Loading...
HomeMy WebLinkAboutSW3170304 (5) MAR 2 2011 Storm Water Management Plan Addington Crossing March 17, 2017 Project No. CALATL1603 Addington Crossing (.14) Camino® Shaping the Future Storm Water Management Plan Addington Crossing Project Information Prepared for Cal Atlantic Homes Project Name Addington Crossing Project Number CALATL1603 Project Manager Robert L. Cash, PE Date March 17, 2017 Prepared for: CALAPLANTIC HOMES' Cal Atlantic Homes 6701 Caramel Road,Suite 425,Charlotte,NC 28226 Prepared by: Lria) Car enou Shaping the Future Cardno,Inc. 9800 Southern Pine Boulevard,Suite I,Charlotte,NC 28273 USA March 17,2017 Cardno,Inc. Project Information I Storm Water Managerment Plan Storm Water Management Plan Addington Crossing Table of Contents Executive Summary iii 1 Introduction and General Information 1-1 1 1 Introduction 1-1 1.2 Location of Property 1-1 1.3 Description of Property .. 1-1 1.4 Floodplain Information .1-1 1.5 Topographic Information . 1-2 1.6 Project Site Soils Information 1-2 2 Methodology and Criteria 2-2 2.1 Compliance with Regulations 2-2 2.2 Hydrologic Methodology and Criteria 2-2 2 3 Hydraulic Methodology and Criteria .2-3 , 3 Hydrologic Analysis 3-3 3.1 Existing Condition 3-3 3.2 Proposed Condition .3-3 4 Hydraulic Analysis 4-4 4.1 Storm Drain Analysis.. .4-4 4 2 Drainage Swales 4-4 4.3 Onsite Detention 4-4 5 Water Quality 5-4 6 Summary Tables 6-5 6.1 Detention Basin Summary Table 6-5 6.2 Full Watershed Storm Water Control SummaryTable 6-6 7 Conclusions and Recommendation 7-6 8 References 8-6 Appendices Appendix A Figures , Appendix B Hydrologic Analysis Appendix C Hydraulic Analysis Appendix D Reference Material Appendix E Stormwater Design Plans March 17,2017 Cardno,Inc. Table of Contents ii 2017_0315_Addington_SW Management Report Storm Water Management Plan Addington Crossing Executive Summary Cal Atlantic Homes is proposing to develop a new residential community on the northeast side of the Potter Road within the Village of Wesley Chapel, NC. This residential development covers approximately 103.66 acres and will include 51 single-family homes with lots averaging approximately one acre in size. The residential development will include the construction of roadways and infrastructure that includes four onsite detention facilities. A storm water management plan has been developed to mitigate the impacts upon the watershed for the project area. The watershed is approximately 239.26 acres of which approximately 135.60 acres is considered offsite. A storm drain system will be constructed to direct runoff throughout the development. This storm drain system of storm pipe and grass swales will accept onsite runoff and also allow for offsite drainage to flow through the project site. This runoff will be directed towards the historic flow path downstream of our project site and into Price Mill Creek. The four detention basins mentioned above will be constructed, as part of the storm drain system,to assure that storm water runoff amounts post project will be less than or equal to pre-development levels. March 17,2017 Cardno,Inc Executive Summary is 2017_0315_Addingtan_SW Management Report Storm Water Management Plan Addington Crossing I ' 1 Introduction and General Information 1.1 Introduction Cal Atlantic Homes is proposing to develop a new residential community on the northeast side of the Potter Road within the Village of Wesley Chapel, NC. This residential development covers approximately 103.66 acres and will include 51 single-family homes. This storm water management analysis presents detailed hydrologic and hydraulic analyses for the existing and proposed development, as required in the North Carolina Department of Environmental Quality (NCDEQ) Storm Water BMP Design Manual and the Erosion Sediment Control Manual. 1.2 Location of Property In general, the subject site is located on the northeast side of Potter Road, which is northwest of the intersection of Wesley Chapel Road and Patter Road. See Figure 1, Location Map found in Appendix A. 1.3 Description of Property The project site consists of one parcel, totaling approximately 103.66 acres. The P.I.D. Number for the site is 06021007 and the Deed Book and Page Number for the site is 6638/409. The site is bounded on the west by Potter Road and the extreme northeast part of the site is bounded by Hudson Church Road. Remaining portions of the project site are bound by undeveloped rural '__ land. There are two intermittent jurisdictional streams that flow through the property from north to south. Each stream has established areas that have been identified as wetlands. The upper headwater of the eastern most intermittent stream is composed of a makeshift farm pond. The pond appears to have been established due to a pre-established access crossing a portion of the stream. The pond is only 2 to 3 feet in depth with a downstream berm established at the area of crossing. Currently the ponded area is not at full capacity and does not present an overflow situation downstream. The site, in general, exists in an undeveloped condition, having mostly wooded areas with small patches of non-grazed meadows. The site generally slopes from the north to south and southeast at approximately three to five percent slope. 1.4 Floodplain Information The Federal Emergency Management Agency (FEMA), Flood Insurance Rate Map (FIRM), Community Panel Numbers 3710449600J, effective October 16, 2008, designates that a small portion of the project site is within 'Zone AE with Floodway' and the remaining portions of the project site is within 'Zone X'. 'Zone AE with Floodway' is described as a zone where base flood elevations have been determined and that a floodway area designated to be free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood elevations. Zone 'X' is described as an area determined to be outside the 0.2% annual chance floodplain. The most current panel has been used in this study. See Figure 2, FIRM in Appendix A. March 17,2017 Cardno,Inc. Introduction and General Information 1-1 2017_0315_Addington_SW Management Report Storm Water Management Plan Addington Crossing 1.5 Topographic Information Topographic information for this project was gathered from aerial and field topographic survey completed by GPA Professional Land Surveyors of North Carolina, Inc., at a 1-foot contour interval. 1.6 Project Site Soils Information The project site's soils are predominantly soil groups B and C, with soils group more specifically defined below: • BdB2— Badin channery silty clay loam, 2 to 8 percent slopes, moderately eroded. (Group C) • BdC2— Badin channery silty clay loam, 8 to 15 percent slopes, moderately eroded. (Group C) • TbB2—Tarrus gravely silty clay loam, 2 to 8 percent slopes, moderately eroded (Group B) • TbC2 -Tarrus gravely silty clay loam, 8 to 15 percent slopes, moderately eroded (Group B) A soils report generated from the Web Soil Survey has been provide in Appendix D. 2 Methodology and Criteria 2.1 Compliance with Regulations The methodologies utilized in the preparation of this study are in compliance with the latest edition of the North Carolina Department of Environmental Quality (NCDEQ) Storm Water BMP Design Manual and the Erosion Sediment Control Manual and also those design ordinances as designated by the Village of Wesley Chapel. 2.2 Hydrologic Methodology and Criteria Hydrologic methodologies used in this study are in accordance with those methodologies found in Chapter 3 of the NCDEQ Storm water BMP Design Manual. HydroCAD and HydraFlow computer software packages were used to determine the hydrology for the project site. Precipitation values for the 24-hour storm event along our project site were established based upon point precipitation frequency estimates from NOAA Atlas 14, Volume 2, Version 3. These values were used to establish the rainfall parameters within the HydroCAD and HydraFlow software. The project site is composed of two distinct watersheds that confluence at Prices Mill Creek. Calculations provided, using the methods described above, were calculated per watershed. To be conservative, a cumulative total of runoff amounts calculated in both watersheds were totaled to compared those values for the pre-development condition. Hydrologic calculations can be found in Appendix B. Reference Material used in the hydrologic calculations can be found in Appendix D. March 17,2017 Cardno, Inc. Methodology and Criteria 2-2 2017_0315_Addington_SW Management Report Storm Water Management Plan Addington Crossing 2.3 Hydraulic Methodology and Criteria Hydraulic methodologies used in this study are in accordance with the latest edition of the NCDEQ BMP Design Manual. Culvert Master and Hydraflow hydraulic programs were used to assist in hydraulic calculations. Excel spreadsheets based upon standard design criteria as found in the NCDEQ BMP Design Manual have also been used for any other necessary hydraulic calculations. Hydraulic calculations can be found in Appendix C. Reference Material used in the hydraulic calculations can be found in Appendix D. 3 Hydrologic Analysis 3.1 Existing Condition The project site currently exists in an undeveloped condition, having mostly wooded areas with small patches of non-grazed meadows. There are a couple of onsite buildings that will be demolished prior to construction. The site generally slopes from the north to south and southeast at approximately three to five percent. The soils for the site are mostly composed of soil groups B and C. Approximately 136 acres of offsite area provides runoff that is directed through our project site. Site storm runoff is directed from north to south and concentrates along the pathway of two intermittent streams. The two streams confluence at a point along the southern most property _ boundary and directs flow into the adjacent Price Mill Creek. There are portions of the 1% annual chance floodplain of Price Mill Creek within the property boundary of the project site. No construction activities or encroachments are proposed within the any special flood hazard areas. Refer to Section 6.2 of this report for the runoff totals for the project area for the existing condition. Additionally, refer to Pre Storm Water Tributary Map 1 of 5, in Appendix E, for the existing condition drainage basin boundaries and associated travel time pathway designations. 3.2 Proposed Condition The proposed project site has been designed to incorporate 51 single family home lots that are approximately 1 acre +/- in size. The design also incorporates all necessary roadways and infrastructure improvements including the use of a proposed storm sewer system,several grassed swales and four individual detention basins used to mitigate proposed runoff amounts to be equal to or less than the pre-development runoff totals. A proposed crossing is being proposed along the eastern most intermittent stream. A twin culvert system has been designed to an acceptable upstream headwater condition during storm events. Refer to Section 6 of this report for summaries of the runoff totals for the various storm system components designed for the site during the proposed condition. Additionally, refer to Post Storm Water Tributary Map 2, 3, 4 and 5 of 5, in Appendix E, for the proposed condition drainage basin boundaries and associated travel time pathway designations. March 17,2017 Cardno,Inc. Hydrologic Analysis 3-3 2017_0315_Addmgton_SW Management Report Storm Water Management Plan Addington Crossing 4 Hydraulic Analysis 4.1 Storm Drain Analysis A storm sewer system has been designed to direct a majority of the storm runoff generated from the proposed impervious services. This storm sewer directs runoff towards one of four onsite detention basins proposed for the site. An additional storm sewer system has been designed to direct offsite/bypass runoff through our project site. Both storm sewer systems were designed based upon runoff totals for the 25-year storm event. Refer to the Storm Drain reports located in Appendix C for the proposed storm sewer design. 4.2 Drainage Swales Onsite drainage swales have been design to direct runoff from the onsite storm sewer system to the onsite detention basins. The swales have been designated as being constructed as treatment swales for the purposes of providing water quality for the project site. 4.3 Onsite Detention The runoff produced during proposed conditions will be mitigated to be equal to or less than pre- development conditions through the use of four onsite detention basins. To allow for capture of first flush materials, all detention basins have been design to include rock forebay areas. Each detention basin has also been designed with multi-stage outlet control structures to control runoff volumes up to and including the 50-year storm event. Emergency spillways have been provided at each detention basin to allow for passage of larger storm events. 5 Water Quality The proposed project site is located within a rural watershed that provides runoff for Prices Mill Creek. The post development impervious percentage for our project site is approximately 12%. This impervious percentage is further reduced when including the remainder of the total acreage of the Prices Mill Creek Watershed. Taking this very low impervious percentage into account, water quality design for the site has been provided through low impact methods. All runoff from the proposed impervious areas will be directed towards grassed swales to provide a disconnect between our proposed construction and the intermittent streams to which to runoff is directed. All grassed swales being proposed are greater than or equal to 100 If in length. Much of the runoff being directed along the rear portions of the lots will allow storm runoff to sheet flow across grassed surfaces prior to entering the adjacent intermittent streams. This will provide an additional drainage disconnect between impervious surfaces within the lots and the adjacent intermittent streams. March 17,2017 Cardno,Inc. Hydraulic Analysis 5-4 2017_0315_Addington_SW Management Report Storm Water Management Plan Addington Crossing 6 Summary Tables 6.1 Detention Basin Summary Table ! I Detention Basin Det 1 -Summary Table Event Post-Dev Post Dev Basin Peak Basin Peak Inflow(cfs) Routed Peak HWL (ft) Storage (cu-ft) (cfs) - 1yr-24hr 2.14 0.65 100.41 2,666 2yr-24hr 3.66 1.36 100.62 4,150 10yr-24hr . 8.65 3.39 101.30 9,489 25yr-24hr 12.07 - 4.34 101.82 13;824 50yr-24hr 14.96 5.01 102.25 17,739 Detention Basin Det 2 -Summary Table Event Post-Dev Post Dev Basin Peak Basin Peak Inflow(cfs) Routed Peak HWL (ft) Storage (cu-ft) (cfs) . 