Loading...
HomeMy WebLinkAbout20170346 Ver 1_Bridge 990222 Yancey SMP_20170323k 11�;11��'<14' North Carolina Department of Transportation �� SL[�rtl]�YdtPf Highway Stormwater Program ���' STORMWATER MANAGEMENT PLAN ��--• (Version 2.04; Released November 2015) FOR NCDOT PROJECTS WBS Element: 17.BP.13.R.89 TIP No.: 990222 County(ies): Yancey Page 1 of 4 General Project Information WBS Element: 17.BP.13.R.89 TIP Number: 990222 Project Type: Bridge Replacement Date: 12/7/2015 NCDOT Contact: Roger Bryan Contractor I Designer: Moffatt & Nichol; CC:Leah Young Address: 55 Orange Street Address: 1616 East Millbrook Rd Asheville, NC 28801 Raleigh, NC 27609 Phone: 828 251-6171 Phone: 919 781-4626 Email: rdb ran ncdot. ov Email: I oun moffattnichol.com Cit ITown: Burnsville Count ies): Yance River Basin s: French Broad CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 0.07 mi Surroundin Land Use: Rural; Agricultural; Forested Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.2 ac. 0.1 ac. Typical Cross Section Description: 9' Travel Lane with 2' Paved Shoulder 9' Travel Lane with Grass Shoulder Annual Avg Daily Traffic (veh/hr/day): Design/Future: 210 Year: 2020 Existin : 210 Year: 2010 General Project Narrative: Bridge Replacement of Structure 990222 with DBL 5' x 5' RCBC. 20 LF of downstream and 25 LF of upstream channel improvements are proposed. Limiting Riprap (Description of Minimization of Water Embankments to above Ordinary High Water will minimize stream impacts. Quality Impacts) Waterbody Information Surface Water Body (1): Bailey Branch NCDWR Stream Index No.: 7-2-63-6 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Trout Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative)