Loading...
HomeMy WebLinkAbout20141169 All Versions_Email_20080522 (2) R-2514: 5/22/08 Mtg Packet Mistake Subject: R-2514: 5/22/08 Mtg Packet Mistake From: Mark Pierce <mspierce@dot.state.nc.us> Date: Wed, 07 May 2008 10:35:19 -0400 To: William Wescott <william.g.wescott@usace.army.mil>, Christopher Militscher <militscher.chris@epa.gov>, Gary Jordan <gary_jordan@fws.gov>, Karen Compton <kcompton@fs.fed.us>, Ron Sechler <ron.sechler@noaa.gov>, Travis Wilson <travis.wilson@ncwildlife.org>, Steve Sollod <steve.sollod@ncmail.net>, David Wainwright <david.wainwright@ncmail.net>, Trish Murphey <trish.murphey@ncmail.net>, Renee Gledhill-Earley <renee.gledhill-earley@ncmail.net>, Daniel Van Liere <dvanliere@eccog.org> CC: Neil Lassiter <nlassiter@dot.state.nc.us>, Allen Pope <apope@dot.state.nc.us>, Jim Speer <jspeer@dot.state.nc.us>, Jay Twisdale <jwisdale@dot.state.nc.us>, Rob Hanson <rhanson@dot.state.nc.us>, Brian Yamamoto <byamamoto@dot.state.nc.us>, Wes Stafford <wstafford@wilbursmith. com> Everyone, I am writing to notify you of a mistake in the 5/22/08 CP2 Revisited Meeting Packet regarding bridge lengths for the Maysville Bypass alternates. Gary Jordan notified me yesterday that the bridge lengths and associated jurisdictional impacts were incorrect for structures S4A and S4B in the 5/22/08 meeting packet. Gary is correct. During our 2/22/08 CP2A (southern portion) Concurrence Meeting, the Merger Process Team agreed to shorten those bridges. The packets we mailed to you incorrectly present the old bridge lengths and jurisdictional impacts, not only for S4A and S4B, but also for S6 and S8. I intend to send errata sheets to you prior to the meeting. The following table presents the previous bridging recommendations and the 2/22/08 agreed-upon bridging recommendations. Structure Previous Bridge Recs 2/22/08 Agreed-Upon Bridge Recs S4A 880 ft 100 ft S4B 110 ft pipe or culvert S6 620 ft 160 ft S8 1690 ft 560 ft I appreciate Gary bringing this to our attention and apologize to the Team for the mistake. Mark (919) 733-7844 x214 Mark Pierce wrote: 1 of 2 5/7/2008 10:34 AM R-2514: 5/22/08 Mtg Packet Mistake Dear Merger Process Team, Please let me know if you did not receive the packets for our CP2 (entire project) Revisited and CP2A (northern) meetings on 5/22/08 for R-2514 (US 17 - Belgrade to New Bern). USACE, DWQ, NCDOT, and our consultants have addressed the action items from our field meetings and concurrence meetings held during 2007. Please contact me regarding any comments, questions, or suggestions as you prepare for our meetings. Thanks, Mark (919) 733-7844 x214 My e-mail address will change on May 27, 2008 from mspierce@dot.state.nc.us to mspierce@ncdot.gov. Please update your records. My e-mail address will change on May 27, 2008 from mspierce@dot.state.nc.us to mspierce@ncdot.gov. Please update your records. 2 of 2 5/7/2008 10:34 AM