1yr-24hr 7.71 3.71 100.82 5,634 2yr-24hr 13.11 7.47 101.21 8,750 10yr-24hr 30.51 18.03 102.42 19,299 25yr-24hr 42.39 24.26 103.28 27,738 50yr-24hr 52.45 32.19 103.84 33,669 Detention Basin Det 3 -Summary Table Event Post-Dev Post Dev Basin Peak Basin Peak Inflow(cfs) Routed Peak HWL (ft) Storage (cu-ft) (cfs) 1yr-24hr 8.97 0.51 100.63 11,002 2yr-24hr 12.64 0.62 101.32 16,463 10yr-24hr 23.24 1.18 103.09 32,620 25yr-24hr 29.95 4.82 103.46 36,394 50yr-24hr 35.43 9.71 103.82 40,339 Detention Basin Det 4 -Summary Table Event Post-Dev Post Dev Basin Peak Basin Peak Inflow(cfs) Routed Peak HWL (ft) Storage (cu-ft) (cfs) 1yr-24hr 12.60 0.33 102.08 23,239 2yr-24hr 21.12 0.42 103.25 39,435 10yr-24hr 48.29 4.51 104.72 63,016 25yr-24hr 66.75 20.62 105.15 70,562 50yr-24hr 82.34 36.08 105.64 79,489 March 17,2017 Cardno,Inc. Summary Tables 6-5 2017_0315_Addington_SW Management Report Storm Water Management Plan Addington Crossing 6.2 Full Watershed Storm Water Control SummaryTable Combined Summary Table 1WS1 &WS2) Event Pre-Dev Peak Post-Dev Peak Flow(cfs) Flow(cfs) 1yr-24hr 46.15 44.16 2yr-24hr 90.72 84.22 10yr-24hr 251.18 227.50 25yr-24hr 367.26 330.93 50yr-24hr 467.55 421.29 7 Conclusions and Recommendation As detailed in this report, the Addington Crossing Residential Subdivision is in compliance with all state and local ordinances. No adverse impacts are expected either upstream or downstream of the subject site. Cardno recommends that the project be constructed as proposed. 8 References North Carolina Department of Environmental Quality Storm water BMP Manual, Revised 1/3/2017 Culvert Master Version 3.3, 1995-2017, Bentley Systems Flood Insurance Rate Map Number 3710449600J, dated October 16, 2008, Federal Emergency Management Agency. HydroCAD Version 10.00-19, Copyright 2016, HydroCAD Software Solutions, LLC HydraFlow Storm Sewer Extension, Version 10.4, 2007-2015, Autodesk, Inc. Web Soil Survey, Copyright 2017, USDA, Natural Resources Conservation Service NOAA Atlas 14, Volume 2, Version 3, Copyright 2017, NOAA, National Weather Service March 17,2017 Cardno,Inc Conclusions and Recommendation 8-6 2017_0315_Addington_SW Management Report Addington Crossing / APPENDIX / /A \ 1 _I l / \\ , I FIGURES March 17,2017 dardno,Inc. A-1 2017 0315_Addmgton_SW Management Report Appendix A Storm Water Management Plan Figures Addington Crossing Appendix A Figures A.1 Figure 1 —Vicinity Map A.2 Figure 2 — FEMA FIRM March 17,2017 Cardno,Inc A-1 2017_0315_Addington_SW Management Report <q bp No i? 0 ,p "53o 111/ OHO 04SITE BEULAH CHURCH RD 2.4i- • 20� Z� A• OT m 73?-1\ . 0 m MCN iko WESLEY CHAPEL UNION COUNTY, NORTH CAROLINA VICINITY MAP /\ NOT TO SCALE If PROJECT NO. CALATL1603 FIGURE ONE Cr, ardno DATE. 03/17/17 ADDINGTON CROSSING ShapingtheFuture PORTLAND BY: TLK Cal Atlantic TE'LS(5 3)41925 DR, FAX(503)4 O z�D,OR 97221 SHEET NO. X# Village of Wesley Chapel,North Carolina �� y� :",.• ..., ("t 'tet , 7 Ra a..ut"4�q ,e� rr f•..��yy?-"1. - ,,. , 1114 I1 �lu�pc',',+5.q:'i" -- 'E #t• !i' `S� /05 �1`��'1ia:it',"'i>j .3�, .",:,Lt4"pv '•+k•T .`fir"/*•,,,1' ^,c',.'ia4a' •y, vt' `I4<'4^'j`d ,*t� y 4 Ti('15.' 1 sl i.f' 11A' a4 .,.%), ••1,.,,1•.,,, <V, '(i,t j' ,,,,,M L' "+r2,,`E n 1 % '"• ,,����}'r' `y .:`r ,< �+ 34, e r , 4 ; }r i} ' GRID NORTH 1., ;. �srn' fig;.. ,.._,?,14:„.!. "� t3 ,, ',� ,• •'Y ,,e.--sI,,,..,,„.,._..,...,„.„,:‘,t_ •i ZOIV--X,, :, 1,i, ,,,. Y _ '• .. , `:���1 : w' 7,r;'.,%,.-.‘p'.M d,' o =,, ,a0` .. t;*�; ;�,r, rh �f ' �,. ik SCALE 1"=500'(1 . 6,000) 8 �,' __ ryLF'l i,'0 ,4 0.a, �s, a` k.,..,...,,,,,i,„1 h.+.- rrr• '�° b q a �% r' j►3h' 'y .", v�yF �° �L'ra `_.<� 4'AV' p' t /5 �iG ui: " 250 500 750 1,000 0:,:tt.F , '>`t•7 f ;�1.A4 .-ZONE}-,7. ''"r',at, 2. "7,A t ,t.p.;- �' i�,�:.3;/! YLr"!' 'r /tr„I� aJ•'` yH'. _r FEET �`,�ea.”' .S s` "'7^ c•�•`'r,yid} 'w a Cs l." �Cr 'nr i r:vtt`� ,, a„t i ',j, :,..,,l- . e. Xi- >- +tsgcc3 .. \ 'TJa ;t r . Pat f-.:,. .,''1,:i�" rk31 yQQ % ,aY. ;C:,. •i� •J��"sF,,l�,�� .�, r � ��bti .. r- L r-4, ,y : • -''It- i iw' .rs h J� Asti '> r-4:0 , "" ,-,'7`,; t::r'.q '`,-5 �-trr it ,y+'.� w�„ y�"" 'S s i 4'9\ ib/4; N Pb:"M ,,,!M1 'ry� 6f'' ,� fi�� ,^ „4 X,yt�v � 1 M'.rG. ..N,� "iCy ----,44;47$7:,'::.'ell ,'�� Yr - � f. `h "/,';' ,..,;;;,,,?4",-...,.4+x1•.'• ,,r i ,;i price ,tiwal �fy, ”) a .yw ,t � + y ••.. -- ,1 I > • PANEL 4496J ii„,y r.'�klsa,,i.cAyi''tg9, 'dt•iY 'ni ttT ` /,O�n. 1"11'•11:-.` r,r,,, j N. ,rJ;. • •�iraaL - `. ::t '12.v•-,--1 Ate. ,',`I ,,,:,' 4) t5„'<,1, ,'c t, s_.,rl‹; 4J r: •:,,#. , ' �, (.-.`-- PROJECT SITE ,::. . t--, M , �, Mfr,,,,:s '*, :.. �� 6 FIRM "r,`z+1' -IF OS+Ory a",,:✓,,1{�\�+c, ,i'-,1'.; -.44$ ' . k A M ,_6t, A P�' 'y /t/•J'i , ,, t � .,?: .��r ..��✓ , y. ,lam *f :4y9Rc ' ' - l < 9't4 '.,a'',1 P. l i. ' FLOOD INSURANCE RATE MAP s .a' :; HRS. f „«� ,,g ., .,y ✓� �l;„. ,: ZON E'At,, <„h '.• , ,'7 +'* y',("�r• iw � . . 'el `' 't't p"',•'/3 x7 j' ;<'d, j;?."O of _.-.2—.....1,--_, t--'1.:' ,','' ''` •, •h-,. ri, . s r l' ,,,x..1” i �.y 1 rS:»� Q" ,, G l��Y fa ;�;>o I ��� }' ;Pz ` NORTH CAROLINA ^r..= .' �-. ++`." < ,. ,' F4°'-,v6,-;&. - , ,, R • ., 7 -,,,CWKn.r t i - ----'7<..", ry - r lyr'` a � f- r-'" 2 a.t't y..A••,, i'gi!`i_fr&, iy 1. %a i" ' A .t,t r'T. i' -i�S•^Q-j!, ' ,i y-y'i_ `t rA yy, 'L'' •y, rt', , !!! ,p ",R,n" :/�' , 8 `;J l r,'tv �,1 . 't t,BT,e;�C,,�,�?4a,�. YoQ1 x, =•, 'nkJ /,--a_ l r ;• •-•,,-7,-;;;S":'/4,{A 1, t '+ „,,,,,•.:,,:.2-:!"”.'i,;.-4 ,' ` •�'S:• p�,3.;."` :.'Stiff;, '`tic.#/, r> �. �' ,,' ; ,>.� ,1 ' q_., i 4 ,1-�- ; 0. aj ..4.,. ,'".6. <' 67'x, f �n PANEL 4496 �� =<r �+{i4 -s'.,-1'. •• c '4--,..,,r,' r '�,� ' ' -, '4; (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL "/ ;;'''-,:n 1``''`Y 5:r^ ,'"'- '`.i .!,,,,l . "''';..!.' <ga r;,,, •' : "+;:n;.r,,,., ,,,•,30.-, v`r� . - .�- - �, LAvouT 'k. y ; '�j'.' L , l "CI.'"/� Y .`,GY.y ZYYr; ..' }' 1 n ?t>"€3 y YY, d� ' edf�;r1 �, t f i j w _ CONTAINS 4,,,' saji.,r-eYFc .24-4,4.1.",-...y:',i d ,.,r�.e„i;•'Fes,1 4 -,.\,k,,,:....-,,,-,..'` ✓ `' `t” , •,-, •-/A-,,./tF-;;'F'x,...° s _:.-. G� ,y, /,� e1:.', . , t�- 4;:',..,--6,,:'-..,Ar5r y'•A � l� L .�M J,' aa.-:-.^,,,"�'.�c 2-79" l^a,,,< rri. ,xy � i :, `L Utz 5 =�i° ,y4 Er" - 1)/4../.i' 't K f ., COMMUNITY CO No PANEL SUFFIX � ,h„�„ r,!',t • y �',y,+ N ,,t` 1r,` °t 2:•1?1��•vv.�'�o f.w ',-..:;,•,,,s' ,'r � 'u �!A:��;....-�� INDIAN TRAI TOWN OF 371Y135 4496 J '''''''',.:11:-#17... V(,' 1r 4 4 t +,+,aW :t j hi•,w qTL '' ,.. ' i i - •t,”•" •"+7 " UNION COUNTY 370234 4496 J : i-�p ufl f i�..'£� 0•v!,:.•.'•.1,• ..1 .' '-A4t--:' Y_ rr ,.n1; - '''',11,'_:. ... 11%,',,,,,,,,,,- �(� :.1,‘..--..--„''::'::14,'•,-.• c t $ t„�' "i. w �' r + '' ti��f=�•rr'ii:4�.t1 ';'. J'� l''. . tt '',;,,,,45:4, ; t' WEDDINGTON.TOWN OF 370518 4496 J S� q4,.,,��,�l ,�"�' , -3i,, i,; Ne Yt':',���'t -hr.;ti,`j�it'` ;rii 4. WESLEY CHAPEL,VILLAGE OF 370525 4496 J _ � •� v,""�ar'�' C41"1 =rNv'r �n6•'' �' c c r i-JI'�'j k dt�` e. a t,r,f,' ..,.,` �x:� i'e' „�„S p�',- `,-.A '<s&.,e:L: 14 ,n f.,; ' ,,,;;+ti i-,,,- d'ro1c, .,� -' o' y� ; Addington Crossing • `?` ,APPENDIX r °a;fa.• •$ z3�.. a• :..5... i a.I •,:aa , .,. / ., • • I • a ; . a.. 1 ° •• • .. • e HYDROLOGIC ,ANALYSe ,I=S• • "� March 17,2017 ardno,Inc A-1 2017_0315_Addington_SW Management Report Appendix B Storm Water Management Plan Hydrologic Analysis Addington Crossing Appendix B Hydrologic Analysis B.1 HydroCAD Calculations —SWM-WS1 B.2 HydroCAD Calculations — SWM-WS2 B.3 HydroCAD Calculations —SWM-WS-HH B.4 HydroCAD Calculations — SWM-Culvert 2 March 17,2016 Cardno,Inc B-1 2017_0315_Addington_SW Management Report 411 fe BP-1 BP-2 <DR1> - DET-1 DET-2 C > C > C > Ex WSEx-2 BP-1 BP-2 DR 1 Dti Dt-2 011AP-2 Det'ond 1 Det Pond 2 (new Link) II MI (new Link) 4ubca) Reach 'on. NI Routing Diagram for Potter Road SWM-WS1 Prepared by Cardno, Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Potter Road SWM-WS1 Type ll 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment BP-1: BP-1 Runoff = 7.09 cfs @ 12.29 hrs, Volume= 0.739 af, Depth> 0.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 11.750 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.650 68 1 acre lots, 20% imp, HSG B 16.990 68 Weighted Average 16.460 96.88% Pervious Area 0.530 3.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 150 0.0533 0.13 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.2 875 0.0305 2.81 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.6 350 0.0100 9.44 66.70 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' , n= 0.013 0.3 110 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 4.4 2,242 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 29.5 3,727 Total Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 3 Subcatchment BP-1: BP-1 Hydrograph I I I I I 1 II ®Runoff` 7.09 cfs 7 FiType II 241;hr --- ---- -- ----1--Year-Rairtfalt2:95" 6 ,., 1,11 Runoff Area®16.990 ac 5 - i ttil Runoff;Volume=0.739;of -, 1 I I I I 1 - ; Runoff-De - - 4 Flow LenOth9 727 II 3 „HITc=291 5 niin )11 CN=68 2 �I I I j '4 .04,zier,"„e", ,„,, 11 I I I 1 j,„ I I I I 5 6 7 8 9 110 11 112 1'3 14 15 16 117 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment BP-2: BP-2 Runoff = 12.08 cfs @ 12.25 hrs, Volume= 1.352 af, Depth> 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 18.540 70 Woods, Good, HSG C 27.820 58 Meadow, non-grazed, HSG B 46.360 63 Weighted Average 46.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment BP-2: BP-2 Hydrograph / I ; I I I I I a I I J J L I 1 J 1 I J El Runoff 13 , l - 12.08 cfs gir --� -I I L ; I I 12_ Ti T_ype_1i 244hr__ I 11) I I , I 11� _ 1-Y-ea-r- Rainfall?-2.95 - 10_' 1 I I p 9- r s :f( ie#tnoff A 'ea�=46. 60 ac ! $� ; __- r -- -Runoff;Vo�urie=1-352 of Runoff-DepthhG 35"- . , - Flow Length;3,352 LL 6 I 5` J , L ) i Tc=24;.7 i n I i I I 4� C - -4 i ► -6 3 I - I I I /�+' I I 1 l!I i I I I IMS 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DET-1: Det 1 Runoff = 2.14 cfs @ 12.20 hrs, Volume= 0.189 af, Depth> 0.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 4.340 68 1 acre lots, 20% imp, HSG B 3.472 80.00% Pervious Area 0.868 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.2 177 0.0565 0.14 Sheet Flow, Sheet Woods. Light underbrush n= 0.400 P2= 3.56" 0.8 184 0.0543 3.75 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.2 129 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Penm= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 23.3 750 Total Subcatchment DET-1: Det 1 Hydrograph ®Runoff 2.14 cfs -1-Type II 2441r-- - 1-Year Rainfall 2.95" �S Runoff Area=4.340 ac Runoff;Volutne=0;189 af I Runoff Depth>0.52" 3 � ."- - - Flow-Length=750'-- Tc=23.3 nlin k CIV-68 o f. . V- ` c is>. ¢,�; ;iii 5 6 7 8 9 10 11 • 12 13 14 ,15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 1-YearRainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment DET-2: Det-2 Runoff = 7.71 cfs @ 12.12 hrs, Volume= 0.562 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 12.830 68 1 acre lots, 20% imp, HSG B 10.264 80.00% Pervious Area 2.566 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 100 0.0200 0.12 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.0 135 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 17.3 1,433 Total Subcatchment DET-2: Det-2 Hydrograph ®Runoff 8- 7.71 cfs 7J. --- -- -k ----- - - 1-Year Rainfalls 2.95" 6= Runoff Area=;12.830 'pc 5_: " --Runoff;Volume=0;562;of-- . - Runoff Depth>0.53" T V LL y Flow Length;1,433' �� 3-� Tc -17.3 rn i n I I I I I I _CN-168 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WSI Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment DR-I: DR-1 [46] Hint: Tc=0 (Instant runoff peak depends on dt) Runoff = 11.15 cfs @ 11.90 hrs, Volume= 0.411 af, Depth> 0.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 5.570 70 Woods, Good, HSG C 0.260 98 Roofs, HSG C 1.240 74 >75% Grass cover, Good, HSG C 7.070 72 Weighted Average 6.810 96.32% Pervious Area 0.260 3.68% Impervious Area Subcatchment DR-1: DR-1 Hydrograph I I I I I I _ ®Runoff 12: 11.15 cfs 11 ' Type 1124-hr - - I I I 1 1-Year Rainfall=2.95" Run®ff Area=7.070 ac 8. __- ---Runoff_Volum e=0;4.11 af_ 7-3 _ Runoff Depth>0.70"- Tc�®I.®-Ftiln_- IJ. C N=7 2e _ 4-- - - --- - ---- - - - - ---- -- - - 3_^ i 'IX -- 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 20.58 cfs @ 12.25 hrs, Volume= 2.304 af, Depth> 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph 7___ ___I I r T I _r r _____I ___r I 1 I 1 I 23] , , I _ 7 _ __ _ ___ I- ®RUn Off 22- . ----I----t--- -I - --- 20.58 cfs -,- 1 21,- t -1- - r 20- ; -- - - - ----;-T-yj�e IF 244hr�- 181 . , -+ i-Year_ RalrifallI 2.95"_ 17= i I I JO 16-:- -; - ROo f Al ea- 78.97® ac-- 15= ----+ ' _ Ru oifff Vo ume-2;304 af-_ 14= I 47. 13- • I 1 ���l 1 I 1 1 I 1 �_ a Runoff_ Depth .0.35" - .2. 12= - 4 11=' i , Iru. rFlowl�ength 3,352'I I J �_� 1 L 1 - I I 1 1 1 Tc-24a.7_r_ in__ 8-, ; -t �n 6_ 1 1 J L vY//�,___1____L____1_ ___1 C �J�v 1 1 1 ' I I 4_ 1 /! -r ��0�� 1- 1 -I 1 1 I 1 1 1 I 1 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment Ex-2: Ex-2 Runoff = 6.13 cfs @ 12.17 hrs, Volume= 0.483 af, Depth> 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph 1 , I iJ Runoffr 6.13 cfs 6- Type II 24;hr _ , C1 1-Year_RairifaII Z,95" 5— 11 Runoff Area=9.600 'ac Oa Runoff\/oHume=0:'483af 4- ' y _ I c:::: Runoff Depth>O.6O" ,° 3-' 0,11 FIo Length=694' Tc=21.0 rnln 2—, AA CN=70 I -- 5 6 7 8 9 10 11 12 1'3 14 15 1'6 • 17 18 1'9 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 10 Summary for Pond P-1: Det Pond 1 Inflow Area= 4.340 ac, 20.00% Impervious, Inflow Depth > 0.52" for 1-Year event Inflow = 2.14 cfs @ 12.20 hrs, Volume= 0.189 af Outflow = 0.65 cfs @ 12.70 hrs, Volume= 0.167 af, Atten= 70%, Lag= 30.0 min Primary = 0.65 cfs @ 12.70 hrs, Volume= 0.167 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 100.41' @ 12.70 hrs Surf.Area= 6,898 sf Storage= 2,666 cf Plug-Flow detention time= 88.3 min calculated for 0.166 af(88% of inflow) Center-of-Mass det. time= 50.9 min ( 892.1 -841.2 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 12.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.65 cfs @ 12.70 hrs HW=100.41' (Free Discharge) L1=Orifice/Grate (Orifice Controls 0.65 cfs @ 2.17 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) - 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) , I IPotter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 iHydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 11 Pond P-1: Det Pond 1 IHydrograph ®Inflow 2.14 cfs ' ❑outflow I -- Inflow�Area 4.340 ac-- °Pnmary ❑Secondary • Peak EIev' 100.41' ®Tertiary 2- l(1 Storage=2,666 cf , .0,, r r IV) .2. - rHR c rf 1 LL 1--' 10.65 cfs ;ter„yzjir, y���/i/'/r�/l�I i Az-..#9,7,4 w.e/z,fff. re4-#7;4, ' '.-',' '''''..4„... Ia a a �'/////�///////////// ///AO //// 0.00 cfs /7/O//////O/////I///////////U/////////////////////////////////////O 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 12 Summary for Pond P-2: Det Pond 2 Inflow Area = 12.830 ac, 20.00% Impervious, Inflow Depth > 0.53" for 1-Year event Inflow = 7.71 cfs @ 12.12 hrs, Volume= 0.562 af Outflow = 3.71 cfs @ 12.34 hrs, Volume= 0.531 af, Atten= 52%, Lag= 12.9 min Primary = 3.71 cfs @ 12.34 hrs, Volume= 0.531 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 100.82' @ 12.34 hrs Surf.Area= 7,582 sf Storage= 5,634 cf Plug-Flow detention time= 43.6 min calculated for 0.531 af(94% of inflow) Center-of-Mass det. time= 24.7 min ( 861.6 - 836.9 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 24.