Loading...
HomeMy WebLinkAbout20170357 Ver 1_401 Application_2017031769 SPANGLER ENVIRONMENTAL, INC. PAID Land Planning - Permitting - Environmental Consulting - Construction �ana�e­ment-- Expert Testimony LETTER OF TRANSMITTAL Date Name- Church Street - Morrisville Company Name- Spangler Environmental From- R E -. Church Street - Morrisville PCN Application 27 -Mar -1 7 2o, 70357 WE ARE SENDING YOU: Attached Shop Drawings X Letters X Reports SEI #-. Under Separate Cover Specifications Change Order Computer Disk F<eproducibles Samples COPIES DATE DESCRIPTION 4 3/27/2017 1 PCN Applications for Church Street - Morrisville 1 1 THESE ARE TRANSMITTED as checked below: For Approval Approved as Submitted For Your Use Approved as Noted As Requested Return for Corrections For Review & Comment FOR BIDS DUE Resubmit Copies for Approval Submit Copies for Distribution Return Corrected Prints Other SIGNED. L 0 C��� CC: 4338 Bland Road Raleigh, N.C. 27609 tel 919-875-4288 fax 919-875-4287 1-866-SPANGLER www.spanglerenvironmental.com 0� %NA T�'q 0 lqiiii'�..'Viuw � Office Use Only: Corps action ID i DWQ project no. Form Version 1., L9 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: Section 404 Permit E] Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1 d. Type(s) of approval sought from the DWQ (check all that apply): IX -1 401 Water Quality Certification — Regular El Non -404 Jurisdictional General Permit F� 401 Water Quality Certification — Express Z Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: E] Yes Z No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. E] Yes Z No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. E] Yes Z No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Project Information -2. 2a. Name of project: Myers Point Townes 2b. County: Wake 2c. Nearest municipality / town: Morrisville 2d. Subdivision name: I 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Church St. NC, LLC 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 448 Viking Drive, Suite 220 3e. City, state, zip: Virginia Beach, VA 23452-7331 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: E] Agent Other, specify: Owner of Project 4b. Name: Wakefield Development Company 4c. Business name (if applicable): Wakefield Development Company 4d. Street address: 3100 Smoketree Court, Suite 210 4e. City, state, zip: Raleigh, NC 27604 4f. Telephone no.: 919-723-7070 4g. Fax no.: 4h. Email address: Ryan@lmssi.com 5. Agent/Consultant Information (if applicable) 5a. Name: Jim Spangler 5b. Business name (if applicable): Spangler Environmental, Inc. 5c. Street address: 4338 Bland Road 5d. City, state, zip: Raleigh, NC 27609 5e. Telephone no.: 919-875-4288 5f. Fax no.: 919-875-4287 5g. Email address: jspangler@spanglerenvironmental.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): 1 b. Site coordinates (in decimal degrees): I Latitude: 35.829011 Longitude: -78.832176 1c. Property size: 15.35 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Crabtree Creek 2b. Water Quality Classification of nearest receiving water: C; NSW 2c. River basin: Neuse River 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The subject property is currently undeveloped and wooded. 3b. List the total estimated acreage of all existing wetlands on the property: 0.51 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 554 3d. Explain the purpose of the proposed project: The purpose of this project is to construct a residential subdivision on the subject property. 3e. Describe the overall project in detail, including the type of equipment to be used: The project is a residential subdivision that will involve grading/earth moving and utility work by using grading and excavating equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property project (including all prior phases) in the past? El Yes E9 No El Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? E] Preliminary E] Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ZNo El Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? El Yes 0 No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): 0 Wetlands Streams — tributaries Z Buffers El Open Waters El Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 T Excavation Unknown No Corps 0.007 W2 T Excavation Unknown No Corps 0.053 W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.06_ 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S11 T Excavation UT to Crabtree Creek INT Corps 8 20 S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 20 3i. Comments: I Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts bell w. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake cmon truction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Pi Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, t en you MUST fill out Section D of this form. 6a. Project is in which protected basin? Z Neuse [-] Tar -Pamlico [] Catawba E] Randleman E] Other: 6b. Buffer Impact number – Permanent (P) or (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) —Temporary 131 T Utility Line Installation LIT to Crabtree Creek No 1,225 1,562 B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 1,225 1,562 6i. Comments: Permanent maintenance corridor will be 10 feet or less. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be deployed including sediment and erosion control devices. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? E] Yes No 2b. If yes, mitigation is required by (check all that apply): El DWQ Corps 2c. If yes, which mitigation option will be used for this project? 0 Mitigation bank 0 Payment to in -lieu fee program El Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. El Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 . Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified 0 Yes E] No within one of the NC Riparian Buffer Protection Rules? 1 b. _ If yes, then is a diffuse flow plan included? If no, explain why. Yes n No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 36.7% 2b. Does this project require a Stormwater Management Plan? ED Yes El No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? TW—ake County 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? Wake County 1:1 Phase 11 NSW 3b. Which of the following locally -implemented stormwater management programs USMP apply (check all that apply): E] Water Supply Watershed E] Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes No attached? 4. DWQ Stormwater Program Review E]Coastal counties [--IHQW 4a. Which of the following state -implemented stormwater management programs apply E]ORW (check all that apply): []Session Law 2006-246 E]Other: 4b. Has the approved Stormwater Management Plan with proof of approval been E] Yes E] No attached. 