Loading...
HomeMy WebLinkAbout20161239 Ver 1_More Info Received_20170330k,ib mmInarlllo]w:1 SHEET NUMBER DESCRIPTION LAYOUT OVERVIE 2 EROSION AND SI 3 PLANVIEW — LO' 4 PLANVIEW — LO' 5 PLANVIEW — UP 6 PLANVIEW — UP 7 PROFILES 8 TYPICAL CROSS - 9 EXISTING CROSS 10 DETAILS 11 DETAILS 12 DETAILS 13 GENERAL NOTES NOTE: SOURCE OF EXISTING CON_ - - - WAS DEVELOPED BY GC MAPPING, PLLC AND DATED SEPTEMBER 5, 2016. = - a� � "� u �. � ,`' 'fes.- aJ'•' ti�w,�. � �wr j, r VICINITY MAP CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com o � W }' N U ryo O c .O W z (04-J > O � 4 o V D U -0 -0c6 O c: Q > j a� U z 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: u 100 200 300 SCALE 1" = 100, r' f kmana CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com z �o W L (U U 0 t O .O W Z V) Ocz � z O V -0 U O-0 O > W U z 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: w w U) w z U I -- Q CGNTRACTING ti Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com U Q LU �o a� DC u LU 0 ° .o z � -�-j o o J -� a L Ln > v -0 w � av i z 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: "INSTALL CROSS VANE \ STATION 15+40 \ NSTALL CONSTRUCTED RIFF STATION 13+50 \ co w ` 1 _ o z7 0 TA 0 oZ I m 0 1. �,A I O � I 0o I I I I / I INSTALL CROSS VANE \ STATION 11+50 �O OOH /w I --,LIMITS OF DISTURBANCE MATCHUNE SHEET 5 CGNTRACTING ti Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com 1 U Q W •o a� DC u W 0 p z ru O o J -N a L L oC U -0 W � � ca a� � z' Q v J z 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: TCHLINE SH V vvwv//vv�vw� v. ABANDONED CHANNEL / DEPRESSIONAL �\\ \ WETLAND HABITAT I i//i .moi\i\i\i\i\ 61' \\\ \ MATCHL_INE SHEET 6 Me 0 V� LIMITS OF DIST[ Bq \ _ NCE MATCHLINE SHEET 4 INSTALL CK/ROLL RIFFLE STATION 7k10 W IN NST CONTRACTING Blueline Environmental bluelineenv.com \ 919.656.2554 / dani@bluelineenv.com \ I I / U � � a � / Wo / U LU a --i / � O O z L � ci U / -0 W -0 / z / Q U J / CL / 1 , \ z \_ ocf) I PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: MATCHLINE SHEET 5 ABAN ONED 'i 1 � , '3 I XS 1 (SEE SHEET 9) cHA L PLUG I 1 I I 1 I I 1 1 1 , � \ I ? 1 NSTALL CO STRUC-� ED RI FLE STATION 4+ 0 REACH 1 (STATION 0 00 T017+00) i NSTALL CROSS VANE STATION 3+50 NSTALL CULVERT STATION 2+34 INV. = 613.04' a �a 80 �Mp INV. = 613.36' CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com z u Q W �p -F-J U W 4-J o LL. z o/ I ^� (u L Ln U -0 Lu -0 / ca 5 z> Qv 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: c 0 co N 605 w 600 585 615 610 c 0 605 m W 600 585 0+00 0+50 1+00 1+50 2+00 2+50 3+00 PROFILE - MALLARD CREEK D � � N C>/)j� Z D � C 3+50 4+00 Station PROFILE - MALLARD CRFF NIF0 C7 D N p O O � � z 9 + M O + 4+50 5+00 5+50 6+00 6+50 7+00 r 7+50 D n E: Z M 00 615 N I � =�D I (n C7 D0 cnx --j (/) � �D �� OZ z D orz + 0 i �x bluelineenv.com +ocn O z __jm � D i O> + + 0 r l - 610 o; 0 0 +00 o + M U m O O L Z � ° w 605 f0 4-J z 0 600 585 D n E: Z M 00 8+00 C O N 605 W 600 585 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 Station 12+50 PROFILE - MALLARD CREEK 13+00 13+50 14+00 14+50 15+00 15+50 615 610 Ln m 605 0 600 585 16+00 I cn x I � =�D I (n C7 D0 cnx --j (/) � �D �� OZ z Blueline Environmental orz + 0 i �x bluelineenv.com +ocn 919.656.2554 o� + __jm � D i O> I 0 r l - + o; 0 8+00 C O N 605 W 600 585 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 Station 12+50 PROFILE - MALLARD CREEK 13+00 13+50 14+00 14+50 15+00 15+50 615 610 Ln m 605 0 600 