HomeMy WebLinkAbout19960830 Ver 2_CAMA Application_20080728
q6-o83.ov2
Are kA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
July 25, 2008
MEMORANDUM:
TO: Ms. Cyndi Karoly
Environmental Biological Supervisor
Division of Water Quality
FROM: Doug Huggett
Major Permits Processing Coordinator
SUBJECT
Applicant:
Project Location:
CAMA/DREDGE & FILL Permit Application Review
Lo'r Decks @ Calico Jacks, LLC
The project site is located on the southeast side of Harkers Island, adjacent to
Back Sound at 1698 Island Road, Carteret County
Proposed Project: The applicant is proposing to renovate the Calico Jacks Marina, reducing the
slip count by 6, replacing a portion of the bulkhead and performing
maintenance excavation of the basin and access channel.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
8/15/2008. If you have any questions regarding the proposed project, please contact
Tere Barrett at (252) 808-2808. When appropriate, in-depth comments with supporting data are
requested.
REPLY: This agency has no objection to the project as proposed.
This'agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED 400 Commerce Avenue, MgA[TEl City, North Carolina 28557
Phone: 252-8084808 \ FAX: 252-247-3330 \ Internet: www.nccoas a managemen .net
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper
I i' ?,T ?
R? ? ?
y,
Major Permit Fee Schedule
Circle One
DCM % DWQ %
Development Type Fee (14300160143510009316256253) (2430016024351000952341)
1. Private, non-commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas: $250 100%($250) 0%($0)
II. Public or commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas: $400 100%($400) 0%($0)
111. For development that involves
the filling and/or excavation of up
to 1 acre of wetlands and/or open
water areas, determine if A,B, C,
or D below applies:
III(A). Private, non-commercial
development, if General Water
Quality Certification No. 3490
(See attached) can be applied: $250 100%($250) 0%($0)
111(B). Public or commercial
development, if General Water
Quality Certification No. 3490
(See attached) can be applied: $400 100%($400) 0%($0)
III(C). If General Water Quality
Certification No. 3490 (see
attached) could be applied, but
DCM staff determined that
additional review and written
DWQ concurrence is needed
because of concerns related to
water quality or aquatic life: $400 60%($240) 40%($160)
III(D). If General Water Quality
Certification No. 3490 (see
attached) cannot be applied: 60%($240) 40%($160)
IV. Development th nvoives the
filling and/or exc ation of more
than one acre wetlands and/or
open water ar s: $475 60% ($285) 40%($190)
Check # lC l
Amount llz?)? 00
Project t4 (?IaA
Name eC le u
S 1_L_-C_
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Lo'r Decks C Calico Jacks, LLC
2. LOCATION OF PROJECT SITE: The site is located on the southeast side of Harker's
Island, adjacent to Back Sound at 1698 Island Road, Carteret County.
Photo Index - `06: #6343, gr. 0-19, P-19, P-20; `00: #605, gr. P-19, Q-19, Q-20.
State Plane Coordinates - X: 2741400 Y:349000
3. INVESTIGATION TYPE: CAMA/ D&F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 7/07/08;12/19/08
Was Applicant Present - Yes, Yes
5. PROCESSING PROCEDURE: Application Received - 7/07/08
Office - Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Carteret County
Land Classification From LUP - Limited Transition/ Conservation
(B) AEC(s) Involved: EW, PTA, ES
(C) Water Dependent: Yes
(D) Intended Use: Commercial
(E) Wastewater Treatment: Existing - On-site septic
.Planned - None
(F) Type of Structures: -Existing - Motel, Parking, Boat Ramp, Bulkhead, Marina,
Ship Store, Ferry Service to Cape Lookout, Fuel Service
Planned - Marina Renovation, Maintenance Excavation
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
(D) Total Area Disturbed: 145,698 fts (3.34 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA/ORW Open: No
8. PROJECT SUMMARY: The applicant proposes to renovate the Calico Jacks Marina,
reducing the slip count by 6, replacing a portion of the bulkhead, and performing
maintenance excavation of the basin and access channel.
9. Narrative Description
The applicant is the new owner of the Calico Jacks Marina located on the southeast side of
Harker's Island. This property is located adjacent to Back Sound at 1698 Island Road in
Carteret County. The site currently houses a 45-slip marina, ferry service to Cape Lookout, motel,
parking, ship store, and commercial boat ramp. The 263 linear feet of shoreline is presently
stabilized by a timber bulkhead, with further marina stabilization in the form of a breakwater located
under the docks. The total tract size of the Calico Jacks property is 1.73 acres, and the site averages
Calico Jacks
Page 02
+5' nhw in elevation. The property is unzoned.
Presently, this property is serviced by Harker's Island Community Water, and utilizes a private
septic system. The existing marina was developed prior to the implementation of the CAMA,
and has received several permits through the years for maintenance excavation and minor
modifications to the marina. The riparian corridors to this marina extend historically with the
outer edges of the existing docking system. The marina is currently situated adjacent to the
corridors, with no setback in place. The existing boat ramp is located to the west side of the
property, and the docks surround the marina on all four sides with a 56' opening on the
waterward side. The ship store is located beside the ramp, and will remain as-is. Fuel service is
presently provided for ferryboats and slip occupants. Parking is located to the west of the motel,
which is configured perpendicular to the shoreline in the middle of the property. The septic
system is to the east of the motel, and until recently, the far east side of the property was used for
R/V parking. Parking for the marina also exists on the north side of Island Road.
There is no clear evidence as to how far the original access channel was excavated, however
aerial photography suggests that it was not excavated more than ±250' to ±300' offshore. The
federal channel extends through Back Sound at the marina location, several hundred feet
offshore. Current soundings within the basin average -2.6' nlw, and in the access charnel -3.7'
nlw. There is no submerged aquatic vegetation within or adjacent to the project area, nor is there
coastal marsh or other wetland species.
The Carteret County Land Use Plan classifies this site Limited Transition, with AEC's classified
as Conservation. The water quality classification within Back Sound is SA, with the added
protection afforded ORW's. Back Sound is not designated Primary Nursery Area, and the waters
within and immediately around the marina are closed to the taking of shellfish for consumption.
No shellfish are visible within the marina. Bottom composition in this high-energy area is
predominantly sand. Back Sound is ±2.5 miles wide at the project location.
Uses on the properties of Back Sound east and west of Calico Jacks are exclusively residential,
with residential docks. The first dock to the east of the site is approximately 75' away, while the
first to the west is in excess of 100' away. Several hundred feet to the east of the site lies the
National Park Service Cape Lookout headquarters and museum.
The applicant applied for and received CAMA Minor Permit #464-08 for the conversion of the
motel and R/V parking area to a 94-space dry stack building with mobile travel lift. This was
stand-alone development intended to be in operation prior to the development proposed in this
application. Legal actions have prevented the majority of that development from being
constructed to date.
10. Project Description: The applicant proposes to renovate the existing marina. The
bulkhead along the northern shoreline would be replaced in two locations. Stabilization in the
form of a 34' concrete vertical bulkhead would be constructed across the existing boat ramp,
removing this feature. Along the east side of the property, a new 100' section of concrete vertical
Calico Jacks
Page 03
bulkhead would be replaced. Both sections of wall would average 2' from the existing wall or
nhw contour, with no more than 5' offset from same at any point. Tieback and deadman
installation would disturb approximately 10' of high ground along the structure.
The existing boardwalk to the east, west, and along the shoreline of the site would remain, as
would the breakwaters. Six new piers are proposed:
Dock A is proposed for 163' x 5', and would extend along the western breakwater and
boardwalk, providing 8 slips to its east, inside the basin. Four slips would be 34' x 15', with 14'
x 16' boatlifts, and 4 slips would be 28' x 12', with 13' x 14' boatlifts. Between the slips would
be two 34' x 3' finger piers and two 28` x 3' finger piers. A waiver has been obtained from the
western adjacent riparian property owner for the docks to be reconstructed in their present
location, up to the dividing riparian corridor line.
Dock B is proposed for 90' x 5', and is located along the shoreline, providing four 40' spaces
ranging from 16' to 20' in width, defined by 5 mooring pilings and a single 20` x 3` finger dock.
At the east end of Dock B is a 21' x 16' access platform and transient dock for loading. This is
the area of the permitted travel lift. At the west end of this dock is a 19' x 14' platform for access
and loading of the ferryboat, allowing this existing service to continue.
Dock C is proposed for 191' x 8', providing dockage on both sides in the form of six 14' x 16'
boatlifts, and six 13' x 14' boatlifts. The west side slips would be defined by three 34' x 3' finger
docks, and the east side would be defined by four 28' x 3' finger docks. This dock, Dock C,
would connect to Dock B at the north end, and would have a 68' x 8' platform at the waterward,
or southern end. This platform would serve as the fueling dock.
