HomeMy WebLinkAbout20070747 Ver 1_Mitigation Bank Proposal Review_20080729Q?QF WA
TF9OG
co
July 29, 2008
David M. Lekson, PWS
U.S. Army Corps of Engineers
Washington Regulatory Field Office
P.O. Box 1000
Washington, NC 27889-1000
Re: Proposed Flat Swamp Mitigation Bank Site
Craven County, North Carolina
NCDWQ# 07-0747
Dear. Mr. Lekson:
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen Sullins. Director
Division of Water Quality
We have reviewed the Draft Phase II- Preliminary Mitigation Plan dated June 2008 (the Plan)
prepared for the above-referenced project. DWQ has also received a draft MBI and plans (dated July
2008) to establish a riparian buffer and nutrient offset bank at the site. Additionally, Eric Kulz and
Periann Russell with DWQ visited the site on July 23, 2008. Our comments are as follows:
Stream Restoration
Review of the USDA soil maps, USGS topographic map and LIDAR images of the property did not give
any indication of the former presence of streams on the site. Based on the aerial photographs presented
in the Plan, the former presence of all of the stream threads shown on Figures 7 and 8a through 8d
appears inconclusive. However, it is possible that this site did formerly support zero-order stream
valleys/swamp runs, as described in the draft guidance document entitled Information Regarding Stream
Restoration with Emphasis on the Coastal Plain (2007).
In addition, due to the significant hydrologic manipulation of the site and surrounding areas, the
proposed stream valley restoration project outlined in Figure 11 may actually include some stream
creation, as proposed swales and valleys are not shown in the same locations and alignments as the
original streams depicted in Figures 7 and 8a through 8d.
That said, DWQ does not necessarily disagree with the proposed concept of zero-order valley restoration
(creation) on this site for mitigation credit. DWQ is concerned that based on the fall across the site (one
foot of fall from the northwest corner to the main outfall, as per Scott Frederick), and the potentially
small sizes of the subwatersheds of each of the proposed valleys shown on Figure 11, that some of the
stream features may not exhibit flow and may not be considered to be streams.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone (919) 733-1786 / Fax (919) 733-6893
Internet: http://h2o.enr.state.nc.us/ncwetlands
One
Np
?r hhCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper
Mr. Lekson
USACE Washing Regulatory Field Office
Proposed Flat Swamp Mitigation Bank Site
Page 2 of 3
Data on the size of each proposed subwatershed should be provided to the MBRT to assess using the
above-referenced data as guidance.
Of utmost importance in this project is that the streams restored/created need to exhibit flow. Some
form of flow documentation, whether it is photodocumentation of actual flow, or of wrack lines or
drainage patterns forming, or using sand plots, must be included in the success criteria. These issues
were discussed with Scott Frederick on-site, and the possibility of reducing the number of proposed
valleys was discussed.
According to the Plan and Scott Frederick during on-site discussions, surface flow to the proposed
stream valley restorations will be supplied by ditches carrying flow from upgradient areas offsite. It is
unclear how the water in these ditches, some of which are fairly large and deep, will be brought up to the
new streambed elevation to flow into the shallow swales or valleys which will constitute the zero-order
streams to be restored.
Wetland Restoration and Other Issues
The desire for the Sponsor to generate nutrient offset credit has the potential to affect the wetland
portion of the bank, which has already been approved. Figure 11 a in the proposed buffer MBI (a
modification of Figure 11 in the stream plan) shows areas shaded in gray where potential buffer credit
for nutrient offset can be generated. Some of this credit is proposed to be generated along the
restored/created stream runs. Other credit is proposed by leaving sections of ditches downstream from
the green ditch plugs in place (ditches can be buffered for nutrient offset credit, unlike riparian buffer
credit).
What this proposal will amount to is open (but buffered) field ditches extending from the ditch plugs and
through the riparian zone of the restored/created streams, discharging to these stream features. We are
not comfortable with the idea of providing stream credit for a stream that has ditches (even buffered)
entering every 100 feet along the stream run, as this does not constitute restoration of a "natural" or
reference riparian system.
DWQ also questions the effect of these remnant ditches on the proposed wetland restoration areas on-
site.
This proposal also potentially reduces the amount of wetland credit available, as described in the MBI
for the wetland portion of the site. According to Scott Frederick, the ledger presented in Appendix B of
the stream restoration plan is not really correct, as the green unshaded (wetland) areas on Figure 11 a do
not total 323 acres, as the ledger indicates. A revised ledger has been provided to me for my files, but
DWQ indicated to Scott that this would require approval of the MBRT and a modification of the
wetland MBL
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone (919) 733-1786 / Fax (919) 733-6893
Internet: http://h2o.enr.state.nc.us/ncwetlands
Noa` Carolina
tura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper
Mr. Lekson
USACE Washing Regulatory Field Office
Proposed Flat Swamp Mitigation Bank Site
Page 3 of 3
DWQ strongly feels that a meeting of the MBRT, the Sponsor, and the consultants for the project be
held to determine the scope of work proposed for the project, a discussion of the types of stream and
wetland systems expected to be restored, and the expected mitigation credits to be generated. Plans
submitted in the original wetland restoration plan (for which an MBI was executed), the stream
restoration plan, and the draft buffer restoration plan/draft state MBI all appear to show differing plans
and credits for the project. Some of the work proposed to create buffers for nutrient offset credit may be
detrimental to the establishment of a functioning headwater stream and wetland system.
Please feel free to contact Eric Kulz at (919) 733-1786 if you have any questions regarding this project.
Sincerely,
C
4 1;4
Cyndi B. Karoly, Program Manager
401 Oversight and Express Review Program
cc: File Copy (Eric Kulz)
Central Files
Kyle Barnes - DWQ Washington Regional Office
NeehCarolina
ataM4
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone (919) 733-1786 / Fax (919) 733-6893
Internet; hftp://h2o.enr.state.nc.us/ncwetiands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper