Loading...
HomeMy WebLinkAbout20040596 Ver 1_Complete File_20040420\(V A TA Michael F. Easley, Governor \O William G. Ross Jr., Secretary 0 North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality p Coleen H. Sullins, Deputy Director Division of Water Quality April 20, 2004 Wake County DWQ Project # 04-0596 APPROVAL of 401 Water Quality Certification and Neuse River Buffer Rules City of Raleigh Central Engineering Department Attn: Carl Dawson, Jr. Post Office Box 590 Raleigh, NC 27602-0590 Subject Property: 4231 Standing Rock. Way Dear Mr. Dawson: You have our approval, in accordance with the attached conditions, to impact 127 feet of perennial stream and 0.01 acres of Neuse River Buffers for the purpose of stream bank stabilization as you described in your application dated March 8, 2004. After reviewing your application we have decided, this fill is covered by General Water Quality Certification Number 3399. This Certification allows you to use Nationwide Permit Number 13 when the Corps of Engineers issues it. This approval is also valid for the Neuse River buffer rules (15A NCAC 2B .0233). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and those listed below. Conditions of Certification:. 1. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (http://h2o.enr.state.nc.us/ncwetlands ftE Page 2 Mr. Dawson April 20, 2004 Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions are made conditions of the Federal 404 and/or coastal Area Management Act Permit. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone John Dorney at 919-733-9646 or Bob Zarzecki at 919-733-9726. Sincerely, JRD/bs Attachments: Certificate of Completion Cc: USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files P.E., or DWQ # 04-0596 v March 30, 2004 Ms. Jennifer Burdette Raleigh Regulatory Field Office United States Army Corps of Engineers 6508 Falls of Neuse Road - Suite 120 Raleigh, North Carolina 27615 RE: Pre-Construction Notification Application Form for Streambank Stabilization at: 4231 Standing Rock Way Raleigh, NC 27606 Dear Ms. Burdette: WETLANDS/ 401 GROUP APR 1 5 2004 WATER QUALITY SECTION Please find enclosed one copy of a completed "Pre-Construction Notification Application Form" for the referenced project. I am submitting seven copies of this application concurrently to Mr. John Dorney with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, 401/Wetlands Unit. It should be noted that the proposed repairs are not for new development construction, but rather to address an existing erosion problem along a stream channel in the Neuse River Basin. Thank you for your assistance in processing this application. If I may answer any questions concerning the application or if you would like to meet me for a site inspection, please contact me at telephone number (919) 890-3188. Sincerely, ?VPA? John D. Hollis, E.I. Stormwater Project Engineer JDH/ Enclosure cc: Mr. H. Daniel Bowden, P. E. Ms. James Leumas, P.E. Mr. John Dorney Ms. Becky L. Ward, P. E. 040596 March 30, 2004 1 GROUP VVETLkNaS 14Q Ms. Jennifer Burdette Raleigh Regulatory F' Id Office APR, 2$04 United States Army orps of Engineers 6508 Falls of Neu eRoad - Suite 120 ITy SECTION Raleigh, North rolina 27615 WATER?(???- RE: Pr -C nstruction Notification Application Form for e bank Stabilization at: 4231 tanding Rock Way a gh, NC 27606 Dear Ms. Burdette: Please find enclosed one copy of a completed "Pre-Construction Notification Application Form" for the referenced project. I am submitting seven copies of this application concurrently to Mr. John Dorney with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, 401/Wetlan6 Unit. It should be noted that the proposed repairs are not for new development construEtion, but rather to address an existing erosion problem along a stream channel in the Neuse River Basin. Thank you for your assistance in processing this application:',If I may answer any questions concerning the application or if you would like to meet me for a site inspection, please contact me at telephone number (919) 890-3188. Sincerely, John D. Hollis, E.I. Stormwater Project Engineer JDH/ Enclosure cc: Mr. H. Daniel Bowden, P. E. Ms. James Leumas, P.E. Mr. John Dorney Ms. Becky L. Ward, P. E. Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "NIA".) I. Processing 4C%J1 is;-JUCr,.JrJ, 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ® Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW13 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? H. Applicant Information 1. Owner/Applicant Information Name: City of Raleigh Mailing Address: Central Engineering Department Post Office Box 590 Raleigh, NC 27602-0590 Telephone Number: (919) 890-3030 Fax Number: (919) 890-3832 E-mail Address: Carl.Dawsonna,ci.ralei2h.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Company Affiliation: Mailing Address: VvEl DS 1401 G AP Telephone Number: E-mail Address: Fax Number: WATER (QUALITY SECTI01 Page 5 of 14 M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: 4231 Standing Rock Way, New Hope Crossing 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 1725708377 4. Location County: Wake Nearest Town: Raleigh Subdivision name (include phase/lot number): New Hope Crossing Townhouses Phase I Directions to site (include road numbers, landmarks, etc.): Take I-440 to New Bern Avenue, HWY 64, north to New Hope Road SR 2036, turn left on New Hope, left on to Skvcrest Drive, take the first left into New Hope Crossings development on to Charnev Road, first right is Standing Rock Way. The drainage ditch is behind the first town homes on the right. 