HomeMy WebLinkAbout20070705 Ver 1_DCM Permit_20080808^ Permit ... Class p LCj "_d? (?-?? ?2U Permit Number
?T F : O'1 - 0 1 OS
NEW ' 0'1 / S 5 3 119-08
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
AU G 8 2008
trMit WATER QUALITY CH
DENR
for WETLANDS AND STORMWATER 6
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Issued to Fish Factory Associates, LLC, 5001 O'Quinn Blvd, Unit J, Southport, NC 28461
Authorizing development in Brunswick County at adj. to AIWW 4907 Fish Factory Road,
Southport , as requested in the permittee's application dated 3/21/07 (MP-1), and
4/17/07 (MP-4) includinjZ the attached workplan drawings (4) all dated "revised 6/11/07".
This permit, issued on August 6, 2008 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subiect to fines, imprisonment or civil action; or may cause the permit to be null and void.
Docking Facility
1) Unless specifically altered herein, this permit authorizes only the 9-slip. docking facility and access pier,
all as expressly and specifically set forth in the attached workplan -drawings. No other structure,
whether floating or stationary, shall become a permanent part of this docking facility without permit
modification. No non-water dependent uses of structures shall be conducted on, in or over public trust
waters without permit modification.
2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
docking facility. Any sewage discharge at the docking facility shall be considered a violation of this
permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout
the entire existence of the permitted structure.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James H. gson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
December 31, 2011
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
Fish Factory Associates, LLC
ADDITIONAL CONDITIONS
Permit # 119-08
Page 2 of 3
3) The pier and associated structures, including all tie-pilings, shall have a minimum setback distance of 15
feet between any parts of the structure and the adjacent property owner's riparian access corridor. This
corridor is determined by drawing a line parallel to the channel or deep water, then drawing a line
perpendicular to the channel line or deep water line that intersects with the shore at the point where the
upland property line meets the water's edge.
4) In order to ensure compliance with Condition No. 3 of this permit, an as-built survey showing the
location and dimensions of the constructed structure, and the distance to the neighboring riparian
corridors, shall be performed on the facility, and copies of the survey shall be provided to the Division
of Coastal Management, within 60 days of completion of construction.
NOTE: Failure to provide the survey required in Condition No. 4 shall result in a violation of this permit.
5) All portions of the access pier/walkway located over Coastal Wetlands shall not exceed a width of 6 ft.
and shall be elevated a minimum of 3 feet above the marsh substrate as measured from the bottom of the
decking.
6) In accordance with commitments made by the permittee in the attached workplan drawings, a handrail
shall be installed on the landward end of the northern-most finger pier to prevent unauthorized docking.
7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
8) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party.
9) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee will not be entitled to compensation for damage to the authorized structure or work, or injury
that may be caused from existing or future operations undertaken by the United States in the public
interest.
10) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather.
11) This permit authorizes a maximum of nine boat slips.
NOTE: Any proposal to add two or more additional boat slips to the authorized 9-slip facility shall
require that the docking facility be classified as a marina, and will therefore require a review
under the N.C. Environmental Policy Act (NCEPA).
Fish Factory Associates, LLC
ADDITIONAL CONDITIONS
Permit # 119-08
Page 3 of 3
NOTE: Due to the proximity of the AID W, boats utilizing the docking facility shall be subject to
frequent wavewash from passing vessels. The issuance of this permit does not relieve the
permittee from taking all proper steps to ensure the integrity of the structure and the safety of
moored boats. The permittee stall not hold the State of North Carolina or the United States
liable for any damage to the structure or moored boats.
General
12) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required,
upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or
obstructions caused thereby, without expense to the United States or the state of North Carolina. No
claim shall be made against the United States or the state of North Carolina on account of any such
removal or alteration.
13) No open water areas or vegetated wetlands shall be excavated or filled, even temporarily.
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
15) If a court of competent jurisdiction determines that a party other than the permittee has legal title to any
part of the area approved for development under this permit, this permit shall be null and void as to the
area the court determines is not owned by the permittee. This condition shall take effect on the date
such court judgment becomes final. In such event, the permittee shall consult DCM prior to initiating or
continuing any further development under this permit.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (910) 796-7215 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal high water level.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water
Quality Certification No. 3624 (DWQ Project No. 070705), which was issued on 5/22/07.
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No.
197800056 (COE Action Id. No. SAW-2007-01794-010) which was issued on 8/6/08.