HomeMy WebLinkAbout20170370 Ver 1_Bridge 990175 Yancey Plans_20170329.�
�
V
W
0
�
�
•�
�
V
�
�
O
V
See Si�et 1-A For Index of Sheets
���1 1l � �11� ����11J� ����J.Le���
�� �V ����� �ll' ����T�� V'V' � 1L �
YAI�CEY .COUI�TY
LOCATION: BRIDGE 1110.175 OVER JI.M'S CREEK
ON SR 1402 (JIM CREEK RD)
TYPE OF WORK: GRADI11lG, DRAINAGE, PAVI11lG, A111D STRUCTURE
� " I ' I'� I �� � I ��-
���I��:"I'I..'�\II) I�II".'���"I'�
�
m-� sR
�
ti
���
��
r
�
—L— STA 10 + 09.46
BEGIN BRIDGE REPLACEME11iT
PROJECT 17BP.13.R.85
NOTE:
1. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
2. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
RD
y
—L— STA l2 + 45.00
END BRIDGE REPLACEMENT
PROJECT 17BP.13.R.85
PRELo MINARYST PLANS
- .-� _
NAD 83/
NSRS 2007
NCDOT CONTACT:
TROY S. WILSON, PLS
GRAPHIC SCALES DESIGN DATA PROJECT LENGTH P�epored ln the Offlce of: �'DRAULICS E1YGIIVEER S ATEI OF NORTHIGCAROLINA
ADT 2010 = 60 KCI ASSOCIATES OF NC
50 25 0 50 l00 V= 15 MPH LENGTH OF ROADWAY PROJECT 17BP.13.R.85 = 0.045 MILES o601 s,x Fo.ks Rd., su��e zzo, Ra[eigh Nc, 27609 ��af MORiqc'
_ RURAL 2012 STANDARD SPECIFICATlONS ef 9��
PLANS FUNC. CLASS - LOCAL �'.E. w '
SIGNATURE: � e
50 25 0 50 l00 RIGHT OF WAY DATE: CHARLES L. FLOWE. PE
TOTAL LENGTH OF PROJECT 17BP.13.R.85 = 0.045 MILES rRotEcz sxcrxEEx ROADWAY DESIGN `E �
PROFILE (HORIZONTAL) ENGINEER yr0�r r���teo
Sub-Regional Tier &
l0 5 0 l0 20 Very Low-Volume Local LETTING DATE: BARRY C. SMITH, PE
Roads Guidelines. APRIL ,2013 Pxo�scr nEsrcn� ExcrNeErz
PROFILE (VERTICAL) P.E. r.E.
SlGNATURE: STATE HIGHWAY DESlGN ENGINEER
ll�A]f�C]E]L
1�T�,
1
E
I"I'�(�)I"I�:1'�"I'�' (�)��"\I�:I'��
�� � I I � I�� � I�� I�� i'� I � �
���ulii�
�UN]E ]LI]LIES �
][�]ENN� ]E��S]E
�]El[$]E�� ]L, ��]L]L�A��
� u� ir� i�,��D
li JI� C][$]E]El� ]l$�
]��JRN�VgIL]LlE NC 28i��
���1 ]�A]LI� 1�][7CN ]f��
]��JRN���]L]LlE NC 28�Il�
][�][$�][�]E][$7C�'
�� ��e
�8i2������290��
��i2��8i2i��0��
WETLAND AND SURFACE WATER IMPACTS PERMIT
TEMPORAR Y
DETO UR
DETAIL A
CUT DITCH
�No b Scale�
froni
� DncF
G�o�n �'S� 1F�o e� Sloae
D
d
Geoie.�ne Min. D- 1.0 Ft.
Type of Liner CLA55 8 Rip Rop Max. d= 1.0 Ft.
FROM STA. 10+20 TO STA. 10+60 LT -DET-
FROM STA. 11+40 TO STA. 12+20 RT -DET-
DETAIL B
CUT DITCH
�No eo Smle�
Noo�n �5 � � �e� DIoPe
� D F
d
Geore.�na Min. D= I.0 F.
Type of Liner- CLASS 2 Rip-Rop Mox. d= 1.0 Ft.
FROM STA. 10+50 TO STA.10+63.9 RT -DET-
DETAIL C
CUT DITCH
�No�to Scole7
F.a��
on�n
Guwo� l �'�'� 0e` sope
ro�� � :/ p Po
d
Min. D- 1.0 Ff.
Type of liner= PSRM Max. d= 1.0 Ft.
FROM $TA.10+90 TO $TA.11+40 LT -0Ef-
DETAIL D
TOE PROTECTION
�Nmm s�oie�
��R riu
ti'�(�E s�orE
caouHo d F
d= 1.0 R. �Eor[xmE
Type of Liner= CLA55 B R'ip-Rap
FROM STA.11+40 TO STA. 10+40 RT -DET-
�
�
--- --------- - - - °
�_. 1f .�C\ ,. �.
BL-I /
�
_�_
EX.R�
35'
45' � / -L-
CUT DITCH
SEE DETAIL A
9 /�OO
F
)�— f � $l'O. l�'��.� c .
:ARING AH= N 4'_q$' 26 B,"; �
�$�"�sP
BEGIN CONSTRUCTIOpN
—��— �Q ��'�"���U — } p
-Er- Poc sra i2-�a.��. 116.09'
Offset = 8.82' LT � E
TS sr
CUT DITCH -DE7
SEE DETAIL 6 +85
2 e 54'CSP .A��-----30-
—DET—
Pl 570 /1-f07J1 Pl S7a I2+99A3 Pl S7a 13+9734
�= 6455' 332' (LTI �= 22' 07' S8.5' IRTI �_/0' 39' S33' lLT)
D= l43' l4' 22A' D= 22' 30' 00.0' D= l0' 45' Oi0.0'
�OOL= 45.33' L= 98.37' L= 99.?J'
T= 25.45' T= 498P � T= 4975'
,,� , R= 90.00' R= 254.65 R= 53298'
tv.
r.t� ��� SE = O.a4
DB 301PG 568
;'.� L� � � � �....� .
� .� —DET— PT 57a.14+46.80
.`
ISBRD `� �
�`
�♦ ♦
� i
� � �\ BL-3
/ , � �
-L-
+95
f"Sbf`OETAIL C I
� �.,� F
F �s O
� �ti y �Z
� -L- +45
G F a EK�� JER�4Y I_. 6�'iL�l; �C;
/ ' ��r_- ,;,� ,.;;_ :: �
—DET— PRC S7a. /3+47.60
/� +bo �e'
25' �R
F o�- BL-2 �y� e��c
25 �'j CUT DITCH
SEE DETAIL A
� BM �I -�- +as
25'
O NOT �
DISTURB fn
SITE 1
PROlECT REFERENCE NO. SHEET NO.
l7BPJ3.R.85 3
WW SHEET NO.
ROADWAY DESIGN HYORAULICS
ENGINEER ENGINEER
PRELI MI N RYhT PLANS
� 11V 1 N I .I�..\C'rk fio J Ln J� I:l II .� �.�_2�
I'I (9191] 1 9 1 ForfvlY) 3 2
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
TEMP TEMP NOTES:
CHANNEL SW 1) PROPOSED CULVERT WIDTH = 10 FEET
IMPACTS IMPACTS EXISTING BRIDGE: OAL = 18 FEET
SITE 1 38 LF 256 S.F.
2) METHOD TYPE II
CLEARING AND GRUBBING
� 'T PROIECT REFERENCE NO. SHEET NO.
i �
; � l7BPJ3.R.85 4
i ROADWAY DESIGN HYORAULICS
i � ROCK CROSS VANE W ET LA N D A N D S U R FAC E ENGINE� SHEET NO. ENGINEER
O
0
DETAIL A
CUT DITCH
�no�+a s�oie�
NaNral ? A.1 �e� DnA
roun .) p F�o Slope
d
ceo�e.�l� M n. D= 1.0 Ft.
Type of L ner CLA55 B Rip-Rap M x. d= 2.0 Ff.