5. Site coordinates, if available (UTM or Lat/Long): Lat 39°30'54"/ Long 83°25'07" (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 0.49 Acres 7. Nearest body of water (stream/river/sound/ocean/lake): Unnamed Tributary to Crabtree 8. River Basin: Neuse River Basin (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The project site has been developed into a combination Page 6 of 14 of Town homes and single family lots. The proposed project is located within the town home common area. The watershed is approximately 14.7 Acres. The watershed is Fully built out with single family homes above the project site. The homes in the watershed have been built in a high density development. The project drainage ditch/stream originates at the end of a 42 inch RCP culvert that was placed under Skycrest Drive. The watershed above the 42 inch pipe is connected with a storm drainage system throughout the development. The ditch/stream continues as an open channel for approximately 127 feet to a 36 inch flared end section downstream of the 42inch pipe. The stormwater enters the 36 inch system and is piped through the subdivision on the south side of the project. The stormwater eventually discharges from the system into an unnamed tributary of Crabtree Creek. A 15" CPP discharges water from a curb inlet located on Standing Rock Way at the upper end of the ditch/stream. The existing ditch/stream is mostly 1.5 to Met in depth through out the oroperU on the eastern bank. The western stream bank is higher in elevation, with the bank beginning at 4 feet and rising to as much as 7 feet above the channel at the downstream end. Town homes have been built in the lower floodplain area to the east of the ditch/stream. Above the eastern bank on the downstream end is a single family residence. The residential structures are close at the down stream end with only approximately 40 feet between the structures. The drainage conveyanceis located between the two structures. The ditch/stream is normally dry and functions only as a storm water conveyance system. The ditch/stream has been lined with ripral) and has lost much of its capacity with the placement of the rip rap in the channel. The town homes are currently experiencing flooding in the crawl spaces during frequent storm events. There is no existing vegetation along the ditch/stream except for the grass which has been planted up to the edge of the riprap and some weeds through the rip rap. 10. Describe the overall project in detail, including the type of equipment to be used: The proiect will consist of improvements in the capacity of the existing channel . removal of the existing riprap along most of the channel, installation of erosion control matting in place of the riprap to allow vegetation to grow, and the removal of the 15'CPP to construct a new channel . The proposed ditch/stream western bank will remain with the same bank slope and dimensions as the existing conditions. The eastern bank will be excavated to provide for an new channel section that has a 3 foot bottom width and 3H: 1V side slope. The upstream and down stream exit and approach areas from the storm drainage pipes will remain as the existing conditions with the rip rap. The 42 inch pipe has been constructed with a steep slope that could generate velocities as much as 23 feet per second during storm events. The riprap is needed to armor the channel to prevent erosion. At the approach to the 36 inch pipe at the downstream end the rip rap will remain to continue to stabilize the high steep banks that are adjacent to constructed vegetation to grow along the channel banks. The existing 15" CPP at the upstream end of the proiect is currently undersized and is causing problems with street drainage and is therefore proposed to be removed. In its place a 5' Reinforced concrete flared end Page 7 of 14 section will be attached to the existing yard inlet and a new channel will be constructed to the existing ditch/stream. The equipment that is proposed to be used on this project is a dump truck, loader and track hoe. The work is proposed to be completed from the eastern side of the ditch on the town home property. 11. Explain the purpose of the proposed work: The purpose of this proiect is to address flooding concerns of the town home owners on the eastern side of the open channel and to provide for additional storm water quality benefits with the removal of existing riprap. The proposed proiect was requested by the town home association to the City of Raleigh. This project qualified for funding by the City of Raleigh Storm Drainage Policy and is currently being designed and permitted by the City for construction. The proiect will stabilize the channel banks, provide for better conveyance and better vegetative buffer on the channel banks. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T:I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe?the anticipated work, and provide justification for the exclusion of this work from the current application. None anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream Page 8 of 14 evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed project will impact approximately 127 linear feet of ditch/stream channel. The impacts will be in improvements to channel capacity and placement of drainage control fabric on banks. No wetland impacts are anticipated for this site. Erosion control measures will be installed to contain sediment prior to any rain events. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at littp://,,N-w?v.femzt.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 0.00 acres Total area of wetland impact proposed: 0.00 acres 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? lease specify) S I Channel capacity improvements & stabilization w/ fabric 127 feet UT to Crabtree Creek 8 feet Storm Water Flows only Page 9 of 14 * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at ;NAN,N.us2s.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., vvyNy-topozornc.com, wv?-, .mapquestxom, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 127 feet 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U. S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name Wate) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A N/A NA NA NA * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: NIA VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Page 10 of 14 This proiect is limited to a channel length of 127 feet tat has qualified for the City of Raleigh assistance program for structural flooding problems. The work to the stream will be limited to improving conveyance on the eastern bank The western bank because of its height and steepness will not be worked on only to remove the existing riprap and to install the drainage fabric and plants. Because this area is confined by structures and utilities there is not any opportunity to make changes in the glanform. It was not possible to create a bankfull bench in the floodplain because of the close proximity of the sanitary sewer and the cover requirements over the pipe required by the City of Raleigh. The ditch/stream only carries water when it rains. The channel is dry as well as the surrounding soils until it rains. The conveyance improvements will have no effect on any aquatic plant or animal species because none are currently present. The structural flooding can only be addressed by improved conveyance. The conveyance improvements to the channel were minimized to prevent the peak flood water elevation for the 10 year event from reaching any structures. The 10 year design storm is a minimum standard for the City of Raleigh. The work proposed will be an enhancement for water quality because the plan calls for removal of approximately 105 sauare yards of riprap to be removed. This area will be amended with too soil, covered by an erosion control blanket and then planted with a variety of sedges VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htip-.//Ii-?o.enr.state.nc.us/'ncwetiands/*stri-n()ide.htm]. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions Page 11 of 14 and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. NIA 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http:/./h2o.enr.state.nc.us/wrp/indox.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes E] No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Page 12 of 14 Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ® No ? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* I Impact^*\ I Multiplier Required 475 2 I 1.5 Total 475 Zone I extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or. 0260. As a Dart of this project 475 sauare feet of channel bank in zone one will be impacted by reshaping activities. The banks will be sloped back at a 3H:1 V slope and planted. Additional improvements included in the plan will involve the removal of an additional 475 sauare feet of riyrap on the western bank. This bank will also be enhanced with sedges and perennial flowers. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 13 of 14 XM. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 14 of 14 0 Vicinity Map Scale F = 1000 feet Becky L. Ward Consulting Drainage Area = 14.7 Acres UT Crabtree Creek Watershed Map 4 Scale: 1" = 300 feet Becky L. Ward Consulting N Map Cop 0 Soils Map Scale: 1" = 582 feet 33 ft Becky L. Ward Consulting O LO O O to LO O LO LO CL ?; rn c 00 m O co M N N O L V LO N r j -. N o to c c co c U O r s i VJ O O O OO I? CO to ct M N O r- M M M M M co co M co co M (Iaa}) UOIIBA013 0 m CEO c CL Q. ,c O O c X LO N O N LO N Z C O M V O v C43 C43 .b.+ O N V ca ? U) c°o c N O N 0 N V y 0 m 0 > a L 0 Cf) co 0 o O o 0 0 0 0 0 o O o O O O o 0 0 0 o O o O O O O 00 f? Cfl lCj (M N O W N r r r r r r I- r r TI- M M co M co M M M M M M M (4001) UOIIBA01 0 M ? W U ? 0 Q. o a L 3 o Cl) ? 0 ti LO 0 0 0 LO LO M L co + > M 7 r v O _ a LL Ih LO M •-• V) N C +. 7 J w `r M V Q ) t 0 n m N 4) O 2 O ?' U) M U) V) a a ca N (A Q L V U c C Lcu- co N Q- E X W N O E O j O ? N O In Z 0 O 0 co co U M N 0 O O 00 ?- M M M M M M M M M M M M M (1001) UOIIBA013 ti LO Cfl 0 0 LO L 0 LO N LO v N r O O .? y ca Q M V O ? V M 0 V) w N O N L U O N r O r O O 0) OD I- Cfl LO d M N r O N r r r r r r r r r r M M M ro M Cl) M M Cl) M M (1001) UOIIBA013 d t U c m a rn d m c v 0 0 U .6 C7 U C7 U 0 z w Os u R W t 00 z d' T c O Lo co rn CO E 00 W c = LLO v co + C a U)i o o = vca CD U) O 2 ? 'v 3 ? a? z? A O O J Y p O M U O N _ CO co C*4 C3 O T U) U C o r+ ago Y E Cf) c c rn C 4k O 2 'a ? c o O O L -.CD C F- o OL C t= 0.0 O O a O U Q- O U L LC O O E?jIX O ui mza E l4 i co 00 LO Ln T LO LO M N N T T T M M M N LO Ln 4.41 N N N Y E E CL m C E > .` E L E aa) U C3 to cc cx Q z O N _ O +?- 4- O ? CO CC a CL W cu o o U o o 1- F - H F - F - = O N M st O w LO O to T CO T T L[) ?- C 0 . T T O T a CO LA a M r . M CO CO et LO U') LO W> M ai N N M LO 0 0 0 r- ? ? T M T M T M T M T M T M T M T M T M r M T M T M T M T M T M W O Co w '-t co a M 00 M ti a t- rl- M r- Co CO tl P- OR ? Go O co 00 LQ n M O N co U) 0 O CO O C) 0 N tV m 0 O CA 0 0 w LL 0 T T T T T T T T T T T ` LL o 0 co o OR E _ -W i u) M 2 c Co CA t T fA (? ar Y m LL m O a 0 0 d: N t-- r*-: Ln CR O CO O a O C C T O Co CA N e}' Lo CC) I,- 00 Lo Lo T r- " y r- .