Loading...
HomeMy WebLinkAbout20170146 Ver 1_Email_20170322Strickland, Bev From: Beasley, Troy < TBeasley@withe rs rave nel.com > Sent: Wednesday, March 22, 2017 10:05 PM To: Norton, April R Cc: Homewood, Sue Subject: RE: Buckhorn Preserve Additional Information Request Attachments: Bionet Spec Sheet.pdf, 5.10 STREAM CROSSING DETAILS.pdf April, Thanks for taking the time to discuss our project on Monday. The responses to the items in your email are below: Map B highlights the temporary impacts due to sewer crossings. Could you please describe how you plan to restore the impacts from the sewer crossing (will you use rip rap or vegetation, etc.)? The restoration of the temporary stream impacts from the sewer crossings (impacts 4 & 17) will be accomplished by grading the bed and banks to match pre -construction conditions. The stream banks will be stabilized by installing "Rollmax Bionet C70OBN Erosion Control Blanket" (or equivalent), which is an organic, biodegradable matting designed for use on stream banks (see attached Specifications Sheet). Please note that the Bionet will be placed only on the stream banks, and will not be placed within the stream bed, . After installation ' the banks will be seeded with a riparian seed mixture. The Bionet, in combination with the seeding, will provide temporary stabilization of the disturbed stream banks until natural recruitment of native vegetation permanently stabilize these areas. Please note that the disturbed stream bed or banks will not be stabilized with rip -rap. Map C, Impact 6, highlights the permanent road crossing. Could you please describe the clewatering sequence which will be used to accomplish this? The culverts will be installed "in the dry" by conducting the work during periods of forecasted dry weather and diverting the stream flow around the impact areas during construction. The diversion of the of flow will be accomplished through utilizing coffer dams and either a pump -around system (if culvert installation can be completed in 3 days or less) or construction of a bypass channel (if culvert installation will take longer than 3 days). The coffer dams will be constructed within the proposed impact areas, and will not require additional temporary impacts. The details of the clewatering sequence has been illustrated in the attached "5.10 Stream Crossing Details" plan. Upon completion of installation of the culverts, the coffer dams will be removed and flow will be directed into the eastern culvert, which will be conveying base flow. Please let me know if you have any other questions, or require any additional information to complete your review. Thanks in advance for your assistance with this project. Troy Beasley 1410 Commonwealth Drive, Suite 101 1 Wilmington, NC 28403 Office: 910.256.9277 1 Direct: 910.509.6512 Mobile: 910.622.0122 tbeasleykwithersravenel.com moon CONMENTIALITY AND NONDISCLOSURE From: Norton, April R [mailto:april.norton@ncdenr.gov] Sent: Monday, March 20, 2017 8:44 AM To: Beasley, Troy <TBeasley@withersravenel.com> Cc: Homewood, Sue <sue. homewood@ ncdenr.gov> Subject: Buckhorn Preserve Additional Information Request Hi Troy, I have completed the PCN review for Buckhorn Preserve. Could you please provide me with the below additional information? - Map B highlights the temporary impacts due to sewer crossings. Could you please describe how you plan to restore the impacts from the sewer crossing (will you use rip rap or vegetation, etc.)? - Map C, Impact 6, highlights the permanent road crossing. Could you please describe the dewatering sequence which will be used to accomplish this? Thanks! April April R. Norton Environmental Specialist Division of Water Resources North Carolina Department of Environmental Quality 336-776-9692 office 336-354-2284 mobile april.nortongncdenr.gov Winston-Salem Regional Office 450 W. Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 ��NothingCornpares.] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 0 STIR r44 UPSTREAM IMPERVIOUS DAM di/JS PUMP -AROUND PUMP 21 �J .1i .2J .2J 2J :6 V) TEMPORARY FLEXIBLE HOSE _j 01 TEMPORARY SILT FENCE TO BE INSTALLED DURING HEADWALL ND CULVERT CONSTRUCTION DOWNSTREAM IMPERVIOUS DAM DEWATERING PUMP SEDIMENT TEMPORARY STREAM BYPASS CHANNEL FILTER BAG (USE IF CULVERT CANNOT BE CONSTRUCTED WITHIN 3 DAYS USING dvds PUMP BYPASS METHODS) dl/:IS di/JS di/ di/AS 4 1// GRAPHIC SCALE 20 0 10 20 40 1 inch= 20 ft. STREAM CROSSING DETAIL PRE CULVERT CONSTRUCTION -rr'h fir)nn A MW flnKIC-Ml Irl-rinki LI-rnrA R A llr')nClCllKlfN POLYETHYLENE FABRIC ON FACE (8 MIL THICK) TO PUMP 12'MIN STREAM FLOW => kQL_L_ -tj PLAN PROPOSED EARTH BERM (TYP) FROM PUMP TOP OF BANK NOTES: 1 EROSION STONE TO BE "CLASS I" RIP -RAP UNLESS DESIGNATED DIFFERENTLY ON CONSTRUCTION PLAN. 2. PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR. 3. WIDTH OF CONSTRUCTION EASEMENT SHALL BE MINIMIZED BASED UPON FIELD CONDITIONS. ANY DISTRUBANCE(S) EXCEEDING WHAT IS SHOWN ON PLANS MAY REQUIRE ADDITIONAL WATER QUALITY PERMITTING. MAINTENANCE NOTES: 1 INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT ES 1 INCH OR MORE OF RAIN. THATPRODUC 2 2. REMOVE SEDIMENT AND WOODY DEBRIS PROMPTLY. 3. REMOVE COLLECTED SEDIMENT FROM STONE/RIPRAP AREAS AS NECESSARY. TOPDRESS WITH 2", WASHED STONE AS NECESSARY. PROPOSED EARTH BERM, TYP POLYETHYLENE FABRIC ON FACE 1,.. 1111111-7 EX STREAM BOTTOM (8 MIL THICK) TEMPORARY STONE DAM SECTION A -A CONSTRUCTION SEQUENCE 1 INSTALL PUMPS UPSTREAM OF TEMPORARY STREAM CROSSING AND PUMP TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND CONTINUE PUMPING WHILE WORKING WITHIN THE STREAM. 2. INSTALL UPSTREAM DAM AND DOWNSTREAM DAM WITH POLYETHYLENE FACING. 3. INSTALL EARTH BERMS ALONG TOP OF BANK ON EACH SIDE OF STREAM IN THE CONSTRUCTION AREA. 4. INSTALL SEDIMENT FILTER BAG AT TOP OF BANK. DEWATER CONSTRUCTION AREA BETWEEN STONE DAM USING THE FILTER BAG. 5. INSTALL THE NEW PIPELINE. 6. UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS, POLYETHYLENE, AND TEMPORARY CMP, DEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL WITH STREAM BOTTOM. 7. REMOVE TEMPORARY EARTH BERM AND SEDIMENT BAGS AND STABILIZE AREAS AS INDICATED ON DRAWINGS. TEMPORARY STREAM CROSSING BYPASS NOT TO SCALE co/ C(,D C14 0 N I C�l ey Cl UPSTREAM IMPERVIOUS DAM dJJJS ____-275 4D 24+00 7�/ TEMPORARY SILT FENCE TO BE INSTALLED DURING HEADWALL IND CULVERT CONSTRUCTION 12" W DOWNSTREAM IMPERVIOUS DAM 25+00 TEMPORARY FLEXIBLE HOSE V It CA PUMP -AROUND PUMP AAAd _AAA CQ11 12 Cl / z DIEWATERING - - - - PUMP 2 0' 27 5 SEDIMENT' TEMPORARY STREAM BYPASS CHANNEL FILTER BAG (USE IF CULVERT CANNOT BE 7� CONSTRUCTED WITHIN 3 DAYS USING 7— PUMP BYPASS METHODS) 0 —OHE OH 0 Op E� OHE di/JS dl/:IS d_U di/JS CB -635 (0 Av —OHE 7Z--OHE —8HE — __ �l / / / / 1_/ / �,o / / / I / / OHE GRAPHIC SCALE E 7— —7-OHE Ile, <�; /OHE OHE OHE 20 0 10 20 40 /7— 1 1 1 1 1 inch= 20 ft. FABRIC OVERLAPPING FABRIC LINED BANK AND SECURED DIVERSION CHANNEL I \ 2'MIN 4'MIN a 1, 0 -0 4'MIN EXISTING GRADE TEMPORARY STREAM BYPASS CHANNEL NOT TO SCALE % POLYETHYLENE SHEETING (6 MIL MIN) VARIABLE VARIES WITH (10'MIN.) GROUND SLOPE I I j a SILT FENCE ` TOP VIEW USE #57 STONE TO LEVEL BAG FROM NATURAL GROUND LINE NOTES: 1. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE TEMPORARY SEDIMENT FILTER BAG WHEN PUMPING. 2. THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAY VARY PER VENDOR SPECIFICATIONS. 3. TEMPORARY SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A MINIMUM FOUR -INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS SLEEVE A MINIMUM OF SIX INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE. 4. THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE TEMPORARY SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS. 5. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 6 INCHES OF SEDIMENT HAS ACCUMULATED OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 6. CONTRACTOR SHALL SIZE THE BAG DEPENDING ON USE AND FLOW REQUIREMENTS. GEOTEXTILE FABRIC VARIES SILT FENCE EXISTING GROUND LINE SIDE VIEW SEDIMENT FILTER BAG NOT TO SCALE POLYETHYLENE SHEETING 'I-, NOTES: 1) ALL HEADWALLS AND ENDWALLS ARE TO BE DESIGNED BY A STRUCTURAL ENGINEER EXCEPT WHERE A NCDOT STANDARD PRE -CAST STRUCTURE US SPECIFIED. 2) CONSTRUCTION OF HEADWALLS AND ENDWALLS AND PLACEMENT OF BACKFILL IS TO BE COMPLETED UNDER THE OVERSIGHT OF A GEOTECHNICAL ENGINEER. 3) HEADWALLS AND ENDWALLS SHALL BE CONSTRUCTED OF STRUCTURAL CAST -IN-PLACE CONCRETE OR PRE -CAST CONCRETE IN ACCORDANCE WITH NCDOT GUIDELINES. 4) ROADWAY CROSS DRAINAGE PIPES ARE TO BE INSTALLED PER NCDOT STANDARD 300.01. ROADWAY CROSS DRAINAGE PIPING CONSTRUCTION SEQUENCE 1 ) ALL EROSION CONTROL DEVICES TO BE IN PLACE PRIOR TO CROSS DRAINAGE PIPE INSTALLATION. 2) CONTRACTOR TO INSTALL ALL CROSS DRAINAGE PIPING DURING A PERIOD OF TWO DRY DAYS. 3) INSTALL TEMPORARY SILT FENCE BETWEEN EXISTING STREAM AND AREA OF DISTURBANCE FOR ALL CULVERTS. 4) INSTALL TEMPORARY SEDIMENT TRAPS AND DIVERSIONS AS SHOWN ON THE PLANS. CLEAR ONLY AS REQUIRED TO CONSTRUCT THESE DEVICES. 5) CONSTRUCT ALL SECONDARY OVERBANK CULVERT (IF APPLICABLE). 6) ONCE ALL SECONDARY CULVERTS ARE COMPLETE, INSTALL IMPERVIOUS DIKE ACROSS STREAM CHANNEL AT MAIN CULVERT ENTRANCE. 7) CONSTRUCT MAIN CULVERT. 8) BEGIN BACKIFILLING AROUND CROSS DRAINAGE PIPING. 9) REMOVE TEMPORARY SILT FENCE THAT CROSS PROPOSED ROADWAY WHEN BACKFILL REACHES SILT FENCE. 10) BEGIN REMAINING ROADWAY AND UTILITY CONSTRUCTION. 11) MAINTAIN ALL EROSION CONTROL DEVICES TO PREVENT SEDIMENT ENTERING THE CROSS DRAIN PIPING. 12) CONTRACTOR WILL BE RESPONSIBLE FOR ALL SUPPLIES REQUIRED FOR ANY PUMPING OF WATER FLOW UNTIL CULVERT IS BUILT. MAINTENANCE NOTES: 02160203.00 1 . INSPECT WEEKLY AND AFTER EACH RAINFALL EVENT PRODUCING 21 INCH OR MORE Date OF RAIN. ANY DAMAGE TO THE SEDIMENT FILTER BAG SHALL BE REPAIRED 0 IMMEDIATELY. 2. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 6" OF SEDIMENT HAS ACCUMULATED OR IN ACCORDANCE WITH THE MANUFACTURER'S > RECOMMENDATIONS. 3. MONITOR SEDIMENT FILTER BAG REGULARLY FOR THE PRESENCE OF TURBID > WATER BEING DISCHARGED. IF ANY TURBID WATER IS BEING DISCHARGED FROM SEWN -IN CONNECTION SLEEVE THE BAG THE SITUATION SHALL BE RESOLVED IMMEDIATELY. IF TEMPORARY BLOCKAGES ARE NOT FOUND, ASSUME THE BAG IS AT SEDIMENT CAPACITY AND FOR PUMP DISCHARGE HOSE REPLACE IMMEDIATELY. 