FROM STA 10 I-25 TO STA. 10 i� 852 LT -L-
FROM STA 10+25 TO STA. 10+75 RT -L-
FROM STA.11+20 TO STA.12-45 RT -L-
DETAIL C
TOE PROTEC710N
� n smia�
` \o��e
Haw.a� ti.� °`�gwce
Gro��,d b F
d
d= 1.0 Ft.
b= 5.0 Ft. Geo�e•�Ile
Type of L�ner- C1A55 6 Rip-Nap
FROM STA. TO 11+05 STA. 11+10.5 LT -L-
DETAIL D
STANDARD HEAD DITCH
� n � m s�oi��
��ai
G�aund � �h G�ound
d D
B Min. D= 0.5 Ft.
Mox.d- 1.0 Ft.
'When 8 is < 6.a B= 5.0 Ft.
Type of Liner= CONCRETE
FROM STA. 10+30 OFF. 40 70 STA. 10+30 OFF. 17.6 LT -L-
�
�
DETAIL E
s STANDARD TAIL DITCH
� ,�o��o ��o�a,
� �a,�,a�
� .o�� �
w p ti.� ro�
d
0 Min. D- OS fl. g
j_ 8= 5.0 Ft.
ir'� FROM STA. 10 r 30 OFF. 27.3 TO STA. 10+86.1 OFF. 92 RT -L-
i
�,
�
�
0
�
.�
�
�
E
0
�
w
�
�
WATE R IMPACTS PE R.MIT
/ �/
� j f
� �� _ __- - -. �� FRENCH 8Fi0A� ��/ /�
FI FCTRIQ
i�� � � � � is e�. BL-I ,�
� � `�,
PORC
-L
+
_�_ '
GLADYS WILSON, et al `�^� Ex�� 5''
DB 567 PG 336 35' �y�
�`
�;�
� � �f� J F
Rr .
C o
�
CUT DITCH - c1
SEE DETAIL A � / J
RIP RAP PAD FLOODPWN BEA�N
CLASS I
EST IITONS
E5T 2I FF
TAIL DITCH
SEE DETAIL E �� 9T 2T �
E5T DDE = 105 CY
SITE 2 �`�J
j l ' � i �,�c� -o�
+E
1 � \O � 30'
�
1 1 ', , � �,''? x ���
�
/
�0
�v �
� � �'
� ct; , � a
��/ tv . 1
� � �4 301PG 568
�� � 1
�
✓
TOE PROTECTION
OFFSET 10' TO 20' LT
SEE DEfAIL C
HEAD DITCH DO NOT BLOCK DRIVEWAY
SEE DETAIL D
EST DOE = 16 CY
EST 10 TONS CONCRETE
DITCH
DETAIL A
45'
/ FLOODPUVN �NCiI
_�_
0
�
��R\
F `NT DITCH
L SEE DETAIL A O
-L- i 45
\�- _ � E��R&,,�, JC-�RY L WILLIAMS
DB 516 PG 146
-L-
_L_
- 86.92
i 60 25'
25'
B -2
L + — — +
25
SITE 1 +
BEARING AH= N 72 36' l2J' W
�Ra�r �.�s�"s�'ar �oc�c
tELIMINA�RY PLANS
DO NOT UBB F04 CON3TRUCTION
KCI �.��_;;:;��=,fio4�sz� � ;�k� „ ,,.
'" I'hone19191]33-9?la . PovfvlYl]8J-vRfi6
DETAIL• U/S CHANNEL IMPROVEMENT &
D/S BANK STABUZATION PROFILE INTSI
FLOOOWUVN
0'
C$�'.I�X:1�%1�
5g/��yK ROCK '
Sl'AB/L/W/QV CLASS l/R/PR4P ��S �A /LlZ �
DErAIL F: INLET CHANNEL PROFILE LOOKING UPSTREAM
EX.CHANNEL CENrERUNE
�,�'`c� � � r�+�,� �,�
EX.GAIX/ND
�,Z�J
�•,, Roac �
s�"�uznr,av
CLASS llRIPRM
DETAIL G O(!/Z.E/" CHANNEL PROFILE [AOKING
DOWNSTREAM
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
STREAM SW NOTES:
IMPACTS IMPACTS 1) PROPOSED CULVERT WIDTH = 21 FEET
ITE 1 102 LF 928 S.F. EXISTING BRIDGE: OAL = 18 FEET
TEMP TEMP
CHANNEL SW 2) METHOD TYPE II
IMPACTS IMPACTS CLEARING AND GRUBBING
SITE 2 8 LF 39 S.F.
� 'T PROIECT REFERENCE NO. SHEET NO.
i �
; � l7BPJ3.R.85 5
i ROADWAY DESIGN HYORAULICS
i � ROCK CROSS VANE W ET LA N D A N D S U R FAC E ENGINE� SHEET NO. ENGINEER
Z
O
>
0
DETAIL A
CUT DITCH
�no�+a s�oie�
NaNral ? A.1 �e� DnA
roun .) p F�o Slope
d
ceo�e.�l� Min. D= 1.0 Ft.
Type of L ner CLA55 B Rip-Rap Max. d= 2.0 Ff.
FROM STA. 10 I-25 TO STA. 10 i� 852 LT -L-
FROM STA. 10+25 TO STA. 10+75 RT -L-
FROM STA.11+20 TO STA.12-45 RT -L-
DETAIL C
TOE PROTEC710N
�nor�o smia�
` \o��e
Haw.a� ti.� °`�gwce
Gro��,d b F
d
d= 10 Ft.
b= 5.0 Ft. Geo�e•�Ile
Type of L�ner- C1A55 6 Rip-Nap
FROM STA. TO 11+05 STA. 11+10.5 LT -L-
DETAIL D
STANDARD HEAD DITCH
� n � m s�oi��
��ai
G�aund � �h G�ound
d D
B Min. D= 0.5 Ft.
Mox.d- 1.0 Ft.
'When 8 is < 6.a B= 5.0 Ft.
Type of Liner= CONCRETE
FROM STA. 10+30 OFF. 40 70 STA. 10+30 OFF. 17.6 LT -l-
�
r
�
°1 DETAIL E
s STANDARD TAIL DITCH
� ,�o��o ��o�a,
� �a,�,a�
� .o�� �
w p ti.� ro�
d
0 Min. D- OS fl. g
j_ 8= 5.0 Ft.
ir'� FROM STA. 70 r 30 OFF. 27.3 TO STA. 10 I- 86.1 OFF. 92 RT -L-
i
�,
�
�
0
�
.�
�
�
E
0
�
w
�
�
WATE R IMPACTS PE R.MIT
�
i
BL-I
* _�_
; � Nf?_`. � i� a� �.�
DB 567 P6 336 3S
;} , �
•��
CUT DITCH _
SEE DETAIL A '� /
RIP RAP PAD FLOOpPLAIN BEA�
CLASS I
E57 IITONS /
E5T 2I FF
TAIL DITCH
SEE DETAIL E � 92'
E5T DDE = 105 CY
TS i oe
116.0 '
E'
$ITE 2 .�
�
�
,4?�` .
��
30'
�0
�— �v O �
� 1 �
� �.;; � � a
�/ ���.IV� Y ZGSL 1
� � � DB 301PG 56B
�� � 1
C
✓
TOE PROTECTION
OFFSET 10' 10 20' LT
SEE DEfA1L C
HEAD DITCH DO NOT BLOCK DRIVEWAY
SEE DETAIL D
EST DOE = 16 CY
EST 10 TONS CONCRETE
DITCH
DETAII A
45'
/ FLOODPUVN �NCiI
-�-
0
8L-3
�
�, R\
� F `NT DITCH
L SEE DETAIL A O
. -L- i 45
�- � zo� a �.�. i i;,miS
�i— EX. RNJ .��] � C r G v:i
-L-
_L_
- 86.92
i 60 25'
zs
B -2
_� � — — +
25'
SITE 1 +
BEARING AH= N 72 36' /2.7' W
�ROCK �.�5 S� A�CK
tELIMINA�RY PLANS
DO NOT UBB F04 CON3TRUCTION
KCI �.��_;;:;��=,fio4�sz� � ;�k� „ ,,.
'" I'hone19191]33-9?la . PovfvlYl]8J-vRfi6
DETAIL• U/S CHANNEL IMPROVEMENT &
D/S BANK STABUZATION PROFILE INTSI
FLOOOWUVN
�'
C$�'.I�X:1�%1�
� �
� `
5g�y ROCK
Sl' L/W/QV CLASS l/R/PR4P ��S �A /LlZ �
DErAIL F: INLET CHANNEL PROFILE LOOKING UPSTREAM
EX.CHANNEL CENrERUNE
�,�'`c� � � r�+�,� �,�
EX.GAIX/ND
�,Z�J
$�/ �Y��/(�� �'X �
S'/ AWLIZAT�N
CLASS llRIPRM
DETAIL G O(!/Z.E/" CHANNEL PROFILE [AOKING
DOWNSTREAM
�DENOTES IMPACTS IN
SURFACE WATER
�DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
STREAM SW NOTES:
IMPACTS IMPACTS 1) PROPOSED CULVERT WIDTH = 21 FEET
ITE 1 102 LF 928 S.F. EXISTING BRIDGE: OAL = 18 FEET
TEMP TEMP
CHANNEL SW 2) METHOD TYPE II
IMPACTS IMPACTS CLEARING AND GRUBBING
SITE 2 8 LF 39 S.F.
_
� �
�,
�
�
��
2,97C
�_ � _ �
`-------------JI
2,960 F � N
(A � T
� ao Pl = ll+15.00 P/ _//t70.00 0�'
� a EL = 2,92J.65' EL = 2,924A5' cac "
2,950 0� K_� vc = sa �;
a o, V= 30m V= 25m z �
Z N Pl = 10+35A0 W W
2,940 ; W EL = 2,9/6.4�'
9'
W � VC = 50'
mw K=9 = N
V = l5m c m -
i �
2,930 ' � ' +" /.
I _ o ' �+ �� 33�
Z
N �+ 11 W �� �,/�
i + +N � my+�4�6 6� ��� �S
I n u ��'g1� o .
2,920 I a' `�` ck� � � � _ ��
+
�
i=� �.���+� I --_ �
s
2,970
2,960
2,950
2,940
2,930
2,920
' PROIECT REFERENCE NO. SHEET NO.
�------------________�________��____�, ' neP.i3.�.a5 s
IBM #1 - RR SPIKE IN BASE OF 12" DOUBLE MAPLE ROADWAY DESIGN HYDRAULICS
-L- STA. 11+24.42, 24.44� RT I ENGINEER ENGINEER
�EL-=-2924.58� ��__________��______________� � I �'`
; ' ; � , � �,
k :; ' '�; ; �; j _ :j � :L:
� I I, , I - � � ��- � -iI PRELIMIN Y PLANS
I I I I{ I I I I I I I I I � I I I� �a_i_ii�! . �-�-!�-��� _i I,:!, �_;_i: j_�! �' I i: ::: i I i � � i -� r; i: � �-� i `� i
DO N(YI' UBF FO CONBTRUCT[ON
I I I I , 11..I I�__.I I ..
�i
�
. '-I I �� ' 1 I �' I1�� I '. � � w��� �
�
, T " ��=� KC I
� � � , �
�_ _________________________________________ � i_ �, � � � m s....
� � , �� v Ua �r�vn �,a
CULVERT HYDRAUUC DATA I I I ������
r � �i j�I '� ; '.�' I � �-�'
-
DES/GN h'W ELEVATION 2920Jp FT � �� I T
- '
DESIGN DISCHARGE = 330 CFS i � i � � �
DESIGN FREQUENCY - l0 YRS ;:- I�� I �, I ; I � I I� , I � I j�
j� � I
BASE DISCHARGE = 650 CFS � � _ , � �
-r i_ i :
, BASE FREQUENCY =/QO YRS, �=_ �_ � I
� � � �� �� �� � ��� ,��� �� �� ��
� BASE HW ELEVATION = 2920.86 FT � :
� OVERTOPP/NG D/SCHARGE = 450 CFS � � � � �
, , �'� �'� � � � � �, �
iOVERTOPP/NG FREQUENCY= 25 +/- YRSi 'i ' '
� OVERTOPP/NG EI�VAT/ON = 2920.40 fT �
_,,, , , , �
� � � ,,
'-____________�����____ � �, � , �'�� � � �' � � � � � � �' � �� � � ��� � ��
� �� � �� � �� � �� ��.
2,910 I oo '�a, � " , � 2,910 ' ' -� , � � �
> � �� �
��-a n * m � la1 . '. '. •--------------------------------------- i . . . �. . . . . . . . . �. '. ... . � ,. �: . . . . � . ,. . �. . . �,. . . . . . ��.. . . . . . . . . . . . . . . . . . .-.-- . . . --.
� � � ; FOR -L- ALIGNMENT, SEE SHEET 4 ; � -r - - - r - �r —� - � r - , � �
�r N r � i
y ��
'_______________________________________�
2 900 m W 2 900
10+00 11 +00 12+00 13+00 14+00 15+00
__ r ,
- �- DET -;
_ � �
L _- - _- - _- - - _I O
.. ... . .. . . .... OI
O
N
� +
¢ -----
�
c N �
�
a � ,,
cfl F-
G � P� _ ��'�'8�.00
� 2,950 ' °'• EL = 2,9/9.45'
� o � VC = 50' __
w arn K=//
s �
o C7 N
>
� 2,940 � > Pl = ll�l�65.00
^ � W EL = 2.922.84'
m w VC = 50
°, K=17
�
,� 2,930 Pl= l0+30.00
EL = 2,9/5.09'
� VC = 35'
� K = 5
� 2,920 �� c+3�8 � ��
� � �
f 9/28%�l
� , 2,910
10+00
� �
��
� a;
u�
S II
C
7 �
�-=-3----=-3-----_---
' FOR -DET- AUGNMENI,Stt slitt/ 'L—Ai
�------------------------------------------�
11+00 12+00 13+00
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 11 +07 TO 11 +32 L Culvert 0.02 <0.01 102 8
1 10+60 TO 10+80 -DET- Detour <0.01 38
TOTALS: 0.02 0.01 102 46
ATN Revised 3/31 /05
1 li�;tl�v 3�' North Carolina Department of Transportation �` �
6t01111bv2itf T Highway Stormwater Program
�.'I
STORMWATER MANAGEMENT PLAN --
(Version 2.04; Released November 2015) FOR NCDOT PROJECTS
WBS Element: 17.BP.13.R.85 TIP No.: 990175 County ies): Yancey Page 1 of 4
General Project Information
WBS Element: 17.BP.13.R.85 TIP Number: 990175 Pro'ect T e: Brid e Replacement Date: 12/7/2015
NCDOT Contact: Roger Bryan Contractor I Designer: Moffatt & Nichol; CC:Leah Young
Address: 55 Orange Street Address: 1616 East Millbrook Rd
Asheville, NC 28801 Raleigh, NC 27609
Phone: (828 251-6171 Phone: 919 781-4626
Email: rdb ran ncdot. ov Email: I oun moffattnichol.com
City/Town: Burnsville County(ies): Yancey
River Basin s: French Broad CAMA County? No
Wetlands within Project Limits? No
Pro'ect Descri tion
Pro'ect Length lin. miles or feet : 0.05 Surroundin Land Use: Rural; Agricultural; Forested
Pro osed Pro'ect Existin Site
Pro'ect Built-Upon Area ac. 0.1 ac. 0.1 ac.
Typical Cross Section Description: 9' Travel Lane with 2' Paved Shoulder 9' Travel Lane with Grass Shoulder
Annual Avg Daily Traffic (vehlhrlday): Desi n/Future: 60 Year: 2020 Existin : 60 Year: 2010
General Project Narrative: Bridge Replacement of Structure 990175 with a DBL 10' x 4' RCBC. 25 LF of downstream and 20 LF of upstream channel improvements are proposed. Armoring the banks will
(Description of Minimization of Water be minimize erosion. Two 54" CMP will be used for the temporary detour
Quality Impacts)
Waterbod Information
Surface Water Body (1): Jim Creek NCDWR Stream Index No.: 7-3-32-1
NCDWR Surface Water Classification for Water Body Primar Classification: Class C
Su lemental Classification: Trout Waters Tr
Other Stream Classification: None
Im airments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Pro'ect Includes Brid e Spannin Water Bod ? Yes Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
HI�f71�'cll' North Carolina Department of Transportation � �
- SIor�1�4��at�er ��+
��� -„� HighwayStormwaterProgram ,,,�1����
STORMWATER MANAGEMENT PLAN --
(Version 2.04; Released November 2015) FOR NCDOT PROJECTS
WBS Element: 17.BP.13.R.85 TIP No.: 990175 County(ies): Yancey Page 4 of 4
Bridge to Culvert Avoidance and Minimization
Proposed Structure Summa
Sheet No. & Station Sheet No.: 4 Station: 11+19.2 Number of Barrels: 2
Draina e Area (ac or sq mi : 1.2 Sq. Miles Barrel Width/Diameter (ft): 10
Surface Water Bod : 1 Jim Creek Barrel Height (ft : 4
Culvert T e: RCBC Culvert Length (ft) 45
Avoidance and Minimization Efforts: Bridge Replacement of Structure 990175 with a DBL 10' x 4' RCBC. 25 LF of downstream and 20 LF of upstream channel improvements are
(Bridge to Culvert) proposed. Armoring the banks will be minimize erosion. Two 54" CMP will be used for the temporary detour. Proposed low flow channel will
maintain existing channel geometry. Alternating sills and baffles will be utilized.
Stream Slope Fish and/or Aquatic Life Passa e
Existing Average Stream Slope (%): 4.20 °/o Existing Low Flow Channel Dimensions 6' - 12' Wide (WE to WE); Normal Depth = 0.5';
Proposed Culvert Slope %: 4.20 °/o in the Stream: Banks = 4' - 6' High with 1:1 - 2:1 SS
Culvert Burial
Proposed Culvert Burial Depth ft : 1.5
Existing Streambed Material: Silt and Cobbles Proposed Low Flow Dimensions 8' - 10' wide; 0.5' High
Through the Culvert:
Proposed Sills/Baffles: Low Flow 1.5' sills to be placed 1' inside inlet and
outlet barrel with baffles alternating every 10'. (See Existing Low Flow Velocities in the
Detail A). High Flow 2.0' sill to be placed 1' inside inlet Stream ft/s : 3
and outlet barrel. Proposed Low Flow Velocities Through
the Culvert ft/s : 3
Alternating Low Flow Sills/Baffles: Yes
Culvert/Stream Ali nment
Stream Patterns Upstream and Downstream Stream runs parallel to road embankment upstream
of the Culvert that Could Affect Fish Passage
and Bank Stability:
Bed Forms Impacted by Culvert (riffles, N/A
pools, glides, etc.):
Low Flow Floodplain Bench Required? No Floodplain Bench provided
(provide justification)
Sharp Bends at Inlet/Outlet? Yes Stream runs parallel to Road Upstream
(describe culvert alignment with stream)
Stream Realignment Necessary? (provide No
justification)
Bank Stabilization: Bank stabilization required 20 LF upstream & 25 LF downstream
Outlet Velocities
Natural Stream Channel 2-yr Velocity (ft/s): 7 Natural Stream Channel 10-yr Velocity ft/s): 9.7
Proposed Culvert 2-yr Outlet Velocity (ft/s): 6 Proposed Culvert 10-yr Outlet Velocity (ft/s): 7.3
Roadway Geometric Considerations
Evaluate/Describe Roadway Geometric Constraints:
Existing grade constraints only allowed for 10-year design, which maintains existing level of service. Raising the existing grade would violate design speed and create s safety hazard with
intersection with SR 1395