RE: Master Subdivision Plan Approval for Woodbury (formerly Bristol Assemblage)
2521 New Hill Olive Chapel road
On November 15, 2o16, the Apex Town Council approved the master subdivision plan for the
project referenced above with the following conditions:
1. The applicant, Pulte Group, will work with staff to adjust the location of the proposed 50'
right of way dedication to the Thompson property (Wake County Pin # 0720177185) to
allow a future access to a public street in the Woodbury Subdivision. The connection may
require modification to road and lot layouts that will be reviewed and approved by
Planning staff as delegated by the Town Council at the November 15, 2o16 Town Council
Meeting.
2. If Duke Energy will not allow a play lawn in the Duke Energy Easement, the play lawn will
be allowed to go elsewhere on the site where allowed as determined by staff.
Per Section 2.3.7(D)(3) of the Unified Development Ordinance (UDO), a development approval
for Master Subdivision Plans shall automatically expire four (4) years after the date of the Town
Council's approval if:
i) The use authorized by the development approval for the Master Subdivision Plan has
not commenced; or
ii) Less than 1o% of the total cost of all construction, erection, alteration, excavation,
demolition, or similar work on any approved development has been completed on the
site. With respect to phased development, this requirement shall only apply to the
first phase.
No extensions are allowed.
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 1 (919) 249-3400 1 www.apexnc.org
rP P�E'�
z Q
,z
\h' C AROV
PLANNING & COMMUNITY DEVELOPMENT
This project is now in the Construction Plan phase of review. Construction plans may be
submitted on the next construction plan submittal date. A copy of the Construction Plan
application is available on our website as well as the current Calendar of Meetings and Submittal
Dates, or you may obtain a hard copy from Jean Weatherman in the Engineering Division of
Construction Management Department (919-249-3394)• Please note that no site activity is
allowed and no building or grading permits will be issued until such time that the Construction
Plans are approved by the Technical Review Committee and the requisite number of signed copies
are returned to Jean Weatherman in the Engineering Division of Construction Management
Department.
After the signed Construction Plans are returned to Jean Weatherman, the applicant shall submit
a major subdivision plat (may be submitted for phases) for review and approval (please contact
me at 919-249-3334 or bonnie.brock(&apexnc.org regarding plat requirements, procedures and
applicable fees). The major subdivision plat must be submitted in IDT. The applicant shall ensure
that all public utility easements, private utility easements, private access easements, Resource
Conservation Area (RCA), buffers, and setbacks are shown on a recorded plat prior to building
permit being issued for the development. Note that the major subdivision plat will only be
approved for recordation when the above items are shown correctly, all applicable fees are paid,
and requisite bonds are posted (contact Jean Weatherman at 919-249-3394 regarding bonding
requirements (if any) and procedures).
If you have any questions, please contact the project planner Liz Loftin at 919-249-3439•
Thank you,
Bonnie J. Brock
Development Specialist
cc: Craig Duerr craig.duerrna pultegroup.com