585 16+00 Ulu 610 M co 605 0 600 585 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 Station LEGEND EXISTING THALWEG - PROPOSED THALWEG cn x Blueline Environmental D' i �x bluelineenv.com 0D 919.656.2554 zzM __jm � D i O> 0Z + o; 0 0 +00 o + U O O L Z � ° w f0 4-J z O � z � Ulu 610 M co 605 0 600 585 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 Station LEGEND EXISTING THALWEG - PROPOSED THALWEG CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com i 0 U L � ° w f0 4-J z O � � � �C ci 0.U f6 G � U O W PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: 7 y 0 2 0 —20 —15 —10 TYPICAL RFFLE CROS—SECTION Ht,4.cH I UPPER REACH —5 0 STATION REACH 1 LOWER REACH 5 F_ 4 r� D 3 0 BANKFULL WIDTH =22.0' 5 10 o 1 N 2.0 i —20 —15 —'I —5 0 10 5 F 4 M D 3 0 2 1 0 —20 5 rn 4 F_ M y 3 O 2 1 STATION TYPICAL POOL CROSS—SECTIONS REACH I UPPER REACH BANKFULL WIDTH = 22.0 Ln � N 15 —10 —5 0 STATION REACH 1 LOWER REACH 5 10 15 15 15 5 4 3 2 1 0 20 5 4 3 2 1 0 20 5 4 3 2 1 0 20 5 4 CONTRACTING ti y 0 2 0 —20 —15 —10 TYPICAL RFFLE CROS—SECTION Ht,4.cH I UPPER REACH —5 0 STATION REACH 1 LOWER REACH 5 F_ 4 r� D 3 0 BANKFULL WIDTH =22.0' 5 10 o 1 N 2.0 i —20 —15 —'I —5 0 10 5 F 4 M D 3 0 2 1 0 —20 5 rn 4 F_ M y 3 O 2 1 STATION TYPICAL POOL CROSS—SECTIONS REACH I UPPER REACH BANKFULL WIDTH = 22.0 Ln � N 15 —10 —5 0 STATION REACH 1 LOWER REACH 5 10 15 15 15 5 4 3 2 1 0 20 5 4 3 2 1 0 20 5 4 3 2 1 0 20 5 4 3 2 1 0 0 —20 —15 —10 —5 0 5 10 15 20 STATION LEGEND PROPOSED GRADE — — — BANKFULL WIDTH =25.0' CONTRACTING ti 0 bluelineenv.com 5 4 3 2 1 0 0 —20 —15 —10 —5 0 5 10 15 20 STATION LEGEND PROPOSED GRADE CONTRACTING ti Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com z� Q s O 4-JU W •° z cry o o a� N NO Z3 L� UU J� ro Q U a ru � a U z 0 w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: rn 620.00 618.00 (D 616.00 614.00 a--+ 612.00 cu> O• 610.00 608.00 606.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 1 +00.00 1 +10.00 1 +20.00 1 +30.)0 1 +40.00 1 +50.00 1+6o bo 1 +70.00 1 +80.00 1 +90.00 1+96.38 Station M 616.00 , Profile View of XS -2 o 614.00 O < 612.00 ♦--� 610.00 ; M 608.00 • 606.00 604.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 0+98.27 Station M 612.00 , Profile View of XS -3 610.00 0 +-j< 608.00 +� 606.00 > i W U 604.00 o • 602.00 600.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 1 +00.00 1+10.'00 1 +20.00 N Station Profile View of XS -4 x T 612.00 w 1 610.00 (D 608.00 606.00 -�--+ 604.00 > LEGEND O• 602.00 600.00 PROPOSED GRADE 598.00 W- - - EXISTING GRADE 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 Station CONTRACTIN9 G Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com i z _ U � 4-J Uz a � Q i c� � f6 L V N z� z O (n w PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: rn 620.00 618.00 (D 616.00 614.00 a--+ 612.00 cu> O• 610.00 608.00 606.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 1 +00.00 1 +10.00 1 +20.00 1 +30.)0 1 +40.00 1 +50.00 1+6o bo 1 +70.00 1 +80.00 1 +90.00 1+96.38 Station M 616.00 , Profile View of XS -2 o 614.00 O < 612.00 ♦--� 610.00 ; M 608.00 • 606.00 604.