- T N N N N N N M M ? qt LO Li N r i i t t 1 Q \I c d N ' ? C ' y ? O C L M N i i i E ? j pp N i I 1 to ? i O i f? M i O N O M E (O In ? M N O ` ? M f 7 (q M M fh M ('7 M M M ( ;a al) u0 1?e ns m ar a? t U c m CL aNi m -v U v C9 U c9 N C Z d it w W t 0 0 Z t O C O 'cu 6 5 N ' L W c 0 v co to t O 05 c (n O O U ca O ca 2 3 ? a) Z c >; O a3 J 0.0 Y ? O M It U O CD N N C CO N ca O coo 0 o `? CL o E ca 2) O O .a C co co a) Q. 0 a) cc 0) E L 2 M 'o O cn •? c Y U O ? o w ? L ?O m O c c Q ).O O cc ca _ U Q' O J U 'aco a) ? L co O N EUof O Ill z d O EM O O N ? ii 11 11 11 If 11 II 11 11 IF II Y Y ? Y O W O LO Y Q 0 >3 Q .Q E ,C W .0 0 D co C 'o P N M M M M LQ N N M r' r M M ti O co N M ci M Y 0 't 1° E a) M a i > c6 Ul a) c6 j a=i a) a) uvi E CD U) 'D CL cx E2 ca RS M O co L L' . L N V ' O O CL CL L 3 N O O O O 0) O N Z 3 a) . a> 0) a) 0 ° O ar aD 0 O O O U a? a) Z O ?n M N ?t O co c0 M N M P- 00 c0 M O ao ao ao co v r- ch Ln Un ao rn co M ao M M M M Cl) M CM N N M CO 't LO Ln D r M r M r m T m r M - M r? m r M r M r M r M r M r M r M W r- M st N cO 00 0 M ? M O o0 0 M 0) CD 0) a- c'7 M d N N O I? O st O M M M 4t V, V t UA LO cM M M Of ? o U. [L U- m o ? = i d t M = c t m N U m LL . . CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O ? O w 0 0 ? 0 0 0 O N 4 N N r O O vi Uri co C.) .'r 00 y A N N N M M cM M CO It Nr ` ti u? O 0 i co I i LO O Lf) Lf) C7 O 0 .^ O v . Lf) H O O p M V N U) V Cl t N ' N r i ? O N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O M M I- W Ln e r M N ? O M T- V- _ _ _ M M M M M M M M M M ( 40 01) U0 119 AG 13 d L CL N N l6 C O O U O a O co U °c W C =_ O N t s O ate) o O :. U co CU ? O CQ y CU Z ? > + O O J r C O o U O N C CO ` w N C Cn T co O ? U o aL-io C cc cc ?. E m co N C N o c ca O > o N a) c L O = O t O cm r 0 U ? N ? E O C C a) O O co cc Q-OJ t? U U co N Y N L cc O CU E U o C ? 150=0 . E co L Y ? Ul ca E O Y U CL C6 co O E O C.) CU C C c E U V a i L L O om 0 CU 0 0 O •L i U z 3 0 o a) 0 0 3 a 'a CD 'a C o o 0 0 O N O OO O O d• co lqt It O T N N O C 1` CC) Ch O C) 00 'gt CA q1t N CR Lg CM N m c) " C") CO C NC vi r- c") qt LO (D ? ? T M \ CO) T cM T CM T C e) r Ce) T C t) T Ce) T o7 r M T M T CM T CM r•' CO W 1? Ca 0 O N O N N ? LO T V A O O M CC) I, CA N CC) C? S T N cr to (n d qt Nt d• 'It d d gr U') (C) S CO CV ? N U. LL O IL ? w C O a> d 7 = i T t C'7 S c L 0) in y V Y M W U- M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O C) U') 0 0 0 0 `a ? Lf) Un Un 0 0 0 CD (C) O O O O CO n- CY) . - LO 00 N ? T N M It r * qt Lr) LO LO Co CD N i c? i i i t c? i i t i tgi i + O Q O C ? O L D ? 1 1 U i N i o I N f1 I e- ? 1 O 1f) O OO CO h- C0 ? ?7 C7 N M m c) M M M M M M m m ( PO I) UO IIB AS 13 CO) z° tu 4) IL Ir N N R a m O lU O U Ct) U U o z O O t O O CB U) N ? O E o u L W c 0 ~ N N + O O N O O z 0? O _ O (3 3 ? m rn Z c A O c0 J U O U N ?C0 C N Cl) cc 2 0 C o R O R ago o E a o m U o = ~ 3 0 O O Y N N?k O = L .2P E O (D E O a) O O N U Q-OJ tV U U O W N L co (v O y E ?j U O Qj .. mz11 E cc L a.. N Y R E y ? C (D CL cl Co Cl) ? -se E 0 ca CL c m U m ?' J O Q' m z 0 o U o 0 a 4) 4) cl Q. o o o O F I- F 0 1 i LO tO 00 . ce) co M O M tf) ( CM (O fl- 0 fl- ? tO ? V- t (D T- , cl 1? O ? N M 7 ? ++ R ? d r ? r M r OM r N r o - a- 0 e- 0 r 0 r 0 r O r N t0 - 0 0 1'- _ j ti M M M M M M M M M M M r M ? M r M r M r M LU co co t0 O Co to O st O W r- e r- (O O M tO r- r,, 0 e I? r*.: tO M ?- O eY N co r- I-- 1- 0i 0) C r O O O tn et ct L LL o) tL T- LL M `o a?i CM _ LL r M 2 c L 1? rn in N d ? U m 1? [D 0 0 0 O 1- tf) 0 1- 0 0 Nt C) Un O O r t0 1'- 1- O O N N ?Y (O W 0 LO ?- 1- r M CO LL i 1 S tf) N r ? w m 0 v I H C N ; N S O N t i ? I S i ? W) s Q N O CO r t0 1A V (Y) N ?-- O M M C7 (h M C7 M M M ('7 M ( ;aN) u0 1 .4e na 13 YZ C?,anr,.?l Slwsc. oaf = X313 5 31?" .Zhu jaL,.v 3. y3 O. oa-7 AW Id 7 ' Tap ed :51 3/4- 70-p /v ae, A. /0 4 ens G = 1,33,1 7 e V = S• 02 ??s _ dJ?3 = .1y 1a lie. ?,-dry k,t c o l o !?s ?f ?? ???? = ? ?.. 39 6 to YaOQ)3 0 3fis ia8 7,06 g ? ez? _ ?'a .33 cis of C it S O. '58 .. C. 0.40 a. ego 0.53 n-9-cs . L = /0200 14 = j 116 - 3 /0 = 3!0 27,OF 6,41o 0.`) 7.q3 o, a tp 0,05 Z 7-9-6s a"j /c a s f nc Sandy /Oam Lo Louts6,c loea , )cxv-J /&J4wtA'a( a /o/s/Ae, a1' -6L N.s a_ 1,75 ,39 1a,o 6 Ir /3 Ob 4 T ,l IF7a. A3 b ,sk - ? t-25-0 y0o 0.01,rO =,S -14,x0.033 ?a7? s = O . aa? .??.? RUNOFF CURVE NUMBER COMPUTATION Version 2,00 Project : Standing Rock Bay User: BLW Date: County Wake State: Checked: Date: Subtitle--.Drainage Discharge Calculation for Bxisitng Ditch ------------------------------------------------------ ----------------- ------ Hydrologic Soil Group COVER, DESCRIPTION A B C D Acres (CN) --------------------------- FULLY DEVELOPED URBAN ARRAS Reg Bstab.) Streets and roads Paved; curbs and storm severs - .08(98) - Residential districts Avg .1 imperv (by average lot size) 1/8 acre (torn houses) 65 12(85) ,39(92) 1/4 acre 38 1.75 (75) 1/2 acre 25 .5(10) - Total Area (by Hydrologic Soil Group) 143 .39 -------------- TOTAL DRAINAGE AREA: 14.72 Acres WBIGHTHD CURVE NUMBER 84t - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : Standing Rock.Way - User: BLW Dated County : Wake State: Checked: - . Date: Subtitle:,Drainage Discharge Calculation for Exisitng Ditch ------------------------ ------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity. Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) --------------------- Sheet 3.6 200 ,.01 f 0.515 Shallow Concent'd 250 .015 u 0.035 Open Channel 500 .033 .0131.7 4,5 0.013 Open Channel 127 ,021 .03516.4 12.8 0.004 Time of Concentration = 0.57+ -- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 t Res. H Woods, Light P'Paved D ,Cultivated > 20 t Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : Standing Rock Way User: BLN Date:' County : Wake State: Checked: _ Date: Subtitle.: Drainage Discharge Calculation for Bxisitag Ditch Data: Drainage Area 14.72 + Acres Runoff Curve Humber 84 Time of Concentration: 0.57 Hours Rainfall. Type Pond and Swamp Area NONE Storm Number 1 2 3--- 4- 5- Frequency (yrs) 2 10 25 50 100 24-Hr Rainfall (in) 3.6 5.38 6.41 7.21 8.00 Ia/P Ratio 0.11 0.07 0.06 0.05 0.05 Used 0.11 0.10 0.10 0.10 0.10 Runoff (in) 2.02 3.62 4.58 5.34 6.10 Unit Peak Discharge 0.768 0.772 0.772 0.772 0.772 0 (cfs/acre/in) Pond and Swamp. Factor 1.00 1.00 1.00 1.00 1.00 0.0t Ponds Used --- ------ Peak Discharge (cfs)' 23 41 52 61 69 - Value(s) provided from TR-55 system routines ?l 2tr ?cG.r.?a? 2 lots f-Ac. = I.15 Ac. i aG.?.,ka,( io t o Vs &c. .= 11, 11 A e- f avt4? =r 0.05Ae, Airris,L EgvalionD ?' 3 4.35 ia8 C? ovUO a? L 0.10 1. ?q?3.OZ _T, 44 (? = 0.58 (7.aa g= sy??. g ? cz? ©.S?lG.?3)CI3.oa) v, 3 ens . I ya "xv /0 077 ya >? z Aim El - - 6a y1 Iq 0.375- -'L&C 675),?6??, 0.,0/3 N .l C o, y0 Cj•!o0 0.q5 &T"'o'M.=v,55 qZ= ,Mc{s. 4x C?y?au?, v ? A a t A = ?, ?a ? ? o•tnoC9.eZ) a ?aa,a . ? h - if -15 T 5 y, 5 ?o ? r. C.artlrs.?" ?? z = h a• 7? = ? ?J? IU V - tv'e4 ltl41v- 6uUUJU ? ?b Nza?I ?? .ate ab?c, 444. j tl 0 a OL" via 4t,%. to gxztl. G" C-,p - YvQok,.-- V= 0?3 ??Sc e, . - ?-Gj Erie cfl, ac vr,?o 42 Inch RCP 10 Yr Storm Event Worksheet for Circular Channel Project Description Worksheet 42 inch pipe Flow Element Circular Chann . Method Manning's Forr Solve For Channel Depth Input Data Mannings Coeffic 0.013 Channel Slope 07740Q Nit Diameter 42.0 in Discharge 55.00 cfs Results Depth 1.05 ft Flow Area 2.4 ft2 Wetted Perime 4.06 It Top Width 0.00 ft Critical Depth 2.32 ft Percent Full 30.1 % Critical Slope 0.004932 Nit Velocity 22.60 ftfs Velocity Head 7.94 ft Specific Energ, 8.99 ft Froude Numbe 4.58 Maximum Disc 301.08 cis Discharge Full 279.89 cfs Slope Full 0.002989 ftfft Flow Type supercritical Project Engineer: Becky L. Ward c:lstanding rock way inlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/08/03 11:26:28 AM © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 M t? N ao co M O OD W to o a CD 'C U to O h O O .- M O co 0 h 0 N 0 0 O - N 0 O 0 O 0 N O N O r O O O v 0 lL N O O V CD O T M O n O IT L O tp N M 0 M n N O V M tD O CO N n W co M N n V O R ^ t0 N h N 7 e cM t o CO Q O to r O M O W M M O IT tD n n d' n R N r W O to to t` CR N M O O m _ n (Y) O t0 N N P, M N O N co Q ? N a - co O O v LL to O N t? CO n M P` O O CO t` ?t CO _ O N OD V' O CO M N co co IT O OR to C M ? N N 7 R ?- O V r 0 0 N r .L N d N N v Cl) O 1- O O N O '7 O n tD M m ^ ( ?pp to M 000 Cl) CO C. N N w m O (Q _ ¢" W O N O CD O N p O R O O O O O p O O O p O O p O p O p O N p O Op O O O p S O C O O 0 0 0 0 O O O O O O O O W N 00 O ao N CD N N O U N O N M N > !- R tD V' Co O? M V ID M V N Ch q Q m ?T ?f V' N M M R In N M V to N M V N W ^ M M M M M M M co M M tM M M M M M W ? q V n O 7 N N C O n 0) c6 M R M M N M Cl) M M r M M Cl) Cl) Cl) U to tD M N N N I N T 0 0 0 > O M 7 h M N M M M M V N M V to M M N N M V' N N M V N W M M M M M M M M M M M M M M M M M to U) to to N N N N 0) 0) a) 0) to to to tD N to M M to N to N N N Cl! Cl! O O O O W N N N N N N N N O O O O L U M M M M M M Cl) M Cl) Cl) M M M M M M c_ O 8 8 0 8 8 ° ° C 0 O O, 0 0 O O 0 0 D R N N N + ' I CD t n p N V tN to N v to CO N 0 R l6 R R R R R R R R R R a m r m r m } } O W) O > O tc) O } O «) O O to O N r N N N r N N N r N N N N N R CCJ m It v h h n n R V R V O O 01 0 U R 0) m m m m m m m R O 0 R c m C C C C C C L c C c C c C L C C C c C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Standing Rock Way Plan: Improved Drainage way 12/11/2003 Just downstream of 42 inch RCP 318 .03 .04 J .03 317 316 31 Q C 314 m W 31 311 310+ 0 EG 50 Year WS 50 Year EG 25 Year r- WS 25 Year EG 10 Year WS 10 Year ...................... EG 2 Year WS 2 Year Crit 50 Year Crit 25 Year Crit 10 Year Crit 2 Year Ground • Bank Sta 40 5 10 15 20 25 30 35 Station (ft) Standing Rock Way Plan: Improved Drainage way 12/11/2003 EG 50 Year WS 50 Year EG 25 Year WS 25 Year EG 10 Year Crit 10 Year WS 10 Year ...................... EG 2 Year Crit 2 Year WS 2 Year Ground • Bank Sta G C 0 d w Station (ft) U io 20 30 40 . 50 W N O N 2? 0• Y co i M I? I O N I I i I c ? I o I m a T ca t`y F ., U 1 C I C ? t , I ? 1 1 ? ? 'ti 1 L CR O ? O ? O ? O ? O 0) O m O ? O d > ao v n v to R I- W r- P- N .-. N N N O r O O N ? ? 0 V 0 O O r r c0 0 r 0 J to > t` h N n co n tV) 0 t[) (0 h -T O C O M N V h tri CV r M m V n c- n O v M aD cV n 0 v 0 q CN cD r tO r U ? m O M f7 OD N CO t` t? V h O) V L C7 N O O O O) t` V ch O C O t0 O tO O W O O CO N N M Q N N [ N co N C V 1 ( O N CL F r N N I V (h O ( 0 L O M O r O r (M 0 _ v 0 O O O M n O O N t0 tO O N V D) O O O O CD 0 U') O O N O O N CO Ul CD O C C M N V (V LO N O tD cM N O N N N r O N N n co N N U CJ Cl) O co O V Ifl m CD CA w t cl? tO O O t- O O N d' C J aD m n o to N O m O) V O N U, N ? Q O N N O V O CO O O N fOh O O O O O O O O O O O O O O O O O O O O O O O W v ? U n N O M O O O O O ?p V tO O V M O O N O O O O CJ O 0 0 O O O O 0 0 0 0 C ? lL tO c0 O) O N (O O) O n to CO N -p N O O N O O O O O 0 0 0 0 O O O O O O O O O O O O O O O O Z C N > O V' CO CD O CO (h n 1O V N O O O ?? V V V v m M V tri M M V tri cv M V ri W m m m m m m co io m Cl) Cl) Cl) 0) co m m U to N M (0 co 0) f` co m v O N O to Cl) N > N c0 t` V 1, W m V' N V M V N CO M <T