24" MIN SILT FENCE 6" MIN OPTIONAL LIFTING STRAPS VARIES WITH GROUND LINE COVER #57 STONE PAD WITH SLOPE GEOTEXTILE FABRIC 170 SEDIMENT FILTER BAG 24" MIN #57 STONE m % POLYETHYLENE SHEETING (6 MIL MIN) VARIABLE VARIES WITH (10'MIN.) GROUND SLOPE I I j a SILT FENCE ` TOP VIEW USE #57 STONE TO LEVEL BAG FROM NATURAL GROUND LINE NOTES: 1. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE TEMPORARY SEDIMENT FILTER BAG WHEN PUMPING. 2. THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAY VARY PER VENDOR SPECIFICATIONS. 3. TEMPORARY SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A MINIMUM FOUR -INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS SLEEVE A MINIMUM OF SIX INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE. 4. THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE TEMPORARY SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS. 5. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 6 INCHES OF SEDIMENT HAS ACCUMULATED OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 6. CONTRACTOR SHALL SIZE THE BAG DEPENDING ON USE AND FLOW REQUIREMENTS. GEOTEXTILE FABRIC VARIES SILT FENCE EXISTING GROUND LINE SIDE VIEW SEDIMENT FILTER BAG NOT TO SCALE POLYETHYLENE SHEETING 'I-, NOTES: 1) ALL HEADWALLS AND ENDWALLS ARE TO BE DESIGNED BY A STRUCTURAL ENGINEER EXCEPT WHERE A NCDOT STANDARD PRE -CAST STRUCTURE US SPECIFIED. 2) CONSTRUCTION OF HEADWALLS AND ENDWALLS AND PLACEMENT OF BACKFILL IS TO BE COMPLETED UNDER THE OVERSIGHT OF A GEOTECHNICAL ENGINEER. 3) HEADWALLS AND ENDWALLS SHALL BE CONSTRUCTED OF STRUCTURAL CAST -IN-PLACE CONCRETE OR PRE -CAST CONCRETE IN ACCORDANCE WITH NCDOT GUIDELINES. 4) ROADWAY CROSS DRAINAGE PIPES ARE TO BE INSTALLED PER NCDOT STANDARD 300.01. ROADWAY CROSS DRAINAGE PIPING CONSTRUCTION SEQUENCE 1 ) ALL EROSION CONTROL DEVICES TO BE IN PLACE PRIOR TO CROSS DRAINAGE PIPE INSTALLATION. 2) CONTRACTOR TO INSTALL ALL CROSS DRAINAGE PIPING DURING A PERIOD OF TWO DRY DAYS. 3) INSTALL TEMPORARY SILT FENCE BETWEEN EXISTING STREAM AND AREA OF DISTURBANCE FOR ALL CULVERTS. 4) INSTALL TEMPORARY SEDIMENT TRAPS AND DIVERSIONS AS SHOWN ON THE PLANS. CLEAR ONLY AS REQUIRED TO CONSTRUCT THESE DEVICES. 5) CONSTRUCT ALL SECONDARY OVERBANK CULVERT (IF APPLICABLE). 6) ONCE ALL SECONDARY CULVERTS ARE COMPLETE, INSTALL IMPERVIOUS DIKE ACROSS STREAM CHANNEL AT MAIN CULVERT ENTRANCE. 7) CONSTRUCT MAIN CULVERT. 8) BEGIN BACKIFILLING AROUND CROSS DRAINAGE PIPING. 9) REMOVE TEMPORARY SILT FENCE THAT CROSS PROPOSED ROADWAY WHEN BACKFILL REACHES SILT FENCE. 10) BEGIN REMAINING ROADWAY AND UTILITY CONSTRUCTION. 11) MAINTAIN ALL EROSION CONTROL DEVICES TO PREVENT SEDIMENT ENTERING THE CROSS DRAIN PIPING. 12) CONTRACTOR WILL BE RESPONSIBLE FOR ALL SUPPLIES REQUIRED FOR ANY PUMPING OF WATER FLOW UNTIL CULVERT IS BUILT. Lu Lu (A Lu 0� CL z 0 u u z V) L/) V) 0 U Lu 0 Lu UO) Job No. E 0 02160203.00 VV&R Date Designer 0 GAS > > 04 ro co 00 170 E_j m cl� 01 10 01 01 Ln CN Lij u z u ILIL u AlA'F Ll) Lu Lu (A Lu 0� CL z 0 u u z V) L/) V) 0 U Lu 0 Lu UO) Job No. Drawn By 02160203.00 VV&R Date Designer 01 loq117 GAS �0000000000000 CA RO 0000 oo 0 0 000 6� �-s 0000 -Fo- PRV o 0 M oo. ROT A P PR EDPOP o . o)�N_-' RYNTIK '0 o. oo lz�l oo--00-oo, 000004�Y R 0000000001'a Revisions 1 PERTOA 2/10/2017 COMMENTS 2 PER TOA 3/10/2017 COMMENTS Sheet No. 5,10 ROLLMA)CM ROLLED EROSION CONTROL Specification Sheet - BioNet' C70OBN T" Erosion Control Blanket DESCRIPTION The long-term double -net Erosion