Dock D would be located along the eastern side of the property, parallel and 15' from the eastern
breakwater and boardwalk. This dock is also labeled Dock C on the plats, but each slip is labeled
with a D. The applicant was unable to secure a waiver of the riparian setback in order to replace
the docks in their present location. The dock will extend for 190' at a width of 5', and will
provide docking to its west, inside the basin. The 12 slips would be defined by six 3' x 26' finger
docks, and one 3' x 27' finger dock. Each will have a 13' x 14' boatlift. All development on this
side is proposed 15' from the neighboring riparian corridor.
Lastly, there is transient Dock E on the landward side of the basin, connecting to Dock D, and
amounting to 78` x 4` in an "L" configuration. This loading dock is in the area of the permitted
travel lift as is Transient Dock D. Both are to support the launching of boats from the permitted
dry-stack storage building.
When completed, the docking system will provide 39 wet slips (6 less than presently offered) in
which 35 will have boatlifts, 2 transient platforms for the travel lift, a platform for fueling, and a
platform for the ferry boats. Total incorporated area is 59,340 sf, with 6,824 square feet of
shading. The proposed boats to be served will be 24'-40' in size.
To support ingress and egress, the applicant proposes to perform maintenance excavation to the
marina and access channel to the depth of the connecting waters, or -4' nlw. The boat basin area
to be dredged is 245' x 230', with existing soundings averaging -2.6' nlw. The 56,350 sf area to
Calico Jacks
Page 04 :? :, ' r
be disturbed by this activity will remove approximately 2922 cubic yards of sand by dragline to
barge. The access channel averages 42' x 200'. with current soundings averaging -3.7' nlw. The
8400 sf area to be dredged to -4' nlw will require the removal of approximately 93 cubic yards of
sand, also by bucket to barge. The total 3015 cubic yards of sand to be removed are to be placed
on an upland location to be determined through the project bidding process. The permit would be
conditioned to require that the spoil site be pre-approved for location, size, and suitability. Spoil
storage should utilize approx. 20,000 sf of high ground area.
The applicant has committed to install a portable wastewater pumpout, place "No Field
Discharge Allowed" signs at the entrance to each of the 4 main docks, place "Pumpout
Available" signs at the same locations, and to limit overnight docking to one week through
marina policy. No onsite vessel maintenance will be conducted.
11. Anticipated Impacts:
The proposed bulkhead should require that approximately 1340 sf of high ground be disturbed
for securing tiebacks and deadmen. Approximately 268 square feet of shallow bottom habitat
will be filled with this shoreline stabilization feature, all within the existing basin area.
The proposed marina will provide 6 less slips than does the existing marina, for a final slip count
of 39. Boatlifts will keep 35 of the vessels out of the water. With the. CAMA Minor. Permit
previously issued, there will also be 94 dry stack spaces to utilize this marina. The existing
commercial boat ramp will be closed with this proposed development. The marina will
incorporate approximately 59,340 square feet of Public Trust Waters, all of which has been
historically incorporated, and will shade approximately 6824 square feet of same. Platform area
along the 263' of shoreline will be 4297 square feet. The entire system will be relocated 15' west
of the eastern breakwater to address the riparian corridor setback. No hazard to navigation will be
brought about by this development.
Excavation of the basin and channel will disturb approximately 64,750 square feet of sandy
shallow bottom habitat, removing approximately 3,000 cubic yards of material from the system.
Turbidity within these Outstanding Resource Waters will be increased during the bucket to barge
dredge activity, but should be short lived. Because of the heavy sand consistency of the substrate,
turbidity should quickly settle, and not introduce significant fines into the water column.
Dredging of this basin and channel will not cause stagnation because of the ±2' of tidal
amplitude, and the connecting water depths being the same as the post excavation contours.
Spoil disposal will disturb approximately 20,000 sf of high ground to be determined at a later
date. No high ground development is proposed under this application, although the issued Minor
CAMA Permit allowed for redevelopment of the existing impervious area, to a lesser amount
than was pre-existing.
The intended use of this development is commercial.
Tere Barrett Morehead City July 24, 2008
APPLICATION for
Maier Development Permit
past vlsed 12127/06)
P/aJ,?North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant Landowner Information
Business Name
Lo'r Decks @ Calico Jacks, Llc Project Name (if applicable)
CALICO JACKS- MARINA REDEVELOPMENT
Applicant 1: First Name
RONALD MI
D Last Name
CULLIPHER
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
151 A HWY 24 PO Box City
Morehead City State
INC
ZIP
28557 Country
USA Phone No.