d V V r to co M v M M d ri ri M V ri W ? M ('7 a) M m m m Cl) co co Cl) Cl) co co m M W N p l6 l0 N l0 t0 l0 N l0 l6 l6 l6 l0 a a } r r d r i > i a r } } } o 0 to > o n o } o to O } o n o (V N O N C) N O N N 0 N N O N d V Q' V ?V V C V V R' V' V V e r n t` V V R 7 O O O O U N tU d d N N N d N N N N Q/ d N N d C 0 C 0 C 0 C 0 C C 0 C 0 C 0 C 0 C U C U C U C U C 0 C 0 C 0 C 0 Improved Station 0+78 Worksheet for Irregular Channel Project Description Worksheet Station 0+78/ Imprc Flow Element Irregular Channel Method Manning's Formula Solve For Channel Depth Input Data Channel Sic 027000 ftfft Discharge 41.00 cfs Options Current Roughness Methc )ved Lotter's Method Open Channel Weighting I )ved Lotter's Method Closed Channel Weightinf Horton's Method Results Mannings Coefficier 0.033 Water Surface Elev. 312.27 ft Elevation Range 1.29 to 316.29 Flow Area 6.9 ft2 Wetted Perimeter 9.70 ft Top Width 9.26 ft Actual Depth 0.98 ft Critical Elevation 312.38 ft Critical Slope 0.018103 fttft Velocity 5.91 ftfs Velocity Head 0.54 ft Specific Energy 312.81 ft Froude Number 1.21 Flow Type Supercritical Roughness Segments Start End Mannings Station Station Coefficient 0+00.0 0+42.5 0.030 0+42.5 0+55.5 0.033 0+55.5 0+67.0 0.030 Natural Channel Points Station Elevation (ft) (ft) 0+00.0 313.72 0+06.5 313.69 0+10.0 313.38 0+20.0 313.08 0+30.0 312.98 0+40.0 312.84 0+42.5 312.80 0+46.5 311.30 0+51.5 311.29 0+55.5 313.61 Project Engineer: Becky L. Ward c:Wanding rock wayrinlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/11/03 04:17:22 PM C Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 2 Improved Station 0+78 Worksheet for Irregular Channel Natural Channel Points Station Elevation (ft) (ft) 0+58.0 314.55 0+62.0 315.32 0+67.0 316.29 Project Engineer: Becky L. Ward c:\standing rock way inlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/11/03 04:17:22 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 2 of 2 Improved Station 0+48 Worksheet for Irregular Channel Project Description Worksheet Station 0+48 with Improv( Flow Element Irregular Channel Method Manning's Formula Solve For Channel Depth Input Data Channel Sk 027000 ft/ft Discharge 41.00 cfs Options Current Roughness Methc )ved Lotter's Method Open Channel Weighting 1 )ved Lotter's Method Closed Channel Weightnn4 Horton's Method Results Mannings Coefficler 0.032 Water Surface Elev. 313.51 ft Elevation Range 2.52 to 315.83 Flow Area 8.7 ft2 Wetted Perimeter 18.05 ft Top Width 17.76 ft Actual Depth 0.99 ft Critical Elevation 313.59 ft Critical Slope 0.019140 ft/ft Velocity 4.72 ft/s Velocity Head 0.35 ft Specific Energy 313.85 ft Froude Number 1.19 Flow Type Supercritical Roughness Segments Start End Mannings Station Station Coefficient 0+00.0 0+25.0 0.030 0+25.0 0+36.5 0.033 0+36.5 0+48.0 0.030 Natural Channel Points Station Elevation (ft) (ft) 0+00.0 313.85 0+02.0 313.83 0+04.0 313.82 0+12.0 313.64 0+22.0 313.40 0+25.0 313.25 0+28.0 312.53 0+33.0 312.52 0+36.5 313.97 0+39.0 314.68 Project Engineer: Becky L. Ward cAstanding rock way inlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/11/03 04:16:07 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of2 Improved Station 0+48 Worksheet for Irregular Channel Natural Channel Points Station Elevation (ft) (ft) 0+44.0 315.36 0+48.0 315.83 Project Engineer. Becky L. Ward cAstanding rock way inlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005) 12111/03 04:16:07 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 2 of 2 Station 0+08 Full Flow in Existing Channel Worksheet for Irregular Channel Project Description Worksheet Station 0+08 Flow Element Irregular Chant Method Manning's Forr Solve For Discharge Input Data Channel Slope 027000 ft/ft Water Surface Elev. 314.99 ft Options Current Roughness Methc )ved Lotter's Method Open Channel Weighting I>ved Lotter's Method Closed Channel Weightinc Horton's Method Results Mannings Coeffic 0.035 Elevation Range 2.55 to 317.61 Discharge 133.97 cfs Flow Area 16.4 ftz Wetted Perimeter 12.84 ft Top Width 11.57 ft Actual Depth 2.44 ft Critical Elevation 315.34 It Critical Slope 0.020624 Wit Velocity 8.19 ftts Velocity Head 1.04 It Specific Energy 316.03 ft Froude Number 1.22 Flow Type Supercritical Roughness Segments Start End Mannings Station Station Coefficient 0+01.0 0+22.4 0.030 0+22.4 0+35.0 0.035 0+35.0 0+52.0 0.030 Natural Channel Points Station Elevation (ft) (ft) 0+01.0 314.99 0+10.0 315.02 0+16.0 315.13 0+19.0 315.14 0+22.4 315.00 0+24.2 313.18 0+25.7 313.05 0+26.7 312.80 0+27.5 312.55 0+28.8 313.01 Project Engineer. Becky L. Ward 0standing rock way inlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/08/03 11:58:19 AM ® Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 2 Station 0+08 Full Flow in Existing Channel Worksheet for Irregular Channel Natural Channel Points Station Elevation (ft) (ft) 0+35.0 315.38 0+35.6 316.11 0+41.0 316.31 0+47.0 316.85 0+52.0 317.61 Project Engineer. Becky L. Ward c:lstanding rock wayVnlet standing rock.fm2 Becky L. Ward Consulting FlowMaster v7.0 [7.0005] 12/08/03 11:58:19 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 2 of 2 66,nn l S/qc. = 0 -Oa7 -6 y,Scr ? lU _ y? ?oU y? Oi-Ob 31 y 03 31Y.,30 3 i ?.3 9 0 31. 3, ?O 3/3'I 3/3. SS 0 74- 78 313.17 313. a8 313.31 J 13 /11 ITL or- eyAsl7 ?.Gc?-tL G ?t-fJtcdL4 Ci?•?itti4 - / EC :cam t ?a? 1t1 L? C? ! SCu ?c l3) a 13 3/0.13 . qls. #1,1= 3,3 ?- OcsiIn Srm 313. . = 6a b y3 y 3 - Is S??knl. ws X310.0 +3.3 ' 3?3.30 of 310?? roIPC HF,O- CIAS FILE SP•W, ,era Discussion on Drainage investigation for Inlet on Standing Rock Way: The inlet was evaluated using the Flowmaster program, which is based on the HEC-12 methodology in determining the efficiency of roadway inlets. The inlet is a standard City of Raleigh inlet with an opening of 62 inches. The inlet was evaluated for a 10-year storm event as well as the 100-year event. The highest elevation of the driveway before overtopping occurs was field measured to be 316.93 at the right of way. During both of these storm events the models predicted water surface elevations lower than the driveway and therefore overtopping should not occur due to the inlet itself. The 15" RCP pipe from the curb inlet at Standing Rock Way to the yard inlet was analyzed to determine pipe capacity. The pipe was installed with a slope of 0.99% and has sufficient capacity to cant' the 10-year storm event. The 15" pipe was evaluated with the Highway Capacity Charts to check the entrance conditions to the pipe. Assuming inlet control in the pipes the 10-year storm event head water elevation to pass the storm was also predicted to be below the driveway elevation. The pipe was also evaluated assuming outlet control. The assumption was made that the 15"CPP just downstream of the yard inlet was restricted and that the water rose to the top of the yard inlet grate. This placed a tail water of 2 feet on the pipe. During the 10-year storm event through the 50-year it was determined that inlet conditions would still control. The main channel was also checked to see if those water surface elevations would create tail water conditions that were higher than the yard grate elevation. In all cases the water surface elevation was lower than the yard inlet grate. Therefore the entrance to the 15" RCP at the curb inlet is not causing the water to back up over the driveway. The 15-inch CPP exiting from the yard inlet was evaluated to determine pipe capacity. It was determined that this pipe was severely restricting the flow and that only 24% of the 10 year storm event would be expected to be carried through to the main channel causing the water to back up. Therefore it was determined that the most probable cause of the problem at the curb inlet on Standing Rock Way is due to the severely restricted 15 inch Corrugated plastic pipe at the end of the system. Because of the shallow slope a 24-inch RCP pipe would be required to carry the 10-year storm event if the 15" CPP was replaced. Due to the shallow depths of soil in the area, the installation of a 24-inch pipe would not provide any cover over the pipe. Therefore we are recommending that the 15-inch CPP be removed and replaced with one 15" RCP flared end section attached to the box and a channel be constructed to the main ditch. The channel proposed is trapezoidal with a minimum bottom width of 1.0 foot, minimum height of 1.5 foot, and 2H:1 V side slopes. Z -:role ,+ 00 s ,?d? Roek. way sack 04 `Fay Hr rues 7D rat (Oale 1?0WA? - .501. Tu?r.?hr?nGS - • 5 / /, 03 lqc o. 45 . ygy O•!o0 . 3U? 6,-? , (2 - 0.78 1 I mG O? ?,Ur1C'C r? i CO?TL G? - `/ h 1 r,0 i c)r, ?lG. `t fi?? 11 0.3£35 1 L Axdr`aoljC ?Cny?iC. ebalrrzAe-,? AlCi h4 31 a. 3&S' ia8 -LL,e, = ?"3 "A,.) ,&G / /U -r1,13 /o s ewevl ,?o ' _ dzA g?Q = y 9a ens GJf S a&-r eAi Z = , ad 6710 = 0' 7&Z74Z2-) X1,03) = S6e,4 q,7,5-.r 6,7b C 8.19 )(/.03) - (""eo as qsv = 0.7b C 9, 91o y/. °3) = 7, a cls g "uo 0, 7b C 1.7a ) 103 = ?. b efs 1h /r.1 ?,v a?'7 ?/rJGUNi ?rs?n, - F/rrhrrr?e?okc. CHI a.1r•ado?vq? _Gn? ?.c?rr? - /(? ..s , evt? w5 eCcvc? r? `: /fo . 3 7 cz-ce ? ' ?- :mod I' ? G?aS ts'cllC 0,91 r% 1i6-1 ol 6 441 0. ! 9 Z - 0.0099 ?1//1- 1?ve a4-4e, A d d 7,e,4 le - o. 3/CL 0/3 ) Yz- . O/3 die = G. S!z ens ?s''crn ? ? ?,?9? = ,p,ooa9 /Z. - CJ ? 31 d•. A. 1z -033 .S /,aa7) (.31a)2/3 (.ooa9) C .033 //A ),A Fly 'frl c,'?A "o - Q<' = 31 r - i.9oiJ. Standing Rock Way Inlet 10 Year Worksheet for Curb Inlet In Sag Project Description Worksheet Curb Inlet -1 Type Curb Inlet In Si Solve For Spread. Input Data Discharge. 5.80 cis Gutter Width 1.83 ft Gutter Cross Slope 0.050 ftM Road Cross Slope 0.030 MR Curb Opening Lent 5.20 It Opening Heigh 0.50 ft Curb Throat Type iorizontal Local Depression 3.0 in Local Depression 4 183 It Results Spread 14.83 ft Throat Incline Arn30.00 degree Depth 0.48 ft Gutter Depressiot 0.4 in Total Depression 3.4 in Project Engineer. Becky L. Ward 04 tanding rock way)inlet standing rock.fm2 Becky L Ward Consulting FlowMaster v7.0 [7.0005] 12110/03 03:12:09 PM 0 Haestad Methods, inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Standing Rock Way Inlet 100 Year Worksheet for Curb Inlet In Sag Project Description - Worksheet Curb Inlet -1 Type Curb Inlet In St Solve For Spread Input Data Discharge 9.72 cfs Gutter Width 1.83 it Gutter Cross Slope 0.050 M Road Cross Slope 0.030 ftNt Curb Opening Leni 5.20 R Opening Height 0.50 ft Curb Throat Type iorizontai Local Depression 3.0 in Local Depression 1.83 ft Results Spread 20.931t Throat Incline Ant 30.00 degree Depth 0.65 tt Gutter Depressloi 0.4 in Total Depression 3.4 In Project Engineer. Becky L. Ward c:WWnding rock wayliniet standing rock.fm2 Becky L Ward ConsuWng FdowMaster v7.0 [7.0005] 12110103 03:14:04 PM ® Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Storm Inlets Storm Drainage Attribute Field Data Collection Becky Ward Consulting ?,?uv v?cuui ItIML also 9 +(4A std v ws -3 Typical Cross Section '•; '" 24" RCP Required to Replace 16" CPP Worksheet for Circular Channel Project Description Worksheet 15" CPP Flow Element Circular Chann Method Manning 's Forr Solve For Discharge Input Data Mannings Coetfic 0.013 Channel Slope 002900 ft/R Depth 1.25 it Diameter 24.0 in Results Discharge 8.70 cis Flow Area 2.1 tt2 Wetted Perime 3.65 R Top Width 0.00 ft Critical Depth 1.05 it Percent Full 625 96 Critical Slope 0.004991 Wit velocity 421 ftfs Velocity Head 028 ft Specific Energ, 1.53 ft Froude Numbe 0.72 Maximum Disc 13.10 cis Discharge Full 12.18 cfs Slope Full 0.001480 ft/ft Flow Type SubcdOcai Project Engineer. Becky L. Ward cAstanding rock wayVnlet standing rock.fm2 Becky L. Ward ConsuMng FlowMaster v7.0 [7.0005) 12/11/03 10:40:58 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 Trapezoidal Channel to Replace 15" CPP Worksheet for Trapezoidal Channel Project Description Worksheet Trapezoidal Chanrx Flow Element Trapezoidal Chanrx Method Manning's Formula Solve For Discharge Input Data Mannings Coeffia 0.030 . Channel Slope 00299 1ta Depth 1.501t Left Side Slope 2.00 H : V Right Side Slope 2.00 H : V Bottom Width 1.002 Results Discharge 13.54 cfs Flow Area 6.0 fh Wetted Pedmr 7.71 ft Top width 7.00 ft Critical Depth 1.01 ft Critical Slope 0.017471 Nit velocity 2.26 Me Velocity Head 0.06 ft Specific Energ 1.58 2 Froude NumM 0.43 Flow Type Subcriftal Project Engineer. Becky L. Wand c:Nstanding rock wayMnlet standing rock.fm2 Becky L Ward Consulting FlowMaster v7.0 ]7.0005] 12/11/03 11:13:43 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1 r / SKYCREST.QR1VE CB _ 54„LF 42" RCP -00 7.74%- ----1-----------s_ss -ss=?\ ?`?---ss-ss- / S5? ----R---R----? EXISTING TOP -?41 LF(\ 15" rCCP- ®0.29% '-- '0;0 \\ OF BANK 315.1$ t I ?Z • i ?... S.R.WAY r,- 0 , ti I n EXISTING 'CHANNEL ED cc) PUMP ???'A I { LLI / \- - J V. CP& SbUTH / / SINGLE 6'T/ OBROAr? / FAMILY( HOUSE BAND { r %911 7 T ' //.. 7,T -- STANDING ROCK WAY o \\\ 6 T I j 50 PUBLIC ROW ss /, , OFc ?\ i t i EL. 31 .93 PLANTED ISLAND Ao 136' A 'UTIIITY\ OX / / .? N to I° oN CC) rn / W °' O ? ? ~v 03 v w I 0 1 I ? ? w I U -4 I ?a 0 \ \\ ? _ ?Z ?? RR 0. W _ Ma j 0 j W'? a LL 0 0 W _> 0 LEGEND STORM DRAINAGE W ss - ss - SANITARY SEWER LINE CONSTRUCTION - - - - - PROPERTY LINE Z s ?- ,''/ ?O \\ \\ / //app ENTRANCE i _ ROW--_ RIGHT-OF-WAY WAKE CO. TOPO PRIOR ? TO DEVELOPMENT ¢? ,' \ A O,? \ /// ---T-- EASEMENT LIMIT ' o SANITARY SEWER CLEAN OUT AG?'9 \\ \\ //// /z:O EXISTING CONCRETE DRIVEWAY ,? ,pa\ ?? S? \ \ \ v/ // // ,,,'tIf11111A11/i0+t1 E / ,• H CAR01 " JUNIPER E HOLLY 30 15 0 30 60 SCALE IN FEET a 13344 19/N ?HrruNN?`` SHRUB TOB FROM FIELD SURVEYED CROSS SECTIONS TOE FROM FIELD SURVEYED CROSS SECTIONS a SITE ACCESS 11-23-03 PROJECT NAME: Standing Rock Way DWG NAME: c-base SCALE: 1°=30' HEET NO 1 OF LEGEND DRAINAGE FABRIC Lj RIP RAP ??gNUOp???I ?jkk ! 13344 a s:? V 4 • 0 $ c/rr N.T1P?? ? fNIVN 4k,%.?•'? EXISTING CURB INLET RIM EL = 105.32 SKYCREST DRIVE INV EL = 317.38 -..._ CB. EXIST. 42 RCP 50 LF 42" RCP 7.74% EXISTING RIP RAF5'(9 TO REMAIN ,'psFC' EXISTING TOP XAA OF BANK \l;ve' F C REMOVE EXISTING RIP RAP & AMERICAN GREEN C-350 OR APP. EQUAL. SEE CROSS SECTIONS FOR CHANNELIMPROVEMENTS EXISTING SS MH INV. EL = 306.7 (MH BURIED) PLANS CALL ' FOR MH HEIGHT = 6.5 EXISTING CURB INLET -?'? RIM EL. = 313.94 a INV. EL. = 308.14 Q0 X01 nx EXIST(Nl? CHANNEL i CIO 15" X TBM SEE__NOTE..10 EXISTING SS MH RI'M' IM EL 32,3.9._.. _ INV. EL = 311.0 EXISTING YARD INLET RIM EL. = 315.08 REPLACE 15" CPP W/TRAPEZOIDAL INV. EL. = 313.08 r,nn rrcc ATTACHED TO EXISTING YARD INLET 29%° ET & EXTEND RIP RAP APRON INLI - --; FOR A DISTANCE OF 10 FEET. WRAP RIP; RAP--AROUND BEND FROM TOE TO TOB THIS IDE OF CHANNEL vs ,.._. i I { I ?a T a' INV. EL.=312.96 I +. I ? PROPOSED TOB z = PROPOSED TOE'-,, y > f f k? L SHRUBS & TREES IN THE '.? 5 WAY OE CONSTRUCTION 36" RCP ` IVEHICLLS TO BE REMOVED, CO oPRESERVED & REPLANTED. INV.-'EL. 310 ,08? EXISTING RIP RAP T4- REMAIN GENERAL NOTES 1. CONTRACTOR TO INSTALL EROSION CONTROL MEASURES PRIOR TO CLEARING. 2. ALL CONSTRUCTION TO BE IN COMPLIANCE WITH CITY OF RALEIGH STANDARDS. 3. CONTRACTOR TO INSTALL DRAINAGE FABRIC WITH STAPLES PER MANUFACTURERS RECOMMENDATIONS FOR ALL SLOPED/GRADED AREAS. 4. ALL DISTURBED AREAS ARE TO BE RE-SEEDED AND STRAWED PER CITY OF RALEIGH STANDARDS 5. LOW GROWING SHRUBS TO BE PLANTED ON CHANNEL BANKS BY HOA. 6. ALL UTILITY AND TREE LOCATIONS ARE APPROXIMATE. CONTRACTOR TO FIELD LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. 7. DISTURBED AREAS TO BE AMENDED WITH TOP SOIL PRIOR TO SEEDING. 8. SEED TO BE PLACED UNDER ALL DRAINAGE FABRIC. 9. CONTRACTOR TO ANCHOR FABRIC SECURELY UNDER RIP RAP AT BOTH ENDS OF THE PROJECT. 10. EXISTING SS MH RIM AT SKYCREST DRIVE RIM EL ASSUMED 323.9, USED AS TBM FOR PROJECT. 11. CONTRACTOR TO STABILIZE ALL DISTURBED AREAS AS DIRECTED BY THE CITY PRIOR TO ANY RAIN EVENTS DURING CONSTRUCTION. 12. FLOOD PROOFING MEASURES AROUND CRAWL SPACE ACCESS DOORS TO BE PROVIDED BY OTHERS. CONTRACTOR TO CLEAN OUT FROM THE BASINS EXISTING CURB INLET RIM EL. = 315.89 INV. EL. = 313.99 30 15 0 30 SCALE IN FEET DRAINAGE FABRIC SEED UNDER FABRIC NAG USE EXISTING C-350 OR EQUAL RIP-RAP TO PLACE ON BANK 5' MIN. FABRIC LINER UNDER RIP RAP TRAPEZOIDAL CHANNEL "A" NTS AS VIEWED LOOKING DOWNSTREAM Nto r- 0) co w " V W ? w d ovU `T ?+ q z Q wm 'm "a 41 0 N !!ZAz LU v? (0 v W ?> W J V ? w a a2 = J 0 W Z 3:Z W t ZV 12-08-03 REVISIONS: 1-4-04 COMMENTS 'ROJECT NAME: Standing Rock Way )WG NAME: c-channel-improv 3CALE: 1"=34' 3HEET NO. 2 OF 2 00525786 WETLANDS 1401 GROUP APR 1 S 2004 WATER. QUALITY SECTION NC DEPT OF ENVIRONMENT & NATURAL RESOURC NC DIVISION OF WATER QUALITY 401 WETLANDS UNIT 1650 MAIL SERVICE CENTER RALEIGH NC 27699-1650 NUMBER DATE GR. AMOUNT DISCOUNT TAX App. CHRG. NET AMOUNT 4231STANDINGROC 03/17/04 200.00 .00 .00 .00 200.00 ?'.: