Loading...
HomeMy WebLinkAbout20071986 Ver 3_More Info Received_20080801Page 1 of 2 Ruth Yontz 01- tct24 \) 3 From: Bob Zarzecki Sent: Friday, August 01, 2008 3:09 PM To: Ruth Yontz; Mary McVicker Subject: FW: Richland Ridge Road Extension - DWQ No. 07-1986 Importance: High Attachments: DWQ level spreader checklist.pdf; O&M agreement.tif Ruth or Mary: AU G 2008 D51ORMWA RBRN4W Could you print off 5 copies of each of these and send them to DWQ today, courier if something else is going otherwise overnight is fine. Thanks. Job No. 11083.P1 F)O k.,J Z a r[. c 0.,.64 i t?Fi , wf 1.? S''\'t , - From: Bob Zarzecki Sent: Friday, August 01, 2008 2:42 PM To: Ian McMillan Subject: FW: Richland Ridge Road Extension - DWQ No. 07-1986 Importance: High Ian: Attached are the level spreader checklists and O&M agreements that were missing from the Richland Ridge Road Extension additional information package provided this week. I'm on vacation, but will print copies of these and drop them off next week, unless this is good enough. Please let me know. Thanks. 5A ZarzecLi t, t 8/1/2008 Page 2 of 2 From: Warren Sugg [mailto:WSugg@mulkeyinc.com] Sent: Friday, August 01, 2008 9:10 AM To: Bob Zarzecki; Michael Allen Cc: dcady@nc.rr.com Subject: RE: Richland Ridge Road Extension - DWQ No. 07-1986 Attached is the checklist and 08LM agreements. Thanks and let me know if you anything else. Warren 1VL Sugg, PE Mulkey Engineers & Consultants Direct: 919-858-181.1 Fax.: 919-851-1.918 t*7Ut if E,-- ;r 7_7 8/1/2008 Fi11. R 6UIRED ITEMS CHECKLIST i Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below. if a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. %4 &A t-&-? 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), - High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. - -2. Plan details (1" = 30' or larger) for the level spreader showing: 'Sb Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: c. -3,t) Underdrain system (if applicable), Level lip, Upslope channel, and - Downslope filter fabric. _ 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. a 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. °°'Jf 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). AUG 1 2008 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH Form SW401-Level Spreader, Filter Strip, Restored Riparian Butter-Rev.5 Part 111, page 1 of 1 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 01/07 f) 'I - ?98co u3 lirbr. ; ?eoz?exp Y NEWS FNk.jM Daryl Cady Cady Construction Co.. lnc. 123 South white street Wake Forest, NC 27587 P?? ? - 2°p8 ??W)c?n v 4w 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 02107 Pcrmit Number: Oe) ' l q 8 (v 0-3 (to be provided by.nJVQ) Drainage Area Number:. ? ?.. Enter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will ko.-ep a maintenance record. on. this 13MP. This maintenance record will be kept in a log in a!known set location. Any deficient BMP elements noted in the inspection will be correct0d, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety cif the public, and the removal efficiency of the BMP. Tmportsl.nt maintenance procedures: ;Immediately after the filter strip is established, any newly planted vegetation hill be watered twice weekly if needed until the plants become established commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of 'aegetation - Stable groundcover will be maintained in the drainage area to reduce the ?:ediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings 'iarvested to promote the growth of thick vegetation. with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and :nay be allowed to grow as tall as 12 inches depending on aesthetic requirements NIPC,1993). Forested filter strips do not require this type of maintenance. Once a year, the soil will be aerated if necessary. 0.ire a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every stonn event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Record; of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How l will remediate the problem: The eni ire filter strip Trash/debris is present Remove the trash/debris, stem: The flow splitter device The flow sputter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off-site. _ The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for r air. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 03/07 BMP ellement: rotentiai problem- flow I will remediate the roblem: The wsrale and the level The Swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level tip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged., "There is erosion around the Regrade the soil. to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide Lime and a one-time fertilizer _ application. Trecs or shrubs have begun Remove them. to grow on the Swale or just downslo a of the level lip, The byipass channel Areas of bare soil and/or Regrad.e the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcernent is Study the site to see if a larger damaged or ri.pap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material.. The filler strip Grass is too short or too long Maintain. grass at a height of if a licable . approximately three to six inches. Areas of bare soil, and/or Regrade the soil if necessary to erosive gullies have formed, remove the Stilly, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. rEstabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer a lication. Plants are desiccated.. Provide additional irrigation and. fertilizer as needed. Plants are dead, diseased or 17etermine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species- possible. if pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rcv.3 Page 2 of 3 08/0112008 07:50 9195626816 CADY CONSTRUCTION PAGE 04107 Permit Number: _ (to be pro>>r'drd by Lif-frQ) I acknowledge and agree by lily signature below that I atn responsiblc for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problernis with the system or prior to any changes to the system or responsible party. Project!name::a ggal5 r V-y Art &1_j.kt*rr P.artK _ BMP 6ainagge area number: to -t Print nahn Title: L Si.gnatui?e: Tate: /Vote: '!. he legally responsible party should not be a homeowners association unless more than 50% of +lte lots have been sold and a resident of the subdivision has beta named the presidenl.. a Notary Public for the State of ?n Coy OV.)ct..- -,County of do hereby certify that v_1 personally appeared before me this 1 day of_ @?) , and acknowledge the due execution of the forgoing tiJ.ter strip, riparian buffer, and/or level spreader maintenance requirements. Witnesd nay hand and official seal, 4 Cs ?pTAR, t e 1 S1AL My commission expires 1HLy-0?)-_--.-_-_ - Form SVV U401-Level Spreader, Filter Strip, Reslored Riparian. Buffer O&M-Rev.3 Pagc 3 of 3 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 05/07 Permh Numbers _ (to be provided by t) WQ) Drainage Area Number. At 'Z Filter Strip, Restored Riparian Suffer and Level Spreader Operation and Maintenance Agreement I, will keep a maintenance record on this WR Tb.is maintenance record will be kept in a log u1 aiknown set location. Any deficient BMW elements noted in the inspection will be correct6d, repaired or replaced immediately. These deficiencies can affect the integrity of strucitures, safety of the public, and the removal efficiency of the BM-1. Important maintenance procedures: - !Immediately after the filter strip is established, any newly planted vegetation iwill be watered twice weekly if needed until the plants become established ;commonly six weeks). Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the ?.3ediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum, pollutant :removal. efficiency. Turf grass should not be cut shorter than 3 to 5 inches and 'may be allowed to grow as tall as 12 inches depending on aesthetic requirements .?NIPC,1993). Forested filter strips do not require this type of maintenance. !once a, year, the soil will be aerated i.f necessary. - Cnce a year, soil pH will be tested and lime will be added if necessary. After tl;.e filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Recor& of operation and maintenance will be kept in a known set location and will be availaN,'e upon request. Inspection activitics shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem; How I will remediate the problem: The ed!tiire ;Filter strip Trash/debris is present. Remove the trash/debris. System! The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if appiticable) clo d. an sediment of;F-site. The flow splitter device is ake any necessary repairs or damaged. damage is too large for Treplaceif air. Form SVAJ401I vel Spreader. Filter Strip, Restored. Riparian Buffer O&M-Rev-3 Pagc I of 3 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 06/07 BMP element: Potential problem; How I, will rernediate the problem: The swiale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it water until it is established. Provide lime and a one-time ferti.liZU a lication. Trees or shrubs have begun Remove them. to grow on the swale or just d.ownsl.o of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control.. Turf reutforcement is Study the site to see if a, larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if a licable . a roximatel three to six inches. Areas of bare soil. and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground. cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabillze the soil with vegetation if necessary. Provide bme and a one- time fertilizer application. Marts are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem, soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer a lication. Nuisance vegetation is Remove vegetation by hand if choking out desirable species, possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1.786. Form SWt1401-1 evel Spreader, Filter Strip, Restored Riparian Buffer O&M-Rcv.3 Page 2 of 3 08/01/2008 07:50 9195626816 CADY CONSTRUCTION PAGE 07107 Permit Number. (to he 177-014(led hy nWp) I acknoMedge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any MbIW. s with the system or prior to any changes to the system or responsible party. P??dj?ci tara2c: 74? -- 1zg&ti5reY AT- -Rt=m,+A 011 PAWWi, B11?P d?tnirt?gP tares ?xtmrber`: ?#' Z. _ -- Note: ';'he legally responsible party should not be a homeowners association unless more than 50% of ;;he lots have been sold and a resident of the subdivision has been named the president. I.., N Ytik e, L- L-6g , a Notary Public for the State of 1 ll??f b?lYlQ County of - , do hereby certify that personally appeared before me this ? day of ?kkm 2-00 and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witnes.% stetx end official seal, ** i I SEAL My cohmission expires 1 }-11G-DA roan SWU401-Level Spreader, :Filter Strip, Restored Riparian 13uffer O&M-Rev3 Page 3 of 3 . 1445