Loading...
HomeMy WebLinkAboutGreenville N. Rail Connector/Siding S Rcoscicncc,~F~ An employee-owned company 4;% July 18, 2008 David Wainwright NCDENR-DWQ 401 Unit 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 Re: Local Officials Meeting and Citizens Information Workshop Greenville Northern Rail Connector and Greenville Northern Rail Siding, TIP nos. P- 3309AA and P-3309AB, Greenville, Pitt County, NC Dear Mr. Wainwright, The North Carolina Department of Transportation Rail Division (NCDOT) proposes to add a railroad track connection joining the CSX Transportation line with the Carolina Coastal Railway line near Beatty Street and Fourteenth Street in downtown Greenville, North Carolina. A related project involves the addition of two yard tracks and a repair track along approximately 4,400 feet of North Carolina Railroad / CSX Transportation rail bed north of Greenville. The proposed improvements would begin north of the NC 903 / NC 11 juncture, just north of Greenville, N.C, and will extend to a point south of the Staton Mill Road crossing. A CSXT office building would also possibly be relocated from 10th street in downtown Greenville to the project site. The purpose of the two projects is to relocate the existing CSXT switching operation in downtown Greenville and to improve the movement of freight and traffic through the city. The project will improve the safety for motorists and train crews by reducing prolonged waiting periods and eliminating difficult maneuvering conditions between Arlington Boulevard and Howell Street. This letter is to inform you that a Local Official's Meeting (LOM) and a Citizens Informational Workshop (CIW) have been scheduled for the two Railroad Projects: P-3309 AA (Northern Rail Connector) & P-3309 AB (Northern Rail Siding), in Greenville. Both projects will be presented at each meeting. The LOM & CIW will be held on Tuesday, August 26, 2008 at Thomas Foreman Park - Eppes Recreation Center (Multi-purpose Room), located at 400 Nash Street in Greenville, 27834; phone (252)329-4548. The LOM will be held between 3:00-4:00 and the CIW will be held between 5:00 - 7:00 pm. If you have any questions regarding the project, please contact the Project Manager, Mr. Marc Hamel, at (919) 733-7245; or Elizabeth Scherrer or David O'Loughlin at EcoScience at (919) 828-3433. We look forward to meeting with you. Thank you. A division of PW 1101 Haynes Street • Suite 101 • Raleigh, North Carolina 27604 • Telephone: 919.828.3433 • Fax: 919.828.3518 • www.pbsj.com • www.ecosciencenc.com Sincerely, Elizabeth Scherrer Senior Scientist EcoScience: a Division of PBS&J cc: Marc Hamel, NCDOT Rail Division