Loading...
HomeMy WebLinkAboutClemmonsville Rd, W-S (2) r' F WATT Michael F. Easley, Governor Q R William G. Ross Jr., Secretary \Q~ QG North Carolina Department of Environment and Natural Resources co 7 Coleen Sullins, Director Division of Water Quality o < June 6, 2008 MEMORANDUM To: Melba McGee, Environmental Coordinator, DENR From: Amy Euliss, NC Division of Water Quality, Winston-Salem Regional Office Subject: Scoping comments on proposed improvements to Clemmonsville Road in Forsyth County, TIP U-2923. Reference your correspondence dated May 27, 2008 in which you requested comments for the referenced project. Preliminary analysis of the project does not reveal the potential for multiple impacts to perennial streams and jurisdictional wetlands in the project area. Further investigations at a higher resolution should be undertaken to verify the presence of other streams and/or jurisdictional wetlands in the area. In the event that any jurisdictional areas are identified, the Division of Water Quality requests that NCDOT consider the following environmental issues for the proposed project: General Project Comments: 1. The environmental document shall provide a detailed and itemized presentation of the proposed impacts to wetlands and streams with corresponding mapping. If mitigation is necessary as required by 15A NCAC 211.0506(h), it is preferable to present a conceptual (if not finalized) mitigation plan with the environmental documentation. Appropriate mitigation plans will be required prior to issuance of a 401 Water Quality Certification. 2. Environmental assessment alternatives shall consider design criteria that reduce the impacts to streams and wetlands from storm water runoff. These alternatives shall include road designs that allow for treatment of the storm water runoff through best management practices as detailed in the most recent version of NC DWQ Stormwater Best Management Practices, such as grassed swales, buffer areas, preformed scour holes, retention basins, etc. 3. After the selection of the preferred alternative and prior to an issuance of the 401 Water Quality Certification, the NCDOT is respectfully reminded that they will need to demonstrate the avoidance and minimization of impacts to wetlands (and streams) to the maximum extent practical. In accordance with the Environmental Management Commission's Rules { 15A NCAC 2H.0506(h)}, mitigation will be required for impacts of greater than 1 acre to wetlands. In the event that mitigation is required, the mitigation plan shall be designed to replace appropriate lost functions and values. The NC Ecosystem Enhancement Program may be available for use as wetland mitigation. 4. In accordance with the Environmental Management Commission's Rules { 15A NCAC 2H.0506(h)}, mitigation will be required for impacts of greater than 150 linear feet to any single perennial stream. In the event that mitigation is required, the mitigation plan shall be designed to one No hCarolin Transportation Permitting Unit Naturally 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/newetlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper replace appropriate lost functions and values. The NC Ecosystem Enhancement Program may be available for use as stream mitigation. 5. DWQ is very concerned with sediment and erosion impacts that could result from this project. NC DOT shall address these concerns by describing the potential impacts that may occur to the aquatic environments and any mitigating factors that would reduce the impacts. 6. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 7. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and appropriate native woody species should be planted. When using temporary structures the area shall be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate naturally and minimizes soil disturbance. 8. Placement of culverts and other structures in waters, streams, and wetlands shall be below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by DWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. 9. If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section as closely as possible including pipes or barrels at flood plain elevation and/or sills where appropriate. Widening the stream channel shall be avoided. Stream channel widening at the inlet or outlet end of structures typically decreases water velocity causing sediment deposition that requires increased maintenance and disrupts aquatic life passage. 10. If foundation test borings are necessary; it should be noted in the document. Geotechnical work is approved under General 401 Certification Number 3494/Nationwide Permit No. 6 for Survey Activities. 11. Sediment and erosion control measures sufficient to protect water resources must be implemented and maintained in accordance with the most recent version of North Carolina Sediment and Erosion Control Planning and Design Manual and the most recent version of NCS000250. 12. All work in or adjacent to stream waters shall be conducted in a dry work area unless otherwise approved by NC DWQ. Approved BMP measures from the most current version of NCDOT 1 Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures should be used to prevent excavation in flowing water. 13. Sediment and erosion control measures shall not be placed in wetlands and streams. 14. Borrow/waste areas shall avoid wetlands to the maximum extent practical. Impacts to wetlands in borrow/waste areas could precipitate compensatory mitigation. 15. While the use of National Wetland Inventory (NWI) maps, NC Coastal Region Evaluation of Wetland Significance (NC-CREWS) maps and soil survey maps are useful tools, their inherent inaccuracies require that qualified personnel perform onsite wetland delineations prior to permit approval. 16. Heavy equipment shall be operated from the bank rather than in stream channels in order to minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This equipment shall be inspected daily and maintained to prevent contamination of surface waters from leaking fuels, lubricants, hydraulic fluids, or other toxic materials. 17. In most cases, the DWQ prefers the replacement of the existing structure at the same location with road closure. If road closure is not feasible, a temporary detour should be designed and located to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks. If the structure will be on a new alignment, the old structure shall be removed and the approach fills removed from the 100-year floodplain. Approach fills should be removed and restored to the natural ground elevation. The area shall be stabilized with grass and planted with native tree species. Tall fescue shall not be used in riparian areas. 18. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed. t Thank you for requesting our input at this time. The DOT is reminded that issuance of a 401 Water Quality Certification requires that appropriate measures be instituted to ensure that water quality standards are met and designated uses are not degraded or lost. If you have any questions or require additional information, please contact Amy Euliss at (336) 771-4959. cc: John Thomas, US Army Corps of Engineers, Raleigh Field Office Federal Highway Administration Marla Chambers, NC Wildlife Resources Commission DWQ 401 Transportation Permitting Group File Copy