252 - 247 - 7479 ext. FAX No.
252 - 247 - 4098
Street Address (if different from above) City State ZIP
Email
rcullipher@ec.rr.com
2. AgentContractor Information
Business Name
N/A
Agent/ Contractor 1: First Name MI Last Name
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
ZIP Phone No. 1
-
- ext. Phone No. 2
- - ext.
FAX No. Contractor #
Street Address (if different from above) City State ZIP
Email x
JUL 2, 8 2008 <Form continues on back>
pGN4•V?F,TEkC:uP,UTr ?
?1^ AND STOftN`?';;?E?L+'2AN:;
252-308-2308 „ I-B83-41RCOAS T .. www.€?cco?sia@n3 a€r.?sc .??<
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
CARTERET 1698 ISLAND RD UNKNOWN
Subdivision Name City State Zip
NA HARKERS ISLAND NC 28531-
Phone No. Lot No.(s) (if many, attach additional page with list)
252 - 728 - 3575 ext. NA, ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
WHITE OAK BACK SOUND
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural ?Manmade ?Unknown BACK SOUND
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
?Yes ®No work falls within.
CARTERET COUNTY PLANNING JURISDICTION
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
263 LINEAR FEET 75322 SF
c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or
N/A, NWL (normal water level)
(If many lot sizes, please attach additional page with a list) 5 ®NHW or ?NWL
e. Vegetation on tract
GRASS AND LANDSCAPING
f. Man-made features and uses now on tract
MOTEL, SHIPS STORE, PARKING LOTS, FORMER RV PARK
g. Identify and describe the existing land uses adiacent to the proposed project site.
SINGLE FAMILY RESIDENCE TO THE WEST, SINGLE FAMILY VACATE RESIDENCE TO THE EAST
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
UNZONED (Attach zoning compliance certificate, if applicable)
?Yes ?No ®NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ®No ?NA
If yes, by whom?
1. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes ®No ?NA
National Register listed or eligible property?
<Form continues on next page>
252-303-2306 .. 1-838-462COAST ., uvvvv.¢?c:?? talcaaa??.:acfeKS >.;.za z
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site?
?Yes ®No
(ii) Are there coastal wetlands on the site?
?Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ?Yes ?No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
EXISTING ONSITE SEPTIC SYSTEM
o. Describe existing drinking water supply source.
HARKERS ISLAND COMMUNITY WATER SYSTEM
p. Describe existing storm water management or treatment systems.
SHEET FLOW ONLY
5, Activities and Impacts
a. Will the project be for commercial, public, or private use? ®Commercial ?Public/Government
® Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
TO PROVIDE FOR IMPROVED WET SLIP UTILIZATION AND CONFIGUARATION, TO PROVIDE BETTER ACCESS
TO FERRY BOATS AND CUSTOMERS OF THE MARINA
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
DREDGE MATERIAL WITH BUCKET AND BARGE, DRIVE PILES WITH PILE DRIVING EQUIPMENT ON A BARGE
AND SET FLOATING DOCKS WITH BARGE EQUIPMENT
d. List all development activities you propose.
RENOVATE EXISTING MARINA TO FLOATING DOCKS, 35 OF THE 39 PROPOSED WITH A BOAT LIFT, BULKHEAD
TWO PORTIONS OF THE SHORE LINE, ONE AS A REPAIR,THE OTHER FOR A BOAT LAUNCH, DREDGE THE
MARINA AND MOUTH TO -4 NLW
INSTALL APPROPRIATE ELECTRICAL FACILITIES AND WATER TO SLIPS
e. Are the proposed activities maintenance of an existing project, new work, or both? BOTH
f. What is the approximate total disturbed land area resulting from the proposed project? NA ?Sq.Ft or ?Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes ®No ?NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
SHEET FLOW OF STORMWATER EXISTS, NO NEW DISCHARGES
i. Will wastewater or stormwater be discharged into a wetland? ?Yes ®No ?NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ?NA
j. Is there any mitigation proposed? ?Yes ®No ?NA
If yes, attach a mitigation proposal.
<Form continues on back>
252-303-23G3 ., 1-683-4RCOALST ., www.nocoasttaimanacjewiieni.kiei
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be, submitted hi order for the application
package to be complete. Items (a) - (0 are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name CHARLES KAFER Phone No. UNKNOWN
Address PO BOX 947, NEW BERN, NC 28560
Name JANET CRIESEDIECK Phone No. UNKNOWN
Address 943 PERRY RD, ZEBULON, NC 27597
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
CAMA MINOR PERMIT 464-08
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date -5-MV08 half O?a? Print Name -RONALD D. CULLIPHER
Signature C:P-m \_/ N *j
Please indicate application attachments pertaining to your proposed project.
®DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts
?DCM MP-3 Upland Development
®DCM MP-4 Structures Information
252-B08-2308 ,. I-88fi-sRC0A3T ,. wvv.v.nce ;...c.ialni n g : n; €ki.;ae
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding
(NLW or Breakwater shoreline
NWL) stabilization)
Length 200 245
Width 52.7' MAX 230
Avg. Existing
Depth -3.7 -2.6 NA NA
Final Project
Depth -4 -4 NA NA
1. EXCAVATION ?This section not applicable
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards. SAND
3000 CY
C. (i) Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards.
(CW) submerged aquatic vegetation (SAV), shell bottom (SB), NONE
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL NNone
(ii) Describe the purpose of the excavation in these areas:
2. DISPOSAL OF EXCAVATED MATERIAL ?This section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
TO BE DETERMINED BY SUCCESSFUL CONTRACTOR NA
c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
?Yes ?No NNA ?Yes NNo ?NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh f
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL NNone
(ii) Describe the purpose of disposal in these areas:
(i) Does the disposal include any area in the water?
?Yes NNo ?NA
(ii) If yes, how much water area is affected?
252-808-2808 :: 1-888-4RCOAST :: vvww.nccmastaimanag-_ n eeai.r4et ea•Pse" !281Itk
1 -
3. SHORELINE STABILIZATION i - pThis. sectTdn'not applicable
(If development is a wood groin, use MP-4 - Structures)
a. Tvoe of shoreline stabilization: b. Lenoth: 100.3
®Bulkhead ?Riprap []Breakwater/Sill []Other:
c. Average distance waterward of NHW or NWL: 2
e. Type of stabilization material
CONCRETE
g. Number of square feet of fill to be placed below water level
Bulkhead backfill 25 CY Riprap
Breakwater/Sill Other
i. Source of fill material.
LEGAL SAND MINE TO BE DETERMINED
Width: 12" ,
d. Maximum distance waterward of NHW or NWL: 5
1, .'. -..t 1W
f. (i) Has there been shoreline erosion during preceding 12
months?
[]Yes ®No []NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
SAND
4. OTHER FILL ACTIVITIES 0This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? []Yes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW).
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW []SAV ?SB
?WL []None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
PLACED DIRECTLY BEHIND NEW BULKHEAD TRACKHOE AND SHEET PILE DRIVING EQUIPMENT
c. (i) Will navigational aids be required as a result of the project?
[]Yes ®No ?NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? []Yes ?No ?NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
LO'R DECK @ CALICO JACKS, LLC
Date A ant Name
CALICO JACKS- MARINA CLUB
Project Name
Applicant Signature
252-808-2808 :: 1-888-4RCOAST :: www.nccpasfatrnanageLnent.neg revs 2 :12/25/"36
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facility/marina:
®Commercial ?Public/Government ?Private/Community
?This section not applicable
b. (i) Will the facility be open to the general public?
®Yes ?No
c. (i) Dock(s) and/or pier(s)
(ii) Number -4,4
(iii) Length DOCK A-163'.DOCK B-90' DOCK C-
191',DOCK D-190', DOCK E-78',TRANS "D" 40'
(iv) Width DK A-5'.DK B-5',DK C-f'.DK D-5' DK E-4'
TRANSIENT 4 - 5';?
(v) Floating ®Yes ?No t? ) b G`
e. (i) Are Platforms included? ®Yes ?No
If yes: r
(ii) Number
(iii) Length 68 Arl P-1
?
(iv) Width 81' 11c' ) )41
(V) Floating i Yes ?No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
39
(ii) Number of slips existing
45+
i. Check the proposed type of siting:
? Land cut and access channel
?Open water; dredging for basin and/or channel
?Open water; no dredging required
®Other; please describe:
EXISTING OPEN WATER BASIN WITH MAINTENANCE
d. (i) Are Finger
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating
Piers included? ®Yes ?No
20
VARIES, 26' TO 40
®Yes ®No
f. (i) Are Boatlifts included? ®Yes ?No
If yes: _
(ii) Number 35 i"V - f ? j5 l - ? >
(iii) Length VARIES 26L-T6 34` at J e
(iv) Width VARIES 12' TO 15'
h. Check all the types of services to be provided.
? Full service, including travel lift and/or rail, repair or
maintenance service
® Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 39
[A Dry storage; number of boats:
? Boat ramp(s); number of boat ramps:
? Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
OFFSHORE FISHING BOATS- 24' TO 40' TYPICALLY
DREDGING
k. Typical boat length: 28'
1. (i) Will the facility be open to the general public?
252-808-2ao8 :: 1-388.4RCOAST :: www.nccoastalmaiia€tement.net revised: 12/-%7!66
.•? .?u ?<' .? it a.? :j y..t,?c..t.?a _.?.3 .., - ew ??
m. (i) Will the facility have tie pilings? NYes ?No
NYes ?No
(ii) If yes number of tie pilings?
5 a ± i L .
2, DOCKING FACILITY/MARINA OPERATIONS ?This section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
? Office Toilets
N Toilets for patrons; Number: 2; Location: EXISTING ON SITE
? Showers
N Boatholding tank pumpout; Give type and location: PORTABLE ON DOCK
b. Describe treatment type and disposal location for all sanitary wastewater.
EXISTING ONSITE SEPTIC SYSTEM
c. Describe the disposal of solid waste, fish offal and trash.
EXIST TRASH SERVICE
d. How will overboard discharge of sewage from boats be controlled?
NO DISCHARGE SIGNS POSTED AND ENFORCED BY STAFF
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
4 ONE ON DOCK EACH DOCK
(ii) Give the location and number of "Pumpout Available" signs proposed.
4 ONE ON EACH DOCK
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
NO ONSITE MAINTENANCE OR REPAIRS PROPOSED
g. Where will residue from vessel maintenance be disposed of?
NOT ALLOWED
h. Give the number of channel markers and "No Wake" signs proposed. 0
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
EXISTING ON SITE
j. What will be the marina policy on overnight and live-aboard dockage?
LIMITED TO ONE WEEK AT A TIME
k. Describe design measures that promote boat basin flushing?
EXISTING BASIN
252-808-2808 :: 1-888-4RCOAST :: wwrw.ncccastall a.aan_ag_e npnt.net rovised-. 12/2?/06
I. If this project is an expansion of an existing marina, what types of services are currently provided?
RENOVATION OF AN EXISTING MARINA THAT WILL REDUCE MARINA SLIPS, S
TRV) IS FUEL AN1J SHIPS 8TC
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
?Yes ENo
n. Is the marina/docking facili proposed within or adjacent to any shellfish harvesting area?
_Yes XNo--V ' ?v 1 i w ,t 4 _.
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
?CW ?SAV ?SB
?WL ®None
p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ?Yes NNo
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s):
?Commercial ?Public/Government ?Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable
a. (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s):
?Commercial ?Public/Government ?Private/Community
c. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
252-808-2808 :: 1-838-4RCOASTi :: www.necoastalman_a ement.net revised: '12127107,
.? . ,r ..? ,:fin r . m •i ?:. ..:"':.i; ..., _..'? ? i ? „. , ?•
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
PROJECTED FROM WITHIN EXISTING BASIN
b. Proximity of structure(s) to adjacent docking facilities.
100 FT +/- TO THE EAST
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
2.5 MILES +/-
d. Water depth at waterward end of structure at NLW or NWL
-4 NLW
e. (i) Will navigational aids be required as a result of the project?
?Yes NNo ?NA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER ?This section not applicable
a. Give complete description:
REMODEL AND REPAIR EXISTING MARINA WHICH WILL INCLUDE NEW FLOATING
DOCKS AND SLIPS, DREDGING WILL CLEAN OUT ACCUMULATED SILT AND SEDIMENT AND ELECTRICAL
UPGRADES WILL PROVIDE APPROPRIATE POWER TO THE FIXED AND FLOATING DOCKS
/-)) 02--L)
Date I L
CALICO JACKS MARINA CLUB
Project Name
LO'R DECK @ CALICO JACKS, LLC
nt Name
Applicant Signature
252-808-2808::1-888-4RCOAST::www.nccoastainianaggtMpnt.raet rc?i ecb:12127/06
,..,
}}
! 2 9 2003
Ed ? „?
C RLfip.G.F,-M U o t? kD
of
S Tic
I C D TAC-.V- S