Control Blanket (ECB) shall be a 100% biodegradable, machine -produced mat fabricated in the U.S.A. of coconut (coir) fiber with a functional longevity of greater than 36 months and permissible shear stress exceeding 2.2S psf. (NOTE. Functional longevity may vary depending upon climatic conditions, soil, geographical location, and elevation.) The blanket shall be of consistent thickness with the coconut fiber evenly distributed over the entire area of the mat. The blanket shall be covered on the top side with a 60 x SO woven coir fiber netting with mesh openings not to exceed .75 in. x .7S in. (1.90 x 1.90 cm). The blanket shall be covered on the bottom side with 100% biodegradable woven natural fiberjute netting. The jute netting shall form an approximate O.SO in. x 1.0 in. (1.27 x 2.S4 cm) mesh. The blanket shall be sewn together on 1.50 in, (3.81 cm) centers with degradable thread. The C70OBN shall meet Type 4 specification requirements established by the Erosion Control Technology Council (ECTC) and Federal Highway Administration's (FHWA) FP -03 Section 713.17 Matrix 100% Coconut Fiber 0.5 lb/sy (270 g/sim) 100% biodegradable 60 x 50 coir netting 143 lb/1000 sf Netting (700 g/sm) 100% biodegradable jute netting 7.7 lb/1000 sf (37.13 g/sm) Thread Biodegradable Width 8.0 ft (2.4 rn) Length 45 ft (13.7 m) Weight ± 10% 74.4 lbs (33.75 kg) Thread 40 sy (33.45 sm) Tensar, NORTH AMERICAN GREENO Thickness ASTM D652S 0.S6 in. hereunder shall conform to the specification stated herein. Any other warranty including Slope Length (L) (14.2 mm) Water Absorbency ASTM D1117 186.8% Mass/Unit Area ASTM 6475 26.61 oz/sy 20-50 ft 0.003 (903 g/sm) Swell ECTC Guidelines 35% Lignin Content TAPPI TM222 32.8% Light Penetration ASTIVI D6567 14.9% 1271 lbs/ft Tensile Strength - MD ASTM D6818 (18.84 kN/nn) Elongation - MD ASTIVI D6818 38.7% Tensile Strength - TD ASTM D6818 834 lbs/ft (12.34 kN/m) Elongation - TD ASTM D6818 41.4% Maximum Permissible Shear Stress Unvegetated Shear Stress 2.3S psf (112 Pa) Unvegetated Velocity 10 fps (3.05 M/5) Roughness Coefficients - Unvegetated Flow Depth Manning's In � 0.15 rin (0.50 ft) 0.022 0.50-2.0 ft 0.022-0.014 a 0.60 M (2.0 ft) 0.014 Tensar International Corporation Tensar International Corporation warrantsthat at the time of deliverythe product furnished Slope Gradients (S) hereunder shall conform to the specification stated herein. Any other warranty including Slope Length (L) �5 3:1 3:1-2.1 > 2:1 < 6 M (20 ft) 0.0001 0.018 0.050 20-50 ft 0.003 0.040 0.060 > 15.2 m (50 ft) 0.007 0.070 0.070 Roughness Coefficients - Unvegetated Flow Depth Manning's In � 0.15 rin (0.50 ft) 0.022 0.50-2.0 ft 0.022-0.014 a 0.60 M (2.0 ft) 0.014 Tensar International Corporation Tensar International Corporation warrantsthat at the time of deliverythe product furnished 2SOO Northwinds Parkway hereunder shall conform to the specification stated herein. Any other warranty including Suite 500 merchantability and fitness for a particular purpose, are hereby executed, If the product Alpharetta, GA 30009 does not meet specifications on this page and Tensar is notified prior to installation, Tensar will replace the product at no cost to the customer. This product specification supersedes 800-TENSAR-1 all prior specifications for the product described above and is not applicable to any tensarcorp.com products shipped prior to January 1, 2012. @2013, Tensar International Corporation ECRIAXIMPIES-0008IN-6.13