should be posted at the job site. In addition, it should be not,,d that this plan approval shall expire three (3) years following the date of approval, if no land-disturbing aeti` ity has been undertaken, in accordance with Title 15A, North Carolina Administrative Code (NCAC) 413-0 D29. If any modifications are not incorporated into the plan and implemented in the field; ale site will be in violation of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute (NCGS), 113A-61,1). 15A NCAC 4}3.0018(a) requires that a copy of the approved plan be on file at the job site. Also, this letter gives the notice required by NCGS 113A-61.1(a) concerning our right to perform period is inspections to ensure compliance with the approved plan, 1628 Mail Service Center, Raleigh, North Carolina 27699-1628 Phone: 9191791-4200 / FAX: 9191571-4718 / Internet: www.enr.state.nc.us/ENR/ AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER-60 o RECYCLED11o% POST CONSUMER PAPER JUN-20-2008 FRI 01;16 PM DENR RRO FAX NO. 19195714718 P. 02 Nigh April 20, 2007 Page 2 North Carolina's sedimentation pollution control program is performance oriented, r squiring protection of the natural resources and adjoining properties. If at any time during this project it is determined that the Erosion and Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (NCGS 113A-51 through 66), this office may require revisions in the plan and its implementation to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with applicable federal and state water quality laws, regulations and rules, This could include the Division of Water Quality under stoumwater or other specific water quality standards, and the U.S. Army Corps of Engineers tender Article 4041.urisdiction. Our approval does not supersede anv other required permit or approval, Since this project disturbs one or more acres, one such approval relates to the stormwater that will discharge from your project. This runoff is permitted pursuant to the National Pollutant Discharge Elimination System (NPDES) administered in North Carolina by the Division of Water Quality (DWQ). The General Stormwater NPDES Permit, NCG010000, as revised, covering your activity is attached, You are responsible for complying with the General Permit requirements and are subject to enforcement by DWQ for any violations of the General Permit. Please note that this approval is based in part on the accuracy of the information pros ided concerning financial responsibility- You are requested to file an amended Financial Responsibility Form if any changes become necessary. fn addition, it would be helpful if you would notify this office when the pn oposed land- disturbing activity covered by this plan is initiated, Your cooperation is appreciated and we look fonvard to working with you on this project. If there are any questions, please do not hesitate to contact this office. Sincerely, J hn L. Holle,/, Jb!; p.1r., egiolality Engineer and Section JLH ugh Regional Office LAUREL HILLS DAM TECHNICAL SPECIFICATIONS Prepared For: City of Raleigh P.O. Boa 590 Raleigh. North Carolina 27602-0590 Prepared By MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue Raleigh. North Carolina 27604 August 14, 2007 TABLE OF CONTENTS PAGE 1.0 GENERAL ........................................................................................................................... 1 1.1 PROJECT ADMINISTRATION .................................................•---.............................................. 1 1.2 PROJECT (GEOTECHNICAL) ENGINEER ........................ ................... I 1.3 CONTRACTOR RESPONSIBILITIES ................. ....... ................................... ............................... 1 1.4 LIST OF DRAWINGS ................................................................................................................ 2 1.5 RELATIONSHIP OF DRAWINGS AND SPFCIFICATIONS ............................................................ 2 2.0 SPILLWAY UPGRADE ..................................................................................................... 2 2.1 GENERAL --••......................................................................................•--•-----..._..--•- -----..........2 2,2 COFFERDAM .......................... .............. ................................ ........................ ....... ................... 3 23 TEMPORARY HDPE DRAINAGE PIPE .............. _............................................5 2.4 PRINCIPAL SPILLWAY ..................... ............... .............................................. ................... ....... 7 3.0 BACKFILL ........................................................................................................................10 3.1 MATERIALS .................................. ..................................................................... .......... ........ l0 3.2 INSTALLATION .......................................... ........ ..................................................... ............. . 10 3.3 QUALITY CONTROL ............................................................................................................. I l 4.0 CONCRETE ...................................................................................................................... 11 4.1 MATERIALS ............................................................. •---••---• ---••---....-- - .......... 11 4.2 INSTALLATION ..................... ................................................... ........................ ........... .......... 11 4.3 QUALITY CONTROL ............................................. ........................ ....... ........ ..... .•-.... ............ 12 5.0 EROSION PROTECTION .............................................................................................. 12 5.1 MATERIALS .......................... ............ ......... ........ ... -••-------.................... ............................ 12 5 2 INSTALLATION .......................... ................ ..................... --............ .......................... ---........... I3 6.0 SANITARY SEWER ......................................................................................................... 15 6.1 MATERIALS ..................... .......... .............................................. .......... ----....---....................... 15 62 INSTALLATION ..................................... ............. ...-...... ----_...................... --- .......... ............ 16 7.0 POTABLE WATER .......................................................................... ...................... 16 7.1 MATERIALS ............................... ................................................... .......... ....... ....................... 16 7.2 INSTALLATION .................................................... ..............• ........ ....................... ---............. 17 8.0 FISH REMOVAL AND RESTOCKING ........................................................................ 17 8.1 REMOVAL ....................... ........ ................................................ ............................................. 17 8.2 RESTOCKING ........... ................................•---....---............----.................................................. 18 9.0 QUALITY CONTROL ........................................................................... ........ 18 SPECIFICATIONS 1.0 GENERAL 1.1 Project Administration The project will be administered by: City of Raleigh P.O. Box 590 Raleigh, North Carolina 27602-0590 Attention: Ms. Veronica L. High. El Phone: 919-890-3931 1.2 Project Geotechnical Engineer The Project Geotechnical Engineer is: MACTEC Engineering and Consulting, Inc. 3301 Atlantic Avenue Raleigh, North Carolina 27604 Attention: Mr. J. Allan Tice, P.E. Phone: 919-876-0416 Direct: 919-831-8052 1.3 Contractor Responsibilities 1 j Deviation from drawings and specifications shall be pre-approved by the City of Raleigh. Zj As-built drawings shall be submitted by the contractor at the completion of the project. Two sets of drawings shall be provided to the City of Raleigh and one set to MACTEC Engineering and Consulting. Inc. Two additional sets of as-built drawings; signed; sealed and dated by Mr. J. Allan Tice_ P.E., along with a letter of engineering certification will be required to be submitted to the Division of Land Resources before an approval to impound water will be issued by the Division of Land Resources. The following specification/work descriptions may be implemented in any order the contractor chooses provided there is no infringement regarding the integrity of work. delays are not incurred. and the City of Raleigh does not object. However, specific portions of this project have detailed construction sequences that must be adhered to and are outlined in later- sections. 4) The Contractor shall submit to City of Raleigh, prior to construction and for approval. a complete construction schedule, proposed material staging locations, anticipated work hours, brief description of methods used to construct the spillway and sewer work, shop drawings, and sheet piling/shoring design. 5) Disruption of business or routine activities shall be minimized. Construction activities that may disrupt normal business activity must be approved by the City of Raleigh. Coordinate traffic rerouting with the City of Raleigh per plans. 1.4 List of Drawings DRAWING TITLE DRAWING NO. DATE REVISION Cover Sheet 6/02 0 Site Plan C-1 3/06 G Cofferdam/Temporary HDPE Drain C-2 3/06 C Sections/Details C- 3 3/06 E Riser Box Construction Details C-4 3/06 C Slide Gate Assembly Bottom Drain C-5 3106 C Seepage Diaphragm and Erosion Control Details C-6 3/06 C Outfall Endwall Plan C-7 9/00 A Utility Plan and Profile U-1 3/06 B Utility Crossing Details U-2 3/06 C Traffic Control Plan Sheet T-I 4/03 B Easements Map S-1 8/00 6 1.5 ' Relationship of Drawings and Specifications The specifications are accompanied by design drawings that show the intended placement and types of materials planned for the project. In the case of discrepancies between the drawings and specifications. please contact the City of Raleigh Project Engineer. which will then discuss any discrepancies with the Project Geotechnical Engineer. 2.0 SPILLWAY UPGRADE 2.1 General A. Prior to beginning any work on the existing dam, install sediment and erosion control measures as shown on drawings in accordance with Section 5.0. Refer to Drawing T-I for traffic control details and coordinate implementation with the City of Raleigh. B. Drain the pond at a rate not to exceed l foot per day by pumping or siphoning through the existing 24-inch diameter reinforced concrete pipe (RCP) spillway and remove any localized areas of ponded water that remain along the upstream toe that may affect construction activities. Once the pond has been drained to the lowest level, elimination of existing fish, if present, shall be performed as specified in Section 8. C. Provide sump pits and pumping as required to control water- during construction of the temporary cofferdam and HDPE drain piping. D. Construct the cofferdam and initial section of HDPE drain as shown on the drawings in accordance with the following specifications. E. Collect and pump accumulated flow in the work area between the cofferdam and existing dam through the existing 24-inch diameter R.C.P. (previous spillway) until the temporary HDPE drainage pipe has been completely installed through the existing dam. Proper placement of the new spillway will require a work area free of ponded surface water. F. Use shoring, sheeting or other mechanical methods to support the excavation through the existing embankment to allow for the placement of the temporary HDPE drainage pipe and subsequent new spillway- G_ Install concrete riser box, barrels, and endwall with outlet protection as shown on drawings and in accordance with the following specifications. Precast concrete sections are allowable, subject to City and engineer approval. H. In fill areas, the Project Geotechnical Engineer or Project Geotechnical Engineer's representative shall observe the subgrade prior to fill placement. Fill placement and compaction shall be in accordance with Section 3.0. I_ Remove cofferdam, construction entrance and sih fence. J. Upon receiving impoundment authorization from Darn Safety, close bottom drain gate and fill the lake. 2.2 Cofferdam 2.2.1 Materials A. The soil fill to be placed for the cofferdam shall consist of existing suitable dam soil or borrow soil with similar physical and engineering properties. Existing dam soil may be reused as fill: however, some drying or wetting may be required in order to achieve the desired compaction. Soil obtained from an on-site off-site borrow sources shall be approved by the Project Geotechnical Engineer. At a minimum, the following items must be provided to the Project Geotechnical Engineer for evaluation of the proposed borrow material: soil sample, moisture content (ASTM D2216), Wash 4200 sieve grain size analysis (ASTM D422), soil classification, Atterberg limits (ASTM D4318) and maximum dry density and optimum moisture content for Standard Proctor (ASTM D698). f=lowable fill 3 having a compressive strength of 200 psi may also be used for backfilling purposes. The liquid limit of the fill shall be less than 50, plasticity index less than 25 and greater than 50 percent shall pass the No_200 sieve. 2.2.2 Installation A. Excavate to the cofferdam bearing elevation shown on drawings and remove soft/loose soil from the foundation area. Allow the Project Geotechrucal Engineer to inspect the bottom before constructing the cofferdam. If unsuitable soils are present, excavate or repair as directed by the engineer. Excavation slopes shall be constructed in accordance with OSHA requirements but shall in no case be steeper than 2(H):I(V)_ B. Place and compact soil fill in 8 to 10 inch loose lifts and compact to at least 95% of the standard Proctor maximum dry density. A minimum thickness of 2 feet is required prior to the operation of heavy equipment above the HDPE temporary drainage pipe. Manual placement and compaction of fill may be required beneath the pipe haunches to attain the required compaction percentage. The maximum loose-fill thickness for manually compacted fill is 4 inches. C. Bench into the slope surfaces as indicated on the drawings and place till material in 8 to 10 inch loose lifts along the slopes and compact to 95 percent of the Standard Proctor maximum dry density. Scarify subgrade (approximately 2 inches deep) prior- to the placement of fill for the next lift. D. The cofferdam shall be constructed to the elevation shown on the drawings. A 5- foot minimum width path along the centerline of the top of the dam should exist upon completion of the cofferdam. The slopes of the cofferdam shall be no greater than 2(H):1(V). 2.2.3 Quality Control A. For backfill placed around the temporary HDPE drainage pipe; allow City of Raleigh's testing agency to perform at least one field density test per 25 linear feet of pipe per foot of compacted lift thickness to confirm that the desired compaction percentage is achieved. B. City of Raleigh's testing agency will perform at least one field density test per each 2-500 square feet of compacted fill thickness with a minimum of one test per lift at other locations to confirm that the desired compaction percentage is achieved. C. Fill that does not meet requirements shall be reworked or removed and replaced at no cost to the City of Raleigh. Additional compaction testing shall be at the contractor's expense. 2.2.4 Contractor Alternate A. The contractor may propose alternate methods of handling water during the construction that provide for handling stream base flow as well as protect the work area from flooding during a 50-vear storm or two 10-yr storms occurring within three davs of each other. Alternate methods can assume the existing 24-inch spillway pipe will be available throughout the construction period. Submittal of alternate methods must be accompanied by sufficient drawings and calculations to allow review by the City of Raleigh and the Project Geotechnical Engineer. 2.3 Temporary HDPE Drainage Pipe 2.3.1 Material A. Barrel High Density Polyethylene (PE3408) Pipe (ASTM D' )3 )50/S.D.R.=3 )2.5) Joint Connections-Butt fusion weld (ASTM D3261) Collar (Waterstop) - 3-inch wide. 1.25-inch thick HDPE (ASTM D3350) (Prefabricated or extrusion welded on-site in accordance with manufacturer's specifications) 2.3.2 Installation A. Excavate to the embankment bearing elevation shown on drawings and remove soft/loose soil from the foundation area. Allow the Project Geotechnical Engineer to inspect the bottom before constructing the embankment. If unsuitable soils are present. excavate or repair as directed by the Project Geotechnical Engineer. Excavation slopes shall be constructed in accordance with OSHA requirements but shall in no case be steeper than 2(H): l (V). B. Install the HDPE pipe to the elevation shown on the drawings. The bearing surface of the pipe shall be free of debris, including rocks, stones. boulders and other items that are deemed by the Project Geotechnical Engineer to be injurious to the pipe. Use shoring, sheeting or other mechanical methods to support the excavation through the existing embankment. Some existing underground utilities may remain in service in accordance with the drawings. Existing overhead utilities (electric, cable. telephone) are to remain in place and in service throughout the construction. The contractor shall plan excavation support methods to avoid damage to all existing utilities. C. Fusion weld (ASTM D3261) barrel sections together to form a water-tight connection in accordance with manufacturer's requirements for installation. D. Backfill above the pipe to the proposed cofferdam elevation with fill and compact in accordance with Section 222. Backfill placed around and beneath the pipe haunches will require manual placement and compaction to attain the specified compaction percentage. 2.3.3 Quality Control A. Piping shall be tested for leaks in accordance with manufacturer's requirements and are the only special requirements for the foundation of the temporary procedures. Backfill placement shall be monitored and tested as outlined in Section 3.0. 0 2.4 Principal Spillway 2.4.1 Materials A. Riser Reinforced Concrete (ASTM C94) having unit weight of 1 75 pounds per cubic foot or greater No. 5, 10 and 11 rebar reinforcing steel (ASTM A615/Grade 60) Waterstop (Volclay-Waterstop RX101 or approved substitute) B. Slide Gate Assembly Waterman AC-31 Aluminum Canal Gate (15-inch diameter gate) C. Barrels High Density Polyethylene (PE3408) Pipe (ASTM D3350/S.D.R.=32.5) Joint Connections-Butt fusion weld (ASTM D3261) Collar (Waterstop) - 3-inch wide. 125-inch thick HDPE (ASTM D3350) (Prefabricated or extrusion welded on-site in accordance with manufacturer's specifications) D. Endwall Per NCDOT Standard Drawing 838.22 modified to site conditions as shown on Drawings. E. Seepage Diaphragm Aggregate - NCDOT 1 S. 78M and No. 57 washed stone Non-woven geotextile (Mirafi 170N or approved substitute) filter fabric with the following properties: Grab Tensile Strength (ASTM D4632): 180 lbs. Elongation: 50% Mullen Burst Strength (ASTM D 3786) 330 psi Trapezoidal Tear Strength (ASTM D 4533) 75 lbs. Puncture Strength (ASTM D 4833) 105 lbs. AOS (ASTM D 4751) 80 (US Sieve) Permittivity (ASTM D 4491) 1.4 sec-' Flow Rate (ASTM D4491) 105 gaUrnin/s.f. Geotextile filter fabric shall be free from tears, punctures or other defects and shall be provided in plastic wrap to protect against ultraviolet rays until deployed. F. Seepage Sea] A geosynthetic clay liner (GCL) comprised of two lavers of Qeotexti]e with sodium bentonite clay stitched between the textiles. G. Soft Foundation for Riser- (Optional depending on existing conditions) Coarse Aggregate Base Course (ABC (Type A) - NCDOT Section 1010 Table 1010-1.) Woven geotextile (Mirafi FW 700 or approved substitute) filter fabric with the following properties: Wide Width Tensile Strength (ASTM D4595): 225 lb./in. (MD) 145 lb./in. (CMD) Grab Tensile Strength (ASTM D4632): 370 tbs. (MD) 250 lbs. (CMD) Elongation: 16% (MD) 15% (CMD) Mullen Burst Strength (ASTM D 3786) 450 psi Trapezoidal Tear Strength (ASTM D 4533) 100 lbs. (MD) 60 lbs. (CMD) Puncture Strength (ASTM D 4833) 120 lbs. AOS (ASTM D 4751) 70 (US Sieve) Permittivity (ASTM D 4491) 0.28 sec-' Percent Open Area (COE-02215-86) 4-6 Flow Rate (ASTM D4491) 18 gal/min/s.f. Geotextile filter fabric shall be free from tears. punctures or other defects and shall be provided in plastic wrap to protect against ultraviolet rays until deployed. H. Trash Guard No. 10 Galvanized rebar (ASTM A615/Grade 60) Fill The soil fill to be placed around the pipes shall be in accordance with Section 3.0 2.4.2 Installation A. Excavate to riser bearing elevation shown on drawings and remove soft/loose soil from riser subgrade. Excavation slopes shall be constructed in accordance with OSHA requirements but shall in no case steeper than 2(H):] (,V,). If soft soil conditions exist below design bearing elevation, install filter fabric and stone base layer as shown in Soft Foundation Detail on Drawing No. C-5, for soft soil conditions if necessary. B. Remove sediment that may be present in the vicinity of the riser location and dispose offsite. Sediment shall be removed from the temporary working area upstream of the riser below the elevation of the slide Late bottom drain as shown on the drawings and dispose offsite. This will provide a sediment collection area in the vicinity of the riser. C. Excavate and install barrels to elevations as shown on drawings. Bearing surface of pipes shall be free of debris that includes rocks.. stones. boulders and other items that are deemed by Project Geotechnical Engineer to be injurious to the pipe. Use shoring, sheeting or other mechanical methods to support excavation. Existing underground utilities (sewer) is to remain in service in accordance with the drawings. Existing overhead utilities (electric, cable, telephone) may remain in place and in service throughout the construction as per the plans. The contractor shall plan excavation support methods to avoid damage to all existing utilities. 8 D. Sloped excavations through the dam will not be allowed except for the riser area and the seepage diaphragm area. Contractor shall submit a plan of the excavation support, sealed by a registered professional engineer licensed to practice in North Carolina, at least two weeks prior to any excavation activity for review and approval by the City and the Project Geotechnical Engineer. Approval of the plan by the City and the Project Geotechnical Engineer does not relieve the Contractor of responsibility for the correct construction and proper performance of the design. Excess soil from the excavation or soil not suitable for re-use as fill material shall be disposed offsite. E. Cast barrels monolithically with riser box as shown on drawings. Should voids around pipe penetrations exist following placement of concrete, place Sikaset mortar or approved substitute in accordance with manufacturer's specifications to fill the voids. F. Attach the slide gate support frame to the side of the riser using threaded rod and flat stock as shown on the drawings and install the slide gate in accordance with the manufacturer's specifications. G. Install remaining barrel pipe sections and terminate as shown in modified NCDOT endwall. Fusion weld (ASTM D3261) barrel sections together to form a water- tight connection in accordance with manufacturer's requirements for installation. H. Install a geosythetic clay liner (GCL) measuring a minimum 5-feet wide, vertically- against the sheetpile system and laterally within the bottom of the spillway trench, to installing the compacted fill material and HDPE barrels. The soil along the shoring face shall be free of deleterious material thus allowing the GCL to be fitted against the sheetpile system. The GCL shall be placed into the trench on a l0-foot spacing over the length of the sheetpile section. The lateral section of GCL shall extend a minimum of 10 feet into the trench and shall be securely covered with compacted fill material, such that it does not pull loose when the sheetpiling is extracted. The GCL should be kept dry during installation, but should not be wrapped in plastic. Backfill to the proposed pond bottom elevation around riser and to the seepage diaphragm subgrade elevation around barrels, if necessary, with soil fill in accordance with Section 3.0. Backfill placed around and beneath the pipe haunches will require manual placement and compaction to attain the specified compaction percentage. J. Place filter fabric for seepage diaphragm on prepared smooth subgrade and along the pipe excavation side slopes loosely and without wrinkles. Fabric alignment (long side) should be perpendicular to the pipe alignment. K. Overlap adjacent sections of fabric a minimum of 2 feet with upstream sections on top of downstream sections. Nog rings or temporary pins can be used to hold the overlap sections. L. Install stone/aggregate as shown on drawings. 9 M. Fold the ends of the fabric over the top of the stone/aggregate. Install additional fabric if needed to completely cover the stone and aggregate. Special care should be taken to ensure that the fabric completely covers the aggregate at the upstream end of the seepage diaphragm. Leave outlet end of drainage stone open and protect outlet end from contamination with soil fill. N. Place and compact soil fill above the seepage diaphragm in accordance with Section 3.0 to tie in with original ground contours. Road section shall match existing road section in accordance with City of Raleigh requirements. 3.0 BACKFILL 3.1 Materials A. The soil fill to be placed around the riser and barrels shall consist of existing dam soil or borrow soil with similar physical and engineering properties. Existing dam soil may be reused as fill; however. some off-site drying may be required in order to achieve the desired compaction. Soil obtained from an off-site borrow source shall be approved by the Project Engineer prior to use in the dam embankment. At a minimum, the following items must be provided to the Project Geotechnical Engineer for evaluation of the proposed borrow material; Soil sample, moisture content (ASTM D2216), Wash #200 sieve grain size analysis (ASTM D422), soil classification. Atterberg limits (ASTM D4318) and maximum dry density and optimum moisture content for Standard Proctor (ASTM D698). Flowable fill having a compressive strength of 200 psi may also be used for backfilling purposes. The liquid limit shall be less than 50. plasticity index less than 25. and greater than 50 percent shall pass the No.200 sieve. 3.2 Installation A. Backfill around most of the barrel pipe lengths will consist of compacted soil fill. The seepage diaphragm will serve as the majority of backfill around the final 30 feet of the barrel pipes as shown on the drawings. Placement of' soil fill and construction of the seepage diaphragm will occur concurrently. B. Place and compact soil fill in 8 to 10 inch loose lifts and compact to at least 95% of the standard Proctor maximum dry density. A minimum thickness of 2 feet is required prior to the operation of heavy equipment above the pipe. Manual placement and compaction of fill may be required beneath the pipe haunches to attain the required compaction percentage. The maximum loose-fill thickness for manually compacted fill is 4 inches. C. Bench into the slope surfaces as indicated on the drawings and place fill material in 8 to 10 inch loose lifts along the slopes and compact to 95 percent of the Standard Proctor maximum dry density. Scarify subgrade (approximately 2 inches deep) prior to placement of fill. 10 3.3 Quality Control A. For backfill placed around spillway barrels, seepage diaphragms and slope drain, allow City of Raleigh's testing agency to perform at least one field density test per 25 linear feet of pipe per foot of lift thickness to confirm that the desired compaction percentage is achieved. B. City of Raleigh's testing agency will perform at least one field density test per each 2.500 square feet of compacted fill thickness with a minimum of one test per lift at other locations to confirm that the desired compaction percentage is achieved. C. Fill that does not meet requirements shall be reworked or removed and replaced at no cost to the City of Raleigh. Additional compaction testing shall be at the contractor's expense. 4.0 CONCRETE 4.1 Materials A. Ready-mixed concrete is defined in this specification as concrete produced regularly by a commercial establishment and delivered to the purchaser in the plastic state. Concrete shall have a 28-day compressive strength of 3000 psi. Slump shall be between 3 and 5 inches in accordance with ASTM C 143. Provide 4 to 6 percent air entrainment. Concrete used in the riser structure shall have a unit weight of 175 pounds per cubic foot or greater. B. Concrete shall be formed, placed and cured in accordance with applicable requirements outlined in American Concrete Institute (ACI) and American Society for Testing and Materials (ASTM) standards including ACI 301. 302, 308 and ASTM C 171. C309 and D2103. 4.2 Installation A. Provide batch ticket information for each load of ready mix concrete. Do not place concrete when weather conditions prevent proper placement and consolidation; in uncovered areas during periods of precipitation. or in debris- and water from within the forms. Consolidate concrete with high frequency. internal.. mechanical vibrating equipment supplemented by hand spading and tamping. B. Provide and maintain 50 degrees F minimum concrete temperature. Do not place concrete when the ambient temperature is below 40 degrees F. Cover concrete and provide with a source of heat sufficient to maintain 50 degrees F minimum while curing. C. Concrete temperature from initial mixing through final cure shall not exceed 90 degrees F. Shade the fresh concrete and start curing as soon as the surface of the fresh concrete is sufficiently hard to permit curing without damage. D. Repair formed surfaces by removing minor honeycombs, pits greater than 1 square inch surface area or 0.25 inch maximum depth, or otherwise defective areas. Patch with Sikaset mortar or approved substitute in accordance with manufacturer's requirements. Patch defects when the forms are removed. Concrete with extensive honeycomb (including cold joints, entrapped debris, separated aggregate, or other defects) will be rejected at the City's or the Project Geotechnical Engineer's discretion. Obtain approval of corrective action prior to repair. The surface of the concrete shall not vary more than the allowable tolerances of ACI 301. Exposed surfaces shall be uniform in appearance. E. Protect concrete from injurious action by sun, rain, wind, flowing water, frost, mechanical injury, tire marks, and oil stains. Do not allow concrete to dry out from time of placement until the expiration of the curing period. Forms may be rennoved 72 hours after concrete placement. 4.3 Quality Control A. Allow the City of Raleigh's testing agency to collect samples of fresh concrete at commencement of each concrete placement and for each batch (minimum) or every 10 cubic yards (maximum) of concrete for tests of air entrainment or slump and . for the riser structure, unit weight. Fresh concrete that does not meet the testing criteria outlined in Sections 4.1 and 4.2 shall be removed and replaced with concrete that meets the criteria at no cost to the City of Raleigh. B. City of Raleigh's testing agency will prepare four 6-inch diameter, 12-inch long cylinders of fresh concrete for each sampling event. The test cylinders will be tested in unconfined compression as follows: one cylinder after 7 days and two cylinders after 28 days. The fourth cylinder shall be held in reserve pending the outcome of the 28-day tests. 5.0 EROSION PROTECTION 5.1 Materials A. Riprap Class B Erosion Control Stone (d50 = 8 inches) 2. Erosion Control Stone meeting the following requirements; minimum of` 18 inches. midrange of 27 inches. maximum of 42 inches- and containing 12 no more than 5% smaller than the minimum or 10% larger than the maximum B C. Woven geotextile filter fabric (Miraf FW 700 or approved substitute) with the following properties: Wide Width Tensile Strength (ASTM D4595): Grab Tensile Strength (ASTM D4632): Elongation: Mullen Burst Strength (ASTM D 3786) Trapezoidal Tear Strength (ASTM D 4533) Puncture Strength (ASTM D 4833) AOS (ASTM D 4751) Permittivity (ASTivi B 4491 Percent Open Area (COE-02 215-86) Flow Rate (ASTM D4491) 225 lb./in.(MD) 145 lb./in. (CND) 370 lbs. (MD) 250 lbs. (CMD) 16% (MD) 15% (CMD) 450 psi 100 lbs. (MD) 60 lbs. (CMD) 120 lbs. 70 (US Sieve) 0.28 sec-) 4-6 18 gal/min/s.f. Geotextile filter fabric shall be free from tears, punctures or other defects and shall be provided in plastic wrap to protect against ultraviolet rays until deployed. Silt Fence - Wooden posts. woven wire and filter fabric that meets requirements of NCDOT Section 1605-2. 5.2 Installation 5.2.1 Temporary Prior to beginning any ground disturbing activity, install silt fence and temporary sediment trap at locations shown on drawings. Inspect silt fence and sediment trap after each rain event and promptly repair damaged sections or remove accumulated silt. Seed finished grade areas as necessary to provide temporary cover during construction. Reseed as necessary to maintain cover on finished grades. The contractor may propose for the Project Geotecbmcal Engineer and City of Raleigh approved alternative siltation protection in the vicinity of the original streambed if he deems it necessary to improve the work area available. 13 5.2.2 Permanent A. The contractor is required to establish permanent ground cover in accordance with the permanent seeding specifications that is sufficient, in the opinion of the City of Raleigh, to retain erosion. If permanent seeding is to be performed outside the recommended seeding dates. contained in the specifications; then the contractor shall establish and maintain groundcover in . accordance with the temporary seeding specifications until permanent vegetative cover can be established. Seed repair areas with permanent cover after construction in accordance with the following. Vegetate the dam crest (excluding roadway), downstream slope (to edge of riprap) and finished slope drain channel surface with drought tolerant grass as described in this section. a. The completed fill surfaces shall be scarified to a depth of at least 6 inches prior to seeding. b. Agricultural lime shall be applied at a rate of 2 tons per acre or according to soil tests. C. Fertilizer shall be applied at a rate of 1,000 pounds per acre. d. Superphosphate shall be applied at a rate of 500 pounds per acre. e. Till the soil after applying lime, fertilizer and superphosphate to obtain a reasonably uniform mixture. f. Seed using one of the following mixtures as appropriate to the time of year the seeding is done. August 25 - September 15 Blend of 50% KY-31 tall fescue and 50% mixture of two or more turf-type tall fescues, or a blend of 3 or more turf type tall fescues 250 lbs./acre Temporary Seeding (if required) Prepare the seed bed as directed above and seed according to the following dates and varieties. January I - May I May I - August 15 Annual Rye (grain) 120 Ibs/acre Kobe Lespedeza 50 Ibs/acre German Millet 40 lbs/acre 14 August 15 - December 15 Annual Rye (grain) 120 lbs/acre Broadcast seed to obtain reasonably uniform coverage or apply using hydro mulch or spray techniques. B. Place one layer of NCDOT Class B erosion control stone on the top and up the dam side slope of the newly graded slope drainage swale and between the swale entrance and the driveway culvert as shown on the drawings in accordance with the following. Place filter fabric on smooth prepared subgrade loosely and without wrinkles. 2. Overlap adjacent sections of fabric a minimum of 2 feet. Hog rings or temporary pins can be used to hold the overlap sections. 3. Place a minimum of 4 inches of NCDOT No. 57 stone cushion on fabric prior to placement of Class B erosion control stone as shown on drawings. Note: Riprap used to construct the temporary sediment trap may be reused as riprap lining in the bottom layer of the output dissipater and other appropriate locations at the site following stabilization of disturbed areas that drain into the basin, if approved by the City. C. Place a final layer of rip-rap (d50 = 27 inches) as shown on drawings that extends 60 feet downstream from the outlet end of the endwall using same procedures as described in Section 522.B. Prior to placing final riprap in the receiving channel, remove excess sediment that may have accumulated during construction. 6.0 SANITARY SEWER 6.1 Materials A. Sewer pipe - Pressure Class 50 ductile iron pipe and fittings for sewer mains and Schedule 40 PVC pipe for sewer service ]]ties meeting the requirements of the City of' Raleigh Public Utilities Department (PUD) Manual standard specifications and details. B. Manholes and Related Materials - Precast, reinforced concrete meeting the requirements of the City of Raleigh standard specifications and details. Is 6.2 Installation A. Install sewer and manholes as shown on drawings and in conformance with the requirements of the City of Raleigh PUD Manual standard specifications and details. Confirm ground surface elevations at manhole locations at time of construction and adjust rim elevations as necessary to be flush with pavement surface in roads and a minimum of 12 inches above ground in easements. B. Install aerial crossing across the area to be excavated for the spillway pipes using City of Raleigh PUD Manual standard details S-10, 5-11, S-12, S-13. S- 14, S-18 and S-19. Exceptions: No riprap is required. Concrete supports may be placed directly under the pipe with no minimum embedment and no pier. Distance between edge of support footing and edge of excavation support shall be at least 5 feet. C. All bedding and backfill material for sewer installation within the limits of the existing dam shall be low permeability soil. or flowable fill as approved by the Project Geotechnical Engineer. Sand or clean stone will not be allowed. D. Place and compact bedding and backfill material in accordance with the requirements of the City of Raleigh PUD Manual standard specifications and details, except within the dam embankment which must meet the requirements as specified in Section 3.0. No stone bedding may be used through the dam except through the filter drainage diaphragm. E. Sequence sewer construction so new manholes and sewer lines are in place before constructing aerial section. Maintain sewer flow in existing lines throughout construction period. Bypassing of sanitary sewage flows will be allowed for no more than 8 consecutive hours to remove Manhole 1, install connection to new Manhole IA and install aerial section. Provide 48 hour advance notice to City of Raleigh of interruption schedule. The bypass is incidental to the sanitary sewer project. F. Install a Schedule 40 PVC sewer service line as indicated on Drawing U-1 at manhole ID. The location shown is approximate and will be field adjusted so the embedment depth is a minimum of 3 feet below the drainage ditch that parallels Laurel Hills Road and so the end of the line will extend to the existing right-of-way line. A standard Schedule 40 PVC wye and cleanout shall be installed on the right-of-way line. 7.0 POTABLE WATER 7.1 Materials A. Potable Water Pipe - Ductile iron pipe meeting the requirements of the City of' Raleigh PUD Manual standard specifications and details. 16 7.2 Installation B. Install cased temporary 6-inch water line or cased 12-inch water line as shown on drawings and in conformance with the requirements of the City of Raleigh standard specifications and details. Once construction is complete, the final water line size is to be no less than 12-inch inside diameter and shall be installed a minimum depth of j feet from the surface. C. Install aerial crossing across the area to be excavated for the spillway pipes using City of Raleigh standard details S-10. S-11, S-127 S-13, S-14, S-18 and S- 19. Exceptions: No riprap is required. Concrete supports may be placed directly under the pipe with no minimum embedment and no pier. Distance between edge of support footing and edge of excavation support shall be at least 5 feet. D. All bedding and backfill material for water line installation within the limits of the existing dam shall be low permeability soil. or flowable fill as approved by the Project Geotechnical Engineer. Sand or clean stone will not be allowed through the dam embankment. E. Place and compact bedding and backfill material in accordance with the requirements of the City of Raleigh PUD Manual standard specifications and details. F. Provide 48 hour advance notice to City of Raleigh of interruption schedule. 8.0 FISH REMOVAL AND RESTOCKING 8.1 Removal A. If fish are present in the Laurel Hills Pond, the contractor shall remove them during lake draining by trapping or toxifying the water with Rotenone as detailed in chapter 2 of the Pond Management Guide. published by the North Carolina Cooperative Extension Service. The procedure for fish removal and restocking is outlined in detail in this guide. Once construction has been completed and the pond refilled- the pond can be restocked with desired fish. Draining and removal of fish will be incidental to the overflow structure project. The uide and additional information is available online at.- C, ://W?,V ??.CeS.ncsu.edu/nreos/wile[%fislieries,,index.litml or from: Jim Rice Extension Fisheries Specialist NC State University Zoology Department Rm 3 Clark Labs. 919-515-4592 Raleigh, NC 27695-7617 jim rice:a;ncsu.edu. 17 8.2 Restocking B. The contractor shall restock the pond using a balanced population of native fish; similar to that seen when the pond is drained. The fish will be restocked as directed in Chapter 2 of the Pond Management Guide. Depending on the time of project completion, restocking may need to be postponed until the October or November months, or as indicated by the Cooperative Extension Service or the Wildlife Resources Commission. If this delay in stocking is needed, the contractor or his representative shall be responsible for restocking at the appropriate time. Restocking the pond will be incidental the overflow structure project. 9.0 QUALITY CONTROL A. Quality control will be the responsibility of the City of Raleigh or the City of Raleigh's representative(s). Implementation of the quality control measures outlined in the previous sections will be at the direction of the City of Raleigh. In addition to the specific quality control measures outlined in the preceding sections for certain tasks, the Project Engineer or the Project Engineer's representative(s) plan to visit the site periodically to view the overall construction process and confirm that the dam improvements are being constructed in accordance with the intent of the plans and specifications. This will include verifying that the specified materials and construction procedures are being followed. 18 LAUREL HILLS DAM REPAIRS MACTEC PROJECT 30720-08-3090 ANTI-FLOTATION CALCULATION 6.5 fl 92.07 7-7 7-7 NEI i i \ 30.17 ft 20 ft PLAN CROSS SECTION base thickness, 2.25 ft Note: Concrete Unit Weight is 175 lbs/ff U li t F,=V.y,N F„- 30.17x20x23.32x62.4=878.0 kips Submerged Weight of Riser V,=2x(211.07x 153+21.07x30.17)x(28/12)+20x30.17x2.25=5822fr W c- V c •Yconc Wc? 5822 x 175 1018.8 kips Factor- of Safety FS = 1018.8 / 878.0 = 1.16 Calculations by.- Date: 2007 Checked by: I ` Date: f ?0