HomeMy WebLinkAbout20170347 Ver 1_MOORE_14_Hyd_permit drawings_03022017_201703271 li�;tl�v 3�' North Carolina Department of Transportation �
6tUt111bv2itet" Highway Stormwater Program
'�. I
STORMWATER MANAGEMENT PLAN --
(Version 2.06; Released June 2016) FOR NCDOT PROJECTS
WBS Element: 17BP.8.R.119 TIP No.: SF-620014 County(ies): Moore Page 1 of 1
Generel Project Information
WBS Element: 17BP.8.R.119 TIP Number: SF-620014 Pro'ect T e: Brid e Re lacement Date: 10/18/2016
NCDOT Contact: Art King Contractor I Designer: Andrew Nottingham
Address: g02 N Sandhills Blvd Address: 1011 Schaub Drive, Suite 100
Aberdeen, NC 28315 Raleigh, NC 27606
Phone: 919-944-2344 P hone: 919-851-6606
Email: ackin ncdot. ov Email: anotthinham mi-en ineers.com
Cit /Town: Pinehurst Count ies : Moore
River Basin s: Cape Fear CAMA County? No
Wetlands within Project Limits? Yes
Pro'ect Descri tion
Pro'ect Length lin. miles or feet : 0.149mi Surroundin Land Use: Rural, wooded
Pro osed Pro'ect Existin Site
Project Built-Upon Area ac. 0.4 ac. 0.4 ac.
Typical Cross Section Description: 2 lanes undivided highway with 10' lanes, normal crown 2 lanes undivided highway with 10' lanes, normal crown and superelevated to the
upstream side in the vacinity of the existing bridge.
Annual Avg Daily Traffic (veh/hrlday): Desi n/Future: 2400 Year: 2025 Existin : 1200 Year: 2013
General Project Narrative: Existing 61.3" (1@15'10", 1@15', 1@14'-10", 1@15'8") bridge on SR 1102 (Thunder Rd) spans Horse Creek. Existing bridge will be replaced while the road is closed (no detour
(Description of Minimization of Water bridge). The replacement bridge is a single span (1 @70') 24" cored slab bridge with sloping abutments and spans the creek with no bents in the water. The proposed bridge
Quality Impacts) does not have any bridge deck drains, therefore, direct discharge into the stream is eliminated. Bridge deck drainage is collected into TB 2GI's at the lower end (western end) of
the bridge and outlets to the left side of the bridge into a rip rap pad and then disperses into the floodplain before entering the creek. Roadway drainage on the eastern end of the
project, left and right, near the end, drains via grassed fill slopes and disperses into the floodplain before entering the creek. Roadway drainage on the western side of the
project, left and right, near the beginning, drains via grassed fill slopes and disperses into the floodplain before entering the creek.
Waterbod Information
Surface Water Body (1): Horse Creek NCDWR Stream Index No.: 14-2-10
NCDWR Surface Water Classification for Water Body Primar Classification: Water Supply II WS-II None
Su lemental Classification: Hi h Qualit Waters HQW
Other Stream Classification: None
Im airments: None
Aquatic T&E Species? No Comments:
NRTR Stream ID: Buffer Rules in Effect: N/A
Pro'ect Includes Brid e Spannin Water Bod ? Yes Deck Drains Dischar e Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A
Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
• �
See Sheet � A For I ndex of Sheets
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO
LIMITS ESTABLISHED BY METHOD .
����� �� �����I � ��� ��1I ��—�
������ ���. ���1� ����J� �����
LOCATI01�: BRIDGE 1�0. 620014 01� SR. I102 (THU11tDER ROAD)
O T�ER HORSE CREEK
-------------------------------------
TYPE OF WORI�: GRADII�G, DRAII�A GE, PA T�I1�G � S TR UCT URE
WETLAND AND
�.
S U RFAC E WATE R IMPACTS PE RMIT
-L- POT Sta. 18 + 53.88 -L- POT Sta. 19 + 26.13
��������°�]� �����
�� ��� ��� ��� � � � ����������
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PLANS PREPARED BY: PLANS PREPARED Fox: HyDRAULICS E11tGI1VEER
GRAPHIC SCALES DESIG11t DATA PROJECT LE11tGTH � ENGINEERING DIVISIOIV oF HIGHWAYS
� DIVISIOIV 8
ADT 2 Ol 3= 12 00 3220 Gl.r:v ROS'�1L RD. R:�I.r;IGt-I, NC 27617 902 N S a n dh i ll s B 1 v d
50 0 50 100 Tri.r.��1�.�aa.ozz:�rax,��iy.�ga.oz3z Aberdeen, xc 2s31s �� �0��� �
— ADT 2025 = 2400 LENGTH ROADWAY PROJECT 176P.8.R.119 = 0.135 mi .c�.�cr:�.sr:#�-����:�
K p/o 2012 STANDARD SPECIFICATIONS ----------------------- �°s�� �'��oQ
PLANS -- � �
�—-- % LENGTH STRUCTURE PROJECT 17BP.8.R.119 = 0.014 mi SIGNATURE: P.E. � a
50 _ 0 50 100 T— 6 ��o * RIGHT OF WAY DATE: �' �
BRIAN A. WI LES, PE a
V = 6O MPH D EC EMB E R 2 Ol 6 PROJECT ENGINEER ROADWAY DESIG11t � �
* TOTAL LENGTH OF PROJECT 17BP.8.R.119 = 0.149 mi E111GI11lEER ��� Q�Q
PROFILE (HORIZONTAL) TTST = DUAL __ �
F U N C C LASS = LETTIIIIG DATE: �� '� � p���o
10 _ 0 10 20 �
LOCAL J U N E 2 017 TIM W E LC H, PE -----------------------
NCDOT CONTACT
PROFILE (VERTICAL) SUBREGIONAL TIER DIV 8 BRIDGE PROGRAM MANAGER P'E'
SIGNATURE:
r
� PROJECT REFERENCE NO. SHEET NO.