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 0+98.27 Station M 612.00 , Profile View of XS -3 610.00 0 +-j< 608.00 +� 606.00 > i W U 604.00 o • 602.00 600.00 W 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 1 +00.00 1+10.'00 1 +20.00 N Station Profile View of XS -4 x T 612.00 w 1 610.00 (D 608.00 606.00 -�--+ 604.00 > LEGEND O• 602.00 600.00 PROPOSED GRADE 598.00 W- - - EXISTING GRADE 0+10.00 0+20.00 0+30.00 0+40.00 0+50.00 0+60.00 0+70.00 0+80.00 0+90.00 Station CONTRACTIN9 G Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com i z _ U � 4-J STRUCTURE II ELEVATION PER PF STAKE(TYP) " MIN. OVE BLAB IN DOWNSTREAM DIRECTION AT MAP EN13S TOP OF BAIT TOE OF SLOPE EROSION CONTROL MATTING O'Q) STAKE (7Yp) TOE OF SLOPE 14 Amofff-671 (-5--ROCK CROSS VANE 8 j NOT TO SCALE NOTES: 1. PROVIDE TURNING RADIUS SUFFICIENT TO CONTRACTING ` J ACCOMMODATE LARGE TRUCKS, 5. LOCATE CONSTRUCTION ENTICE AT ALL dani@bluelineenv.com POINTS OF INGRESS AND EGRESS UNTIL SITE IS O= STABILIZED. PROVIDE FREQUENT CHECKS OF O THE DEVICE AND TIMELY MAINTENANCE. 6. MUST BE MAINTAINED IN A CONDITION WHICH � V)O WILL PREVENT TRACKING OR DIRECT FLOW OF f6 a -J MUD ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY. 7. ANY MATERIAL TRACKED ONTO THE ROADWAY C6 MUST BE CLEANED IMMEDIATELY. S. USE CLASS A STONE OR OTHER COARSE AGGREGATE APPROVED BY THE ENGINEER. S. PLACE FILTER FABRIC BENEATH STONE. 2" Typical Stake TOP OF BANK SECURE MATTING IN B" DEEP TRENCH EROSION CONTROL MATTING NOT TO SCALE (-2-CULVERT B NOT TO SCALE (-4--CHANNEL PLUG 111�8jNOT TO SCALE BACKFILL (MBITE ALLUVIUM) CHANNEL EEC 1' ZifPE TSE OF aLOPr= FILTER FABRIC HEAD OF RIFFLE ELEVA71ON EXTEND FILTER POINT PER PROFILE FABRIC & MIN. A\ IR c 70P OF BAPIK tTYP) EXTEND FILTER FABRIC fir' MIN, UPSTREAM A7RUCTURF INVERT FLFVATION HEADER R=K IL \FCOTERROCK FLOW EROSION CONTROL MAT SIDE SLOPE PER TYPICAL SECTION BOJLDFR TOE PROTFCTION SEE PROFILE FOR LENGTH OF RIFFLE E TOP OF BANK( Dtn, e . 19 anxv CONSTRUCTED RIFFLE NOT TO SCALE Plan Vlaw [Z744"', } 9 O 14 A'NNEL COMPACTED SELECT TOCP OF SAND JVP) Aj CHANNEL SA,CKFILL 12" NOMINAL THICKNESS OF EQUAL PANTS CLASS A, S, AND 1 STONE HEA© OF RIFFLE TAIL OF RIFFLE A' POOL k CL Lu Lu TENDS F 0 UPSTREAM 5 MIN. STONE EXTENDS LU UPSTREAM S' MIN. U. U. z TOP OF BAND (T'Y'P) TAIL OF RIFFLE ELEVATION POINT FUER PROFILE � i CONTRACTING ` J Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com O= O ca � N U � V)O J � •° z f6 a -J f6 W L 0 U C6 � f6 N G � U O cn w 0' PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: 10 FLOW THALWEG " STOP OF BANK NONWOVEN � FILTER FABRIC NORMAL WATER SURFACE it Y ROCK AND ROLL RIFFLE NOT TO SCALE vo S BURY INTO BARK 51 MIN.(TYP) f=IIkyA101•2- A1124 1 112 11 F E3At K {TYP) 70F OF SLOPE {TYP) -� EXCAVATE POOL PER PROFILE STRUCTURE INVERT � ELEVATION POINT PER PROFILE (_3_LOG CROSS VANE g NOT TO SCALE structure Dimensions 4 fT) W(F7) Y (FT) DEGREE) dani@bluelineenv.com '3 1'D s BANKFOLL 1511 DIAMETER OR GREATER (TYP) POOL WIDTH PER TYPICAL SECTION MIX OF LASS A& #57 STONE TYPE 2 TOE FILTER FABRIC TOP OF BANK JTYP) 70E OF SLOPE MIX OF CLASS A &#57STONE EXTEND FILTER FABRIC 5'MIN. UPSTREAM 12" NOMINAL THICKNESS OF EQUAL PARTS CLASS A, B> AND `V aTQNE. Section A -A! STRUCTURE INVERT ELEVATION PER PROFILE P� iL FOOTER ROCK OR LL1 section 13-B, Tarp sof Bank Lag Sill Detail 1. Log vane size and material to be approved by dealgner. 2. Choose straight loge as possible. 3. Excavate trench to accommodate footer and log. 4. Key in vane 5ft past tap of bank. 5. Tap of crane nearly level with stream, bad. S. Connect filter fabric with galvanized tacking. 7. Backfill as directed. Plan View Plow Top of Bark Lour flow water surtaaie Strearnbad Profile View !pe Scour Pool k,singie or triangular) 2 LOG SILL g NOT TO SCALE TRANSPLANTED SOD AND ROOTHASS TOP OF BAND EROSION C NTROL MATTING (T'YP. Section riew Piffic imb&tion NOTES: 1. PREPARE THE BANK WHERE THE SOD MAT WILL BE TRANSPLANTED BY RAKING & FERTILIZING. 2. EXCAVATE TRANSPLANT SOD MATS WITH A VIDE (BUCKET AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE. 3. PLACE TRANSPLANT ON THE BANK TO BE STABILIZED. 4. SECURE WITH SOD STAPLES. E. FILL IN ANIS HOLES AROUND THE TRANSPLANT AND COMPACT. B. AW LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. 7. PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT THEY TOUCH. 8. INSTALL EROSION CONTROL MATTING ABOVE TRANSPLANTED SOD MATS. FLOW r•- TRANSPLANTED SOD AND R007MASS � w w w ti W w W IV W W W IV Ve w Vs 9e W W P OF BAND TOE OF SLOPE Plan View `'' CO STRUCTED RIFFLE Riffle 'Installation 4 SOD MAT 9 NOT TO SCALE CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com 1'D O ca � 4-'U N O � •° J z Q O V) W L/ 0 U ca N U z O W PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: BARE ROOT PLANTING NOT TO SCALE cai Ar_cra sanrvru VARIES �''� RFs.. — --—,i•. SPACING PER PLANTING PLAN INSERT THE DIBBLE, OR SHOVEL, STRAIGHT !DOWN INTO THE SOIL TO THE FULL DEPTH OF THE BLADE AND PULL BACK ON THE MAN OLE TOOPEN THE PLANTING HOLE. (DO NOT ROCK THE SHOVEL BACK AND FORTH AS THIS CAUSES SGML IN THE PLANTING HOLE TO BE COMPACTED, INHIBITING FOOT GROWTH. sectim view REMOVE THE DIBBLE, OR SHOVEL, AND PUSH THE SEEDLING (ROOTS DEEP INTO THE PLANTING HOLE, PULL THE SEEDLING BACK LIP Tfl THE CORRECT PLANTING DEPTH (THE FOOT COLLAR SHOULD BE 170 3 INCHES BELOW THE SOIL SURFACE). GENTLY SHADE THE SEEDLING TO ALLOW THE FOOTS TO STRAIGHTEN OUT. CSO NOT TWIST OR SPIN THE SEEDLING OR LEAVE THE ROOTS J-RO07(=0. (-TLVE STAKING jo NOT TO SCALE INSERT THE DIBBLE, OR SHOVEL, SEVERAL INCHES IN FRONT OF THE SEEDLING AND PUSH THE BLADE HALFWAY INTO THE SOIL, TWIST AND PUSH THE HANDLE FORWARD TO CLOSE THE TOP OF THE SLIT TO HOLD THE SEEDLING IN PLACE, LIVE STAKE (TYP) TOE OF :SLOPE LIVE Section View 101 DIBBLE BAR PLANTING BAR SHALL HAVE A BLADE WITH A TRIANGULAR CRASS -SECTION, AND SHALL BE 12 INCHES LONG, 4 INCHES WIDE AND 1 INCH THICK AT )CENTER. (ROOTING PRUNING ALL R007S SHALL BE PRUNED TO AN APPORIATE LENGTH TO PREVENT J -ROOTING. PUSH THE DIBBLE, OR SHOVEL, DOWN TO THE FULL DEPTH OF THE BLADE, EROSION CONTROL MATTING (SEE DETAIL) P" DOTE: TOE OF SLOPE 1. LIVE STAKES TO BE PLANTED IN AREAS AS SHOWN ON PLANS AND DIRECTED BY THE ENGINEER. PULL BACK ON THE HANDLE TO CLOSE THE BOTTOM OF THE PLANTING HOLD. THEN PUSH FORWARD TO CLOSE THE TOP, ELIMINATING AIR POCKETS AROUND THE ROOT. NOTES: 112" TO 211 DIAMETER 7' Q Lie Btake Detain 1. ALL SOILS WITHIN THE BUFFER PLANTING AREA SHALL BE OISKED, AS REQUIRED, PRIOR TO PLANTING, 2. ALL PLANTS SHALL BE PROPERLY HANDLED PRIOR TO INSTALLATION 70 INSURE SURVIVAL. (REMOVE THE DIBBLE, OR SHOVEL, AND CLOSE AND FIRM UP THE OPENING WITH YOUR HEEL. BE CAREFUL TO AVOID DAMAGING THE SEEDLING. CONTAINERIZED PLANTING NOT TO SCALE BRANCH CUTTINGS (TYP) 143 GAUGE GALVANIZED WIRE SECURED TO STADES LIVE FACINE BUNDLE OR 12" COIFS LOO SECURED WITH 3S" STADES AND WIRE 5ection View SHALL BE A MINIMUM OF 35 BRANCH OU77INGS PER SQUARE YARD (1 INCH MAX. DIAMETER) 21 TYPICAL 2x CONTAINER WIDTH SECURE WITH 24" LONG STAKES (TYP) 18 GAUGE GALVANIZED WIRE SECURED TO STAFFS BRUSH MATTRESS WITH COR LOG NOT TO SCALE 2" FILL IN GAPS WITH TOP SOIL, LIVE FASCINE BUNDLE OR 1 211 COIR LOG, NOTE: - LL OTE: LL 2„ 1T- ,,ical Off* LL 1. BOARD FOR STADES SHALL BE 2" 2"X 24" OR 2" X 2" X 38" AS DIRECTED BY THE ENGINEER. 2. ROOTEDILEAFED CONDITIONS OF THE LIVING PLANT MATERIAL IS NOT REPRESENTATIVE AT THE TIME OF INSTALLATION. CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com C6 O f6 L N U ate--+ V) O J � •° z � Q W L/ 0 U L C6 � f6 N G N U z O cn Li PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: PROJECT SUMMARY: EROSION AND SEDIMENT CONTROL NARRATIVE THE MALLARD SITE RESTORATION AND CHANNEL RELOCATION PROJECT IS LOCATED OUTSIDE OF CONTRACTING A. PROJECT DESCRIPTION: THE MALLARD STREAM RESTORATION PROJECT IS LOCATED NEAR GROVER, NORTH CAROLINA, NORTH OF MALLARD DRIVE. THE PROJECT REACH IS LOCATED WITHIN A AGRICULTURAL AREA WITH FLOODPLAIN WETLANDS. THE WATERSHED FOR THE PROJECT REACH IS APPROXIMATELY 0.8 SQUARE MILES IN GROVER, NC, IN CLEVELAND COUNTY. AND FLOWS FROM THE CULVERT UNDER MALLARD DRIVE. THE AREA AND IS PREDOMINATELY RURAL IN NATURE. LAND USE INCLUDES PASTURE, AGRICULTURE, ROADS, RESIDENTIAL STRUCTURES, AND FORESTED AREAS. THERE ARE NO SIGNIFICANT TRIBUTARIES FLOWING INTO THE STREAM WITHIN THE PROJECT AREA. PROJECT REACHES INCLUDE APPROXIMATELY 3615 LINEAR FEET OF TWO UNNAMED TRIBUTARIES TO B. EXISTING SITE CONDITIONS: THE PROJECT REACH CONSISTS OF A SINGLE THREAD CHANNEL THAT IS IMPACTED BY ONGOING DREDGING, LIVESTOCK ACCESS, MINIMAL RIPARIAN BUFFER, AND BEAVER ACTIVITY. THE IMPACTS OF THESE ACTIVITIES INCLUDE: CHANNEL AGGRADATION, BANK EROSION, LOSS OF RIPARIAN VEGETATION, BUFFALO CREEK. THE GOAL OF THE PROJECT IS TO RELOCATE A STREAM (REACH 1) TO A NATURALLY AND ULTIMATELY UNSTABLE CHANNEL DIMENSION, PATTERN, AND PROFILE. LOW AREA OF THE ADJACENT PASTURE, AND POSSIBLY THE HISTORICAL LOCATION OF THE CHANNEL. C. ADJACENT AREAS: THE PROPERTIES ADJACENT TO THE PROJECT SITE CONSIST OF THE AGRICULTURAL FIELDS AND WETLANDS. THE CURRENT CONDITION OF THE STREAM IS SIGNIFICANTLY DEGRADED AND CURRENTLY D. OFF-SITE AREAS: NO OFF-SITE AREAS WILL BE INCLUDED IN THIS PROJECT AS ALL CUT MATERIALS WILL BE USED AS FILL ON SITE. EXPERIENCING IMPACTS FROM CATTLE ACCESS, DREDGING, MINIMAL BUFFER, AND BEAVER ACTIVITY. E. CRITICAL AREAS: ALL EARTHWORK ASSOCIATED WITH THE PROJECT WILL BE PRIMARILY WITHIN THE PASTURE AREA ADJACENT TO THE EXISTING CHANNEL. THE PROPOSED CONSTRUCTION SEQUENCE IS FROM UPSTREAM TO DOWN, WITH VARIATIONS POSSIBLE RELATED TO BALANCING OF CUT -FILL. FOR PORTIONS OF THE ACTIVE THE GOAL OF THE RELOCATION AND PRIORITY 1 RESTORATION FOR REACH 1 IS TO CREATE A STABLE CHANNEL BEING GRADED, STREAMFLOW MAY BE DIVERTED. EACH PORTION OF THE ACTIVE CHANNEL BEING GRADED WILL BE STABILIZED AT THE END OF EACH DAY. AS EACH SEGMENT OF THE PROJECT IS BROUGHT TO FINAL GRADE AND STRUCTURES INSTALLED, THE BANKS WILL BE SEEDED AND MATTED COIR FIBER IN CHANNEL WITH FUNCTIONAL IN -STREAM AND RIPARIAN HABITAT. THE NEW/RESTORED CHANNEL WILL ACCORDANCE WITH DETAILS. INCLUDE A FEW STRUCTURES FOR GRADE CONTROL AND POOL ENHANCEMENT AND TO AID IN F. EROSION AND SEDIMENT CONTROL MEASURES: THE FOLLOWING E&S MEASURES MAY BE USED BY THE CONTRACTOR, AS WELL AS ANY OTHERS DEEMED NECESSARY, DEPENDING ON SITE CONDITIONS AT THE TIME OF CONSTRUCTION. UNLESS OTHERWISE INDICATED, ALL E&S MEASURES (VEGETATIVE AND STRUCTURAL) WILL BF CONTROLLING THE DIRECTION OF FLOW TO PROTECT NEWLY CONSTRUCTED BANKS AS VEGETATION INSTALLED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, AS WELL AS ANY OTHER APPLICABLE