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=3.70 cfs @ 12.34 hrs HW=100.82' (Free Discharge) t1=Orifice/Grate (Orifice Controls 3.70 cfs @ 3.07 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) 1ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 13 Pond P-2: Det Pond 2 Hydrograph I I I = ®Inflow .71 cfs ' o Outflow nflo_W Area 12...83{-alc-- ®Primary ----r------------ y---7 - - r El Secondary Peak EIev=100.82' ®Tertiary Storage=5,634 cf 6 - 71 r w 5 I 3.71 cfs 0 4 7 r r 1:11; #00% 2 400,7400, I.I,%Jj/fo�l 0.00 cfsosrAWM,!//!/!//!!//ir%%/////Q///////////////////////////////////////Lf 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 14 Summary for Link 1L: (new Link) Inflow Area = 88.570 ac, 0.00% Impervious, Inflow Depth > 0.38" for 1-Year event Inflow = 26.09 cfs @ 12.23 hrs, Volume= 2.787 af Primary = 26.09 cfs @ 12.23 hrs, Volume= 2.787 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph / 1 I ®Inflow I 7S flci of I Pnma 28_ 26.09 cfs -in#Iow Area=38.570 ac Primary - ,, I 1 ' 1. I I 24- - +- _ I I "t:�{ j I I 20-.� , 1,` ,ff__J____L_ __ i_____ , 1 f I 1 18 'AO/ ` 71 I 16_` I I � IAilI I I I 12-- K - I I F �,� I I 10-x' f/1 r- -t T I 5 6 7 8 9 10 11 12 13 14 1'5' 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 15 Summary for Link 2L: (new Link) Inflow Area= 87.590 ac, 4.82% Impervious, Inflow Depth > 0.44" for 1-Year event Inflow = 24.23 cfs @ 12.27 hrs, Volume= 3.200 af Primary = 24.23 cfs @ 12 27 hrs, Volume= 3.200 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 2L: (new Link) Hydrograph I 1 1 I I -L ' ' I ' ©Inflow Y 1 I I 24.23 cfs I 24 3 Nnflow_Area-$7_.59Q_ac- 1 I I 22 1 1 l I J 20 1 1 18 -1 1�' -1 [- + - - 1 1 1 16 I -r w1 14 , 1 12 - 1 -__ ___ ri)/0.000, ,r t / __r__r !!'iii�iTTLL/,'//YAA�BB i r Y 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment BP-1: BP-1 Runoff = 29.05 cfs @ 12.25 hrs, Volume= 2.581 af, Depth> 1.82" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" i Area (ac) CN Description 11.750 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.650 68 1 acre lots, 20% imp, HSG B 16.990 68 Weighted Average 16.460 96.88% Pervious Area 0.530 3.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 150 0.0533 0.13 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.2 875 0.0305 2.81 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.6 350 0.0100 9.44 66.70 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.3 110 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 4.4 2,242 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 29.5 3,727 Total Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 17 Subcatchment BP-1: BP-1 Hydrograph 11111 32 1 1 i I F1_ 1 1 1 1 ©Runoff` 29.05 cfs ____ -___I i i i i _ 30: 11 28 � - r i -I-T�/pe II-24 hr_ 1 1 , 1 1 1 26 1 t - 10-YearRaInf-aH 5.20" 1 1 I I 1 1 I I 24_ , _ 1 0 - RIO-off Area 6.990 ac 22 i i 01 20 _ j 4_ i 1. Runoff;Voume=29581,of 18= i Runoff Depth�1-.92"- 03 16_ y -t r 1 , , 1 , II f rodv C.ength=3;727'__ u. 14 i i 1 __ _ 12 - i � Tc=29.5_rriin _ T 10 i w, cc i et, i CItl�V8 - 8 i g 1 1 I i - fff/%/////Z/////.//i///1/%e":" 1�. . . ' .. . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment BP-2: BP-2 Runoff = 69.22 cfs @ 12.20 hrs, Volume= 5.647 af, Depth> 1.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 18.540 70 Woods, Good, HSG C 27.820 58 Meadow, non-grazed, HSG B 46.360 63 Weighted Average 46.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass' Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment BP-2: BP-2 Hydrograph I I I 1 75_ I I -, I I I I L®Runoff' - 69.22 cfs -- 1 70_ + l- ' j --; 11-- TyPe II 24=;hr 65i I 1 1 6`0- ' - - ear aln a -5.20 55� , Runoff AMea=4&360 ac 50_ '- 0Runoff Volume=5 647 of 45-1-- 40 11/11 Runoff Depth>---1-A6"- 3 - -_ J 1 a ' 4---- --- 1 I -17. 35� � ; 1Flow Length;3,35.2'_ • 30=' ' ' - ----L-- 1-024.7 nein-- 25 , 'I I 1 I I 20 = fi , 0 ; D1V=163 J 1L _ 1 L 1 I J 15 1 1 i I I I -I T 7 1 G 4>9". 7 1 _1 L fI"r, Q I 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment DET-1: Det 1 Runoff = 8.65 cfs @ 12.17 hrs, Volume= 0.661 af, Depth> 1.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 4.340 68 1 acre lots, 20% imp, HSG B 3.472 80.00% Pervious Area 0.868 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.2 177 0.0565 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 0.8 184 0.0543 3.75 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.2 129 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 23.3 750 Total Subcatchment DET-1: Det 1 Hydrograph Runoff' 9- ' 8.65 cfs Type-Ii-24;hr-- 8- 10-Year Rainfall5.20" Runoff Are0=4.340 ac Runoff Volulrne=0.1661af N _ I I 5� Runoff De�pthy1.83"-- LL J Flow-Length=750'-- 10 Tc=2313-nn i-n-- r OJ IV=166 T---- 2 I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment DET-2: Det-2 Runoff = 30.51 cfs @ 12.11 hrs, Volume= 1.959 af, Depth> 1.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 12.830 68 1 acre lots, 20% imp, HSG B 10.264 80.00% Pervious Area 2.566 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 100 0.0200 0.12 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.0 135 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 17.3 1,433 Total Subcatchment DET-2: Det-2 Hydrograph 34I _ J 1 1 L 1 1 1 L 1 J p Runoff 32 I 30.51 cfs 30 , , P Type_l�_24 hr_- 28 26 4 _ 10=Year Rainfall .-2®"-- 1 i L __ ___ _1___ _L 1 _ -_I __I 24 ; - _Runoff Area 12.p3Q,ae _ 22 , i ----- r , ----Runoff Vodurne 1 959;of- 20 -- - - '1 "-- --- ---- / -- -'-----4- - , - k I 18cn Runoff Depth>1.63'® ,° 16.14 , r `V , Flow Length=-1;433' 12- I -+ + - '� ' 0,- -1 To1=17:3 niin 10 : CN=68 I . 1 l ; 6 J r J i 1 L I k ______1____L 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment DR-1: DR-1 [46] Hint: Tc=0 (Instant runoff peak depends on dt) Runoff = 34.27 cfs @ ' 11.89 hrs, Volume= 1.273 af, Depth> 2.16" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 5.570 70 Woods, Good, HSG C 0.260 98 Roofs, HSG C 1.240 74 >75% Grass cover, Good, HSG C 7.070 72 Weighted Average 6.810 96.32% Pervious Area 0.260 3.68% Impervious Area Subcatchment DR-1: DR-1 Hydrograph -+----'----4-- - I - 38 i '---- ®Runoff. 36= - -- 1 L 34.27 cfs --- - ++ - 34 Type-ll-2qq 4hr-- 3a_ - i lb-Year rainfall=5. 0 I t I I I I I 28=-' - - - - - - - ---- - -- Runoff-O�rea=7.070 a+c 24= r _ -- - --Runoff;V-olune=1;273-af- w z0.3 1� Runoff Depth>2.'f 6'w- • = 0 18-- - 8 Tc=®.0 rvi i n 18= 14� I CN=72 3 4 4khee.„&LA/40 21 5 6 7 8 9 10 '11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 117.90 cfs @ 12.20 hrs, Volume= 9.620 af, Depth> 1.46" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231 62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph _J-- --L--- -'-----1 -- 1 -" .1 - - 1 - _L - --_I L I , I I I I I -1 1 1 1111111 130 -I r I r I T 7 r , r- - --1 r 1 ®Runoff 125. L 1 117.90 cfs - L L 120 , , g q/ r 115 J L I 1 0 --1 _ - Type �� Hn�1 __1_. __ 1 t L 1 J J__ I • I I I I I I 110 -I r i FIT- -1- r--- I I - , r I - 105 = � ___ ; Hiii- 90 earRairrfallx.20"- 100 Runoff Area '18.970-'ac= 90" EL I I 1 r __ r Runoff Depth> AV r.A 70 •----- I I I ----- - -- 3 65 + o -- F ---r----I ° --'- 60 1 I Ft--I-- Length=3 3 2' 111111 . 50 I lir I i I _Tc`241 7_11 in- 45_ - - - 1 - + - 1 r 40 1 1 1 1 35= "-----t----r----1----r----I----+--/I- ^ I63- 30 r L Lr 1 I 25 r - I r20- "-r---T--���--� r ---- -I----r- , --- -r----1 J L L L 1 4 r 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment Ex-2: Ex-2 Runoff = 22.24 cfs @ 12.15 hrs, Volume= 1.587 af, Depth> 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods. Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph ' 1 1 p Runoff" 24-f' , 1 22.24 cfs -i i r _ 1 -1 23 22" •---- i----------- ---t- - r - - r-- ----Type II 24.Thr - 20 i + _,_-- - - - - - - --10-Year Rainfal fr5:20"-- 191" , , , 1 , , , 17 -- ---'----- - - - -- - -Ru offArea=9;_600,ac - 16- , -' 1 ;- --Runoff /O Lit�e1-587-af- 15� -- -- , ti y 14 , i __ 2. 13 , 1____ Runoff®�pth 'I.O6"- 12 ,- , 1:10 ,,_ 11 + - Flow L-ehgth`604'-- 105 -, T 7 r 7 I 9j --__ Te=21:0 min 8-", -1 T 7- r ----1:1 7 7 T -V1�-,7 @/ 7:21 , , _ , , 3�' - , , , -, , pd e4t7V,z,4- , i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) • Potter Road SWM-WS1 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD©10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 24 Summary for Pond P-1: Det Pond 1 Inflow Area= 4.340 ac, 20.00% Impervious, Inflow Depth > 1.83" for 10-Year event Inflow = 8.65 cfs @ 12.17 hrs, Volume= 0.661 af Outflow = 3.39 cfs @ 12.51 hrs, Volume= 0.625 af, Atten= 61%, Lag= 20.0 min Primary = 3.39 cfs @ 12.51 hrs, Volume= 0.625 af , Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 101.30' @ 12.51 hrs Surf.Area= 8,197 sf Storage= 9,489 cf Plug-Flow detention time= 55.5 min calculated for 0.625 af(94% of inflow) Center-of-Mass det. time= 36.0 min ( 849.7-813.6 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 12.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=3.39 cfs @ 12.51 hrs HW=101.30' (Free Discharge) L1=Orifice/Grate (Orifice Controls 3.39 cfs @ 4.31 fps) ,Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 25 Pond P-1: Det Pond 1 Hydrograph I I I I I I I I I I I I I I I I k- 1 ®Inflow tz-- ---k—--- --—-- —-__ $.65 cfS 4 I+ I 1 1 1, 0 Outflow .�., I I I I I ..1- - Inflow Area=4.340 ac- o Secondary 11 9-: 1 -T-- -Peak-EirIev=101.30 ®Tertiary JII --1--- Storage=9;4'89-;cf i I �I -r--- 7 f --r r r r r 6_ a w _ 11 �0rf -1.1 1 L - iz 3.39 c� 4- i i 3� 1 - //! '� ' I/ � 2 �%///// ZerAreY// 0.00 cfs %//////////. lO////O,/O///l/////////////////////I///////O//////O 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWIM-WS1 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Pane 26 Summary for Pond P-2: Det Pond 2 Inflow Area = 12.830 ac, 20.00% Impervious, Inflow Depth > 1.83" for 10-Year event Inflow = 30.51 cfs @ 12.11 hrs, Volume= 1.959 of Outflow = 18.03 cfs @ 12.26 hrs, Volume= 1.909 af, Atten= 41%, Lag= 9.4 min Primary = 18.03 cfs @ 12.26 hrs, Volume= 1.909 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 102.42' @ 12.26 hrs Surf.Area= 9,361 sf Storage= 19,299 cf Plug-Flow detention time= 26.1 min calculated for 1.902 of(97% of inflow) Center-of-Mass det. time= 16.5 min ( 825.6 - 809.1 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 24.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=17.98 cfs @ 12.26 hrs HW=102.41' (Free Discharge) L1=Orifice/Grate (Orifice Controls 17.98 cfs @ 5.72 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) 7-ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 27 Pond P-2: Det Pond 2 Hydrograph i r -- - - - -- - - ,- I - --1 --1--- I --- Y - 1 I I I I I I 30.51 cfs I I 1 H r r , 7 r ❑Outflow - --Inflow Area=42:830-ac- ®Pnmary ❑Secondary 34_ I j Peak Elev=T02.42r ®Tertiary 30 I Storage=19,299 cf 28 .. I 1 26- 1 7 . J J 1 L 1 1Rn1rf i I I I 24= 1 1 I_ _I18.03cfsi i I 1 D0. I 1 1 y 20J i r- 18-i- r- f --1- - -1 r LL ! I I 6, // /Q 9 illy /�-----®//0/--. 7.A.. 0/�0//r 0.00 cfs IV ,/////////////////////U//////U//////U///U////U/////U/////////• 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 28 Summary for Link 1L: (new Link) Inflow Area = 88.570 ac, 0 00% Impervious, Inflow Depth > 1.52" for 10-Year event Inflow = 138.99 cfs @ 12.19 hrs, Volume= 11.207 af Primary = 138.99 cfs @ 12.19 hrs, Volume= 11.207 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph II I I I I I .1 1 1 I-_ 1 1 I- 1 1 L 4 ' l I'3R QQ rf Inflow I 50= i 138.99 cfsrlf L_ __ J cf -i jowArea80570ac I I 130 I 1 Imo` 1 120 T I T -1 r i�' ___- I_ L___1_ �/ 1__ L_-_1 110 I 1 1 1 1 1 I I I I I I I I I I _ 1 1 '1 N 90' 1 1I J I J L J 'y L 80=r ,f 1 I 1 1 1 -- - 1 --- -- r- ---1-- -r--- I �, ." 1- - I - -- -r - r---- LL 70 _ I I /!1, I I 1 1. -' I- _ _ r _1-_ 1 4 L ' 60.- 1 LO`I I �� I 40-E 1 1�'�%p`1 I 1 1 1 303 ,' J//!` 1 I OOp6a1I O.4V2-00 % 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ii Potter Road SWM-WS1 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 29 Summary for Link 2L: (new Link) Inflow Area= 87.590 ac, 4.82% Impervious, Inflow Depth > 1.65" for 10-Year event Inflow = 121.76 cfs @ 12.22 hrs, Volume= 12.034 af Primary = 121.76 cfs @ 12.22 hrs, Volume= 12.034 af, Atten= 0%, Lag= 0.0 min ' Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 2L: (new Link) Hydrograph I 1 I I I ./ i 1 I I 1 l _171 7F rf ®Inflow _ J J____J__ __L, - J 1 J _LL_____ 0Pnmary 130_ 121.76 cfstlnflowRrea=87.590 ac__ 1207- ,• -f0, I JJ I I I I I I I 110 ' r r r T r -r _ O I I 1 I I I 1 100_' _____ ________ 1 r. I I - I I I I I I I I I I J.._ J-___J____L___1_ `� L J -t 1 90J ' I I �. I I I I I I I I 1 I w _ • I I '� I I I I I V I I I I 70- ' r r ? 0. -r 4 7 r `$ I I I I I u. 6o I I I I I I I I 1 50 a L J L .. L J 1 J L 1 O_ , I ., . I I I I 40- ' I y r--- 1 I V ° I I I 0 I 1 I I 20.� �OO '.' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment BP-1: BP-1 Runoff = 40.60 cfs @ 12.25 hrs, Volume= 3.565 af, Depth> 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 11.750 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.650 68 1 acre lots, 20% imp, HSG B 16.990 68 Weighted Average 16.460 96.88% Pervious Area 0.530 3.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 150 0.0533 0.13 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.2 875 0.0305 2.81 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.6 350 0.0100 9.44 66.70 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.3 110 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Penm= 13.1' r= 1.33' n= 0.035 4.4 2,242 0.0210 8.58 231.62 Channel Flow, Main Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 29.5 3,727 Total Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 31 Subcatchment BP-1: BP-1 Hydrograph 1 I I I I I 44' I I I I I I ❑. Ruoff n • 40.60 Cfs 42- , I I I I I I -/r __-�_ ____ I ____ -__J-_ L _/ __ __ 1 L _ 1 40. I 1 Type-II-g4;hr38= t 36- '- 25-Year Rain€a11=6.20" 34- L 1 -_L 32i.. - 40+ - Runoff Area=76.990 ac 28=- , - - Runoff, oume�3�565;of- y 26= ' __- 1 1 _ L_ 24 I __ _--_1-RU_ _1_no-_ _ff De__pth>2.r2'-- 1 _ - t 1 jr 3 2z LL 20=- -- 1 i Frow_Length=3,727'_ I 1 I I I I T_c-29.5-n'�iL4- 16 '/, -- r ��r 14- /� I I I 123 - a --- - ----1--- -4----- ri O L-__ _I___ _ _-_ __Clil.�/q�p�JV __ 101 . ---y r r r11 6G 1 J I ,,A �' --eO 1 1 J ' I I I �OOOOOppp�021 00000p 6rdOMP.7,- 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 11 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment BP-2: BP-2 Runoff = 101.28 cfs @ 12.19 hrs, Volume= 8.066 af, Depth> 2.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 18.540 70 Woods, Good, HSG C 27.820 58 Meadow, non-grazed, HSG B 46.360 63 Weighted Average 46.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment BP-2: BP-2 Hydrograph / 1 I I 1 I 1 1 1 110- • I I I I 1 I , I I I -- 1 - 1 i�� Runoff 1054 ' ; __ 101.28 cfs L � 1 1 1 h100C ' I *- * 1T e 124 r 11 I zO r r -I r I 90- , ! : ij ! 25-Year--Rainfall=6.-20" - 85- --J- - ' L 1 L 1 , i 80- -H -� -1- ---I --- -Runoff-Alf ea=46:360-'ac- I I I I I I 1 I I I I 75=' - -1 r r- - 71---_f --1----r----1-- i 701' --;Renof#;uollx.ime-B.O�S;af- i, 65= , J l- L _ 1 I 1 � J1J _I_ 1I - Runoff-Depth?2.09"- C 55 ' I -I--- I 1 1 ,� 50_ J L L 1 r; _i, Flow Length=3 352'- 1 1 1 I D I 1 45= * /� a� T mmI- 404 , 1 I D 1 --r- I_7T-c -24�T-•'-��n- 35-? r 1 1 1 1 '30_ , L 1 Al ������///III/// 1-___L___J____ 1 ___-1__-_ _I��IV_V 1 I 1 " " 0 1 I 1 I I I I 25 :-----1 r I Y '1----r----II----1- -1 r,- 203 204S 1 1 1 ! 'I I I 1 I 1 -I - -L --1 ----I-----I -� �i - ---�-- - "__1 _ 1 _ I I 10= ' 1 - �D�Op0000011001 5-.1,2 ' 00�000/1J000O. y,• G'O 0-0000000,0." .!0000000/OOOOlI00/�� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment DET-1: Det 1 Runoff = 12.07 cfs @ 12.17 hrs, Volume= 0.913 af, Depth> 2.52" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description _ 4.340 68 1 acre lots, 20% imp, HSG B 3.472 80.00% Pervious Area 0.868 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.2 177 0.0565 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 0.8 184 0.0543 3.75 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.2 129 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 23.3 750 Total Subcatchment DET-1: Det 1 Hydrograph = ' _❑Runoff` 13: -- - --- 12.07 cfs - - I 12- . i I I Type_IL2_41hr__ „- 11! 25-Year-Rainfall=6.20"-- 10- Runoff-Are0=4:34-0 aC 9, 87.:- 0----Runoff Volume=0 913-af- fl 7. 1.0 ------- Runoff Depth>2.52" ° Flow Length=750' 5� iir `_ _ _ I r Tc=23 3 to i n I I I I 4y' Q `' 63 3J Y I I 0 2] 1 �O a: its/7/7/i,rilii/iiii'`ii�//.//// - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment DET-2: Det-2 Runoff = 42.39 cfs @ 12.10 hrs, Volume= 2.706 af, Depth> 2.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 12.830 68 1 acre lots, 20% imp, HSG B 10.264 80.00% Pervious Area 2.566 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 100 0.0200 0.12 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.0 135 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 17.3 1,433 Total Subcatchment DET-2: Det-2 Hydrograph 1 I 1 1 1 1 1 1 1 ----I---- 46. I 1 Icfs 11 p Runoff' 44 J L 42.39J.111 1 _I 42- _,,iii1 -- -; --Type-H 24 hr- 40 - 1 1 1 r 38 -a ! 25=Year-Rainfal I=6.-20"_ 36 I r- r - - r- -1 1-- _ I 34 _ ---J -- ---- Run-off Area=12:83-0-,ac-- 32 ;1 1 1 30 -1T Runoff;!/oWme=2706;of 28. J ^" 1 1 1 - -1 1 1 1 I w 26_ 1 - - , Runoff De th>2.53�' 24 -- T -I 1 -1 1 -1 -- 1 -r--- I--- - lj 0 22= - J 1 Flow L-ength=1-43-3`- 18 ' _ - J_ L ID______ � _; T6,=17,.3= ' min 1 12 1 1 � 0 1 CN 168 _ 1 1 1 O 1 1 10 J 1 J L a J L 1 - 8 7 T -r r ::/1 /,� -r- r 6 _ J/ f/D 4 ��00000 '-' 'OOp0000",ffep00000� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment DR-1: DR-1 [46] Hint: Tc=0 (Instant runoff peak depends on dt) Runoff = 45.63 cfs @ 11.89 hrs, Volume= 1.718 af, Depth> 2.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 5.570 70 Woods, Good, HSG C 0.260 98 Roofs, HSG C 1.240 74 >75% Grass cover, Good, HSG C 7.070 72 Weighted Average 6.810 96.32% Pervious Area 0.260 3.68% Impervious Area Subcatchment DR-1: DR-1 Hydrograph 50 - L - ' - 1 - - ❑O Runoff 48! ;- -; 45.63 cfs � , -I- , 46-' • - -J- I .1 L I TyT T1 tI 71 pe-if 24 hr- I 1 1 _ J L ! 1_ 1 _1 i J 40,f; - ____,___ T____ I T 25-Yea-r-Rainfall-6-.20"- 38' • J 1 J L L I J L 1 I J 36`- - -, T r - --Runoff-Ar-ea=7:070 ac-- 34 1 J L 1__ I J _L____I____l____IJ____ 32 , 1---- r Runoff;Volume=1 7-18-of- 30- 1 I I I I I I I I w28= I I n 26: , I I ' Runoff ®efh>2:92 24=' -1- +- I 1 I 1 , 0 _. 22-r •• Tc=01.0-min_ I I I I I 20= ----I - 1 - '- -- -' - 18 i ; -CN=,72- 16 - I 4, a I ! I I I I 1 14i- I 1 , I I 1 I 1 - 12° --- I- - -- '- --I - --- -- --J- I- --F I - - --' - - 1 ----1- ---1--- I I I I I I I I 10'_ I T r r I -I 8�, _ J l ' _ / L 1 I J 1 I 4„ 4 T 1 4j4,, ___ ' -- -1 --' - - /QO��Y/ �d01100000�Oy1000���UO00000000�l00/I/IffO000i'' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 172.52 cfs @ 12 19 hrs, Volume= 13.739 af, Depth> 2.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph 190 O Runoff` 180= ' _ 172.52 cfs 17O ' T-ype-I,I-24;hr- 160_ ! 15°- 25-Year ainfall,=6.-20" 140.1 Ru noff Area=78:970-ac- 130 _ 120_ AO R.unoffVolume13J39 of_- ,00 Runoff-Depth2:09"-- 0 90 Flow l.en' th-=_3 352'- 70 i Tc=24.7 m i n 60 r r 1prir r CN=63 50 ' r r 7 s# r 30 — r T 0D0 01 O OlOO7: 1°0 /OOOOOIIj./�U00000�0r"re00� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment Ex-2: Ex-2 Runoff = 30.50 cfs @ 12.14 hrs, Volume= 2.167 af, Depth> 2.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods. Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph 34' I I I I ___J___ __1 J L. I I - 1 Li ©Runoff 32- " 30.50 cfs 30_"' T'yp.e-11-24;hr-- 28- _ -+ -1 -F 25=Year Rainfall=6-.-20"-- 24'2 ' _ aun®ff_Ar-ea= L60Q ac_ . 22_T - _-- kRuhoffVoiume2167afJ 1 J N J 1 f E Runoff Depth"2.71" i)40----- --— -Flow- Le'ngth`604'- 14= I I I I I I I " _ - f i - _ Tc;21.0 rain 1Z= J _1J_ _ I 10 � �'' I ,- GN=7 0 I I8= I - I t -I I- -1 6-? 1 J L 1_ -- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 38 Summary for Pond P-1: Det Pond 1 Inflow Area= 4.340 ac, 20.00% Impervious, Inflow Depth > 2.52" for 25-Year event Inflow = 12.07 cfs @ 12.17 hrs, Volume= 0.913 af Outflow = 4.34 cfs @ 12.52 hrs, Volume= 0.872 af, Atten= 64%, Lag= 21.2 min Primary = 4.34 cfs @ 12.52 hrs, Volume= 0.872 af Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 101.82' @ 12.52 hrs Surf.Area= 8,719 sf Storage= 13,824 cf Plug-Flow detention time= 54.3 min calculated for 0.872 af(95% of inflow) Center-of-Mass det. time= 37.9 min ( 845.0- 807.0 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation 'Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 12.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=4.33 cfs @ 12.52 hrs HW=101.81' (Free Discharge) L1=Orifice/Grate (Orifice Controls 4.33 cfs @ 5.52 fps) Secondary OutFlow Max=0.00 cfs © 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type ll 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 39 Pond P-1: Det Pond 1 H/ --------------------------------------H--- -- droraph 12.07 cfs I I1 I I 1 ®Inflow 1 1 I I 1 1 ❑Outflow ( nflow-Area=4.340-ac -l ; I I 1 I I ®Fnmary ❑Secondary J___ F_C 2s ®Tertiary 13� ��////��� Peak GJev�lOt82 ,21 Stolrag;e=13824'cf_ 11=' .I l !! I - ------ -- - - - - l -- - 10= ',I, I I - I 1 a a = - --k-- -- - 4.34 cfs % - - -- - --- --- • 4-::./,--- „,- ,• ; 1- .4-A3 , r - , - Pi' ':.:''' .".' * --- -, . ' ,. .Wii:". _ ' -- // ��iredZmoirl®O///i,,09.3// 0.00 cfs %/////y//////////// //////////////////////////////////////////////!///' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 40 Summary for Pond P-2: Det Pond 2 Inflow Area = 12.830 ac, 20.00% Impervious, Inflow Depth > 2.53" for 25-Year event Inflow = 42.39 cfs @ 12.10 his, Volume= 2.706 af Outflow = 24.26 cfs @ 12.27 his, Volume= 2.648 af, Atten= 43%, Lag= 9.8 min Primary = 22.84 cfs @ 12.27 his, Volume= 2.632 af Secondary= 1.42 cfs @ 12.27 hrs, Volume= 0.016 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 103.28' @ 12.27 hrs Surf.Area= 10,302 sf Storage= 27,738 cf Plug-Flow detention time= 24.6 min calculated for 2.639 af(98% of inflow) Center-of-Mass det. time= 16.5 min ( 819.0- 802.4 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 24.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=22.77 cfs @ 12.27 hrs HW=103.27' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 22.77 cfs @ 7.25 fps) Secondary OutFlow Max=1.33 cfs @ 12.27 hrs HW=103.27' (Free Discharge) 2=Orifice/Grate (Orifice Controls 1.33 cfs @ 1.66 fps) 1ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19_s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 41 Pond P-2: Det Pond 2 Hydrograph I I I I I ii f_ ®Inflow / 42.39-cfs nflow urea='�2:830- � __ ❑Outflow P rimary aa� ❑Secondary 45-" I -Peak-Elev=103.28. _ 0 Tertiary 40 �� Storage=27;738 of- 'I /1 J _, 1 , 35 F2747.26 cfs 301' - 22.84 cfs N / 25. ii: 20- • / )10* - 15-'' 10i �. C 1.42 fs -44571"101", ZoOPMAPIrZel,2%. ,A, c ' ., ice-' = 0.00cfs 10 p,�/ ,/ �/ �y� �yf� ///%I . ,- O//////.-, -, O//may/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type Ii 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD©10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 42 Summary for Link 1L: (new Link) Inflow Area = 88.570 ac, 0.00% Impervious, Inflow Depth > 2.16" for 25-Year event Inflow = 201.56 cfs @ 12.19 hrs, Volume= 15.906 af Primary = 201.56 cfs @ 12.19 hrs, Volume= 15.906 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph I I I I I I II I I I _ 1 I I 120'1(11.. F.rf- - -_ � - 1 1 LU III Ir I"r r _1efsvrn '220- ' y y 200-' ,, ow Area=8-8-5Thac-- - I ;/. I I I I I I Iso= ,---- - - - -- -- -- --------+--- -I----�--- +---- 160- ' I I I I I I I I I I I I I 1 I I 1 ��//� 1 I I I I I I 170=' J I L L L J I L 1 J 1 I I 1 I I I I t I 160 ,'`___--_i____I___-}___y-_-_r_-_y 1 __t---y--______y I__--F___-I---- 150: _ I 1 I 1 1 1 I I I I 1 I I I -1 I i" � -7" I - f I f' ---7---- 140 ,' - J I 1 J L J - I L J 1 J L 1 ] , ,' I I II I I I I I I I ^ 130= - , --------I- ---+----{----r I----+ * t w 0 120=' ,', I I I I I I 1 I 1 � I I -- - I 1 1 I I I I I I I I I 3 1104:. ____J I 1 J I 1 ) __LI___1________1___J____L___1____ Q I 1 1 I I �� I I I 109' , ---- I -- --I-- --'I-- -'--I----r---- -I --f"---"I-------- 7 -- 90X'. I I 1 I I I A I I I 1 I 1 I I I I I 1 I I 80€ J I L J L 1 I � L J 1 J L J. I I I I �r///• I I I II I I __ - __ _ I- i_ _ _r_ r__ _ 6060-21 1 1 I I I I I I I I I 1 2 1 1 I I I I 50. ' _ 1 I _1___J_ _ _L_____I J 1 "1 L 1 I 1 I 1 1 I I 30_ OO 1 20' ' �O//�l/O��//l�Of/O/Il/Jp�100�000/Ill/lsU� 1000�000lgi07M,,00�00000������ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 43 Summary for Link 2L: (new Link) Inflow Area= 87.590 ac, 4.82% Impervious, Inflow Depth > 2.31" for 25-Year event Inflow = 172.60 cfs @ 12.21 hrs, Volume= 16.868 af Primary = 172.60 cfs @ 12.21 hrs, Volume= 16.868 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 2L: (new Link) Hydrograph 1 J I ! 1 , 1 1 ■Inflow ` 190= ' i , 7=117�-�R(1 i fj J 1 J L i Primary fi , 180-` IL_1=72 6o„�fs • ;It�f4'av��4r0a=87:59a ac 170_ }- -4- - - ;-1 160_" I 1 1 1 4. 1 1 150='" 140,_,- • I 1 I 1 130- - 1 1 I 1 1 1 1201 1 n 110 v - - 7 T '1 r T -r-- -f----r---T---1----r---T---- 100- / I I 1 '�'. 0 90=" 1 ,,f 1 a -- r I: . f 80 1 1 1 70 O 1 6O- C L �. i 50= ___J___ 1 J__ _L___ 1 L 40 i r 1 ''„ 30,:. J L J L 1 __I_ , ,'„ L 1 20, 1 r OOOOO �,i r .i ; 10=.- , : ` ' %; "°%` „% �Ol/�D000000010/1�0000000/0010!/ a./001000�/,O''' 'v'001'' w'' /�O!!o�' , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment BP-1: BP-1 Runoff = 50.41 cfs @ 12.24 hrs, Volume= 4.411 af, Depth> 3.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 11.750 70 Woods, Good, HSG C 2.590 58 Meadow, non-grazed, HSG B 2.650 68 1 acre lots, 20% imp, HSG B 16.990 68 Weighted Average 16.460 96.88% Pervious Area 0.530 3.12% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 150 0.0533 0.13 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 5.2 875 0.0305 2.81 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.6 350 0.0100 9.44 66.70 Pipe Channel, Culvert 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.013 0.3 110 0.0200 7.26 126.24 Channel Flow, Channel 1 Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 4.4 2,242 0.0210 8.58 231.62 Channel Flow, Main Channel Area=27.0 sf Perim= 16.4' r= 1.65' n= 0.035 29.5 3,727 Total Potter Road SWM-WS1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 45 Subcatchment BP-1: BP-1 Hydrograph ----i-----T ---- r r r r i ; - -- 55-' I ' I I ' ' 0 Runoff` L 50.41 cfs -__ -.�_-__ L I _ ____�____ 50= n Tyke II 24 4hr 45- 110 50-Year Rainfall=7 .01 ' 40 -' 0Runoff Area=16.990 ac 35: fl Runoff;Volume=4.411;of 30= ' VA Runoff Depth>3.12" - � � LL 25� FIoW Length=3,727' 20- �� Q Tc;=29.5 min b / 0 15- f C`rN=.68 - r1 0 L 1__ L 1 J 0- .r.";e31 ",3,-,•ffeeree - - „ ' , - 7-'f-..ic , 6 7 8 9 1'0 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment BP-2: BP-2 Runoff = 129.00 cfs @ 12.19 hrs, Volume= 10.177 af, Depth> 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 18.540 70 Woods, Good, HSG C 27.820 58 Meadow, non-grazed, HSG B 46.360 63 Weighted Average 46.360 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment BP-2: BP-2 Hydrograph 140-- ' 0 Runoff` - 129.00 cfs 13°� Y/ -------- 1-4,pe - 1 120 r } ; -- - - 50=Y--ear Rainfall=7:01"-- 100 Runoff Arrea=46:360 ac = - - --- - --- - 1):0 Runoff Volume=10:177 af . 80- " Runoff Death2.63" 703 Flow,Length 3,352'- LL 1Te=2'4:7 rain-- 50- -CN=63 - I I 30-! 20 ,o= ; ��Od�0000pO00UOOpO000000OpO00170 °_1000.0/IO "..D00000"..lI d""/"�� _ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment DET-1: Det 1 Runoff = 14.96 cfs @ 12.17 hrs, Volume= 1.129 af, Depth> 3.12" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 4.340 68 1 acre lots, 20% imp, HSG B 3.472 80.00% Pervious Area 0.868 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.2 177 0.0565 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 0.8 184 0.0543 3.75 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.9 160 0.0200 2.87 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.2 129 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 23.3 750 Total Subcatchment DET-1: Det 1 Hydrograph Z. I 1 I 1 I I I II I I ®Runoff 1s_ , --- ,- -7 r 14.96 cfs -- , � , h 15� Tipe 2r_ 13 T 5-0 Year RalnfaII 7:o1,r I, 12; ___-, - Run®ff-Area=4-340-ac - 11'. i Runoff'�O�urne=1. 29- f . - - f +� h>3 2" 90 a Runoff-D 'pt .1 8- Flow i.ehgt0=70' 7_- -1 7 t.,54V. Tc=23.3 mm n 5 , HI?) C =68 - 0 : , 3-' i r ,,. eb - , , -,, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS 1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment DET-2: Det-2 Runoff = 52.45 cfs @ 12.10 hrs, Volume= 3.346 af, Depth> 3.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 12.830 68 1 acre lots, 20% imp, HSG B 10.264 80.00% Pervious Area 2.566 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.5 100 0.0200 0.12 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 1.0 135 0.0200 2.28 Shallow Concentrated Flow, Swale Unpaved Kv= 16.1 fps 1.0 154 0.0162 2.58 Shallow Concentrated Flow, Gutter Paved Kv= 20.3 fps 1.5 944 0.0200 10.18 31.99 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Penm= 6.3' r= 0.50' n= 0.013 0.3 100 0.0100 5.13 89.27 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 17.3 1,433 Total Subcatchment DET-2: Det-2 Hydrograph I II I I I J 1 1 L 1 1 L 1 _ I J H Runoff` 55 52.45 cfs 501 I Type Ii 24;hr- 45 50=Y-ear Rainfall77.01" I � I I I I I 40 J L Jac--- 35 ' --Runoff Ve*rme=3.346 af- T ! ' t Runoff De v30 pth 3.13" - 1 I !fJII 3 f I LL 25 ; `;� Flow-Length=1,433` 20 �c;=17.3 niin 1 �i I I :64 cN-6$ 15 I I 1 /% 0 i 4 I 5 ppOG� 0 I°r e;le1ler:0".UO1 00�?e4fef/j®� l01'l f0�liIO.G� • 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS 1 Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment DR-1: DR-1 [46] Hint. Tc=0 (Instant runoff peak depends on dt) Runoff = 55.05 cfs @ 11.89 hrs, Volume= 2.094 af, Depth> 3.