� ENGINEERING
� l7BPa8oRoll9 5
� _ ROADWAY DESIGN HYDRAULICS
�
ENGINEER ENGINEER
3220 GLEN ROYAL RD. RALEIGH, NC 27617
TELE 919.788.0224 FAX 919.788.0232 ��c���[]��]� ]� ]�][����
NC LICENSE #P-0189 �� N��° u�� ���a °�' ���vd�d�d�N
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
BRIDGE HYDRAULIC DAT A
DESIGN DISCHARGE _ 1200 CFS
DESIGN FREQUENCY = 25 YRS
DESIGN HW ELEVATION = 294.8 FT
BASE DISCHARGE _ 1600 CFS
BASE FREQUENCY = l00 YRS
BASE HW ELEVATION = 295.54 FT
OVERTOPPING DISCHAR�E = 2/00 CFS
OVERTOPPING FREQUENCY= 500 YRS
OVERT OPPING ELEV AT lON = 296.3/ FT
DAT E OF SURV EY = 9-29 -l6
W.S. ELEVATION
AT DAT E OF SURV EY = 294.5 FT
ND GRA E
-L - ST A 3 +15.00
L = 307. 0'
l = l6 +3 .00 Pl = l7 +75.0 Pl = 22 +10.00 ,
EGIN �RA E L= 295. 5 E= 298.5 ' EL = 300.90' ��'
L- ST A l+30.00 �- 62 �� V= l00' VC = 200' �
L= 295. 5' S= 35 m h
K=53 K=34 ��'
_ ��
EXCAVATION O ELEV=291. 0' �� 6�%
, EST =105 cy .�- �6 •
42 ° _ — —
--- ---- --- ---- --- ---- ---_�_-- _ o �'f� _ �__— ---- ------- _ -- WSEL=294.5' -------_ ' °
6 � � � (09/292016)
� -J0.4 62% +)2°428 ' ' '
� � �
� � � <
� � i ,
� • � s � �i � (TYP.
CL II RIP P � � '�
(�n'P.) �,� � �
� �
� �
NWS = 288.8'
BM l E�EV = 336.17'
N 486,959 E 1,846,3/0
l0/ T 0 BENCH MARK
N 29° l6" E 53.16'
60d NAIL lN l5" PINE
� FOR PLAlU9 SEE SHEET 4
�f
11 12 13 14 15 16 17 18 19 20 21 22 23 24
<>>
O 2.5 5 PROJ. REFERENCE NO. SHEET NO.
BP17.8.R.119 X-4
5 0 5 0 5 50 5 0 35 30 25 20 1 1 1 1 20 25 30 5 0 5 50 5 0 5 0 5
�
00
O�
E N S o. Zo o. o�
o _ — — ---
_ — — — _
o �
/ \ o
/ \ o
� — �
� � — �
� \
�
—. ° � � _
0 0 0 0 0 0
W
�
�. 2� N 0. ��
WT D z°` _————----—— — _\
o °
, \ o
� ��
,
� P �
� — _
_ o —
S So 9 0l9 ° ° °
� .
M
O�
0. 24 `V 0. 24
E N S 2� _ _ _ ____ _ _ ____ _ _ � � �
�
� �
�� — EP �
---- — — -- — — ---- — — ---- — — -- — — ---- — � 29 086 — ---- _ — -- — — ---- — — ---- — —
oSo 29 052 ° ° I°
.
5 0 5 0 5 50 5 0 35 30 25 20 1 1 1 1 20 25 30 5 0 5 50 5 0 5 0 5
WETLAND PERMIT IMPACT SUMMARY
Hend Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
ac ac ac ac ac ac ac ft ft ft
1 17+19 to 18+60 -L- LT Roadwa Fill 0.01 < 0.01 0.03
20+18 to 20+90 -L- LT Roadwa Fill < 0.01 0.02
TOTALS": 0.02 < 0.01 0.05 0 0 0
*Rounded totals are sum of actual impacts
NOTES:
