HomeMy WebLinkAbout20070666 Ver 3_Approval Letter_20080730Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
o ?c
Coleen H. Sullins, Director
Division of Water Quality
July 30, 2008
DWQ Project # 07-0666, Ver. 3
Wake County
Broughton Properties
P.O. Box 464
Raleigh, NC 27602
Subject Property:
Oak Forest Road Extension
Ut to Perry Creek [030402, 27-25-(2), C, NSW]
Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River
Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions
Dear Sir or Madam:
You have our approval, in accordance with the attached conditions and those listed below, to place fill
within or otherwise impact 137 linear feet of perennial stream and 7,486 square feet of Zone 1 Neuse
River basin protected riparian buffer and 4,297 square feet of Zone 2 Neuse River basin protected riparian
buffer, as described in your revised application dated November 8, 2007, and received by the Division of
Water Quality (DWQ) on May 5, 2008, with additional information received from you on June 20, 2008,
to construct the proposed mixed-use development at the site. After reviewing your application, we have
decided that the impacts are covered by General Water Quality Certification Number(s) 3705 (GC3705).
The Certification(s) allows you to use Nationwide Permit(s) NW39 when issued by the US Army Corps
of Engineers (USACE). This letter shall also act as your approved Authorization Certificate for impacts
to the protected riparian buffers per. 15A NCAC 2B .0233. In addition, you should obtain or otherwise
comply with any other required federal, state or local permits before you go ahead with your project
including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this
approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in
your application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. If you change your
project, you must notify us and you may be required to send us a new application. If the property is sold,
the new owner must be given a copy of this Certification and approval letter and is thereby responsible for
complying with all conditions. If total fills for this project (now or in the future) exceed one acre of
wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A
NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached
certification and any additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: http://h2o.enr.state.nc.us/ncwctlands
Noy` Carolina
Aturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
Broughton Properties
Page 2 of 5
July 30, 2008
Type of Impact Amount Approved Units Plan Location or Reference
Stream - perennial 137 (linear feet) PCN page 8 of 12
Buffers Zone 1 7,486 (square ft.) PCN page 11 of 12
Buffers Zone 2 4,297 (square ft.) PCN page 11 of 12
2. No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
3. Erosion and sediment control practices must be in full compliance with all specifications governing
the proper design, installation and operation and maintenance of such Best Management Practices in
order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. Sufficient materials required for stabilization and/or repair of erosion control measures and
stormwater routing and treatment shall be on site at all times.
4. Sediment and Erosion Control Measures
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within six months of the date that
the Division of Land Resources has released the project;
5. Diffuse Flow (DWQ Reviewed Plans)
All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected
stream buffers and will not re-concentrate before discharging into the stream as identified within
15A NCAC 2B .0233(5)
In an effort to comply with the diffuse flow provision of the Buffer Rule (15A NCAC 02B
.0233(5)), you have provided the DWQ with level spreader designs dated June 18, 2008. The
DWQ believes that if implemented, as per these plans, diffuse flow will be achieved. However, if
diffuse flow as per 15A NCAC 02B .0233 (5) is not achieved, then the DWQ shall be notified and
corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of
erosion gullies. At no time shall stormwater from the proposed development be piped directly
through the buffer without prior DWQ written authorization.
The structural stormwater practices as approved by this Office as well as drainage patterns must
be maintained in perpetuity. No changes to the structural stormwater practices shall be made
Broughton Properties
Page 3 of 5
July 30, 2008
without written authorization from the Division of Water Quality. Stormwater easements shall be
recorded for a distance of at least 10 feet on each side of all stormwater conveyances, and on all
lots containing these structures including future access for maintenance. The stormwater
easements shall allow for the ability to maintain the structures, perform corrective actions as
described above and shall provide protection of the structures from potential alternations by
future property owners.
An Operation & Maintenance (O&M) agreement signed by the current landowner must be
approved by the DWQ. This O&M agreement must transfer with the sale of the land or transfer
of responsibility for the stormwater facilities and the DWQ must be notified of every transfer.