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 5.570 70 Woods, Good, HSG C 0.260 98 Roofs, HSG C 1.240 74 >75% Grass cover, Good, HSG C 7.070 72 Weighted Average 6.810 96.32% Pervious Area 0.260 3.68% Impervious Area Subcatchment DR-1: DR-1 Hydrograph I I , I I I ®Runoff so__ 55.05 cfs 1 - - I- 4 55-' , - --- - - - Type_II.24_hr _ 50- 1 L 5:0-YearRai nfal l=7.O1"_ 45- i Runoff_ rea=7.070 ac-- 40 Ruinoff Vo1u-me=2054 of- — 35 , - - Runoff Depth>3.55" 3 30 o - LL h- -, T -0�.0 n)in - I 25-, Tp=q.0 20-, 15-" 10-:',--- j°111C 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type ll 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment Ex-1: Ex WS #1 I Runoff = 219.74 cfs @ 12.19 hrs, Volume= 17.335 af, Depth> 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Penm= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph I I I I I I I -----i--- - - i I -- I - I 1 - i--- --, ---, - --1- - -i 240 - J__-_L______ 1_ _ '---.1 I L 1__ 1 -L_ ❑Runoff 230- ' -- --;- ---;--- - -; ---1 - 219.74 cfs r zzo � /I � I I I I I 210 .-- r � -_ -II- ; ;_ TypezU 247-hr I I I I I I I 200 I I --,-- - 50-Year Rainfall=7:01" 190 - __-J_____ _ _ _L__ __IL-_ -_ I i I I 180 "- __-,____I __ _ ____r____I___ T___ � _ _ _-_, I - I_ 170 -I RUPOff.Area-7897#lac_ ;50 ' ; "IZunoffoulUme 17.336 of w140 - I __� L 1 _L- J-y�_ 1_ yt //�� '�_. .Vr -- I 1 i k _ Run_l®ff Depth>2.63 130 ." r ---I----- I - - r 1 --r-- --� - --r I Depth>2:63"- , 120 I i I I- I --I --- ' ; . __ ___-' --E�4v ).-.ength_73-;3152_- 1—y 110 ' , r 100 1, -i so ' TG=247 min 70 J L L 1 1 I I- Ir I 50 1 � I , , It , - �40 - I II 1/409; :° : 7,' ,..,,,,,,..,4-77,1- : -d-e-,,,,,H-zrzeRP-r, '- 30 5 6 7 8 9 10 11 12 13 14 15 1'6 17 1'8. 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment Ex-2: Ex-2 Runoff = 37.44 cfs @ 12.14 hrs, Volume= 2.661 af, Depth> 3.33" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph / I I I , I__ _ I I I I __ __ i]Runoff` 40 - 37.44 cfs 38i J L , 1 L 1 L 1 J 36 J 1 �/ Type=I1 24,h r �� o >� 341 ------- � --- ____ - --- - -+ --- ---5 -Year Rai fall=7. ,1"- 32=' 304-- - T 1 _ r _ _Runoff-Area=9:600 ac 28=' 0 26 ' --- I unoff Volume=2.661 af- ,, 22= - - ; _ _ -- -__L_ _ - _ ,`��_ --__ -Ru- LnoffI Depth3.33" 3 20 - ' Flow Length=604 - u. 18= 16t 1 i VI Tc=21;:0 min 14:7" 12-4''. ,►/�O GN=70 - I ,I 10_ - - - �/A - - - I- 1 - ' I 42i' = -, ,-- /-+1 2OpOOOOO.--„000000000000001 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 52 Summary for Pond P-1: Det Pond 1 Inflow Area = 4.340 ac, 20.00% Impervious, Inflow Depth > 3.12" for 50-Year event Inflow = 14.96 cfs @ 12.17 hrs, Volume= 1.129 of Outflow = 5.01 cfs @ 12.54 hrs, Volume= 1.084 af, Atten= 67%, Lag= 22.5 min Primary = 5.01 cfs @ 12.54 hrs, Volume= 1.084 af Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 102.25' @ 12.54 hrs Surf.Area= 9,179 sf Storage= 17,739 cf Plug-Flow detention time= 55.2 min calculated for 1.084 af(96% of inflow) Center-of-Mass det. time= 40.5 min ( 843.2- 802.6 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 12.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0"W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=5.01 cfs @ 12.54 hrs HW=102.25' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 5 01 cfs @ 6.37 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 53 Pond P-1: Det Pond 1 Hydrograph , / 111111 L L __ I J J J J 1 1 1 L 1 1 1 1 1 Inflow 14.96 cfs Q Outflow inflowl,Area=4:34-0-ac - ry ❑Pnma P �f �f Secondary 16: -. ---- -eak- 02-02:2.51-- ®Tertiary - 1 1 1 1 1 1 15= - f- - 1- afoage=' 7_,739 cf - 14_ '� - 1 13 -1 -, I 1 12c' - r r -------- '+� --1 r � � T r I � , r 1 10_- - s✓/'t N m 1 7 1 { I $" 5.01 cfs 1 per/ , 0.00 cfs .d�///////////////////O///% ///O///////////�///////////O////!//!!////- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 54 Summary for Pond P-2: Det Pond 2 Inflow Area = 12.830 ac, 20.00% Impervious, Inflow Depth > 3.13" for 50-Year event Inflow = 52.45 cfs @ 12.10 hrs, Volume= 3.346 af Outflow = 32.19 cfs @ 12.25 hrs, Volume= 3.283 af, Atten= 39%, Lag= 9.0 min Primary = 25.49 cfs @ 12 25 hrs, Volume= 3.150 af -- Secondary= 6.71 cfs @ 12.25 hrs, Volume= 0.133 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 103.84' @ 12.25 hrs Surf.Area= 10,936 sf Storage= 33,669 cf Plug-Flow detention time= 23.4 min calculated for 3.272 af(98% of inflow) Center-of-Mass det. time= 16.2 min ( 814.2- 798.0 ) Volume Invert Avail.Storage Storage Description #1 100.00' 47,165 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 6,220 0 0 101.00 7,888 7,054 7,054 102.00 8,907 8,398 15,452 103.00 9,984 9,446 24,897 104.00 11,119 10,552 35,449 105.00 12,314 11,717 47,165 Device Routing Invert Outlet Devices #1 Primary 100.00' 24.0" Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 36.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=25.48 cfs @ 12.25 hrs HW=103.84' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 25.48 cfs @ 8.11 fps) Secondary OutFlow Max=6.70 cfs @ 12.25 hrs HW=103.84' (Free Discharge) 2=Orifice/Grate (Orifice Controls 6.70 cfs @ 3.35 fps) Tertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) `3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWIM-WS1 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 55 Pond P-2: Det Pond 2 Hydrograph / I I I I I I I I I I r r r ©Inflow . :/ 52.45 cfs 1 � I I I I 0 Outflow 1nfWW Area=' 2:830 ac p Secondary Primary = . Peak Elev=103.64+ III®Tertiary 55- 50: h Storage=33,669 'cf iI y__ _ _t__ r 45 3cfs 1..2.19 40f 1 35- 25.49 cfs1 I L 1 J I I \øi I 1 ° I I I 1 �O ' ��� l 1 1 15- ,' . ,-" � 6.71 1cfs,�% /0%�'' � .. .. .,- �.�dir� 10 dl�,- " , _a", �eT///// /l//l� !% Potter Road SWM-WS1 Type 11 24-hr 50-Year Rainfall=7.09" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 56 Summary for Link 1L: (new Link) Inflow Area = 88.570 ac, 0.00% Impervious, Inflow Depth > 2.71" for 50-Year event Inflow = 255.48 cfs @ 12.18 hrs, Volume= 19.996 af Primary = 255.48 cfs @ 12.18 hrs, Volume= 19.996 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph I I I I I I I I I - I I I I--- -I , I I I i L i_`7c AR ('f , 1 III Inflow II 280= 1 0 Primary - 255.48 cfs Inflow Arca 88;570-ac 260- I- 1 , • - -- 1i ---- ---- 1- 1 - /' ---- -I- - 1 1240- ___ ____ _ ff I 1 :J I I I 220;: I 1 1 200- J• I 1 1%1 j i 1 1- L _ -II -- 180 I I 'I I J 1 ' ' -� 1 a 160-'' -1 r---7----r----r I 1 -r 7 r r -t 1 I 4fj j 1 1 ---- 140- 1 ✓/ J 0 LL 120: , • i )/- , - I { J 1 1 1 I I1 1 1 100 1 T 1 r /• -r 1 -r r -r- 1 1 , 1 I t - - ---1re;sl -I---- I - - _ L---J I 1 s --- -- - --- -r----i-- ------ '` r--- ---- - -1--- -- - r- - .1V ,•5'_ , 1 , a. 4.4,, ...,-,,,,,, ' i • Time (hours) Potter Road SWM-WS1 Type II 24-hr 50-Year Rainfall=7.09" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 57 Summary for Link 2L: (new Link) Inflow Area = 87.590 ac, 4.82% Impervious, Inflow Depth > 2.88" for 50-Year event Inflow = 219.74 cfs @ 12.21 hrs, Volume= 21.049 af Primary = 219.74 cfs @ 12.21 hrs, Volume= 21.049 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 2L: (new Link) Hydrograph r -I - r1 q _--_J__ __ __-__1-_ 1_ _L_ J 1 1 L J __ Inflow 1 I I71Q74rf 0 1 2404 , r T O Primary 230. „ 219.74 cfs Inf�10W Area=8.7_590-ac-- 220'' r / 216-•' _J I J L 1 _ Lr 1 1 1 - 200.' � r _ ____r___T_ li::1 _ _t__ _ _� _ _ _ r 190= ,. '--- ----- -==1 - - ---' - I -'- - -- A - 180_ r { r rr 170- / 1 - 1 -I--- - - - - -1-- - --- 1 -- 1604 - r / r 1504-, I 1 I 1 , w140= • * .V� 130 , . I I v I I " 43 120=' -- . - - -rv r - t LI. 1 1 0,. - -- --- I I 100° " - - - + FIi_ ✓ � + 9oJ ,`.- I I i I,2(1 O%; I I I I JI 804, a ) 'C70 ' a 60_ / I 40= fr 1 -- - 30z r 1 /f1 r I I I io '"%OAS/fl ,�f/17Cfi.' '� 0 ,��OOp0000 �0Z�0��000�/I/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) BP-3 DR-3 DET-4 Ex WS #3 DR D t 4 P-4 Det mond 4 111 N Dev f Subcat Reach on. Routing Diagram for Potter Road SWM-WS2 Prepared by Cardno, Printed 3/17/2017 . HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Potter Road SWM-WS2 Type ll 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment BP-3: Runoff = 19.26 cfs @ 12.74 hrs, Volume= 3.627 af, Depth> 0.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 51.190 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 116.730 64 Weighted Average 116.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment BP-3: Hydrograph 21' ©Runoff 201 ' 19.26 cfs 19_ Type-II-24;hr - o i- eal� Rain#all=2.9,5'!--- , - -------- -------- -- 16=" 15 Runoff_ACea-=11-fi 7.30_ac Runoff Volume=3.627 of 0 va 12 Runoff Depth0.37" 0 1°;- - -Flow-Length='5,232'- $_ Tp=56;1- min _ -CN=64 • 6 Air 5-_- 2= ti 5 6 7 8 9 10 1'1 12 13 14 15 16, 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment DET-4: Det 4 Runoff = 12.60 cfs @ 12.06 hrs, Volume= 0.738 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 16.800 68 1 acre lots, 20% imp, HSG B 13.440 80.00% Pervious Area 3.360 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Hydrograph I I I I I I 14 I I I I Cl Runoff 13 12.60 cfs 12- # L t I J Type If24hr= 11- 1-Year Rainfall=2.95" 4 4.10= " Runoff Mea�16.800 'ac i Runaf#rV-oume=0738;af_ F2 87" i i Runoff Depth>0.53"- 3 7-- LL 67- Flowtength=827'-- t r I Tc;=11;.7 rain 4J i Q 1 CN X68 P I 3-<" 1 1 _ I� 1 _ _L __1 J I I 1 5 6 7 8 9 10 11 12 13 14 15 16 17 1'8 1'9 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DR-3: DR-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 4.48 cfs @ 11.97 hrs, Volume= 0.200 af, Depth> 0.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 4.540 68 1 acre lots, 20% imp, HSG B 3.632 80.00% Pervious Area 0.908 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Hydrograph - z 1 r 5 I I 0 Runoff 4.48 cfs Type II 24;hr T r r 1-Year Rainfall=2.95" Runoff Area=4.540 ac 3- Runoff-Vol;ume=0 200_a f__ Runoff Depth>0.53" ° • Tc=5:0 min-- 2— CN=66 1-- / r0Q 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type ll 24-hr 1-YearRainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 20.06 cfs @ 12.76 hrs, Volume= 3.928 af, Depth> 0.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 72.530 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 138.070 63 Weighted Average 138.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min)__ (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Hydrograph Z. I I I I 20.06 cfs I -- I "'r-_ J 1 I 1 L I I J. L 1 I J 22- I 21, I I I I I I I I I , ❑Runoff I I I I I 20 Type-I,I-24 hr �� - 19- - L 1 _ 1_ 118'6- _-1 Potter Road SWM-WS2 Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 6 Summary for Pond P-4: Det Pond 4 Inflow Area= 16.800 ac, 20.00% Impervious, Inflow Depth > 0.53" for 1-Year event Inflow = 12.60 cfs @ 12.06 hrs, Volume= 0.738 af Outflow = 0.33 cfs @ 19.95 hrs, Volume= 0.205 af, Atten= 97%, Lag=473.6 min Primary = 0.33 cfs @ 19.95 hrs, Volume= 0.205 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 102.08' @ 19.95 hrs Surf.Area= 12,945 sf Storage= 23,239 cf Plug-Flow detention time= 249.5 min calculated for 0.205 af(28% of inflow) Center-of-Mass det. time= 138.0 min ( 970.9-832.9 ) Volume Invert Avail.Storage Storage Description #1 100.00' 106,407 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 8,957 0 0 101.00 11,360 10,159 10,159 102.00 12,826 12,093 22,252 103.00 14,377 13,602 35,853 104.00 16,012 15,195 51,048 105.00 17,732 16,872 67,920 106.00 19,229 18,481 86,400 107.00 20,785 20,007 106,407 Device Routing Invert Outlet Devices #1 Primary 100.00' 3.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 104.50' 36.0"W x 8.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 105.50' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.33 cfs @ 19.95 hrs HW=102.08' (Free Discharge) t..1=Orifice/Grate (Orifice Controls 0.33 cfs @ 6.73 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 2=Orifice/Grate ( Controls 0.00 cfs) Iertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS2 Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 7 Pond P-4: Det Pond 4 Hydrograph I I I I 1 I I I I 12.60 cfs j__ ' -- I -1 -' - I -- ®inflow I El Outflow T ©Prima Inflow Area= 6:500 ac SecondaryEl 14 _ l Peak_GleV-1OL._Q8! El Tertiary 13 kl , I I I I 12 '- i i Storage=-23 239 cf- ' I 11 11 1 1 1 1 10 111I l I I I I I 1 1 1 1 1 1 1 1 1 1 1 r r -177 - -r---T- -r--- - 1 1 1 1 3 7- I I I I r 1 1 I I 1 1 1 1 0. i � �, wee, yffzeer. 0.33 cfs '�- 0.00 cfs ii//////// / -,i,,,, 4-:, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 8 Summary for Link 3L: N Dev Inflow Area = 138.070 ac, 3.09% Impervious, Inflow Depth > 0.35" for 1-Year event Inflow = 19.93 cfs @ 12.74 hrs, Volume= 4.032 af Primary = 19.93 cfs @ 12.74 hrs, Volume= 4.032 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: N Dev Hydrograph J__ 1 1 1 ` I I �]' r'f B Inflow 22 4 ; ; I ; ; ; O Primary 20= _ infloir Aepa=138;®71,15 93 cfs 19 I, j 7 r ��� F T r 18= ((���///YY� I I I I "�} I I I 17 -+ Al,,,-, 16- , I I I I . " I I I 164 14= + + I' :/ I I -- 134 r I T r "...A" r i T r i 12- ,-, _ 1 1 1 I ��//}_ 1 I j„ 6- 1 I 1 1 _ 5- = r=_ �����G�o�����r,/ate L _- 44 "' r r �OOOOOOOp fll�/j 3- 1 I 1 1 I I 1 D0 : : 000OIOlIp 2 0 '"0"'1 ;4"40/�fI0000"00.00/O ll1,0. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment BP-3: Runoff = 100.36 cfs @ 12.64 hrs, Volume= 14.655 af, Depth> 1.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 51.190 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 116.730 64 Weighted Average 116.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment BP-3: Hydrograph 11111111 I I I I I I I I I I I 1 110= J L J p Runoff 105= 100.36 cfs _ ____ _ I I I I I i I I I I I I 100_ Ty,peii 24;hr 95. � I I _ _ _ -� ear- -aina = 802 -Runoff-Area=116.-730;Ac O - - 70- RUnoi1-Vo'um'e4t4.655_a _ L___J____1_ rn 6 _ __-pp uI n®ffI -®-e1 -th”I .51r--y,I- r _ 55- Flow" Q ---- - Lengfh+5"";232' 0 457 Tc.=56:1 rain 40= � I --- I I I I I I r/�� 35 GN=64 1 --- ' L 1 L 1 L O- I 30c + + 1 1 1 1 I �. U L 1 257 , 1 1 r z / _ r 20- ',-----I _r` 15 I I O�O , arel,"Z 10= + OO�100000/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DET-4: Det 4 Runoff = 48.29 cfs @ 12.04 hrs, Volume= 2.571 af, Depth> 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type Il 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 16.800 68 1 acre lots, 20% imp, HSG B 13.440 80.00% Pervious Area 3.360 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Hydrograph ' I I I 1 I I I i]Runoff' ----, T r 48.29 cfs 7, T 50- _ ___ J__ __1_ _ _ J _ L __ - - --1---- Type-II-24hr-- 45- = - - -- f--- ----10-Year-Rainfall=5.20"- 1 1 1 1 4 Runoff_Area=16.80_0_ac__ 35= Ruoff Vol(ume=2 571 af 30- Runoff Depth> 1 .84" 0 25-,` Flow Lehgth=827' LL 2 � 0 L �. ; Tc;=11;.7 rain 1516 2kCN=68 10-, GA -_-,-___ ,________.;____4. IA y_____--_a__ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment DR-3: DR-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 16.52 cfs @ 11.96 hrs, Volume= 0.697 af, Depth> 1.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 4.540 68 1 acre lots, 20% imp, HSG B 3.632 80.00% Pervious Area 0.908 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Hydrograph / I I '-1 T 18- f II---i I I - --- T TI I 1- I T I -I I mRunoff - ----1---- ------ ----'-- 16.52 cfs ----- ----r---1---- 1---- 16� i • -- - "-- L -- -�-TypeIU 24_;hi' 15=-' J L 10=Year Rainfall=5.20" 140 - _ J 1 J L 1 L I 1 I J • 133 Runoff_Ar_e0=4.540 ac__ ' 12:J' - - - - - - - Runoff Voi.ume=0 �697i of- 11` , w _ T r i r 10= ,- -T r Runoff Depth>1.84"-- , ' I I 0=�- I Tc-5.0 Min • -------- ----------- ---H---- F ---,-'--------+----I----- ----- 7_ ,:----_, CN=68-- 6 _, L J L J L , I I 4 I 3 O _ 1 ✓`J O��OoOU/00/i7O 10 .OOO;'rd. '17,000�� 0001J'''��. , �70000OO�IOOG�011j�OG�TOO� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 112.19 cfs @ 12.65 hrs, Volume= 16.531 af, Depth> 1.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 72.530 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 138.070 63 Weighted Average 138.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Hydrograph 112250 II Runoff{', -+ -4- 4-------- 1 112.19 cfs - 110= -T-�Ope1124thr--I - w - - I I I I 1• , I I I I i I 105 '• -- -1- --r- ----I-- --T- - ------ --- -I In AT----r-- - - 1- - -r ----I- --r---- ----- 100- 10;-Year-Rainfall=5.-20 '- Q 95= - -r -1- -r d -r t 90= -RUnoff Area=136.070ac- 85 , _ _ _ I t _ 1 _ � y 80J --Rdinoff-Vo'lum'e=1-6.-531-a 'J- la I I I I I 65 _Runoff_De;pth>1-:44" a---- - - -{ - 30 602 I I I I I I ( 0 Flow-Length=5 232' I r r _ _ 'rr T r r 45,(31 1ar�56r'1min !_ i� J1 r 35 \+IYVI =63 r �r -r- -t r I I I �� I .' I I I I I I ✓UJJ I I I 25- 20- OOD 15-3 � OOp000QOO00000p00000/ 113iI I I I I I I I I I I I 53 7/7/1 //////� ////WZ///////i. = 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 13 Summary for Pond P-4: Det Pond 4 Inflow Area = 16.800 ac, 20.00% Impervious, Inflow Depth > 1.84" for 10-Year event Inflow = 48.29 cfs @ 12.04 hrs, Volume= 2.571 af Outflow = 4.51 cfs @ 12.80 hrs, Volume= 1.193 af, Atten= 91%, Lag=45.3 min Primary = 0.51 cfs @ 12.80 hrs, Volume= 0.338 af Secondary = 4.00 cfs @ 12.80 hrs, Volume= 0.855 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 104.72' @ 12.80 hrs Surf.Area= 17,250 sf Storage= 63,016 cf Plug-Flow detention time= 191.7 min calculated for 1.193 af(46% of inflow) Center-of-Mass det. time= 104.9 min ( 909.7- 804.8 ) Volume Invert Avail.Storage Storage Description #1 100.00' 106,407 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 8,957 0 0 101.00 11,360 10,159 10,159 102.00 12,826 12,093 22,252 103.00 14,377 13,602 35,853 104.00 16,012 15,195 51,048 105.00 17,732 16,872 67,920 106.00 19,229 18,481 86,400 107.00 20,785 20,007 106,407 Device Routing Invert Outlet Devices #1 Primary 100.00' 3.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 104.50' 36.0" W x 8.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 105.50' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.51 cfs @ 12.80 hrs HW=104.72' (Free Discharge) t1=Orifice/Grate (Orifice Controls 0.51 cfs @ 10.32 fps) ,Secondary OutFlow Max=3.96 cfs @ 12.80 hrs HW=104.72' (Free Discharge) T-2=Orifice/Grate (Orifice Controls 3.96 cfs @ 1.50 fps) jertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) `3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS2 Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 14 Pond P-4: Det Pond 4 Hydrograph Z , L , I I I I I I I I I 48.29 cfs J � II ®Inflow 0 Outflow _Inflow Area='�6:800"ac - ®Primary 0 Secondary ///��; Peak E1ev=104.72" - w Tertiary 50- ' I I 1 I I I I i -'Storage= 3;016 cf- 45 L L. i _ J J J 1 1 40=_ ' _ 35- ' 1_ T • I _ .... � _ _L_ I 0 25-, 1 20- J -i- L -- 15- - - [4.51 cfs 11 I 10-_ - �////J' / 4.00 cfs _ .i 0.00 cfs !////r/00///l///./////////l//////'may 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 15 Summary for Link 3L: N Dev Inflow Area= 138.070 ac, 3.09% Impervious, Inflow Depth > 1.44" for 10-Year event Inflow = 105.74 cfs @ 12.65 hrs, Volume= 16.545 af Primary = 105.74 cfs @ 12.65 hrs, Volume= 16 545 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: N Dev Hydrograph ; ---1 ---- --_-t----1 I i -;- --r--- i '-i - - r 7 - I I II i _ ; ki Inflow 1 t 115= - 11 f1T, 74 rf + EPnmary 110= -Inflow Arga X13-8:®t, 105 74 cfs r i 1 L 105=- I I I I .210 100 r (,r 1 I r I 954 ,.- . - -1 L J L I. 1 ,D/ 1_ ____ ____ 90: r r 852_ ; ; ; ; :„,„/ 801 ., h 14 75= 1 r , ; , 7 ; T 70- 1 1 -I L 1 VIA 1 y L 1 60:- ' 1 ' �V ' ; 3 : ; ; D y,% ; 0 55= i gyp{ +- a 50= I -r4 ; T11IIILIIIIIc• 4$ r 30= . ; J I 25Y ,' , ; ; ;r ; ��/F , 205 . , ---1- +— -+- -' /,�U/ %: , 15 i �����011pp01/00006� D//�rr i ` 0000 a // //�/%fj////// /i%07 6 7 8 9 10 .1,1 .12 X13 X14 ,15 .16 X17 •1'8 ,1,9 '20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment BP-3: Runoff = 146.63 cfs @ 12.62 hrs, Volume= 20.810 af, Depth> 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 51.190 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 116.730 64 Weighted Average 116.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment BP-3: Hydrograph r r 7 I r 160=' 0 Runoff` ' 1 146.63 cfs 150 140-3. 130- 25-Year Rainfall=6.20! - i i I I I 120 acounofrea ' 0 110-" ff 100 ' RUioff V®Iume=20.610 a 'r 90_. RunoffDepth>2,14 ; ri A, 4r r 80= Flow Length=5,232° 1Fc=56'1 nun 501- /�A� y 1�-6`'E r f 40t V 30 - 20-3 LAWI I I I I I I 1Q--t I I ` /./.17. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment DET-4: Det 4 Runoff = 66.75 cfs @ 12.04 hrs, Volume= 3.551 af, Depth> 2.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 16.800 68 1 acre lots, 20% imp, HSG B 13.440 80.00% Pervious Area 3.360 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Hydrograph Z I - _______J____L_ I L. 1_ _I___._ ®Runoff' I I I I 70= " 66.75 cfs � � � �°' ii 65= , Type 11 24=h r 60 -.- 2 -Year_Rainfall=6.20"-- 55- I I Iil 50 - --,- 7 Rhnoff-Area=16.-800-ae-- 457- J Runoff;Vohunle=3;551 af- 40- • I Runoff Depth 35_ J` Flow Length=82-7- 30-- 25- � ' I } Te=1-1;.7 rain-- 0i 20-j I -; Cis]=68 15- ----- - - - -- - - -- 7.1 • 5- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment DR-3: DR-3 [49] Hint. Tc<2dt may require smaller dt Runoff = 22.72 cfs @ 11.96 hrs, Volume= 0.962 af, Depth> 2.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 4.540 68 1 acre lots, 20% imp, HSG B 3.632 80.00% Pervious Area 0.908 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Hydrograph -- ----- - -- _ --- _ I I I -- -'-- 1 25 ----1---- t-_ _ t 1 1 1 ❑p Runoff' 24_ i 1 ; 22.72 cfs 23 + = / + I 22J ; ; ' � ; Type-Il-24;hr-- 20_ , 25- Year Rainfall=6.20" 19- _ ___J__ __1___ __ ___I__ L _L L I I J 18= Runoff Area-4:540 ac 16 Run®ff\/o�ur�e-0962J of in 15� J L I I 1 1 1 I 1 I ,3' - --; L Runoff Depth>2 i54"= r I , I 1 1 1 1 I I I c 12. 1 + -I- LL 11=', ----I- - - 1 ----- - - - - -- Tc=51.°1-1)in - I I I I I I I I I I 104.--_,• -, -I- -,- 1 -C o , , il 1 71. J III t ' - HHH 4 0 I- I- -I -I 5 II 4- J1• 11 1 I I I I I 3 T r 1 1 1 1 1 2_ J 1 J 1. Y' 1 L 1 J____ 1'/7llOflOO1I.DOG'00�000000��0/�O�I i 4Wc�0�0000001�1 ..oOOOOG000�7�efe;e4/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 I Time (hours) Potter Road SWM-WS2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 165.70 cfs @ 12.62 hrs, Volume= 23.643 af, Depth> 2.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 72.530 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 138.070 63 Weighted Average 138.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Hydrograph = I I I I I I I 0 Runoff 180= - 165.70 cfs - 170= 1601 _Type]F 24;h r i a L J 15°=° --23;-Year-Rainfall=6.-20s' 14 0: i V 130-:/, �nof'Fp►rea=938:070 ac 120_ -Runoff Vo'lum'e=23:64-3-a 1°° Runoff Depth�2.05" i r r----i----r - r ----Flow Len 'th-5 232'-- ' �--- -CN=63 1 1 ___J _L J 1 J L 50^ Vi*„ 30= 20-4' ; ��U�l��l/���00�00 O/l/I�000/ °= /zz// 'V //.//Al, , , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 - Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 20 Summary for Pond P-4: Det Pond 4 Inflow Area= 16.800 ac, 20.00% Impervious, Inflow Depth > 2.54" for 25-Year event Inflow = 66.75 cfs @ 12.04 hrs, Volume= 3.551 af Outflow = 20.62 cfs @ 12.26 hrs, Volume= 2.166 af, Atten= 69%, Lag= 13.1 min Primary = 0.53 cfs @ 12.26 hrs, Volume= 0.350 af Secondary= 20.09 cfs @ 12.26 hrs, Volume= 1.816 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 105.15' @ 12.26 hrs Surf.Area= 17,954 sf Storage= 70,562 cf Plug-Flow detention time= 139.3 min calculated for 2.159 af(61% of inflow) Center-of-Mass det. time= 62.9 min ( 861.0-798.1 ) Volume Invert Avail.Storage Storage Description #1 100.00' 106,407 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 8,957 0 0 101.00 11,360 10,159 10,159 102.00 12,826 12,093 22,252 103.00 14,377 13,602 35,853 104.00 16,012 15,195 51,048 105.00 17,732 16,872 67,920 II 106.00 19,229 18,481 86,400 107.00 20,785 20,007 106,407 Device Routing Invert Outlet Devices #1 Primary 100.00' 3.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 104.50' 36.0"W x 8.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 105.50' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.53 cfs @ 12.26 hrs HW=105.14' (Free Discharge) L1=Orifice/Grate (Orifice Controls 0.53 cfs @ 10.79 fps) ,Secondary OutFlow Max=19.92 cfs @ 12.26 hrs HW=105.14' (Free Discharge) 2=Orifice/Grate (Orifice Controls 19.92 cfs @ 2.58 fps) 1ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=100.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) I Potter Road SWM-WS2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 21 Pond P-4: Det Pond 4 Hydrograph I , I I I , i I I � I I I ---r - r66.75 cfs - -- ---T---- - --i--- ®Inflow �� ElOutflow _inflow Area-'E6.5Q0_ac ®Primary __ __ ❑Secondary 7°= '- 'Peak -Elev= 105 -.1.5 '- I�Tertiary 65 I :_ ,Storage=70,562 ;cf 60-_ I I I , "____+_______F____________ j. + I I I I I 55- ---L- - - - L - ----- '' - - 4 - - • - 50-u , I I I - _ _ _ __ ____ •I __J___J_ _1_ _ _L___J_ __1___1_ __ - • • I I 45 , II -'- - - .' ." I I I .V. 40.-.. 035- • 20.62 cfs uI I 30_ 20.09 cfs I---�- -- ,-- - -- - ---- 0 • Wer Oo 0.00 cfs //// ///// ..1 .• '' . /�yy/ ° :r,„&a'.Ae1f.f/J/f7fi.0 ./...,,ge . , Y'fr %! %le:%,a , ..�' z:77 f!/.' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 1 Potter Road SWM-WS2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 22 Summary for Link 3L: N Dev I Inflow Area = 138.070 ac, 3.09% Impervious, Inflow Depth > 2.08" for 25-Year event Inflow = 158.33 cfs @ 12.60 hrs, Volume= 23.938 af Primary = 158.33 cfs @ 12.60 hrs, Volume= 23.938 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: N Dev Hydrograph / I 1 I - 111 Inflow I - -- - - - -- 1158. r 0 P maty l 170 "= 158 33 cfs Iso=-" Inflow Area=138.0. ,� 150 . -, 1i = -- -r--- r 140-' a<; V 130 -• 120 �`) V 110.`" I � �����/{)1I I J L J L 1 J 1 L 1 100 " w 0 80 , I, ) rt 70:,'-60='" 0 50. i 40=" j;7 SIi<+F£Lj1 30 „- 20,- s -.-7 �.////l® 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment BP-3: Runoff = 186.52 cfs @ 12.62 hrs, Volume= 26.166 af, Depth> 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 51.190 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 116.730 64 Weighted Average 116.730 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) - (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment BP-3: Hydrograph ®Runoff 200=-" J L I L 186.52 cfs 190 . 180=`, Type Il24;_hr ; _ - { 170- I - -50 Year-Rainfalf=7.01" 160 r r TA r 150; Runoff A-r-ea=11-6.-730 qac 140 130 -/ RUnof _Vo,fume=26.166 a'! J „o =Runoff Depth>2: 69�'- 100: -Flow Length=5,232' 80_ -T-c=56:1-nein - ; T 70 1,4 501 50 I60= I I I - I : ` J L L 1 •____1_V - I I I I I 401 . -+ , 1Oi%///////////////////f/ 5 6 7 8 9 10 11 12 13 14 • • 15 • 16 • 17 18 • 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment DET-4: Det 4 Runoff = 82.34 cfs @ 12.04 hrs, Volume= 4.391 af, Depth> 3.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 16.800 68 1 acre lots, 20% imp, HSG B 13.440 80.00% Pervious Area 3.360 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.0 150 0.0367 0.28 Sheet Flow, Sheet Range n= 0.130 P2= 3.56" 1.2 213 0.0367 2.87 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.7 131 0.0381 2.93 Shallow Concentrated Flow, Shallow Grassed Waterway Kv= 15.0 fps 0.8 333 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 11.7 827 Total Subcatchment DET-4: Det 4 Hydrograph /] I I I - I - -I - -- I -- 90 0Runoff' J , --- ----- ,--- -r-- 82.34 cfs �- -- -� --- -� ---- - --- -----, 85 t - --r T pe-1I-24 h-r- 75= I 5-0=Year Rainfall �:01"- � I 70-' J 1 1 L I J L 1 I J 65 Runoff-Area=16.800 ac _ 6°_1 ; - I " -Runoff;Voume=4;391-of- 55=' I N I I I I I I 5 Runoff Depth>3.14" 3 45. r I i I I Flow Le 9th=8?7' - O u 40::::- - 1 35� l i 16,=1t7 rain 30 1 rA� 1/� 25-;->" _J1 1 L -;, 1 1_ 1 cN J6 20 � 15=" I 04, 0 iai® 01 I 10,2,- I I 5-:- /,'//moi 430 I I ����z � -4-02107. 1/erl �� 7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment DR-3: DR-3 [49] Hint: Tc<2dt may require smaller dt Runoff = 27.93 cfs @ 11.96 hrs, Volume= 1.190 af, Depth> 3.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type ll 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 4.540 68 1 acre lots, 20% imp, HSG B 3.632 80.00% Pervious Area 0 908 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Direct Subcatchment DR-3: DR-3 Hydrograph / 1 I I I J L I I 1 E]Runoff' 30� -1 1 I- 27.93 cfs - -4-- - 28 Type-ii 24 hr-- 24 = 0' 1 r 5b-Year Rainfall=T.-01'F- J 1 1 L __ 1 J 22= T r Run®ff Area=4.540 acI 20 - -- Rujioff4 V--oJu-lme=1®490;of N 18- 1 1 1 1 1 1 1 I - - Runoff Depth>3.14" - ii 14., i Tc=5'.0 m i n 12.'.- -- -- - / I -C lel=16 V 10-'_ ` I Y _ - T 7 r -I 4 r-- - - r -- -I 81 I I J 1 1 L 1___ 1 1 J , ( 0 1 6 1 1 T 7 __ 7 1 -1 41. 1 1 J L I_ _1__ _L _ J- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment Ex-3: Ex WS #3 Runoff = 212.07 cfs @ 12.62 hrs, Volume= 29.856 af, Depth> 2.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 72.530 55 Woods, Good, HSG B 65.540 71 Meadow, non-grazed, HSG C 138.070 63 Weighted Average 138.070 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 26.5 232 0.0200 0.15 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 4.9 945 0.0254 3.24 Shallow Concentrated Flow, Shallow Conc Paved Kv= 20.3 fps 19.7 961 0.0135 0.81 Shallow Concentrated Flow, Shallow Short Grass Pasture Kv= 7.0 fps 4.5 1,977 0.0156 7.39 199.63 Channel Flow, Ex Channel 1 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 2.5 1,117 0.0156 7.39 199.63 Channel Flow, Ex Channel 2 Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 58.1 5,232 Total Subcatchment Ex-3: Ex WS #3 Hydrograph I I I I I I I I I I (, I I I I I I I ®Runoff` 230 220> I I I I 212.07 cfs - - - - ----- -- 210E1,1- Tlipe IN_244hr 200- -- I 190- -50-Year Rainfall -7.01 _ 180 r I -7 - f 170= Runoff-Area=136.-070 qac I ' - 160- - i -- - I - I- --I ---I- - I -- - - '- --Runoff Vo'lum'e=29;656 a 150_' --' I - -r ----- ---r---- - --- 140= �( 1301 � - Runoff-Depth>2.59" - - 120= 110= '• Flow Length= ,232'- --- fri L "- 1003 - -- 907 -Tc=56:1 rein j 1.) L L _ ___ __1 L -cr Vhf-63 I r t--- - 7 „----t- -+ 60^_ I I I I I I I I 50= J L I L 1 ;e_____1__4fri 403 I r r rreee r • I I I 1 " I I I I I 1 r /f///,rs///!!/ %//,'92/4 / + . , . , , . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 sin 08568 ©2016 HydroCAD Software Solutions LLC Pane 27 Summary for Pond P-4: Det Pond 4 Inflow Area= 16.800 ac, 20.00% Impervious, Inflow Depth > 3.14" for 50-Year event Inflow = 82.34 cfs @ 12.04 hrs, Volume= 4.391 af Outflow = 36.08 cfs @ 12.20 hrs, Volume= 3.002 af, Atten= 56%, Lag= 9.6 min Primary = 0.55 cfs @ 12.20 hrs, Volume= 0.360 af Secondary= 34.23 cfs @ 12.20 hrs, Volume= 2.631 af Tertiary = 1.29 cfs @ 12.20 hrs, Volume= 0.010 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 105.64' @ 12.20 hrs Surf.Area= 18,683 sf Storage= 79,489 cf Plug-Flow detention time= 119.0 min calculated for 3.002 af(68% of inflow) Center-of-Mass det. time= 48.5 min ( 842.2-793.7 ) Volume Invert Avail.Storage Storage Description #1 100.00' 106,407 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 100.00 8,957 0 0 101.00 11,360 10,159 10,159 102.00 12,826 12,093 22,252 103.00 14,377 13,602 35,853 104.00 16,012 15,195 51,048 105.00 17,732 16,872 67,920 106.00 19,229 18,481 86,400 107.00 20,785 20,007 106,407 Device Routing Invert Outlet Devices #1 Primary 100.00' 3.