Loading...
HomeMy WebLinkAbout20130223 Ver 6_March Inspection_1_20170324Wetland Inspection Report Project Num: 20130223 Version: 6 Project Name: NCDOT- Greensboro Western L County: Guilford Location: NCDOT- Greensboro Western Loop (U-2524 C& D) Latitude: +36° 08' SW Plan Location Site Owner Name NC DOT PDEA Inspection Date: 3/21/2017 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: Construction SW (NCG010000) Question Areas: � NCG010000 Permit Inspection Summary: Title: ❑ Not Compliant Status: Issued Project Type: Road maintenance/repair/improvemen Region: �linston-Salem Longitude: -79° 53' 04" Phone: Phone: 336-776-9703 While conducting a 401 site inspection, DOT staff requested that I review a pump around configuration of which included a silt bag operation. They were preparing to turn the stream (Richland Creek) into a constructed, rock lined diversion channel (to allow for culvert construction at Site 5) and were using the silt bag as a way to reduce erosive force of the outlet of a 6" pump hose. They placed the silt bag in the stream channel and were pumping clean water into it. The silt bag was preforming well with no turbidity or scouring. Once the bypass is in operation, turbid water from the dewatered area will be pumped into a sediment basin prior to discharge back to the stream. The silt bag will be removed from the channel. page: 1 Site Number: 20130223 Owner: Thorpe, Gregory Inspection Date: 3/21/2017 Inspection Type: Site Inspection (DOT) NCG010000 Permit # Is this inspection related to a DLR/delegated program inspection? If Yes, what was the DLR/delegated program inspection date? Is the site following its E&SC Plan as per DLR or delegated program? Is the site maintaining their E&SC measures as per DLR or delegated program? Is a copy of the approved E&SC plan on site? Is a rain gauge present on-site or is MPE in use for the site? Is rain gauge data or MPE data recorded? Are inspection records complete? Is the site compliant with other conditions of the NCG010000 permit? Comment: Reason for Visit: Routine Yes No NA NE ❑ � ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ � ❑ ❑ ❑ ❑ page: 2