6. Stormwater Management Plan (SMP) Approval Required
Before the impacts specified in this Certification may occur, the applicant must meet all of the
provisions set forth in the document Stormwater Management Plan (SMP) Requirements for
Applicants other than the North Carolina Department of Transportation, available at:
http://h2o.enr.state.ne.us/ncwetlands/documents/SMPRequirementsforAppIicantsotherthanNCDO
T.pdf. The required SMP documentation must be submitted within 60 days of the issuance of the
401 Water Quality Certification to the DWQ (401 Oversight and Express Permitting Unit, 2321
Crabtree Blvd., Suite 250, Raleigh, NC, 27604).
SMP approval and implementation procedures shall be as follows:
• The SMP must be approved in writing by either the 401 Oversight/Express Unit or, if the
project is subject to another state stormwater program, a copy of the approval letter and
approved SMP must be submitted before any impacts authorized in this certification occur.
• If a development is phased, then the SMP for each future phase must approved by the 401
Oversight/Express Unit or, if the project is subject to another state stormwater program, a
copy of the approval letter and approved SMP must be submitted before any site grading
associated with that phase may occur. Future phases must comply with the stormwater
management design requirements in place at the time they are submitted for approval.
• The approved SMP must be constructed and operational before any permanent building or
other structure is occupied at the site. If a development is phased, then the approved SMP for
each future phase must be constructed and operational before any permanent building or other
structure associated with that phase is occupied.
• The approved SMP as well as drainage patterns must be maintained in perpetuity.
• The SMP may not be modified without prior written authorization from the SMP approval
authority. If the SMP falls under another state stormwater program, then a copy of the
approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit
prior to the commencement of the modifications.
7. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact. These mechanisms shall be put in place at the time lots or properties are recorded. A
sample deed notification can be downloaded from the 401/Wetlands Unit web site at
http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified
as appropriate to suit to this project.
Broughton Properties
Page 4 of 5
July 30, 2008
8. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities;
9. Culvert Installation
All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP
measures from the most current version of NCDOT Construction and Maintenance Activities manual
(http://www.ncdot.org/doh/operations/BMP manual/download/BMP Manual.pdf)
such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent
excavation in flowing water.
Culverts required for this project shall be installed in such a manner that the original stream profiles
are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and
longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall
be designed and installed to allow for aquatic life movement as well as to prevent head cutting of
the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall
be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-
installed correctly.
Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the
stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section
dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each
culvert.
Placement of culverts and other structures in waters,- streams, and wetlands must be placed below
the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches,
and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow
low flow passage of water and aquatic life. Design and placement of culverts and other structures
including temporary erosion control measures shall not be conducted in a manner that may result in
dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the
above structures. The applicant is required to provide evidence that the equilibrium shall be
maintained if requested in writing by DWQ.
The establishment of native, woody vegetation and other soft stream bank stabilization techniques
must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is
necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of
Water Quality.
Installation of culverts in wetlands must ensure continuity of water movement and be designed
to adequately accommodate high water or flood conditions.
Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of
Completion" form to notify NCDWQ when all work included in the §401 Certification has been
completed. The responsible party shall complete the attached form and return it to the
401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please
send photographs upstream and downstream of each culvert site to document correct installation
along with the Certificate of Completion form.
tsrougnion rroperues
Page 5 of 5
July 30, 2008
10. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable
Buffer Rules, and any subsequent modifications, the applicant is required to return the attached
certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina
Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650.
Violations of any condition herein set forth may result in revocation of this Certification and may result in
criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct
impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon
expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved wetland or
stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that
you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of
the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water
Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have
any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733-1786.
CHSI Um
Enclosures: GC 3705
Certificate of Completion
Sinc y,
Coleen H. Sullins
cc: USACE Raleigh Regulatory Field Office
Lauren Witherspoon, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
CH Engineering/Maha Chambliss, P.O. Box 30128, Raleigh, NC 27622
Filename: 070666Ver3OakForestRoadExtension(Wake)401 _NBR