Loading...
HomeMy WebLinkAbout20060447 Ver 2_Sediment Clean-up Completion Notice_20080425a-r:V 0(,-0?4-1 v2 Soil & Environmental Consultants, PA 11010 Raven Ridge Road • Raleigh, North Carolina 27614 • Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com July 25, 2008 S&EC Project No. 4865.131 Ms. Natalie Landry DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Re: Olde Towne Sediment Clean-up Completion Wake County, NC Ms. Landry: PD)I JUL ?JI?B Di -N 'N; AfA ER QaJA. [Y M 9 LANDt A G STORPrlW r d?;"ONCH This letter serves as notification of the completion of sediment removal activities at the Olde Towne Development located in Wake County, NC. A sediment clean-up and stream stabilization plan was implemented in response to observations made by the Division of Water Quality (DWQ) and United States Army Corps of Engineers (USAGE) as cited in the Notice of Violations dated March 7, 2008 and April 14, 2008, and the Cease and Desist Letter (Action ID #200620287) dated November 2, 2007. Site Description The project site, a proposed subdivision and golf course of approximately 547 acres, is located east of Highway 440, along New Hope Road, between Poole Road and Rock Quarry Road in the City of Raleigh in Wake County, North Carolina. A vicinity map is provided in Figure 1. Project History Stream bank erosion of the impacted stream channel, overwhelmed existing Erosion and Sedimentation (E&S) devices, and a lack of outlet protection resulted in deposition of sediment within wetland and open water pond areas. Subsequently, a sediment clean-up plan and stream stabilization Plan were developed by Soil & Environmental Consultants, PA (S&EC) and approved by the Division of Water Quality (DWQ) and the U.S. Army Corps of Engineers (USACE). In April 2008, construction bean to relocate and stabilize the impacted stream channel, and was completed on May 2" 2008. On May 5th and 6th 2008, sediment removal from wetland areas was begun. On June 4th, 2008, lowering of the water level of the pond was begun in order to remove sediment. On June 24th 2008, the final sediment clean-up activities on-site were completed. S&EC personnel made frequent site visits to advise and confirm that sediment was removed and disposed of in an appropriate manner. On July 10, 2008, S&EC personnel visited the site to confirm successful completion of clean-up activities, stream stabilization, and document site conditions. The areas of Category 1 and Category 3 sediment were observed to be adequately removed. These areas were seeded, along with the Category 2 areas, with the approved wetland seed mix. Please see the attached photos for before and after photos of the site. Please contact me if you have any questions or comments regarding this notification. We thank you for your assistance and project input to date. Sincerely, SOIL &I Rebecca NC License No. 31 NSULTANTS, PA /6a w C?wA7l)e_du David Gainey Environmental Assessment Department Manager Cc: Ms. Cyndi Karoly, DWQ, 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Mr. Ian McMillan, DWQ, 2321 Crabtree Blvd., Suite 250, Raleigh, NC 27604 Mr. Monte Matthews, USACE, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 Ms. Vicki Fuentes, DWQ, 3800 Barrett Drive, Raleigh, NC 27609 Mr. Patrick Paine, City of Raleigh, PO Box 590, Raleigh, NC 27602 Mr. Mark Bertoncino, Olde Towne Company, LLC, 5810 Cameo Glass Way Raleigh, NC 27612 Attachments: Vicinity Map Site Photos J WK- •» ? ?? r ? / 1 Gi1?1' ( \ ? I ? ,?? ry ?\? rl ? ?? \-? '-.•%ri7 f) • ` ? ?ti !li 'f rC!`?t?? ? ?\?\^~?'?I / •j r .r Project Number: Map Title: l 4865 . D I FI Soil & Environmental Consultants, PA - • Project Manager: ?ure I USGS Map 11010 Raven Ridge Rd.- Raleigh, NC 27614 DG (919) 846-5900 • (919) 846-9467 Olde Towne 5ubdivi5ion Web Page: www.SandEC.com Scale: Wake County, NC I 2,000' Date: Source: 3/28/08 Garner Quadrangle I "T ? r tr' i?- ?.? min ? rta ?@ ? #? ? ?.k? ?• ?4 +m' t ?Ct,?S a? 7 ?• ?}?.. f jR _ ?Y b.t gq9 r y ??. Photo Point 1-Impact Area 1-Category 1 Impacts in Foreground, Cate- gory 2 Impacts in Background, Looking Northeast Photo Point 1-Impact Area 1-Category 1 Post Clean-up, Looking Northeast Photo Point 4-Impact Area 1-Category 2 Impacts (Typical), Looking Southwest Area of Photo Point 4-Impact Area 1-Category 2 Impacts, Post clean- up, Looking Southwest F7 i 4 .. ,. Photo Point 7-Impact Area 2-Sediment Area C-Category 3 Impacts- Near Eastern End of Pond, Along North Edge of Water, Looking East v ? . a Photo Point 7-Impact Area 2- Sediment Area C-Category 3, Post Clean-up-Near Eastern End of Pond, Along North Edge of Water, Look- ing East _ , , u a . . hr ?!4 5 e , ' I'llml' y , 9 Y Yyf. ? ?F j 'XI l?'`? a pa R SFr I P' r ?} s'?y? 1D e e ?iT'lAa.v/I?t? tiYy \ tai 4 ?y #} ? ? ?? 555...{ t ? I ? ? 1 h ? pay {I ? 8i w Photo Point 8-Impact Area 2-Sediment Area D-Category 3 Impacts- Along North Edge of Water, Looking East >.• r:. Photo Point 8-Impact Area 2-Sediment Area D-Category 3, Post Clean-up -Along North Edge of Water, Looking East 4 u } 1? 6 `?y F4 ?'? * !wfF?iPo ig ? ? f ]t yi` ' t I Photo Point 9-Impact Area 2-Sediment Area E-Category 3 Impacts- Along North Edge of Water, Looking East Photo showing area of photo point 9-Impact Area 2-Sediment Area E-Category 3, Post Clean-up- From Western Side of Pond, Looking Northeast I a s Photo Point 10-Impact Area 2-Sediment Area F-Category 3- Post Clean-up-Along North Edge of Water, Looking East pacts-Along North Edge of Water, Looking East Photo Point 11-Impact Area 2-Sediment Area G- Category 3, Post Clean-Up- Along North Edge of Water, Looking East Photo Point 11-Impact Area 2-Sediment Area G-Category 3 Im- pacts-Along North Edge of Water, Looking East 14 Photo Point 12-Impact Area 3-Category 1 Impact Area (Typical), Heavy Deposition Typically Excess of 2-inches in Thickness +?y? b AR _ yam' p r r 4?A ? ? rim r ? 4 1 i x :.' Sea" g a ^N` am 4 ir' i kw Photo Point 12-Impact Area 3-Category 1 Impact Area, Post Clean-up p 4 4 j rt ? h "", ec ? 53 '???5` H? 14 y?a t £ y ? ?n4 ? j34i > o; ??9 `? 1 1+. Yi -? ? ? ?#"+ ?^? A+?xl?l1 ?1 ? a. 'i? £ $ 1' y? ?. in, a wg c? ?OWN??r Ak 4? v?, a t ? Photo Point 14-Impact Area 3-Category 2 Impacts (Typical), Looking Southwest Photo Point 14-Impact Area 3-Category 2 Impacts, Post Clean-up, Looking Southwest w « V S. w ' k. a.'Ir k..w- ?? FR w Failing Stream Bank, Before Repair 'A 1. ';•? 4 •? rv, ?e ' Stream Bank, After Stabilization