REGULATIONS. MATURES. THE STABILIZED CHANNEL WILL ALSO PROTECT THE ROAD ACCESS TO A SAND DIPPING OPERATION AT THE REAR OF THE ADJACENT PROPERTY WITH THE INSTALLATION OF A NEW CULVERT STRUCTURAL PRACTICES UNDER THE ACCESS ROAD. THE NEW CHANNEL (REACH 1) WILL FLOW INTO REACH 2, AN EXISTING 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT - 6.06 CHANNEL ON-SITE. THIS CONFLUENCE WILL BE LOCATED AT THE LOWER END OF REACH 3. CUT 2. SEDIMENT FENCE - 6.623 MATERIAL GENERATED FROM THE EXCAVATION OF THE NEW CHANNEL FOR REACH 1 WILL BE USED TO 3. VEGETATIVE PRACTICES - PARTIALLY FILL IN THE ABANDONED CHANNEL, LEAVING DEPRESSION AREAS FOR WETLAND HABITAT. a. TEMPORARY STABILIZATION - 6.10 ro O b. PERMANENT STABILIZATION - 6.11 SITE DESCRIPTION: +�-+ cn oC w U c. RIPARIAN SEEDING - 6.24 THE MALLARD SITE IS COMPRISED OF APPROXIMATELY 31.6 ACRES AND IS IN PASTURE, WETLAND, AND PERMANENT STABILIZATION: AS FINAL GRADE AND STABILIZATION PROGRESSES DOWNSTREAM THROUGH THE PROJECT REACH, THE BANKS SHALL BE SEEDED WITH TEMPORARY AND PERMANENT SEED MIX, AS WELL AS COVERED WITH A COIR FIBER MATTING (700 GRAM OR APPROVED EQUAL) IN ACCORDANCE WITH DETAIL. ALL FLOODPLAIN. IT IS RELATIVELY FLAT, WITH A VALLEY SLOPE OF LESS THAN 1 PERCENT. TREES ARE OTHER DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY AND PERMANENT SEED MIX AS GRADING IS COMPLETED AND PLANTING IN ACCORDANCE WITH THE PLANTING PLAN ONCE CONSTRUCTION IS COMPLETED. PLANTING SHALL NOT OCCUR WHEN GROUND IS FROZEN. SPARSELY LOCATED THROUGHOUT THE WETLAND AREA AND ALONG PORTIONS OF THE EXISTING STORMWATER RUNOFF CONSIDERATIONS: AS THIS PROJECT WILL NOT INCREASE PEAK RUNOFF RATES, THERE WILL BE NO NEGATIVE IMPACT TO FLOODING OR DOWNSTREAM CHANNEL DEGRADATION. STREAM CHANNEL. THE SOILS ARE PREDOMINATELY SAND, AND THERE IS A SAND DIPPING OPERATION MAINTENANCE: ALL E&S CONTROL MEASURES SHALL BE INSPECTED WITHIN 24 HOURS OF INSTALLATION AND FOLLOWING EACH STORM EVENT GREATER THAN 0.5 INCHES IN A 24-HOUR PERIOD, DAILY DURING PROLONGED RAINFALL EVENTS, AND WEEKLY OUTSIDE OF STORM EVENTS. ANY DAMAGED SHALL BE IMMEDIATELY LOCATED ON AN ADJACENT PARCEL. THE UNNAMED TRIBUTARY THAT IS OUR PROJECT REACH, FLOWS REPAIRED, AND ADDITIONAL MEASURES INSTALLED IF DEEMED NECESSARY. CONTRACTOR SHALL MAINTAIN FIELD NOTES RELATED TO E&S CONTROL MEASURE INSPECTIONS AND ANY RESULTING MAINTENANCE ACTIVITIES. THIS LOG SHALL BE MADE AVAILABLE UPON REQUEST. INTO BUFFALO CREEK TO THE NORTH. THE PROJECT REACH ENTERS THE PROPERTY THROUGH A CULVERT THAT PASSES UNDER MALLARD DRIVE. THERE IS A SAND BED ROAD ALONG THE EDGE OF THE PRIMARY PROJECT REACH THAT ACCESSES THE SAND DIPPING AREA TO THE NORTH. THE NEW THE CONTRACTOR SHALL INSPECT DAILY ALL AREAS OF CONSTRUCTION ACTIVITIES TO ENSURE THAT ALL E&S CONTROL MEASURES ARE INSTALLED AND FUNCTIONING PROPERLY. THE CONTRACTOR SHALL INSTALL ANY ADDITIONAL E&S CONTROL MEASURES THAT MAY BE REQUIRED TO PREVENT DAMAGE TO ADJACENT AND/OR CHANNEL WILL FLOW THROUGH A NEW CULVERT UNDER THIS ACCESS ROAD. DOWNSTREAM WATERWAYS, OR TO THE PROJECT REACH, PRIOR TO PROJECT COMPLETION AND PERMANENT STABILIZATION BEING ESTABLISHED. SOILS: THE FOLLOWING ITEMS SHALL BE INSPECTED IN PARTICULAR: THE SITE IS PREDOMINANTLY WEA - WEHADKEE LOAM AND IS FREQUENTLY FLOODED. THE PROJECT 1. SEDIMENT FENCE BARRIERS: INSPECTING FOR UNDERMINING OF FABRIC. SEDIMENT SHALL BE REMOVED IF LEVEL IS 1/2 OR GREATER OF BARRIER HEIGHT. AREA FALLS WITHIN THE FLOODPLAIN OF BUFFALO CREEK. THE UPPER PORTION OF THE PROJECT REACH 2. SEEDING AREAS: ENSURE STAND OF GRASS IS ESTABLISHED AND MAINTAINED. FERTILIZE AND/OR RE -SEED AS NECESSARY. HAS A SMALL AREA OF CHA - CHEWACLA LAOM THAT IS LESS FREQUENTLY FLOODED. 0-2 PERCENT SLOPES. LOCAL COUNTY INSPECTOR SHALL HAVE THE AUTHORITY TO ADD OR REMOVE REQUIRED E&S CONTROL MEASURES AS DEEMED NECESSARY AND AS CONDITIONS WARRANT. INFORMATION FROM WEBGIS AND NRCS CLEVELAND COUNTY SOIL SURVEY (1999). GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. THE LOCAL OFFICE RESPONSIBLE FOR E&S CONTROL MEASURES SHALL BE NOTIFIED AT LEAST 48 HOURS IN ADVANCE OF ANY PLANS TO BEGIN CLEARING AND GRADING OPERATIONS AND ONE WEEK PRIOR TO FINAL INSPECTION. NOTES FOR CONSTRUCTION: 2. ALL E&S CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING ADJACENT TO THE STREAM CHANNEL OR GRADING THE CHANNEL. 3. A COPY OF THE APPROVED E&S CONTROL PLAN SHALL BE MADE AVAILABLE ON SITE AT ALL TIMES. LOCATION AND INSTALLATION OF IN -STREAM STRUCTURES MAY BE MODIFIED DURING THE 4. IF ANY ADDITIONAL AREAS ARE TO BE DISTURBED (OUTSIDE OF THIS PLAN), A SUPPLEMENTARY EROSION CONTROL PLAN SHALL BE PREPARED AND SUBMITTED TO OWNER FOR REVIEW AND APPROVAL MUST BE OBTAINED FROM THE APPROVING AUTHORITY. IMPLEMENTATION OF THE RESTORATION DESIGN PER THE DISCRETION OF THE DESIGNER (DW 5. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL E&S CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION FROM OCCURRING AS DEEMED BY THE APPROVING AUTHORITY. JOHNSON). THE DESIGNER WILL NOTIFY CLIENT OF CHANGES AT THE TIME AND WILL MAKE NOTE OF 6. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED E&S CONTROL MEASURES DURING LAND DISTURBING ACTIVITIES AND UNTIL STABILIZATION IS ACHIEVED. ADJUSTMENTS. CONTRACTOR NOT TO REMOVE OR DAMAGE ANY TREES OVER 3 INCH DBH WITHOUT 7. CONTRACTOR SHALL INSPECT ALL E&S CONTROL MEASURES WEEKLY AND AFTER EACH STORM EVENT, COMPLETING ALL NECESSARY REPAIRS AND MAINTENANCE TO ENSURE EFFECTIVENESS. APPROVAL FROM OWNER. MINIMUM STANDARDS (MS): (1) SOIL STABILIZATION. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS, BUT LESS THAN ONE YEAR. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. (2) SOIL STOCKPILE STABILIZATION. DURING CONSTRUCTION, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. TEMPORARY PROTECTION AND PERMANENT STABILIZATION SHALL BE APPLIED TO ALL SOIL STOCKPILES ON SITE AND BORROW AREAS OR SOIL INTENTIONALLY TRANSFERRED OFF SITE. (3) PERMANENT STABILIZATION. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS: • UNIFORM • MATURE ENOUGH TO SURVIVE • WILL INHIBIT EROSION (4) SEDIMENT BASINS & TRAPS. SEDIMENT BASINS, SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS, AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. (5) STABILIZATION OF EARTHEN STRUCTURES. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. (6) SEDIMENT TRAPS & SEDIMENT BASINS. SEDIMENT TRAPS AND BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN AS FOLLOWS: SEDIMENT TRAPS • ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES • MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA SEDIMENT BASINS • CONTROL DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES • MINIMUM STORAGE CAPACITY OF 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA • THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION (7) CUT AND FILL SLOPES DESIGN & CONSTRUCTION. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURE' UNTIL THE PROBLEM IS CORRECTED. (8) CONCENTRATED RUNOFF DOWN SLOPES. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME, OR SLOPE DRAIN STRUCTURE. (9) SLOPE MAINTENANCE. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. (10) STORM SEWER INLET PROTECTION. ALL STORM SEWER INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE STORMWATER CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED/TREATED TO REMOVE SEDIMENT. (11) STORMWATER CONVEYANCE PROTECTION. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND THE RECEIVING CHANNEL. (12) WORK IN LIVE WATERCOURSE. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED: PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT, AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION NOWERODI BLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMSEARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER MATERIALS. (13) CROSSING LIVE WATERCOURSE. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIAL SHALL BE PROVIDED. (14) REGULATION OF WATERCOURSE CROSSING. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. (15) STABILIZATION OF WATERCOURSE. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.(16) UNDERGROUND UTILITY LINE INSTALLATION . UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: • NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME • EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES • EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY • MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION • RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS • COMPLY WITH APPLICABLE SAFETY REGULATIONS (17) VEHICULAR SEDIMENT TRACKING. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS: PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. (18) REMOVAL OF TEMPORARY MEASURES. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. (19) STORMWATER MANAGEMENT. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION, AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY, AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION EROSION CONTROL SEQUENCE: 1. PRIOR TO COMMENCEMENT OF ANY ON-SITE LAND DISTURBING ACTIVITIES, AN ON-SITE PRE CONSTRUCTION MEETING WILL BE HELD SO THAT ALL AFFECTED PARTIES ARE AWARE OF THE CONSTRUCTION SEQUENCE. 2. PRIOR TO ANY CONSTRUCTION ACTIVITIES ON THE PROJECT REACH, THE CONSTRUCTION ENTRANCE, ACCESS ROADS, INITIAL STAGING AREAS AND ANY ASSOCIATED E&S CONTROL MEASURES WILL BE INSTALLED. 3. AFTER E&S CONTROL MEASURES ARE APPROVED BY THE INSPECTOR, PROPOSED GRADING AREAS MAY BEGIN CLEARING AND GRUBBING. 4. CHANNEL GRADING SHALL BE COMPLETED IN SEGMENTS WHICH WILL HAVE PUMP AROUND WHERE APPLICABLE AND BE STABILIZED PRIOR TO BEGINNING WORK ON DOWNSTREAM SEGMENTS. 5. EACH SEGMENT WILL BE BROUGHT TO FINAL GRADE AND STABILIZED PRIOR TO CONTINUING WORK IN THE DOWNSTREAM DIRECTION. WORK AREAS WILL BE STABILIZED DAILY TO ENSURE STABLE FLOW THROUGH THE CHANNEL IN THE EVENINGS. 6. AS FINAL GRADE IS ACHIEVED, STREAM BANKS AND OTHER DISTURBED AREAS WILL BE SEEDED AND MATTED IN ACCORDANCE WITH DETAILS. 7. UPON COMPLETION OF CONSTRUCTION AND APPROVAL FROM COUNTY INSPECTOR, ALL TEMPORARY E&S CONTROL MEASURES WILL BE CLEANED UP AND RECLAIMED. CONTRACTING Blueline Environmental bluelineenv.com 919.656.2554 dani@bluelineenv.com i C� O ro ro Lu U O z ro O Ln (uo +�-+ cn oC w U z� Lu ca c� G � U i z O_ w i PROJECT MANAGER: DJ DESIGNED BY: DJ DRAWN BY: ST PROJECT #: DATE: MARCH 22, 2017 SHEET: