Loading...
HomeMy WebLinkAbout20141169 All Versions_Email_20080522 Re: R-2514: Prep for 5/22/08 Mtgs Subject: Re: R-2514: Prep for 5/22/08 Mtgs From: Mark Pierce <mspierce@dot.state.nc.us> Date: Wed, 23 Apr 2008 10:48:19 -0400 To: David Wainwright <David.Wainwright@ncmail.net> David, Would you be willing to summarize your management of this work and either you or Matt Smith (Environmental Services, Inc.) describe the results during our CP2A Meeting on 5/22/08 ? I have included copies of the 10/3/07 ESI Report including your 9/14/07 letter to ESI in the CP2A (northern portion of project) Meeting Packet. Please let me know how you want this presented during our meeting. Thanks, Mark 733-7844 x214 David Wainwright wrote: Mark, I don't object to putting something together. Do you have anything specific in mind? David Wainwright NCDENR, Division of Water Quality Transportation Permitting Unit Raleigh, NC David.wainwright@ncmail.net 919-715-3415 Mark Pierce wrote: > *William and David,* > I am writing to coordinate and prepare for our CP2 Revisited Meeting > and our CP2A (Northern Portion) Meeting on 5/22/08 for R-2514 (US 17 - > Belgrade to New Bern). USACE, DWQ, NCDOT, Wilbur Smith Associates, > and Environmental Services, Inc. have addressed the action items from > our previous concurrence meetings conducted in 2007. I would request > that each of us present a summary and response to those action items > to the Merger Process Team during our 5/22/08 concurrence meetings. > Please review the following action items and let me know whether you > would be willing to lead the discussion of these topics with the > Merger Process Team. Also, please let me know if you have other 1 of 2 4/23/2008 10:47 AM Re: R-2514: Prep for 5/22/08 Mtgs > topics and suggestions for our meetings. > -William Wescott (USACE):_ > * What is the current status of the Byrd Landfill Disposal Site > Violation ? You mentioned that the Byrd Landfill Site could be > evaluated in its pre-violation condition. Would you be willing to > share these topics with the Merger Process Team during our 5/22/08 > concurrence meeting ? > * You and ESI reverified the jurisdictional areas for the > entire project. You mentioned that the bridge lengths were not > changed due to the reverification of jurisdictional areas. Would you > be willing to share these topics with the Merger Process Team during > our 5/22/08 concurrence meeting ? > -David Wainwright (DWQ):_ > * You and ESI prepared the Neuse River Basin Buffer Impacts > assessment and documentation. Would you be willing to present a > summary of the assessment to the Merger Process Team during our > 5/22/08 concurrence meeting ? > Thanks, > Mark > (919) 733-7844 x214 2 of 2 4/23/2008 10:47 AM