Loading...
HomeMy WebLinkAbout20140762 Ver 2_RE R-2915B Revision Status_20170330Carpenter,Kristi From: Dagnino, Carla S Sent: Thursday, March 30, 2017 3:42 PM To: Wanucha, Dave Cc: Cheely, Erin K Subject: RE: R-2915B: Revision Dave, We are waiting on the final design revisions and new hydro drawings before submitting the permit modification. Thanks. Carla From: Wanucha, Dave Sent: Thursday, March 30, 2017 11:25 AM To: Dagnino, Carla S Subject: FW: R-2915B: Revision Hi Carla, Would you be able to look into the status of this permit revision? It has been in the works since November 2016. Thanks. Dave W Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha�ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 �#h�� �14�� �. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: Slaughter, Johnathan H Sent: Thursday, January 26, 2017 3:03 PM To: Wanucha, Dave <dave.wanucha@ncdenr.�ov> Subject: FW: R-2915B: Revision FYI From: Beaver, G Trent Sent: Thursday, January 26, 2017 2:49 PM To: Slaughter, Johnathan H <hslau�hter@ncdot.gov> Subject: R-2915B: Revision Heath, Here is the answer that I got. I was originally told last half of January. Trent, The revised drainage was just approved by Hydraulics this past Monday, the firm is currently incorporating the drainage into the plans. We are expecting submittal from them for review at the end of this week or early next with the updated design. It may be few more weeks before we can process the construction revision, however, we will try to process this as quickly as possible. A right of way revision adjusting the TCE you mentioned will be completed alongside the construction revision. If you have any questions, please contact Tatia White or myself. Thanks Piotr J. Stojda Assistant Project Design Engineer Roadway Design Unit North Carolina Department of Transportation 919 707 6200 office 919 707 6322 direct pstolda(a�ncdot.gov 1000 Birch Ridge Drive Raleigh, NC 27610 1582 Mail Service Center Raleigh, NC 27699-1582 ������"1��'����x'�'� � , G. Trent Beaver, PE Division Construction Engineer North Carolina Department of Transportation 336 903 9117 office 336 957 6763 mobile tbeaver .ncdot.gov P. O. Box 250 North Wilkesboro, NC 28676 e =����Ic������ ��r��a��� � � Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.