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Z Yes E] No Page 8 of 10 PCN Form – Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) Ia. Does the project involve an expenditure of public (federal/state/local) funds or the El Yes No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes El No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval E] Yes No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetiand Rules (15A NCAC 2H .0500), Isolated Wetland Rules (1 5A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, El Yes Z No or Riparian Buffer Rules (1 5A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? El Yes Z No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in E] Yes No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWO Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Municipal sanitary sewer will service the subject property. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes FX� No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act N Yes Ej No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program's element occurrence data set. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? El Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? National Marine Fisheries Service essential fish habitat mapper. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation E] Yes ZNo status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC Natural Heritage Program 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEIVIA-designated 1 00 -year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: There will be no fill placed in the 1 00 -year floodplain. 8c. What source(s) did you use to make the floodplain determination? Spangler Environmental, Inc. 3-23-17 Jim Spangler, President -AP-0�t/Agent's Printed Name g nt's Signature Date It!(Agent's signa re id only if an authorization EZVom I the applicant is provided.) Page 10 of 10 WAKE IELD,,, (()%IPANY 3/23/2017 To Whom It May Concern: The letter serves to inform you that Church Street NC, LLC located at 448 Viking Drive, Suite 220, Virginia Beach, Virginia, 23452 hereby authorizes Spangler Environmental, Inc. to act as our technical agent for the purposes of environmental issues, including wetland and strewn identification, permitting, mitigation planning and regulatory agency coordination at the property known as Myers Point and as shown in Wake County records as 0745968737, 0755064507, 0755062243, 0745968641, 0755062891. All site visits by regulatory personnel must be coordinated in advance with our agent, Spangler Environmental, Inc. This letter supercedes all previous Agent -related correspondence. The following contact persons should be copied on all correspondence: Property Owner (or Legal Agent/Representative): Raymond Gottlieb, Manager Church St NC, LLC 448 Viking Drive Suite 220 Virginia Beach, Virginia 23452 757-463-5000 Technical Agent: James A. Spangler, CEI, A.M.ASCE Spangler Environmental, Inc 4338 Bland Road Raleigh, NC 27609 919-8754288 ispangler@spanglerenvironmental.com Sincerely, _---7 Raymond Gottlieb Manager 3100 SMOKETPEE COURT SUITE 210, RALEIGH, N.C. 27604 - PHONE: 919-556-4310 - FAX: 919-556-0690 k M AL 7; A," 4: Ct 4 V- - J 77 6 4� i Li A- f4l 'Ali 7'� a 'PIZ d4j Legend Property Boundary 7 T Perennial Stream 0 70 140 ______280 420 N11 Wetland I Feet Church Street Delineation Freeman Rd Morrisville, Wake County, NC May, 2015 Art% SPANGLER ENVIRONMENTAL, INC. 4338 Bland Road Raleigh, INIC 27609 919-875-4288 Figure 1 Delineation Map map source: Durham County G IS 0 L o" (D Indian Branch Dr - -- ------ - No IF owx gol o"v e D Natural and Cultural Resources March 23, 2017 Dalton Cook Spangler Environmental 4338 bland rd raleigh, NC 27609 RE: Church Street - Morrisville Dear Dalton Cook: ROY COOPER coveynor SUSI H. IL-MAIELTON S�ewlv NCNHDE-3185 The North Carolina Natural Heritage Program (NCNHP) appreciates the opportunity to provide information about natural heritage resources for the project referenced above. A query of the NCNHP database, based on the project area mapped with your request, indicates that there are no records for rare species, important natural communities, natural areas, or conservation/managed areas within the proposed project boundary. Please note that although there may be no documentation of natural heritage elements within the project boundary, it does not imply or confirm their absence; the area may not have been surveyed. The results of this query should not be substituted for field surveys where suitable habitat exists. In the event that rare species are found within the project area, please contact the NCNHP so that we may update our records. The attached 'Potential Occurrences' table summarizes rare species and natural communities that have been documented within a one -mile radius of the property boundary. The proximity of these records suggests that these natural heritage elements may potentially be present in the project area if suitable habitat exists and is included for reference. Tables of natural areas and conservation/managed area within a one -mile radius of the project area, if any, are also included in this report. Please note that natural heritage element data are maintained for the purposes of conservation planning, project review, and scientific research, and are not intended for use as the primary criteria for regulatory decisions. Information provided by the NCNHP database may not be published without prior written notification to the NCNHP, and the NCNHP must be credited as an information source in these publications. Maps of NCNHP data may not be redistributed without permission. The NC Natural Heritage Program may follow this letter with additional correspondence if a Dedicated Nature Preserve (DNP), Registered Heritage Area (RHA), Clean Water Management Trust Fund (CWMTF) easement, or Federally -listed species are documented near the project area. If you have questions regarding the information provided in this letter or need additional assistance, please contact Rodney A. Butler at Mdnpy,butlera0Qdcr,aov or 919.707.8603. Sincerely, NC Natural Heritage Program Nothing Compares��, :tate 7fNoith Carolina I Departmentot4atura) and Cujlura� ResourM I NatUralHeffUjePrograrn 121 W Jones greet I Raletfh, MC 27603 1651 Mail service cenw I Raleigh, NC 27699-1651 _____www-n0hAGr9 1919-707-8107 Natural Heritage Element Occurrences, Natural Areas, and Managed Areas Within a One -mile Radius of the Project Area Church Street - Morrisville March 23, 2017 NCNHDE-3185 Element Occurrences Documented Within a One -mile Radius of the Project Area Taxonomic EO ID Scientific Name Common Name Last Element Group Rank 5 -Very --- Significantly Observation Occurrence Low Rare Date Rank Dragonfly or 32043 Coryphaeschna ingens Regal Darner 2004 -Pre H? Damselfly --- Endangered G5? SI 4 -Low --- Significantly Reptile 35531 Ophisaurus attenuatus Slender Glass Lizard 1979-09-13 H? Vascular Plant 19976 Buchnera americana American Bluehearts 1949-07-13 H Vascular Plant 3633 Dichanthelium annulum Ringed Witch Grass 1937-06-01 H No Natural Areas are Documented Within a One -mile Radius of the Project Area Accuracy Federal State Global State Status Status Rank Rank 5 -Very --- Significantly G5 S2? Low Rare 5 -Very --- Significantly G5 S2 Low Rare 4 -Low --- Endangered G5? SI 4 -Low --- Significantly GNR S1 Rare Peripheral Managed Areas Documented Within a One -mile Radius of the Project Area Managed Area Name Owner Owner Type NC Department of Transportation Mitigation Site NC Department of Transportation State NC Division of Mitigation Services Easement NC DEQ, Division of Mitigation Services State Wake County Open Space Wake County: multiple local government Local Government Wake County Open Space Easement Wake County: multiple local government Local Government Definitions and an explanation of status designations and codes can be found at httpsm//ncnhde.natureserve.ora/contenYhelp. Data query generated on March 23, 2017; source: NCNHP, Q1 January 2017. Please resubmit your information request if more than one year elapses before project initiation as new information is continually added to the NCNHP database. Page 2 of 3 NCNHDE-3185: Church Street - Morrisville N E March 23, 2017 Project Boundary Buffered Project Boundary Managed Area (MAREA) Page 3 of 3 1:23,778 0 0.2 0.4 0.8 mi 0 0.325 0.65 1.3 km S—c s. Esn, HERE. DeL-na. Int—ap, imennent P Corp, GEBCO,USGS, FAO, ZPS, NRCAN, GeoBase. IGN. Kadaster NL. Ordnan- Sumey, Esn Japan, VIETI Ew Chm (Hong Kong), —topo, Maprnyinda, 0 OpenSteatMap ­ntributDrs. am the GIS User Gon—n" EFH Mapper http://www.habitat.noaa.gov/protection/efli/efhmapper/ EFH Data Notice: Essential Fish Habitat (EFH) is defined by textual descriptions contained in the fishery management plans developed by the regional Fishery Management Councils. In most cases mapping data can not fully represent the complexity of the habitats that make up EFH. This report should be used for general interest queries only and should not be interpreted as a definitive evaluation of EFH at this location. A location -specific evaluation of EFH for any official purposes must be performed by a regional expert. Please refer to the following links for the appropriate regional resources. Sources: Bri. GEBCO, NO.AA, Natiorai Gecgraphic, DeLorrre, HERE, Geonames.org, sr�a other cortributors Query Results Map Scale = 1:72,224 Degrees, Minutes, Seconds: Latitude = 35049'46" N, Longitude = 79010'49" W Decimal Degrees: Latitude = 35.83, Longitude = -78.82 The query location intersects with spatial data representing EFH and/or HAPCs for the following species/management units. 1EFH No Essential Fish Habitats (EFH) were identified at the report location. HAPC�, No Habitat Areas of Particular Concern (HAPC) were identified at the report location. EFH Areas Protected from Fishing No EFH Areas Protected from Fishing (EFHA) were identified at the report location. I of 1 3/23/2017 12:20 PM 'n gg HIM y Maw A/Alax P0 VEMS117. MI -4 i MI liv MINIM -§% V-11' 176A 'I "S IN -1111, F40r 'i. "1 '4 ' V Iffgj WI OF4w RIRIE MITI Into", Opel, ISO Iml QA W . ttAM=NaAA-]1wM mi. SEE= plilii slow wv;irli CORMIER :L'IWA ��11111111111111111 ��Jjjjl 11111 �111 ill 111 iff! I 1111w 0 _W1_ MIN 1 MH 11 I . .... . . ...... . .. I.- -------------- ---- ------ WETPOND #1 WET DETENTION BASIN CONSTRUCTION SEQUENCE 1. U DER NO CIRCUMSTANCES SHALL THE WET DETENTION RAM BE FINALIZED AM PLANTED PRIOR 70 COMPLETION OF CONSTRUCTION AND STABILIZATION OF ALL AREAS WHICH DRAIN TO, IT. A: 1 cTio 2. IF WET DErE N BAS4N IS TO BE USED AS A SEDIMENT BASIN DURING CoNsrRU N, ROUGH GRADE FIER PLANS FILL PLACEMENT AND DU`rLET STRUCTURE CONSTR N SHALL BE IN COMPLIANCE WITH DETAILS AND WET DETENTION BASIN CONSTRUCTION NOTES HEREON. IF THE WET DETENTION BASIN HAS BEEN PREVIOUSLY ROUGH GRADED AN B24OR USED AS A SEDIMENT BASIN. REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN THE N AREA 5 3. ROUGH GRADE WET DETENTION BASIN AS NECESSARY AFTER SEDIMENT REMOVAL AND TO FINAUZE BASIN GRADES. ALL Fl PLACEMENT SHALL BE IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THS SHEET. 1 4. AFTER ROUGH GRADING WET DETENTION BASIN. BEGIN FINE GRADING TO CONSTRUCT FORMAT I BERMS/WALLS AND lAkIN POOL ARM GRADING TOLERANCE FOR THE WET DETENTION BASIN SHALL BE 2 �/- 0.20 FEET FROM GRADES SHOWN ON THIS PLAN. 5. IN CONJUNCTION WITH GRADING AND FILL PLACEMENT. CONSTRUCT OUTLET STRUCTURES TO BRING IT INTO COMPLIANCE WITH TH SE PLANS. IF OUTLET STRUCTURES WERE CONSTRUCTED WITH ROUGH GRADI WHEN USING THE WET DETENTION BASIN AS SEDIMENT BASIN, SKIP TO NEXT STEP. 6 WHEN FINE GRADING AND OUTLET STRUCTURE IS COMPLETE. CALL SURVEYOR AND ENGINEER FOR AS8UILT SURVEY AND EVALUATION. 7. IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS. MAKE CORRECTIONS AS REQUIRED BY THE ENGINEER. AND REPEAT PREVIOUS STEP. OTHERWISE PROCEED TO NEXT STEP. IL UPON NOTIFICATION FROM THE ENGINEER THAT THE WET DETENTION BASIN IS IN COMPLANCE WITH THESE DRAWINGS. PROVIDE LANDSCAPING IN COMPLIANCE WITH THE PLAN SHOWN ON THIS SHEET AND ANY ADDITIONAL SPECIFICATIONS FROM THE OWNER. IF TIMING IS SUCH THAT PIANTINGS WOULD OCCUR E IN SUMMER MONTHS, COORDINATE WITH THE ENGINEER. OWNER, AND THE LOCAL MUNICIPALITY ABOUT DELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR MAXIMUM SURVWABIUTY OF PLANTINGS, 1, SEED ALL DISTURBED AREAS PER THE SEEDING SCHEDULE SHOWN IN T11EIE PLAINS, 10. CALL TOWN OF MORRGVILLE STORMALATER INSPECTOR FOR APPROVAL Or STABIJZATION. ii. CONTRACTOR SHALL WATER NEW PLANT MATERIAL PLANTED IN THE WET DETE IDN BASIN DALY UNTIL 0 COMPLETION OF ALL OTHER SITE RELATED CONSTRUCTION. AFTER THE FULL SCOPE OF THE fic CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTIL PLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY. #1 PLANTING SCHEDULE WET DETENTION BASIN CONSTRUCTION NOTES I. ALL CONSTRUCTION SK46LL BE IN ACCORDANCE WITH TOWN OF MORRMVLLE AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECeTCATIONS, 2- THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR, THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DO NOT SUR"f E. ANY HEALTHY PLANTS NVANGED DURING PLANT REPLACEMENT SHALL ALSO BE REPLACED. 3. SOIL BELOW ELEVATION 307.50 FOR WErPOND SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFFICE FOR PH. WHICH MUST FALL BETWEEN 5.5 AND 7.0. TESTS SHALL ALSO BE PERFORMED FOR NUTRIENTS SUCH AS NITROGEN. PHOSPHORUS, AND POTASSIUM. AND FOR MINERALS SUCH AS CHELATED IRON AND UME. AMENDMENTS TO SOIL RECOMMENDED BY USDA SHALL BE INCORPORATED INTO SOIL TO PROMOTE VIGOROUS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTS PROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER. 4. LANDSCAPING PLANTINGS SHOWN HER ON SHALL BE INSTALLED DURING FALL SEASON OR EARLY WINTER IF POSSIBLE FOR MAXIMUM PLANT SURVIVABILITY. 5. THE CONTRACTOR OR OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLACEMENT FOR PROPER COMPACTION. PROPER COMPACTION SHALL BE PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS, WHICHEVER IS MORE STRINGENT. EMBANKMENTS FOR BASINS SHALL BE PLACED IN B INCH LOOSE LAYERS AND SHALL BE COMPACTED TO A DENSTTY OF No LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF . OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAK PHOTOGRAPHS OF THE OUTLET STRUCIURE AT ALL PHASES OF INSTALLATION AND SHALL RETAIN WITH GEOTECHNCAL TESTING DATA. THE CONTRACTOR SHALL ALSO RETAW ALL SHIPPING RECORDS AND SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA My BE REQUIRE AS PART OF THE MUNICIPAIJTY AS -BUILT PROCESS AND SHALL BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR AND OWNER SHALL HAVE DOCUMENTATION OF THESE TESTS AVAILABLE UPON REQUEST. 6. TOLERANCES FOR FINAL GRADES SHALL BE WITHIN 1/- 0.20 FEET. THE TOWN OF MORRISVILLE WILL REQUIRE AN ASBUILT SURVEY OF THE CONSTRUCTED WET DETENTION BASIN THEREFORE STRICT ADHERENCE TO THE GRADING ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SHALL BE REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THE WET DETENTION BASIN HAS BEEN BUILT IN COMPLIANCE WITH THESE DRAWINGS. UPON COMPLETION OF THE FINAL CF=IOR TO PLACEMENT OF ANY PLANT MATERIA E C R SHALL CONTACT THE TO SURVEY THE ASBUILT CONST DEI_ENTT�LTH BASJ�NTWO RUCTED WET CONTRAC70R SHALL NOTIFY THE ENGINEER THAT THE CONSTRUCTED WET DETENTION BASIN HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE ASBUILT SURVEY DATA FOR COMPLIANCE WITH THESE DRAWINGS. IF THE WET DETENTION BASIN Is FOUND To BE OUT OF COMPUANCE WITH THESE DRAWINGS, THE CONTRACTOR SHALL REGRADE THE WET DETENTION BASIN AS NECESSARY TO BRING THE WET DETENTION BASIN INTO COMPLIANCE WITH THESE DRAWIN S. THE COST OF ANY ADDITIONAL SURVEY OR ENGINEERING EVALUATION REQUIRED RESULTING FROM INCOMPLETE OR INCORRECT GRADING OF THE WET DETENTION akSJN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FILL BUY. m- tun,. 3 Ao Tastier, CROS"ECTION OF WETPOND Nor.sCAUT PIPE SCHEDULE RIP -RAP APRON SCHEDULE Pri Design bers Land Use Area (ac) FLOODPLAINS DO EXIST ON-SITIE PER FIRM MAP PANEL Design Starrn Flowi Z 3720074SOOJ AND 3720075500J DATIED MAY 2,2006 Inlet Type up InleflD "D Top Up lassertillplinvertDril Size Pipe j UP D Ift) Ift) (ft) 11.) Matted ttr*th I (fit) Slope 1%) Struciture d. Velocity L..gth Width Depth Type d. 24 RCPLII 9.05 OW55 MH/JB (fq PR to Pond 2 332.90 327.45 326.55 FES 1 3.00 &4 18 9 22 Class 1B' - 13' 44 334m29 FES 3 2.00 4.5 12 6 22 _9* Class 1B, W-13, IVffj/JB A. FES 17 zoo 5.4 6 6 9 Class B' V* - 13' 180.65 5.92 FES 2D 2.00 63 12 6 314.70 Class B' ir - 13m 24 RCP 111 EW 31 2.00 4.4 a 8 9 (;Ia,,A' T-9' 312.00 30S.T5 FES 40 2aOO 7.1 12 6 22 Class B' 6� - 13' 31_12 Pwivywassoatorsch"Aa Rg. I 304.50 302.00 24 WET DETENTION BASIN CONSTRUCTION SEQUENCE 1. U DER NO CIRCUMSTANCES SHALL THE WET DETENTION RAM BE FINALIZED AM PLANTED PRIOR 70 COMPLETION OF CONSTRUCTION AND STABILIZATION OF ALL AREAS WHICH DRAIN TO, IT. A: 1 cTio 2. IF WET DErE N BAS4N IS TO BE USED AS A SEDIMENT BASIN DURING CoNsrRU N, ROUGH GRADE FIER PLANS FILL PLACEMENT AND DU`rLET STRUCTURE CONSTR N SHALL BE IN COMPLIANCE WITH DETAILS AND WET DETENTION BASIN CONSTRUCTION NOTES HEREON. IF THE WET DETENTION BASIN HAS BEEN PREVIOUSLY ROUGH GRADED AN B24OR USED AS A SEDIMENT BASIN. REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN THE N AREA 5 3. ROUGH GRADE WET DETENTION BASIN AS NECESSARY AFTER SEDIMENT REMOVAL AND TO FINAUZE BASIN GRADES. ALL Fl PLACEMENT SHALL BE IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THS SHEET. 1 4. AFTER ROUGH GRADING WET DETENTION BASIN. BEGIN FINE GRADING TO CONSTRUCT FORMAT I BERMS/WALLS AND lAkIN POOL ARM GRADING TOLERANCE FOR THE WET DETENTION BASIN SHALL BE 2 �/- 0.20 FEET FROM GRADES SHOWN ON THIS PLAN. 5. IN CONJUNCTION WITH GRADING AND FILL PLACEMENT. CONSTRUCT OUTLET STRUCTURES TO BRING IT INTO COMPLIANCE WITH TH SE PLANS. IF OUTLET STRUCTURES WERE CONSTRUCTED WITH ROUGH GRADI WHEN USING THE WET DETENTION BASIN AS SEDIMENT BASIN, SKIP TO NEXT STEP. 6 WHEN FINE GRADING AND OUTLET STRUCTURE IS COMPLETE. CALL SURVEYOR AND ENGINEER FOR AS8UILT SURVEY AND EVALUATION. 7. IF SURVEYOR AND ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS. MAKE CORRECTIONS AS REQUIRED BY THE ENGINEER. AND REPEAT PREVIOUS STEP. OTHERWISE PROCEED TO NEXT STEP. IL UPON NOTIFICATION FROM THE ENGINEER THAT THE WET DETENTION BASIN IS IN COMPLANCE WITH THESE DRAWINGS. PROVIDE LANDSCAPING IN COMPLIANCE WITH THE PLAN SHOWN ON THIS SHEET AND ANY ADDITIONAL SPECIFICATIONS FROM THE OWNER. IF TIMING IS SUCH THAT PIANTINGS WOULD OCCUR E IN SUMMER MONTHS, COORDINATE WITH THE ENGINEER. OWNER, AND THE LOCAL MUNICIPALITY ABOUT DELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR MAXIMUM SURVWABIUTY OF PLANTINGS, 1, SEED ALL DISTURBED AREAS PER THE SEEDING SCHEDULE SHOWN IN T11EIE PLAINS, 10. CALL TOWN OF MORRGVILLE STORMALATER INSPECTOR FOR APPROVAL Or STABIJZATION. ii. CONTRACTOR SHALL WATER NEW PLANT MATERIAL PLANTED IN THE WET DETE IDN BASIN DALY UNTIL 0 COMPLETION OF ALL OTHER SITE RELATED CONSTRUCTION. AFTER THE FULL SCOPE OF THE fic CONTRACTOR'S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTIL PLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY. #1 PLANTING SCHEDULE WET DETENTION BASIN CONSTRUCTION NOTES I. ALL CONSTRUCTION SK46LL BE IN ACCORDANCE WITH TOWN OF MORRMVLLE AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECeTCATIONS, 2- THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR, THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DO NOT SUR"f E. ANY HEALTHY PLANTS NVANGED DURING PLANT REPLACEMENT SHALL ALSO BE REPLACED. 3. SOIL BELOW ELEVATION 307.50 FOR WErPOND SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFFICE FOR PH. WHICH MUST FALL BETWEEN 5.5 AND 7.0. TESTS SHALL ALSO BE PERFORMED FOR NUTRIENTS SUCH AS NITROGEN. PHOSPHORUS, AND POTASSIUM. AND FOR MINERALS SUCH AS CHELATED IRON AND UME. AMENDMENTS TO SOIL RECOMMENDED BY USDA SHALL BE INCORPORATED INTO SOIL TO PROMOTE VIGOROUS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTS PROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER. 4. LANDSCAPING PLANTINGS SHOWN HER ON SHALL BE INSTALLED DURING FALL SEASON OR EARLY WINTER IF POSSIBLE FOR MAXIMUM PLANT SURVIVABILITY. 5. THE CONTRACTOR OR OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLACEMENT FOR PROPER COMPACTION. PROPER COMPACTION SHALL BE PER THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS, WHICHEVER IS MORE STRINGENT. EMBANKMENTS FOR BASINS SHALL BE PLACED IN B INCH LOOSE LAYERS AND SHALL BE COMPACTED TO A DENSTTY OF No LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF . OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAK PHOTOGRAPHS OF THE OUTLET STRUCIURE AT ALL PHASES OF INSTALLATION AND SHALL RETAIN WITH GEOTECHNCAL TESTING DATA. THE CONTRACTOR SHALL ALSO RETAW ALL SHIPPING RECORDS AND SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA My BE REQUIRE AS PART OF THE MUNICIPAIJTY AS -BUILT PROCESS AND SHALL BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR AND OWNER SHALL HAVE DOCUMENTATION OF THESE TESTS AVAILABLE UPON REQUEST. 6. TOLERANCES FOR FINAL GRADES SHALL BE WITHIN 1/- 0.20 FEET. THE TOWN OF MORRISVILLE WILL REQUIRE AN ASBUILT SURVEY OF THE CONSTRUCTED WET DETENTION BASIN THEREFORE STRICT ADHERENCE TO THE GRADING ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SHALL BE REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THE WET DETENTION BASIN HAS BEEN BUILT IN COMPLIANCE WITH THESE DRAWINGS. UPON COMPLETION OF THE FINAL CF=IOR TO PLACEMENT OF ANY PLANT MATERIA E C R SHALL CONTACT THE TO SURVEY THE ASBUILT CONST DEI_ENTT�LTH BASJ�NTWO RUCTED WET CONTRAC70R SHALL NOTIFY THE ENGINEER THAT THE CONSTRUCTED WET DETENTION BASIN HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE ASBUILT SURVEY DATA FOR COMPLIANCE WITH THESE DRAWINGS. IF THE WET DETENTION BASIN Is FOUND To BE OUT OF COMPUANCE WITH THESE DRAWINGS, THE CONTRACTOR SHALL REGRADE THE WET DETENTION BASIN AS NECESSARY TO BRING THE WET DETENTION BASIN INTO COMPLIANCE WITH THESE DRAWIN S. THE COST OF ANY ADDITIONAL SURVEY OR ENGINEERING EVALUATION REQUIRED RESULTING FROM INCOMPLETE OR INCORRECT GRADING OF THE WET DETENTION akSJN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. FILL BUY. m- tun,. 3 Ao Tastier, CROS"ECTION OF WETPOND Nor.sCAUT PIPE SCHEDULE Area Pri Design bers Land Use Area (ac) FLOODPLAINS DO EXIST ON-SITIE PER FIRM MAP PANEL Design Starrn Flowi Z 3720074SOOJ AND 3720075500J DATIED MAY 2,2006 Inlet Type up InleflD "D Top Up lassertillplinvertDril Size Pipe j UP D Ift) Ift) (ft) 11.) Matted ttr*th I (fit) Slope 1%) Pipe Erid C25 41 12191 327.61 327.56 24 RCPLII 9.05 OW55 MH/JB 9S.69 PR to Pond 2 332.90 327.45 326.55 24 LRCLL 79o73 1*13 MH/jB 45 44 334m29 326.45 325.60 24 RCP 111 61.86 1.37 IVffj/JB " 43 332.17 325.50 314.80 24 RCP 111 180.65 5.92 MH/JB 43 42 323.60 314.70 312.10 24 RCP 111 67.78 3.84 MH/JS 42 41 320.74 312.00 30S.T5 24 ROPIII 93.1S 8.11 -...L 41 31_12 10.50 304.50 302.00 24 ROP 111 60.27 4.15 MMH/JB COOT Cl 39 _T_ 37 33o.27 325.20 319.70 15 1 RCP 111 118.34 4.65 NCDOTCI 39 37 324.49 319.95 319.60 15 RCLII_I_ 31m93 0.79 NCDOTCI 37 32 324.67 319,50 1 318.10 25 RCP 111 80.47 1.74 DROP INLET 361 36 325.30 320.10 1 319.80 15 RCP M 3QOB 100 DROP INLET 36 35 325.57 319. 70 318.50 15 RCP 111 126.82 0.95 NCDOTCI 3�_ 34 326wOl 318.25 316.70 18 RCP !1! 13187 1.17 NODOTCI 34__ 32 32189 S14v4O 313.75 18 RCP 111 61.95 2.05 NCDOTCI 33 32 322.98 314.8 . 5 IS RCPIII 28.35 1.63 MH/is 32 31 323.40 312.00 310.00 24 RCP 111 27.33 7.32 SCM OvUet 30 29 311.50 303.00 302.72 24 RCP 111 54.99 0. NCDOT 0 Double 28 26 33222 326.20 324.15 15 RCP 111 203.76 101 NCDOTCI 27 26 335.61 1 330.10 328.30 1 25 1 RCP 111 175.39 1 1.03 NCOCITCI 26 25 333.84 1 324.05 322.85 1 15 1 RCPIII 119.77 1.00 DROP INLET 25 24 331.50 1 322.75 321.60 1 18 1 RCPIII 11216 142 MH/JB 24 23 33O.OD 1 320.10 319.90 18 KP 111 19.19 1.04 N DOTO 23.2 23.1 327.79 322.90 322.55 15 FROPIR 3D.83 1.14 NCDOTCI 23.2 23 3Z7.67 322.45 321.75 15 RCP 111 66.45 1"' NCDOTCI Z3 20 32&73 33S.80 319.� 24 RCP 111 59.55 - 1&01 DROP INLET 22 21 334.91 330.55 i2 20 15 CP III NCDOTCI 21 20 331.08 326.10 324.20 15 RCP 111 97.44 --j.17 NCDOTCI 2D 19 329.69 31910 31815 24 RCP M 30.83 j.76 NCDOTCI 19 18 329.81 318.15 317.60 24 RCP 111 50.50 1.09 1VH/JB 18 17 329.30 316.SD 307.50 24 RCPIIJ 96.02 9.48 NCDOTCI 16.3 16.2 W.65 335.75 333.05 15 RCP 111 190.38 1.42 NCDOT 0 16.2 16 337.95 332.95 332.45 15 REP 111 46.85 2.07 NODOTCI 16.1 16 336.43 332.55 332.35 15 RCP fl! 24.93 Od81 NCDOTCI 16 15 336.43 332.25 331.55 15 RCP 111 93.56 0.75 DROP INLET 15 14 337.31 33035 32915 15 RCP 111 108.32 1.02 NCDOTCI 14.1 14 335.W 330.80 330.55 15 RCP M 24.85 1.01 NCDOTCI 14 13 335.6j_ 32Sa95 3271SO IS RCP H! 7830 1.72 NCDOTCI 13 1 8 332-77 327.50 324.50 28 RCP 111 90-47 3.32 FES 12 n 327.79 1 325.85 322.90 15 1 ROP 111 76.02 3.98 YARD INLET 11 20 32S.S7 322.9D 32D.20 25 1 RCP 111 2.7.86 933 NODOTO 10 9 325-08 320.10 319.90 15 RCP�1111 .93 0.81 NODOTO 9 8 325mOS 319.60 319.00 18 RCP 111 111.37 0.72 fVH/JB 8 7 330.53 318.90 317.80 24 RC ROP M 109182 1.00 YARD INUET 7 6 324m65 317.70 316.35 24 ROP 111 133.99 2.01 NCDOTCJ 6 5 326.13 316.25 315.90 24 RCP 111 33.68 2.04 NCDOTCI 5 4.1 327.27 313.90 313.65 24 ROP fi! 4191 0.57 NCDOTCI 4.3 4.2 319.61 314.75 314.10 15 RCAP 111 64.00 1.02 1 NCDOT CI 4�2 4.1 319.61 14.00 313.10 18 RCP III 125.60_ 0.72 VsH/JB 4.1 4 1 325.81 1 312.60 311.70 24 RCP 111 84.40 JD7 YARD I! .1 4 1:]�3��I- 307, CP III, 50M 6.99 2 1 1 1 31L90 1 3M.OD .607 ��24R . RCP 57.40 0.57 WETPOND SUMMARY a ME yz" 6 OUTLET STRUCTURE #2 DETAIL NOT TO S LE Pq E3 r, 07 (j , t ,- a-- (j) � i 15 'LL "F5 Op. Lu Z _-O LU 3E�a` W Z Z a a- Z .r Lu W .1 cc ca wii�u Z do�! ZC�u) L_ 0 cc 0 �f � MW x:) Z C60 xw< oz, 3C Z 5 1 ' " 5 i f . . . . . �zi z Z LU 7 EL d Z UJI Z WETLANDS EAST ON-SITE I Area Pri Design bers Land Use Area (ac) FLOODPLAINS DO EXIST ON-SITIE PER FIRM MAP PANEL Design Starrn Flowi Z 3720074SOOJ AND 3720075500J DATIED MAY 2,2006 Impervious Open Spout Woodlands I- Cv. C12 Clul C25 CUOD PR to Pond 1 8.07 4.73 334 0000 TO THE NCDOT STANDARDS AND SPECIFICA-n&s 30.33 3&14 59.93 72.04 1 9S.69 PR to Pond 2 2460 !v66 Oa94 MOO APPROVED FOR CONSTRUCTION 10.07 12-P 19.52 23.43 32.02 PRt. Bypas, Pnds 9.49 L64 167 S.17 E,girwirg:_ 18.41 24,25 4LO7 50.75 71.78 Pond I Outfall cc 0 Sir-.: D- G% 1.13 20.03 48.49 N.17 Pond 2 0 2.96 4.86 Ir -24 - 21.94 31.09 PRFInM 1O.L7 639 17.58 24.25 56.6s T­Eu7 7 SO 1 q P WM 2.95 1.89 -...L 22.46 31_12 5678 566.7M8 71 1 1OG92 Surface Ama at Pond 2 9,145 Design Stann Srf- El ... tions (ft) Fr -board (ft) 309.38 5.70 311.33 175 312.23 ZSS 313.40 1.68 1 313.75 1.33 _314.08 LOO S.rface Ani a Pond Z 3,430 Design Stom Surfisoe Elevations (11) F me board (ft) 309.99 3.12 310.95 2.15 311.24 1.76 311-79 1.21 311.88 1.12 1 31L99 1.01 1 Pq E3 r, 07 (j , t ,- a-- (j) � i 15 'LL "F5 Op. Lu Z _-O LU 3E�a` W Z Z a a- Z .r Lu W .1 cc ca wii�u Z do�! ZC�u) L_ 0 cc 0 �f � MW x:) Z C60 xw< oz, 3C Z 5 1 ' " 5 i f . . . . . �zi z Z LU 7 EL d Z UJI Z WETLANDS EAST ON-SITE I FLOODPLAINS DO EXIST ON-SITIE PER FIRM MAP PANEL Z 3720074SOOJ AND 3720075500J DATIED MAY 2,2006 NOTE: ALL CONSTRUCTION ACTIVITY MUST BE IN ACCORDANCE WITH THE ACCEPTED POLICIES OF THE z I - TOWN OF MORRISVILLE, AND UNLESS SPECIFIED DEFERS =1 0 TO THE NCDOT STANDARDS AND SPECIFICA-n&s Issesse 0 Town of Morriwille 0 K 14� APPROVED FOR CONSTRUCTION z 0 LLI D- T ­f wrn,,iu., T- E.gi.- D-ArI.- z a. Z 0' E,girwirg:_ PI-nirg:_ U) Othff(­ify):_ cc 0 Sir-.: D- Lau 1-- 0 2, 0 c� z 1 q P -...L uJ Lu I SCALE IN FEET Lu 11 20 TOWN OF MORRISVILLE PROJECT NO. 16-11000005/16-0006-S/C 0 z 10' TAME. RIP -RAP I AND DRAINAGE MAJORED W/CLAS MOTIECTILE"Alle _0 ��'v is \ HANNEL SCHEDULE L 9 WETPOND 12 L -L Ji Iz, :ban DANK,-flptlon I Bothoin I Side .1 Hydraulic Norinnal $hear I InIng I SI*P.N1 S ope I I I I Raditill Dapth(ft) trane; (pd) D I Area (ac) Ich") lips) (,Q 21% TO 1131 1 0.14 1 04 1 1.01 1 Q. 0.10 0,14 0.24 1 S75, STAPLE �Kr Epp 1 TO 0.17 1 05 1 1.13 1 044 011 015 031 1 S75. STAPLE 0 1 C V -DITCH 1 3,5% 1 IOA141 1 0.38 1 1.2 1 1.38 1 87 0. 7 O�35 0.59 1 S75. STAPLE im"Os W &Wh A- G- RIP -RAP APRON SCHEDULE Sar -lure d. Velocity Length Width Depth Type d. (fP-) Ift) (R) (in) FES 1 3.00 6A le 9 22 Cl- 'B' 6"- 13' FES 3 2.00 4.5 12 6 11 -13, FES 17 2.00 &4 a S". 13" FES 20 2.00 &3 12 61 - IT EW 3`1 2.00 1.4 Less A' 3-61 6% 13' Far NYDoT Dissoil SchodVi, Rg. I WET DETENTION BASIN CONSTRUCTION SEQUENCE I . UNDER NO C40CUMISTANCES SMALL THE WET DETENTION BASIN BE FINALIZED AND PLANTED PRIOR TO COMPLETION OF CONSTRUCTION AND STABR17ATION OF ALL. AREAS WHICH ORION TO IT. 2. IF WET DETENTION BASIN IS TO BE USED AS A SEDIMENT BASIN DURING CONSTRUCTION. ROUGH GRADE PER PLANS FILL PLACEMENT AND OVILEr STRUCTURE CONSTRUCTION SRALL BE IN COMPLIANCE WITH DETAILS AND WET DETENTION BASIN CONSTRUCTION NOTES HEREON. IF THE WET DETENTION BASIN HAS BEEN PREVIOUSLY ROUGH GRADED AND/OR USED AS A SEDIMENT BASIN. REMOVE AND DISPOSE OF SEDIMENT DEPOSITS WITHIN THE BASIN AREA. 3. ROUGH GRADE WET DETENTION BASIN AS NECESSARY AFTER SEDIMENT REMOVAL AND TO FIWLIZE BASIN GRADES. ALL L. PLACEMENT SHALL 13E IN COMPLIANCE WITH THE SPECIFICATION IN THE CONSTRUCTION NOTES ON THIS SHEET. 4. AFTER ROUGH GRADING WET DETENTION BASIN, 13EGIN FINE GRADING TO CONSTRUCT FOREBAY BERM /WALLS AND MIN POOL AREA. GRADING TOLERANCE FOR THE WET DETENTION BASIN SMALL BE S' 0.20 FEET FROM GRAM SHOWN ON THIS PLAN. 5. :14 C WUNCTION WITH GRADING AND FILL PLACEMENT. CONSTRUCT OUTLET STRUCTURES TO BRING IT NTO COMPLIANC WITH THESE PLANS. IF OUTLET STR CTURES WERE CONSTRUCTED WITH ROUGH GRADING WEN USING THE WET DETENTION BASIN AS SEDIMENT BASIN. SKIP TO NEXT STEP. S. WHEN FINE GRADING AND OLrrLET STRUCTURE IS COMPLETE. CALL SURVEYOR AND ENGINEER FOR ASBUILT SURVEY AND EVALUATION. 7. IF SURVEYOR NO ENGINEER DETERMINE THAT GRADING IS NOT IN COMPLIANCE WITH THESE DRAWINGS. MAKE C RECTIONS AS REQUIRED BY THE ENGINEER. AND REPEAT PREVIOUS STEP. OTHERWISE PROCEED TO NEXT STEP. 0. UPON NOTIFICATION FROM THE NrINEER THAT THE WET DETENTION BASIN IS IN COMPLIANCE WITH THESE DRAWINGS, PROVIDE LANDSCAPING IN COMPLIANCE WITH THE PLAN SHOWN ON THIS SHEET AID ANY ADDITIONAL SPECIFICATIONS FROM THE OWNER. IF TIMING IS SUCH THAT PLANTINGS WOULD OCCUR IN SUMMER MONTHS. COORDINATE WITH THE ENGINEER, OWNER, AND THE LOCAL MUNICIPALITY ABOUT DELAYING PLANTINGS UNTIL FALL OR EARLY WINTER FOR MAsIMUM SURVIVABILITY OF PLANTINGS. 9. SEED ALL DISTURBED AREAS PER THE SEEDING SCHEDULE SHOWN IN THESE PLANS. 10. CALL TOWN OF MORRISVILLE STORMWATER INSPECTOR FOR APPROVAL OF STABILIZATION. 11. CONTRACTOR SMALL WATER NEW PLANT MATERIAL PLANTED IN THE WET DETENTION BASIN ONLY UNTIL COMPLETION OF ALL OTHER SITE RELATED CONSTRUCTION. AFTER THE FULL SCOPE OF THE CONTR*CTDR*S WORK IS COMPLETED, IT SHALL BE THE OWNER'S RESPONSIBILITY TO WATER PLANTS DAILY UNTIL PLANTS HAVE BECOME WELL ESTABLISHED AND WATERING IS NO LONGER NECESSARY. A SCM #2 PLANTING SCHEDULE Inletill) Inkal) up D- Top LI limantUp ImmrtDn Slos Pipe Ift) (h) Ift) (I.) Material Length (Ift) Slope 11%) Pipe End 3720074500J AND 3720075500J DATED MAY 2,2006 I...L NAIVE ___T..�. Drainage Am. Land Use Amas (u) SHALLOW LAND PLANTINGS Design Storri Flows Ids) < EF+86 ELAPATORADELPHIS FISTLALCISIS PYE WEED I 1"POT O.C_jFUU_BUSIIY CONTAINER IJOE �IiJSCUS CC)CCINLUS SCARLETT RIAIEMA LOW L r POT HC Be+ III* 124 - 0,C.IFULL BUSHY CONTA SHALLOW WATER PLANTING. 3262_ INL 180 1 AKJPH4R LUTEA SPATTERDOCK LILY I 4 -POT 12,rO.C.IFULL ISA 1 80 ISCIRPUS ACUTUS 13 WET DETENTION BASIN CONSTRUCTION NOTES 45 1. ALL CONSTRUCTION S BE IN ACCORDANCE WITH TOWN OF MORRISVILLE AND THE STATE OF NORTH CAROLINA STANDARDS AND SPECIFICATIC145. 2. THE CONTRACTOR SHALL WARRANTY ALL PLANTED MATERIALS FOR A PERIOD OF 2 YEARS FROM DATE OF INSTALLATION. AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR. THE CONTRACTOR SHALL REPLACE ALL PLANTS WHICH DO NOT SURVIVE ANY HEALTHY PLANTS DAMAGED DURING PLANT REPLACEMENT SHALL ALSO BE REPLACED. 3. SOIL BELOW ELEVATI N 300.50 FOR WETPOND SHALL BE TESTED BY THE USDA AGRICULTURAL EXTENSION OFF E TO PH. WHICH MUST FALL BETWEEN 5.5 AND 7.0. TESTS SHAUL ALSO BE PERFORMED FOR NUTICENTSRSIH AS NITROGEN. PHOSPHORUS. AND POTASSIUM. AND FOR MINERALS SUCH AS CHELATED M I" AND UME. AMENDMENTS TO SOIL RECOMMENDED By USDA SHALL BE INCORPORATED INTO SOIL TO P TE VIGOROUS VEGETATION AND PLANT GROWTH. RECORDS OF TESTS AND AMENDMENTS PROVIDED BY CONTRACTOR SHALL BE PROVIDED TO THE ENGINEER. 4. LANDSCAPI PLANTINGS SHOWN HEREON SHALL BE INSTALLED DURING FALL SEASON OR EARLY WINTER IF POSSIBLE FOR MAJUMUM LANT SUR"I ABILITY. 5. THE CONTRA OR OWNER SHALL EMPLOY A GEOTECHNICAL ENGINEER TO TEST ALL EMBANKMENTS AND FILL PLAC MENT FOR PROPER COMPACTION. PROPER COMPACTION SHALL BE PER THE GECTECHNICAL ENGINEER'S RECOMMENDATIONS OR THESE PLANS. WHICHEVER IS MORE STRINGENT. EMBANKMENTS FOR BASINS SHALL BE PLACED IN 6 INCH LOOSE LAYE AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF � OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. THE CONTRACTOR SHALL TAKE PHOTOG HS OF THE OUTLET STRUCTURE AT ALL PK45ES OF INSTALLATION AN SHALL RETAIN WITH rEOTECHNKAI_ TESTING DATA. THE CONTRACTOR SHALL ALSO RETAIN ALL SHIPPING RECORDS AND SPECIFICATIONS FOR THE OUTLET STRUCTURE MATERIALS AND STRUCTURES. ALL OF THE ABOVE DATA MAY BE REQUIRED AS PART OF THE MUNICIPALITY AS -BUILT PROCESS AND SHALI_ BE MADE AVAILABLE TO THE ENGINEER UPON REQUEST. THE CONTRACTOR AND OWNER SHALL HAVE DOCUMENTATION OF THESE TESTS AVAILABLE UPON REQUEST. 6. TOLERANCES FOR FINAL GRADES SHALL BE WITHIN /, 0.20 FEET. THE TOWN OF MORRISVILLE Wu� REQUIRE AN ASBUILT SURVEY OF THE CONSTRUCTED Er DETENTION BASIN THEREFORE STRICT ADHERENCE TO THE GRADI ON THIS PLAN AND THE TOLERANCES SPECIFIED HEREON SMALL BE REQUIRED PRIOR TO CERTIFICATION BY THE ENGINEER THAT THE WET DETENTION BASIN HAS BEEN BUILT IN COMPLMCE WITH THESE DRAWINGS. UPON COMPLETION OF THE FINAL CRADI= RIOR TO SU F PLACEMENT OF ANY PLANT M ) E C OR SHAUL CO CT THE SUF R TO SURVEY THE ASBUILT CDNST BASI�� RUCTED WET DA!W E CONTRACTOR SMALL NOTIFY THE ENGINE R THAT THE CONSTRUCTED WET DETENTION BASIN HAS BEEN COMPLETED AND THE ENGINEER SHALL EVALUATE THE ASBUILT SURVEY DATA FOR COMPLIANCE WITH THESE DRAWINGS. IF THE WET DETENTION BASIN IS FOUND TO BE OUT OF COMP ANCE WITH THESE DRAWINGS. THE CONTRACTOR SHALI_ REGRADE THE WET DETENTION BASIN AS NECESSARY TO BRING THE WET DETENTION BASIN INTO COMPLIANCE WITH THESE DRAWINGS. THE COST OF ANY ADDITIONAL SURVEY 08 ENGINEERING EVALUATION REQUIRED RESULTING FROM INCOMPLETE DR INCORRECT GRADING OF THE WET DETENnON BASIN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. =DT;: BE As - a& -'A Yt X�S= M 3UAW317M reersaw as 11 DDV M. waa %D\ 7:1 3 3024" CROSS�SECTION OF WETPOND Nor . � PIPE SCHEDULE inlet row _ Up Inletill) Inkal) up D- Top LI limantUp ImmrtDn Slos Pipe Ift) (h) Ift) (I.) Material Length (Ift) Slope 11%) Pipe End 3720074500J AND 3720075500J DATED MAY 2,2006 Drainage Am. Land Use Amas (u) NOTE: ALL CONSTRUCTION ACTIVITY MUST BE IN Design Storri Flows Ids) < KM/JB 46 45 2g_ 327�45 3262_ 24 RCP IN 79.73 13 KM/JB 45 44 _L32 334F29 326.45 325.60 24 RCP 111 61.86 137 MH/JB 44 43 332.17 325.50 314,80 24 RCP III 18D.65 S.92 MH/JB 43 42 323.60 314.70 312.10 24 RCP 111 67.78 3.84 MH/J8 42 41 320.74 312mOD 305o2S 24 ROP 111 8118 8.11 MH/Ja 41 40 310.50 304.50 302.00 24 RCP 111 60.27 4.15 NCDOTCl 39 37 330.27 325.20 319.70 15 RCP 111 118.34 4.65 �CDOTCI 38 37 324.49 319.115 319.60 15 RCP 111 32.83 0.79 NCDOTC1 37 32 324.67 319.50 318.10 15 RCP 111 80.47 1.74 DROP INLET 36.1 36 32530 32D.10 319.80 15 RCP 111 30.08 LOD DROP INLET 36 35 325.57 319.70 31850 " SO 15 RCP 111 12 .82 0.95 NCDOTCI 35 _34- 326.01 - 318.25 316.70 1 8 REP !1! 132487 NCDOTCI 34 32 323.n 314,40 313.171 18 REP H! 6L95 1.05 NCDOTCI 33 32 322.98 314,ES 314.55 18 ROP 111 1&35 L63 PM/JB L2 31 3Z3b4O 312100 I 31O.ED E324.15 24 N III 27.33 7.32 SCMOutlet 30 29 311.50 303.00 302.72 24 Rcp 111 '4'89 0.51 NCCIOT 0 Double 28 26 332.22 326.20 15 RCP 111 203 20176 101 NCDOT CI 27 26 335.61 330.10 328.30 15 RCP !1! 17539 1603 NCDOT Cl 26 25 333.84 324.05 BS 322.85 1.5 RCP 111 119.77 1.00 DROP INLET 25 24 331.50 322.75 321.60 18 RCP 111 112.26 1.02 MH/IB 24 23 330.0) 320.10 319b9O 18 RCP 111 19.19 1.04 NCDOTCI 23.2 23.1 327.79 322.90 322&SS 15 RCP !1! 30.83 1.14 NCDOTCI 23.1 23 327.67 322.45 321.75 15 RCP "1 6"45 1.05 NCDOTCI 23 20 328.73 329.80 319.20 24 RCP 111 59.55 1.01 DROPINUET 22 21 334.81 330.55 326.20 15 ROP III 12B.41 167 NCDOTCl 21 20 331.08 326.10 324.20 15 REP 111 97.44 2-17 NODDY 20 19 1 329.. 319.10 318.25 24 RCP 111 30.83 2.76 C NODOT C: 19 18 329.81 1 18.15 317,60 24 RCP 111 50.50 2*09 18 17 329.30 1 311SISO 307.50 24 RCP 111 9&02 9.48 NZIa O 16.3 16.2 340.65 1 335.75 333.05 15 RCP 111 190.38 1.42 NCDOTCI 16.2 16 "S 332.95 332 15 1.5 RCP 111 46.85 107 NCDOTCI 16.1 16 .43 332r55 332-3S 15 RCP 111 1 24.93 0,81 NCDOTLI 16 15 336.43 332.25 331.55 15 RCP 111 93.56 0.75 DROP INLET 15 14 k3377.95 337.31 330.35 329.25 15 RCP 111 108.31 1.02 NCDOTCI F144.1 14 . SS 335.66 330.80 33GSS 15 REP III 24.�_ LOT NCDOTO 14 13 S.. 328m95 327.60 18 RCP H! 78.30 1.72 NCDOTCI 13 8 332.77 327.50 324.50 19 RCP 111 90.47 3.32 FES . 12 U 327*79 325.85 322.90 15 RCP 111 76.01 3.88 YARDINLET 11 10 325.57 322.80 320.20 1.5 RCP III 27.��_ 9.33 NCDOTCI 10 9 325.08 320.10 319.90 15 RCP 111 24.93 0.81 NCDOTCI 9 8 325.08 319.9D 319.OD 18 RCP 111 111.37 0.72 MH/JB a 7 330.53 318.90 317.80 24 RCP 111 1 109.82 1.0) YARD INLET 6 324.65 317.70 316.35 24 RCP 111 133.99 1.01 NCD0TCI 6 K7 5 326w13 316.25 315.90 24 RCP ]it 33.68 1.04 NCDOTCI 5 4.2 327.27 313.90 313.65 24 RCLIII NCDOTCI 43 4,2 319.61 314.75 314,10 15 RCP III 64� NCDOTCI 4,2 4.1 319.61 314M 31110 18 RCP !1! 2 2 MH/JB 4.1 4 325.81 312.60 311.70 24 RCP IN. !fO 1! .27 YARDINUET 4 3 322.50 311.00 3O7mSO 24 RCP H! 50.08 6.99 SCIVIOutlet 2 1 31290 304.01) 303.67 36 RCP 111 57.40 0.57 WETPOND SUMMARY T -as 0- v AAAAi =21pm- ----------- 4' -7 OUTLET STRUCTURE #30 DETAIL NOT TO SCALE ED d A-; K cmn �9i >:,w 13 W LLI Z q z Uz z sr j ,.- LLI - �d , z 0, mo;! Z= ogom 011� cc4w J =1 - ", x rc R.5 Z i'Ll �. z -Z :�Oz 00 1 At U) (.) 502 12121!rr 9 zzzzzz! 111110 2 2 0 Is 20 1 28 28 28 2 2 2 2 Z 10 As OZ x Z z ULI 0 CL Ir c'j 7 < LLI b 7 14 0 so WETLANDS EXIST ONT-71 PM/Post Design Pa mmetairs DO DaST ON-SITE PER FIRM MAP PANEL 9R z 3720074500J AND 3720075500J DATED MAY 2,2006 Drainage Am. Land Use Amas (u) NOTE: ALL CONSTRUCTION ACTIVITY MUST BE IN Design Storri Flows Ids) < ACCORDANCE WITH THE ACCEPTED POUCIES OF THE w ImpervIous Open Space Woodlands 1" CU. CxZ q1O Q25 Q100 PR to Pond 1 8.07 4.73 3.34 0.00 Town of Morrisville 30,33 38. L4__ 59m83 72.04 95.69 PR to Pond 2 2.60 1.66 0.94 0.00 Sir-.: D- 10.07 12.57 19.52 23.43 31.02 1 FAR to Bypass P., 1.64 2.67 5.17 I'l-mg: 18.41 24,25 41.07 50.75 71.7�_ pould loutfaill LAU I -Ass, T ­f Cwy Milli., W-nd S - 0196 1.13 20.03 4&49 86.17 Porld 2 Clitfall 2, 2.96 4.86 16.24 21.94 30.09 PIT Final 10.67 6.39 4*28 OdO70 27.58 24.25 56.65 104,27 17MO 60 EX 20.36 2.95 1 1.89 1 15.5T- --- 22.46 31.12 56.78 71.71 1 92 SurfiWAs Area a Ford I 8,145 Design Stom Surfate EIL__Ions (ft) F:board (ft) 309.38 530 311.33 3.75 312.. 2.85 313. 1.69 313.75 1.33 314.08 1.00 S rholl Area at Pond 2 3,430 Design Storin SUrbKv El=i ons Ift) board Iftl 309 88 3,12 311 311.99 1.01 ED d A-; K cmn �9i >:,w 13 W LLI Z q z Uz z sr j ,.- LLI - �d , z 0, mo;! Z= ogom 011� cc4w J =1 - ", x rc R.5 Z i'Ll �. z -Z :�Oz 00 1 At U) (.) 502 12121!rr 9 zzzzzz! 111110 2 2 0 Is 20 1 28 28 28 2 2 2 2 Z 10 As OZ x Z z ULI 0 CL Ir c'j 7 < LLI b 7 14 0 so WETLANDS EXIST ONT-71 DO DaST ON-SITE PER FIRM MAP PANEL 9R z 3720074500J AND 3720075500J DATED MAY 2,2006 NOTE: ALL CONSTRUCTION ACTIVITY MUST BE IN < ACCORDANCE WITH THE ACCEPTED POUCIES OF THE A, E TOWN OF MORRISVILLE, AND UNLESS SPECIFIED, DEFE '0 TO THE NCDOT STANDARDS AND SPECIFICATIONS fass- Town of Morrisville Z 0 APPROVED FOR CONSTRUCTION cn Sir-.: D- T ­f -6,0 1., T.- Engi D -An -1, z 0 ErgJn.,Irg: I'l-mg: U) Othe,tswify):_ cc 0 Sir..,.: D ­ LAU I -Ass, T ­f Cwy Milli., W-nd S - Is >AAA 0 Eng,,wi,gl,sWbm�C��,tbecw��(919)463-6907,t,ftni�m24h,,,� 2, 0 - IRY SCALE IH 'ITT TOWN OF MORRISVILLE PROJECT NO. 16-11000005/16-0006-S/C _.. __ t0t`W 209.59' _ 230.15 ALS UPCfURCH, MARY N36" E!£' y 'tr 2P2t r _ 1E3,462 �"F OR 3.?526 ACRES u3 n , °9 n[*V 3f N R/WP1 ZONED: OrCR6n: `,, w 12,532 SF 0RAREA I0,28 ACRES1 P 0� r4 r� USE: VACANT EIIP PROPERTY LINE qtr r9 pn NET AREA l .... 150,570 SF OR ,3.45,35 ACRES, 24" RCP TO BE REMOVED - _ tr t8 rotr 30 ro TO BE ED WETLANDS EXIST ON-SITE Y Z m r 'r. • APPLE - AP • BEECH - BE • r • • w BLACK WALNUT - BW �1 BRADFORDy r • APPLE - AP • BEECH - BE • r • • w BLACK WALNUT - BW BRADFORDy BURFORD HOLLY - BH CA TALPA i CEDAR - OR COTTONWOOD - CW CRABAPPLE - CA CREPE MYRTLE - CMi DOGWOOD ♦: :. �. HACKY HB HICKORY -. HK IRONWOOD ,. LOCUST MAGNOLIA - LC MG �. - MAPLE - MP MIMOSA - MM i PEAR - PR ■ PECAN - PC PERSIMMON - PS PINE - RAI POPLAR - PP • RED �•OA. rO SOURWOOO WAX MYRTLE - WA4 r WHITE OAK - O WILD CHERRY WILLOW• 2 , C CHURCH ST NC LLC �& tr 20 a t! 28 ro E.• ` " tr 2Q hb twin tr = n PIN: 07459656'41 TREE TO BE Town f Morrisville p t P} mg �iPP Q1iE� FSR C�IVS Call CONSTRUCTION �ry x � � WELL DB. 15752 PG, 726 ��rvlV�,� PROPERTY LINE ' REMOVED, T1®P. � Thy BE ZONED: TCRTO BE REMOVED ABANDONED USE: VACANT i�EE TO BE PROPERTY LINE 0 ott ANN S SS CERVICE � AREA TENONED, TYP � tr 20 pn T9 BE REMOVED OVERHEAD ELECTRIC RIGHT--OF-WAY Signature: Date: Z 46,562 SF OR 1.0659 ACRES X, �° DEDICATION M Q TO BE ABANDONED 1� } TO 9E RENO D - � � ��n Q tr 22 pn qtr 21 ro ` Town e Morrisville, Engineer Datellniteals � � Q OVERHEAD ELECTRIC GUYS: (16,840 SF � �� SQ tr t� n tr is o S.SCO TO BE RELOCATED $ng: K tr 19 - tr /2 m� trip p tr p- _ SCO; ANG? SS SERVICE r w _. En i neeri Q _ ND "SS SERVICE SSCO f tr t2 mp for i.tr t� n Pr-ts ro TO ABANDONED Planning: p NV 329.65 qtr is pn „ �E AB �OP�ED AND SS SERVECtc":: ,30.01' � IBM TO BE A N�DONED � bw INV 330.35 ! Other (specify): ti NCDOT Cl 100 FIRE HYDR,A�W- tr 20 pn 10' DIRT ROAD r� r OVERHEAD ELECTRIC � �-=---- =�= 1 F GE BO_ TO BE REMOVED 10'. DIRT ROAD AND LIGHT POLE tr J6 its r 2i pn tr P wn TIC 34 .06 _ - ,.• Rr 2� � V w NV OUT '35.45 EL -.344 "2, INV 335.17 INV 334:33 TO RE REMOVED TO BE REMOVED cr i5 _ -� TO BE REMOVED -�R BE RE OVkE) Pr z2 pn ff , pn x o - �- Signature: Date: N 5' CONC SIDEWALK $g n 10 DIRT ROAD " � � � INV 334. 16 p TO BE" REMOVED - , "� � c � 30 STD CSG tr 22 m1 D1Rr ,BOAC—, - Pr 2,r �» _ 4INV,,3- 14 o Town o€CAry Utihties, Water and Sewer SEB TO BE REMOV RBA ; o n , INV .3JJ. O3 49 , VCy L INV 332.63 ti L 0 + 4 Engineering Ins ec?,onServicesmustbecontaeted 9 9 463-6907 ti u g p { 1 }at a minimum 24 hours U. W - �YL _m. nortathecomm�. :ementofan constructionactivities. �z_ WV SaE!��! t ss 6 WPY� p Y I INV 331.31 INV 337.02 __ � ss — �° Pss �_� � � �. ca ,, ;_ � - � ,, • __.. T , N _.. o' e. _1 " Df WL. ` - BE ABANiSONED, 4 12" Dl WL -- —_-- _— —_- - —_ 2 ---- -_ 8 _------ _ --— _ - - ---- —..— El P �-15 RCP fi SIG '_.. _. RVG WL - RCP oNE 0 _-- - - - 15 RCP - _w_�__ - TO�BE EMOVED ' . , TO � REMOVED �G - - _ — A f �— ELECTRIC . INV IN ,330.17 ' TO BE RELOCATED -EX, 4' DIA. SS MH 103 !NV OUT 321.88 R ' iOP 335.46 TV PEDESTAL RANSFORMER NCOOT Cl29 N C TO BE RELO TM �� M , p INV OUT 330.14 \ hFCDOT ClCf 32 F- '� TIC 338.22 INV IN 329.49 FIBER OP77C MARKER TIC 334.11 BALE Btu FEET UJI W TBM !NV OUT 329.4 t k v EX. 4' DIA. ss MH 105 TO BE RELOCATEtJ = O I FIRE &"DRANT 5 j EfP TOP 337.81 FLANGE BOLT l JG I INV OUT 3,30<97 ELEV - JJZ87 D 25 50 100 150 200 to LIOTOWN OF MORRISVILLE PROJECT N® 0005/16-0006-S/C 340 M. HATCHED AREA DENOTES ALTERNATIVE BUFFER AREA F� U) R-o---� C01 S �� M9 F :. tV CW �- � t C14 C14 V) 345 PROFILE Q V)��`°�, 80 I:Zo 31 0 0 -- q� „ '; PROPOSED PROFILE CENTERLINE • yi OF # AT LEAST : INCHES r THE BOTTOM OF STORM SEWE PIPE WHEN HORIZONTAL SEPARATION IS 3 FEET OR -i -j Town of Morrisville # SANITARY a t. LESS FROM EXISTING O i STORM' 340 EXISTING PROFILE CENTERLINE • w PROFILE "R — EXISTING PROFILE ALONG R.O.W. RIGHT SANITARYTHE BELOOR THE SANITARY IS # #` Signature: Date: SANITARY SEWER SHALL BE DUCTILE '#CONCRETE4. 0 0 U. 0 0 Town of Morrisvi , , Town Engineer HAVING A 6" CLEARANCE. 1 CONSTRUCTION NOTES • GRADE N NATURAL GROUND, PIanni ng, RM �ii!II illifi295 5.00 LF 12" DIP 0.36% 290 0r1012+00 SEWERS1SANITARY Y AT LEAST 10 FEET LATERALLY FROM EXIS71NG OR 31 —C4 � Q Q � Q Q � Q V)��`°�, 80 I:Zo 31 -- q� WHERE WATER MAIN i , R OR STORM SEWER CROSS, i VERTICAL a z SEPARATION IS LESS THAN 18 INCHES, OR THE WATERLINE PASSES UNDER THE �ii!II illifi295 5.00 LF 12" DIP 0.36% 290 0r1012+00 SEWERS1SANITARY Y AT LEAST 10 FEET LATERALLY FROM EXIS71NG OR PROPOSED WATER MAINS UNLESS THE ELEVATION OF THE TOP OF THE SEWER IS AT 18" BELOW THE 150" � OF T�EWATER MAIN W" A HORIZONTAL �SEFARATIPN �'oz WHERE WATER MAIN i , R OR STORM SEWER CROSS, i VERTICAL a z SEPARATION IS LESS THAN 18 INCHES, OR THE WATERLINE PASSES UNDER THE Cl) SANITARY SEWER, BOTH THE ER MAIN AND SANITARY SEWER $HALL BE DUCTILE IRON LU PIPE, EQUIVALENT TO WATER IN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE AT THE POINT ' 1 SANITARY SEWERS SHALL HAVE THE TOP • yi OF # AT LEAST : INCHES THE BOTTOM OF STORM SEWE PIPE WHEN HORIZONTAL SEPARATION IS 3 FEET OR -i -j Town of Morrisville # SANITARY a t. LESS FROM EXISTING O i STORM' � • w -. 1, CROSS, STORMt# AND VERTICAL SEPARATION a INCHES WITH SANITARYTHE BELOOR THE SANITARY IS # #` Signature: Date: SANITARY SEWER SHALL BE DUCTILE '#CONCRETE4. 0 0 U. 0 0 Town of Morrisvi , , Town Engineer HAVING A 6" CLEARANCE. 1 ALL MANHOLETOFs ARE To SE FLUSH WITH FINAL LIFT OF OR • ABOVEA • GRADE N NATURAL GROUND, PIanni ng, 5ALL •R • ACCORDANCE i #RAND �. Other (specify): THE STATE OF NORTHa« -. STANDARDS ,.. SPECIFICATIONS. � .. Signature: Date: Town of Cary Utilities, Water and Sewer WETLANDS EXIST ON -SI TE i Cnz �'oz a z L) 0 C} Cl) LU a w -i -j Town of Morrisville � > x APPROVED T 1 IV Signature: Date: 0 0 U. 0 0 Town of Morrisvi , , Town Engineer Q tg Initials Z Engi neeri ng; PIanni ng, ~ Other (specify): Signature: Date: Town of Cary Utilities, Water and Sewer Engineering Inspection Service -s must be contacted (919) 463-6907 at to the commencement O a ny a minimum 24 hours H M prior construction activities. WW � Z ua TOWN OF MORRISVILLE PROJECT NO. 16-11000CVC 005/16-0006-,