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 104.50' 36.0"W x 8.0" H Vert. Orifice/Grate X 4.00 C= 0.600 #3 Tertiary 105.50' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir _ Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.55 cfs @ 12.20 hrs HW=105.63' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 0.55 cfs @ 11.30 fps) Secondary OutFlow Max=34.21 cfs @ 12.20 hrs HW=105.63' (Free Discharge) 2=Orifice/Grate (Orifice Controls 34.21 cfs @ 4.28 fps) ertiary OutFlow Max=1.24 cfs @ 12.20 hrs HW=105.63' (Free Discharge) 3=Broad-Crested Rectangular Weir(Weir Controls 1.24 cfs @ 0.93 fps) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 28 Pond P-4: Det Pond 4 Hydrograph t _ L L ___J 1____L___ 1 1 1 Q Inflow 82.34 cfs o outflow ;j _ Inflow Are,,a=16.800-ac _ ®Primary ❑Secondary 90 }_ ' - ®Tertiary 851 Store0e=79;4891cf- so_ . :r 751 70_ i 55 i II 36.08cfs -I 7T II 3 45� _I 34.23cfs ' ---- -- - - i , Az r --r--- -is r -, r 30 , 1 , 25� i '' ' 1 , 15 O 4 NI 5' ' //,,,, ///A 1.29 cfs 5 6 7 8 9 10 11 12 13 14 15 1'6 17 18 19 20 Time (hours) Potter Road SWM-WS2 Type 1124-hr 50-Year Rainfall=7.09" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 29 Summary for Link 3L: N Dev Inflow Area = 138.070 ac, 3.09% Impervious, Inflow Depth > 2.64" for 50-Year event Inflow = 201.55 cfs @ 12.59 hrs, Volume= 30.357 af Primary = 201.55 cfs @ 12.59 hrs, Volume= 30.357 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 3L: N Dev Hydrograph 1 I , 1 I T "1 I -1 r 'i - r r 1 I-_ __I_ I I - r - - I - I --- p Inflow II I 1 I I - rf 220 + 1 1 D Primary ' 201.55 cfs P 210 InftowArea='138:0 . 200- ' L- r e; I 1 .i I .1 1 I 1 1 .-, A I 1 1 1 190 i 180 I I _ _ - __ _ _ K' f -- - 1 - - 1 1 - - I -- I 1 - 1 1 l f i t � 1 1 1 1 170 ,160 -,-i ,_ 4 I •i_ - 1 1 1 _____J I 1 1 1 1__V 1 V•�V 1 I I I I I I I 0,-, I I I 1 I 150 - --- -- I 1 I 1- 1 I - - 1 1 1 140' , I J L 1 V k J 1 L_____t ,�,' I 1 - I1 1 I I 1 , 130 _ �f' ^f 120' I I 1 1 1 / 1 ��� I - __ 1 I 1 VVVV I 1 1 � 110 J L �pi,..,;,„,,, �/I__J 1 __J___-____1 p I I I !� ✓✓ Sy 1 1 1 1 I II- 180 7 'r 1-I' ' ✓.'h _ 1 - r = I 90I G",-* 1 60 I 1 1 1 50, ' ��Q�� 30 1 1 1 N/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) <ExHH> <DR2> DET-3 Ex HH DR- D t3 P-3 7Pond 3 HH (new Link) Subcat Reach on. MI Routing Diagram for Potter Road SWM-WS-HH Prepared by Cardno, Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Potter Road SWM-WS-HH Type II 24-hr 1-Year Rainfall-2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment DET-3: Det 3 Runoff = 8.97 cfs @ 12.02 hrs, Volume= 0.455 af, Depth> 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 5.220 79 1 acre lots, 20% imp, HSG C 4.176 80.00% Pervious Area 1.044 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.9 410 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Penm= 6.3' r= 0.50' n= 0.013 0.2 100 0 0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 10.2 860 Total Subcatchment DET-3: Det 3 Hydrograph 1 T r I T , r I , 10 I I I I I I I I ©Runoff 8.97 cfs - ; -,' I I Type II 24hr 8= ` 1 1-Year Rainfall=2.95" I I I I 7 '!, Runoff Area=5.220 ac 6 Runoff;-Vohime=09455 of- w = I I I I I • J 1 L 1 Runoff Depth>1-:05" 5-, I I 1 I I ----Flow Len th=060'- 4-- I I I ------ a ______-- Tc;=10.2 rain _ ri 6 � � � CN=�79 2 -I I 1 �OOI I 11 1 /7/,/,/V/r ��������������zA�/� ODOOI/00000p00---00/l/i000000/0.�00 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment DR-2: DR-2 Runoff = 5.53 cfs @ 12.24 hrs, Volume= 0.493 af, Depth> 0.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 5.680 70 Woods, Good, HSG C 2.400 79 1 acre lots, 20% imp, HSG C 8.080 73 Weighted Average 7.600 94.06% Pervious Area 0.480 5.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.7 80 0.0125 0.10 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 10.1 60 0.0150 0.10 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 1.2 357 0.0950 4.96 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 27.2 1,614 Total Subcatchment DR-2: DR-2 Hydrograph ' ' I I----1----+'--------+----1- ---F 1---F----- ----+ -- - ----+'---- 6 I 1 I i 1 ®Runoff 5.53 cfs J_____L__ L - Ty_pe II.24 Lh r-- 5 tl 1-Year Rainfall=2.95" 1 ! unoff_4r-oa-8.080 ac__ 4 v Runoff Volume=0.+493;of 4 _ .10 1,10 , ,r Runoff-Depth>0,73" 3- ' Flow Length;1, 61 - 4' I 102 Tc=272 min ,. CIV=73 It fj 'fri i 'e". .0 V,‘" ..,:;07,,,, a_zewgree:oy..".,eriffeeremreoll 7,e7.,,,reaM'Ar .. . - 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 1-YearRainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment Ex-HH: Ex HH Runoff = 6.48 cfs @ 12.30 hrs, Volume= 0.665 af, Depth> 0.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=2.95" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph [7 Runoff 7 6.48 cfs - -Type IN 24-hr 6- 1111_m 1-Year Rainfall=2.95" 5_. IAV Runoff Area=43: 90 ac I RunoffVol'ume=0.0651af_ 4- ,,0 Runoff Depth>0.60" 3_ i i -Flow- Length=1,22' f i Tc=30.9 rain 2- 1 I 0 CN=70 y 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 5 Summary for Pond P-3: Det Pond 3 Inflow Area= 5.220 ac, 20.00% Impervious, Inflow Depth > 1.05" for 1-Year event Inflow = 8.97 cfs @ 12.02 hrs, Volume= 0.455 af Outflow = 0.51 cfs @ 13.53 hrs, Volume= 0.310 af, Atten= 94%, Lag= 90.2 min Primary = 0.51 cfs @ 13.53 hrs, Volume= 0.310 af Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 100.63' @ 13.53 hrs Surf.Area= 7,530 sf Storage= 11,002 cf Plug-Flow detention time= 217.8 min calculated for 0.309 af(68% of inflow) Center-of-Mass det. time= 144.3 min ( 947.7-803.5 ) Volume Invert Avail.Storage Storage Description #1 99.00' 53,997 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 99.00 6,027 0 0 100.00 6,928 6,478 6,478 101.00 7,889 7,409 13,886 102.00 8,907 8,398 22,284 103.00 9,984 9,446 31,730 104.00 11,119 10,552 42,281 105.00 12,313 11,716 53,997 Device Routing Invert Outlet Devices #1 Primary 99.00' 4.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 24.0"W x 8.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.51 cfs @ 13.53 hrs HW=100.63' (Free Discharge) t-1=Orifice/Grate (Orifice Controls 0.51 cfs @ 5.82 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=99.00' (Free Discharge) 2=Orifice/Grate (Controls 0.00 cfs) 7ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=99.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS-HH Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 6 Pond P-3: Det Pond 3 Hydrograph I I I 1 I I , ' ' ' 1 ®Inflow 8.97 cfs J 1 J. 1 C outflow IPrima nflow Area=5.220 ac -pi p Se ondary 10- If'i Peak_EI_ev=1®®.63' _®Tertiary 1 I I - 9 . 1Stoage=11_,_O02.cf-_ 8_ 1 1 , 1 I I I I I 7- I I I V I ' 6 - I 1 I I 45 - ' I I I 1 I 1 I I 1 '.: , 1 I 1 I V I " , .._ 1 I 1 1 1 1 os%/,.. /i 2 - ,. a/ AA'r 1Wf%1 � 0.51 cfs z x.%4602/. 1/%/`" 0.00 cfs - . '/O / �:�i� // / //l/ _ �{ /+ f /fjJ,y"g'' 0 .11("s�'�"-07 I � "-_ !.• ,e Jf 1:�?66,� ':Az. 5 6 7 8 9 10 11 12 13 14 15 116 17 118 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 1-Year Rainfall=2.95" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 7 Summary for Link HH: (new Link) Inflow Area = 13.300 ac, 11.46% Impervious, Inflow Depth > 0.72" for 1-Year event Inflow = 6.00 cfs @ 12.24 hrs, Volume= 0.803 af Primary = 6.00 cfs @ 12.24 hrs, Volume= 0.803 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link HH: (new Link) Hydrograph / I , I , F' nn rf ®Inflow r r -i r ®Primary 6.00 cfs_ Inflow Area=13.300 ac ft 5-f _ -.1 •V,,1 i F. 4-o �+ LT. 3 i f - -4 ' 0 + - fs I 2-" , 7� 1 0-SIJJr."Fe.1,.�",/VAe,d74We,"'O 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment DET-3: Det 3 Runoff = 23.24 cfs @ 12.02 hrs, Volume= 1.197 af, Depth> 2.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 5.220 79 1 acre lots, 20% imp, HSG C 4.176 80.00% Pervious Area 1.044 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.9 410 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 10.2 860 Total Subcatchment DET-3: Det 3 Hydrograph I I I I I ( i I I 26_ 1 J L I J_ I J I____ I I I 1 I I ®Runoff 25 ,- -1 T 1 I 23.24 cfs ,- I 1 -I 1 23=" 1 i �/ i r Type I� 24hr- 22'" I I 1 21="- T r 10=Year_ 'Rainfall=5..20"= I I I 1 I I I I I 1 19i7---1- - T 1-- r - Y Runoff Area=5.220-ac - 184 ____I____ L___ _I_ __ .1__ _ _L ' I I I I I I 17` -; ' 16 -Runoff,Vourne=1-.197;of " w 15_ - 1 r 1 r r 1 I T- -I -I 73 ,4." i v 1 Runoff Depth>2.75-'- 3 1 3_ l T 7 r 1 0 12= 1 Flow Length=86-0`- V" 11 7 - - --I- -- I -I r --- I - -I- - T- - -r I I1 1 1 _ Tc-=1 QI.2_mi 1 rn-- 9-:!', -i T 1 r I 8y ____J- ___-1 1 L {1 J L __-_ _1___ I J 7y 1- T I CIV-79 E ._ J 1 J L j 1 L ____ J 5; " 23 I J L r 4�Ofi 5 6 7 8 • •9 10 11 •12 • 13 • • 14 • 15 16 • 17 • •18 • • 19 •20 Time (hours) Potter Road SWM-WS-HH Type ll 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment DR-2: DR-2 Runoff = 17.98 cfs @ 12.22 hrs, Volume= 1.495 af, Depth> 2.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 5.680 70 Woods, Good, HSG C 2.400 79 1 acre lots, 20% imp, HSG C 8.080 73 Weighted Average 7.600 94.06% Pervious Area 0.480 5.94% Impervious Area Tc Length Slope Velocity Capacity Description — (min) (feet) (ft/ft) (ft/sec) (cfs) 13.7 80 0.0125 0.10 Sheet Flow, Sheet Grass' Dense n= 0.240 P2= 3.56" 10.1 60 0.0150 0.10 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.2 357 0.0950 4.96 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 27.2 1,614 Total Subcatchment DR-2: DR-2 Hydrograph i --T -- I--------- ---t- 1 1----T---1- --- 20 I I I I -t- ®Runoff 19---' 17.98 cfs 1 18 17= Type 01 24 hr 16-E7'', ___- `1 -- -- -10-Year RainfaI -5.20"- 15 14' '-_ lijr Eurioff- r_ea=$� Q8.0 _ac_ 13 0 Run®ffj�/oume=1 X495 12-?11 . i 1 1 1 10 j -7,0 j I ---- - --- Runoff Depth2.22" J LL 9= " IIA .Flow Ll ength=;1,614' 81 " r ! vo I I 2 7� �t _ 71� _-iljii 1 6= + -j I- + -N 73 'I (ISI I 5 J + ,- , + I . p' 1 I 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment Ex-HH: Ex HH Runoff = 24.06 cfs @ 12.27 hrs, Volume= 2.188 af, Depth> 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.20" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph / 4 I 1 1 l- I IL 1 1- 1 I 4 _ , I I 1 I 1 LI Runoff 26 ---I 24.06 cfs ----- - --- t ------- I ----,----�---- z4= I , i � r Type_1tz4hr r 1 1 1 1 22- 10- a Rainfall=5.20" T Z 20:_, fJ �( ,8- , H-- Runoff Area- '13.-290-0c- 16- :- Runoff Vokume=2.1-88;of- 14- ; ) Runoff Depth l 98,r- J 1 1 L �� 1 L I I I 12' J 1 L Flow Length 1,252' 1 10 ' 4 T030.9 rrilin 8J --1 A -4 L =7 +- tN ' 0-- - , 6:- I ,---- +----i --1----r------ , i--4 jy--- --- r + 4i• l/��Jj 2J, . 1 1 � /i0, eil 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 11 Summary for Pond P-3: Det Pond 3 Inflow Area= 5.220 ac, 20.00% Impervious, Inflow Depth > 2.75" for 10-Year event Inflow = 23.24 cfs @ 12.02 hrs, Volume= 1.197 af Outflow = 1.18 cfs @ 13.46 hrs, Volume= 0.601 af, Atten= 95%, Lag= 86.5 min Primary = 0.83 cfs @ 13.46 hrs, Volume= 0.565 af Secondary = 0.35 cfs @ 13.46 hrs, Volume= 0.036 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 103.09' @ 13.46 hrs Surf.Area= 10,085 sf Storage= 32,620 cf Plug-Flow detention time= 229.8 mm calculated for 0.599 af(50% of inflow) Center-of-Mass det. time= 151.9 min ( 935.0-783.1 ) Volume Invert Avail.Storage Storage Description #1 99.00' 53,997 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 99.00 6,027 0 0 100.00 6,928 6,478 6,478 101.00 7,889 7,409 13,886 102.00 8,907 8,398 22,284 103.00 9,984 9,446 31,730 104.00 11,119 10,552 42,281 105.00 12,313 11,716 53,997 Device Routing Invert Outlet Devices #1 Primary 99.00' 4.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 24.0"W x 8.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.83 cfs @ 13.46 hrs HW=103.09' (Free Discharge) L1=Orifice/Grate (Orifice Controls 0.83 cfs @ 9.54 fps) Secondary OutFlow Max=0.34 cfs @ 13.46 hrs HW=103.09' (Free Discharge) 2=Orifice/Grate (Orifice Controls 0.34 cfs @ 0.96 fps) Iertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=99.00' (Free Discharge) `3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS-HH Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 12 Pond P-3: Det Pond 3 Hydrograph -- L L --- 23.24 cfs 'L J---J-- --1----L---- ---''--- --- ®Inflow y► El Outflow r - InfI,owArea®,5.22o a� ❑Se ondary 26 ; J Peak EIev=103.09 ®Tertiary zz Storage= 2 6'20 0- , I I I 1 I 1 20= = • r -1 1 II 'iiiFiIIi -r T 18=" II1 17 _ L • i14;" J, 1i 1 1 1 1 ,• _ i 12.- r r ( , r - 1 --r- 7- r 7 1 111111 L_ _ _ ____ _--i //�_-J-_-J- _J J1 10= i --_ - _ i , 111111 $.w ---f --- r Y/. „ -1 -- ,----I - T 'f - - 6i. „, -°'”, . � /,005e '. 1.18 cfs f i'r: ' /%?ov, Apiwx.- __ 4- U.Ir�4e ?/ /U G 0.83 cfs //��G! .0�� 2, U//.�//////UU.%//✓/UUI 0.35 cfs 7 U///U.®�0/®////UU/U/U// 0.00 cfs O///U /U/////// //iiil�,,���. %"y// /// 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 10-Year Rainfall=5.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 13 Summary for Link HH: (new Link) Inflow Area = 13.300 ac, 11.46% Impervious, Inflow Depth > 1.89" for 10-Year event Inflow = 18.75 cfs @ 12.22 hrs, Volume= 2.096 af Primary = 18.75 cfs @ 12.22 hrs, Volume= 2.096 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link HH: (new Link) Hydrograph / I I I I I I I 1 1 I I I p Inflow 1 R 7R r" 1 L i O Pnmary 19y, " 18.75 cfs 'inflow Area-4,3.3-OO ac. 18= ;/l�` I I 1 7 li 1 i 1 16-- _i„, /- 154 , • "1- I Il � 14- / 1 r -I l -, r r r 134. , - I � I('!- I I I y 124 ___ __ _ _____ __1_ ___ L r _J__ _I __ 1 _ _ __ _1 L _ v i I 1 I I 114 - r I i D - ; i 7 T i r 81 � I 1 7r L �f4 � J____L J L 1 i r ��yIII �I 1 I 1 5- rr #7�4rAr r T r 44 i 1 r `/ 2= .� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment DET-3: Det 3 Runoff = 29.95 cfs @ 12.02 hrs, Volume= 1.559 af, Depth> 3.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 5.220 79 1 acre lots, 20% imp, HSG C 4.176 80.00% Pervious Area 1.044 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.9 410 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 10.2 860 Total Subcatchment DET-3: Det 3 Hydrograph vII I 17 Runoff` 32= r - - 29.95 cfs ; r , � - ; 30= /� -- Type II 244hr-- 26 i -.20"-- 24-_ �__ - , ` 25-Year Rainfall=6Runoff-Area=S.-220-ac- 22 . i Runoff;Volume=1- 559;a#- 20 18= �___- ; _ Runoff Depth>3-._58"_ 3 16- u_ 14= 12; f, Flow Length=860' - ,____T-_ r r- Tc=1- T T 0.2 min i 10 , s , CN=79 -8 . I I I I I I 6 F I 4i 11 2-31 1 J ,. Da���00000d10i' Zz' IlG�UOOO�pflO000O�Op/ 5 6 7 8 9 10 11 12 13 ,14 ,1'5 '16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment DR-2: DR-2 Runoff = 24.19 cfs @ 12.21 hrs, Volume= 2.007 af, Depth> 2.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 5.680 70 Woods, Good, HSG C 2.400 79 1 acre lots, 20% imp, HSG C 8.080 73 Weighted Average 7.600 94.06% Pervious Area 0.480 5.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.7 80 0.0125 0.10 Sheet Flow, Sheet Grass' Dense n= 0.240 P2= 3.56" 10.1 60 0.0150 0.10 Sheet Flow, Sheet Grass. Dense n= 0.240 P2= 3.56" 1.2 357 0.0950 4.96 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Channel Area= 27.0 sf Perim= 16.4' r. 1.65' n= 0.035 27.2 1,614 Total Subcatchment DR-2: DR-2 Hydrograph / 1 I Ii I I I I I I I I J 1 I I I I I I ©Runoff 267 -J---- _ J _ --- 24.19 cfs ----1- ----L - - --- I ! 1 [0: 24= iTADeiL 2_44ftr_ :: --- RunaffArea8.O8Oac — -i y1- 25-Year-Rainfaff=6.20"- 1 I I I - -----,---- - 18- 16 , rrRunoff-VOume-2;007;of 1 1 14Ec 7 1(1--- Runoff Depthh>2.981F 1z L i Flow Length=' 1,614' i� 10-: i ; Q Tc 27.2nain J � 0 C�1-173- } ____I- E_ ,-__-, ,1 6- 11 �!1 1 4-E ,*e�Q r 5 6 7 8 9 10 ,1 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment Ex-HH: Ex HH Runoff = 33.12 cfs @ 12.26 hrs, Volume= 2.988 af, Depth> 2.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods. Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph I 1 I I / I I I I I 36::' { ❑Runoff 34= 33.12 cfs I 32- }%- Type=lf 24h_r_= 30 ' i ^�1 26-Year Rai nfal1=6.20" 28- /, l491 1 1 1 1 1 26= ' _Runoff ►r_ea=13.290 ac-_ 22`' Runoff Vourrrre=2;989;of- w ? 7 l(1 7 r T -- 1 20_ -,- -* , r i , Runoff Depth>20" 3 18� i D * F Ce LL 16 - _ low ng_th=1-9252'-- 14 ' J L A Q - - - L Tc 30;.-9-lrr-iin - 12. i L ' , ♦♦ -1L 1 CN=70 10- 1 J a 1____ 1_ _ _ • --- � 4_ r r %/-r O�-ia0�0��� zze• -,- 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 17 Summary for Pond P-3: Det Pond 3 Inflow Area= 5.220 ac, 20.00% Impervious, Inflow Depth > 3.58" for 25-Year event Inflow = 29.95 cfs @ 12.02 hrs, Volume= 1.559 af Outflow = 4.82 cfs @ 12.35 hrs, Volume= 0.920 af, Atten= 84%, Lag= 20.0 min Primary = 0.87 cfs @ 12.35 hrs, Volume= 0.596 af Secondary= 3.95 cfs @ 12.35 hrs, Volume= 0.324 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 103.46' @ 12.35 hrs Surf.Area= 10,501 sf Storage= 36,394 cf Plug-Flow detention time= 173.4 min calculated for 0.917 af(59% of inflow) Center-of-Mass det. time= 100.8 min ( 878.0-777.2 ) Volume Invert Avail.Storage Storage Description #1 99.00' 53,997 cf Dry Det Pond (Prismatic)Listed below (Recaic) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 99.00 6,027 0 0 100.00 6,928 6,478 6,478 101.00 7,889 7,409 13,886 102.00 8,907 8,398 22,284 103.00 9,984 9,446 31,730 104.00 11,119 10,552 42,281 105.00 12,313 11,716 53,997 Device Routing Invert Outlet Devices #1 Primary 99.00' 4.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 24.0"W x 8.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.87 cfs @ 12.35 hrs HW=103.46' (Free Discharge) ,Primary (Orifice Controls 0.87 cfs @ 9.97 fps) Secondary OutFlow Max=3.94 cfs @ 12.35 hrs HW=103.46' (Free Discharge) 2=Orifice/Grate (Orifice Controls 3.94 cfs @ 2.17 fps) ertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=99.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS-HH Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 18 Pond P-3: Det Pond 3 Hydrograph I I I , I • L 1J J 1 j . 29.95 cfs a i L; ___ ®inflow 1 , 1 I I /� 1 ❑Outflow InfI;ow Area=x:220-ac - ®Primary ❑Secondary v i ®Tertiary 32 - H- -eak Elev=103.46-- 1 I 1 I 1 1 30,- r H -__ I' S#op_ag,e=36;3:94 cf 1 I ' I I I I I , 24� r r 22= r 1 f i - i - I 1.e,. 20= i 1 = I I I I 0 16_ A 1 u 14 /4 12= F4.,82 cfs 10 W; 8= ,- -' ..r,0,%'", . ice ✓ .Q" /� .( .j#,. �/�' � .rrr(��. 3.95 cfs �- 1 ,.. ,. j/ /��'/ �f/tel //�. ' 0.00 cfs ?gI ��//r 'T ' '0$ moi �/,%%,ll///v�� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 19 Summary for Link HH: (new Link) Inflow Area= 13.300 ac, 11.46% Impervious, Inflow Depth > 2.64" for 25-Year event Inflow = 28.20 cfs @ 12.24 hrs, Volume= 2.926 af Primary = 28.20 cfs @ 12.24 hrs, Volume= 2.926 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link HH: (new Link) Hydrograph . I I N Inflow 9R 9fl rf p Pnmaryl 30- = i 28.20 cfs ,�In -l4w rea=1;3.300-ac 28:- r 1 r ,`• 1 I 26= 7 r r T r '"(19-1 -1' ,__ _ 24= I 1 1 22.. - 1 1 . / 3 I 20:- ; I 1 ' - ---- J L I J L 1 L W 18_ I i.1 1 „ I I I 3 161,' .- I 1 I I o _ i r_ _____ i-___r.__ _ } LL 14? 1 I I I 1 J 1 L 1 J 1 1 L 12� 1 0 I I I I . 1 1 00', ;1 j— ___ _______ ____ __ _ 8� 61 Q I I Ce: //f////////z,2,A//�0/�®�'� a / � ,. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment DET-3: Det 3 Runoff = 35.43 cfs @ 12.01 hrs, Volume= 1.860 af, Depth> 4.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 5.220 79 1 acre lots, 20% imp, HSG C 4.176 80.00% Pervious Area 1.044 20.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.2 118 0.1360 0.27 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.1 136 0.0150 1.97 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 0.8 96 0.0100 2.03 Shallow Concentrated Flow, Shallow Paved Kv= 20.3 fps 0.9 410 0.0100 7.20 22.62 Pipe Channel, Storm Sewer 24.0" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.013 0.2 100 0.0200 7.26 126.24 Channel Flow, Swale Area= 17.4 sf Perim= 13.1' r= 1.33' n= 0.035 10.2 860 Total Subcatchment DET-3: Det 3 Hydrograph / 1 1 1 I 1 _ J J L 1 1 J L I J I I1 Runoff 38- I I 1 I I - - --- ,--- �-- 35.43 cfs 1 r - � -- 1 1 ii 34- x _ 1 1 L 9 1 Type ll2-44hr 32_ J 1 f 1 - --- - --50-Year Rainfal1=7.01"-- 301JL J_ ,_ 1-_ I I 28 / J_____1____ _____1_ _ I_ Runoff Areo=5220 oc I 1 I I I I I I I 24 I � Runoff_Vol(ume=1 ,8601 of- F. 223 . , - - -Runoff Depth>4.28" LT 18- ---- --- - a____Flov►r Length=860" 1 I 16 +- - - - - -- -I-- --F --- 14- -, -r 1 , r -r Tc=�Q;,2=loin _ 12 i 10= .�_ _ _T_ _______//� / f____r___ _ �� 9- f/ 6-5 - I I -r _ - I ---T - I 4 -I- T - T-- -- --- /- -1 T IF T -1____�___ ___ _ I -, 2 �� r000�/offgmprr':0l��f' ���00000000000000000000..e, zie00/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 11 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment DR-2: DR-2 Runoff = 29.37 cfs @ 12.21 hrs, Volume= 2.440 af, Depth> 3.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7.01" Area (ac) CN Description 5.680 70 Woods, Good, HSG C 2.400 79 1 acre lots, 20% imp, HSG C 8.080 73 Weighted Average 7.600 94.06% Pervious Area 0.480 5.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.7 80 0.0125 0.10 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 10.1 60 0.0150 0.10 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 1.2 357 0.0950 4.96 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 2.2 1,117 0.0210 8.58 231.62 Channel Flow, Channel Area= 27.0 sf Perim= 16.4' r- 1.65' n= 0.035 27.2 1,614 Total Subcatchment DR-2: DR-2 Hydrograph 1 I II I I I I 32-' I I I I p Runoff` 11 29.37 cfs -Li1 ! J 7 - - 28- ; i Type-rl-24 hr- , 261 • 05Q-Year Rainfall,_7.01,1" 24- I Runoff-area=8:080 ac-- 22-, • I 20' --' Run®f \/0ume=2;440 of 1 I 1 I 1 1 18 T -: Runoff De th>3:62" g16- / 1 ✓QIh I LL 14� 1 - - --- ; - Flow-Length 1-;614°-- I I;11,3 ------- - - -- - --- - 12- iP+ I Tcr =2Z' 2_nain _ - -I - 1' -1 1 r 10- 0 I I • i _1I (? _ ___1_ __L _ _ ___ _ CN=73 8-- ' /•I 2-= `iiii�iiii��o��00/��®'O�O���/ OOOOOp�000pO000O0000.0�1OOA00� I 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment Ex-HH: Ex HH Runoff = 40.75 cfs @ 12.26 hrs, Volume= 3.669 af, Depth> 3.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 50-Year Rainfall=7 01" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods. Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph / I I -1 1 J J 1 _L_ 1 J___ I I I I I 1 I I l! Runoff 44 T 7 -r - --r I 4z3" --- 40.75 cfs i___ _i 40 J 1 _1 / TYpe-II-24;hr-- 38: + - -y_ 36- T r _�,�0- 50-Yiaar-Ra.nfalh=7.01" 34,--" I 32 - 1 --- Runoff-Area 13.-290-a&- 30j" -r �� 28- " ; iV-- Ruiloff,Vour->tae=3,A69;of- 24 ----i____ i -- 1_Runoff De th,3.3'1"- 3 22 I --- -I r -; -- -?-Flow LengthT 25-2r- 18= - -1- 16� O I •3O �9- ' ii -1 7 1; 0 r T F= I- 14=' 12. N�• ® J:4f I I , * I 6_' _ J 1 1 1 1 L J 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 23 Summary for Pond P-3: Det Pond 3 Inflow Area= 5.220 ac, 20.00% Impervious, Inflow Depth > 4.28" for 50-Year event Inflow = 35.43 cfs @ 12.01 hrs, Volume= 1.860 af Outflow = 9.71 cfs @ 12.22 hrs, Volume= 1.193 af, Atten= 73%, Lag= 12.4 min Primary = 0.91 cfs @ 12.22 hrs, Volume= 0.618 af Secondary= 8.80 cfs @ 12.22 hrs, Volume= 0.574 af Tertiary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 103.82' @ 12.22 hrs Surf.Area= 10,919 sf Storage=40,339 cf Plug-Flow detention time= 147.5 min calculated for 1.193 af(64% of inflow) Center-of-Mass det. time= 77.3 min ( 850.5-773.2 ) Volume Invert Avail.Storage Storage Description #1 99.00' 53,997 cf Dry Det Pond (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 99.00 6,027 0 0 100.00 6,928 6,478 6,478 101.00 7,889 7,409 13,886 102.00 8,907 8,398 22,284 103.00 9,984 9,446 31,730 104.00 11,119 10,552 42,281 105.00 12,313 11,716 53,997 Device Routing Invert Outlet Devices #1 Primary 99.00' 4.0"Vert. Orifice/Grate C= 0.600 #2 Secondary 103.00' 24.0"W x 8.0" H Vert. Orifice/Grate X 2.00 C= 0.600 #3 Tertiary 104.00' 10.0' long x 11.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.53 2.59 2.70 2.68 2.67 2.68 2.66 2.64 Primary OutFlow Max=0.91 cfs @ 12.22 hrs HW=103.82' (Free Discharge) L1=Orifice/Grate (Orifice Controls 0.91 cfs @ 10.38 fps) Secondary OutFlow Max=8.71 cfs @ 12.22 hrs HW=103.82' (Free Discharge) 2=Orifice/Grate (Orifice Controls 8.71 cfs @ 3.27 fps) Iertiary OutFlow Max=0.00 cfs @ 5.00 hrs HW=99.00' (Free Discharge) 3=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Potter Road SWM-WS-HH Type II 24-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 24 Pond P-3: Det Pond 3 Hydrograph 1 I I I I I I I I I L 1 --L 1 -1 J ! -A ___ ___ L_ ;_--J__ _1 _ 1 I 1 1 ' 1 1 1 1 ®Inflow 1--- -� 1- 35.43 cfs I---,---l---T--- 1 --- T ❑oUtflOW 1 1 I 1 _9nfl;ow:Area®;5.2`0-aC- 0 Primary , ---I----1--- -1 -1---- -1----1 JIIII r11 1H + 1 1 -Sta.-S a=_40-3-39 34= �/' 7 of- 32 L L 1 1 _ i• J 1 1 1 1 ' 1 1 I 1 1 I 1 1 1 1 1 30 t 28"_•,- 1 1 - - 1 1 1 26.• I I I I I -J__-J__-_1_-_1 _ 4 4 I I , , r , I 1 1 24' r r 1 1 , 1 1 T T T w 22= 1 I I I I 1 1 1 1 1 3 20' 1- 1 1 1 l,_ --,----1 1 1 1 r r 1 -, 9.71 cfs 11 - - T _ / - • 1 1 - 1 1 1 1 1 14L , 8.80 cfs f "" 12'- Z-111 Gászàii__ aiii� WW2 P7eareelMedffee4 re-Korar,97 0.00 cfs ,. 0 ►46,4 ,i.�..Gl�!'r .. .f'W.': 6f!//• i3t? `lr .1f. 'G7f/.i?.rte ,`.,, €��4w7w- 55 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-WS-HH Type 1124-hr 50-Year Rainfall=7.01" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 25 Summary for Link HH: (new Link) Inflow Area = 13.300 ac, 11.46% Impervious, Inflow Depth > 3.28" for 50-Year event Inflow = 39.07 cfs @ 12.21 hrs, Volume= 3.632 af Primary = 39.07 cfs @ 12.21 hrs, Volume= 3.632 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link HH: (new Link) Hydrograph J 1 1 _ L J 1 1 L i ' 9 Inflow -1 '1Q (17 rf -1 -1- -1- + O Pnma 42i, _ ry ' 39.07 cfs �"` 1 � 1 T - r- 40= ---- - -- - 1 a— 0 ac - --- - , nflow re, = 3.30 381 ,' --- �- --- -+ - - - - - --- ---- --+-- ' -+-----1-- + ---- 36- / 1 1 I 1 34= PAO- I- --- - 1 - -1-- - 1 32. ,' _ 1 J 1 1 1 L 30 j - + -+ 28Z _ 1 �' 1 I 1 _ -r I r � H----r-- TT T 1 r 4- 2471-' i I 10(1 1_ , 1 ,_ 22- ------ - 1 -- I - 3 = - 1- r 2 20= 1 _- 1 I I 1 _ I 1 u. c 1 i �, 1 I I 18 -' ' i V - -1 - 16- - I _� 1 1 I I 1 1 1 -t ', r -f r 7 1 T , I_ 14� O� I 1 11 1 1 1 � I 12� ' J 1 t �^ 1 1 1 L - • - 1 j. D 1 I 8-E , 7 r r :i.r-,-,Ofro. 7 I T I r / 000000e00000009, 00f 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) K EX-2 <ExHH> KEX- 1) E:12/ x HH Ex WS 1L ..,----\...„ (new Link) Subcat Reach 'on. MI Routing Diagram for Potter Road SWM-Culvert 2 Prepared by Cardno, Printed 3/17/2017 HydroCAD®10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Potter Road SWM-Culvert 2 Type ll 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 172.52 cfs @ 12.19 hrs, Volume= 13.739 af, Depth> 2.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph 190,3 ' I p Runoff` 180,-` 172.52 cfs 170Type-II-2441r- 160= i9 150 25-Year Rain€all=6.20" - 14° 10 Ru not€Area=78.970-ac- 130 120= e,)01 _ o __ w 110= Runoff-Depth 2.09"- 0 190 ' __-- Fro-w Length_0,3521_- Tc=24.7 m i n 70 I i C-N=63- 50 40- , 1 r r p' r r 303 I,0 20 `0001�0OOOOp"zeeeOO�Op©�OOp00000p c r r 7 1a p00�fOGI'lliOODDOO�'�0000000ff•��� . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type 1124-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment Ex-2: Ex-2 Runoff = 30.50 cfs @ 12.14 hrs, Volume= 2.167 af, Depth> 2.71" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph ,____*--------- ---------I------------------- --------------I-----1---- I j I I I I � 34_,,,___,____I________ 4 J L 1 I J I Runoff` 32,-" _ � 30.50 cfs � , 3a= r 1-.30:- f Typal TYpe-II24k�r_- 28: 25=Year Rainfall= 6.20" 24= ' EZunoff_Area=9 f 0Q_ac__ 22 r Runoff;Volume=2167;of w 28- ; J .1.: 18, L Runoff Depth>2.71" � � -- - - -- - I I `p 16: , ,- -flow Leng#h-604' - 14= -+ + 12 J 1 '1� J il L T61=2.1-•0 min I 3-` I I I I I I I i L 14 1_ I ___-_ ____11- _ 1 J I I I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10 00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Pane 4 Summary for Subcatchment Ex-HH: Ex HH Runoff = 33.12 cfs @ 12.26 hrs, Volume= 2.988 af, Depth> 2.70" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.20" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph ' - 1 I I 1 - - II t - - - - I ©Runoff 36 + H- 33.12 cfs { �- -+ :- 34t. + 32= - L P1% L ; Type If 24�hr 30- ii L 215-Year Rainfall=6.20" 28= 26 ' : ) ____Riau-offA rea_;13.290_;ac__ 24_ 22 2a- Runoff; ku Vome=2;999;of- . . -----, e: , Runoff Depth>2 J0"- 18= 1 I I I I 2 16- Ifri;:Iz::1FIow Length=1 ,252 147 Te=30%;.-9-min-- 12_ J 1 J _� J V�_J�_ _ I L 10- J 1 __ _ _ ___1__ ___ _ ____L_ _ _J - ___ i I O 4- _ �OOOOO011IO0..." OOfl�d0000/ 2- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type II 24-hr 25-Year Rainfall=6.20" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 5 Summary for Link 1L: (new Link) Inflow Area = 101.860 ac, 0.00% Impervious, Inflow Depth > 2.23" for 25-Year event Inflow = 232.73 cfs @ 12.19 hrs, Volume= 18.893 af Primary = 232.73 cfs @ 12.19 hrs, Volume= 18.893 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph I I I 1 I I I ' ' I ®Inflow 260- , -, r 232.73 cfs O Pnmary 240- Inflow-Area=1-01-:560-ac-- I 220 ��f 1 1 { 1 200 ____J L J I ^', L ____ __J ___J 1 I 1 1 180 ' L--_J L 1 VV 1 160 -+ ' I ; 140 r -I I Y% r 1 { I I 0 ----- - r t 120 7 %/ � L '3 �' 100 r ; r ---80- % ra F I / r,' 20 f N �i*44f'1 Oi00 GI'IJOIO�OO®O/011/ � o /OIr,O !/00�01�ArfeG ,-11d 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type 1124-hr 100-Year Rainfall=7.86" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment Ex-1: Ex WS #1 Runoff = 271.46 cfs @ 12.19 hrs, Volume= 21.306 af, Depth> 3.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 30.690 70 Woods, Good, HSG C 37.520 58 Meadow, non-grazed, HSG B 5.380 70 Woods, Good, HSG C 5.380 58 Meadow, non-grazed, HSG B 78.970 63 Weighted Average 78.970 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 150 0.0533 0.20 Sheet Flow, Sheet Grass: Dense n= 0.240 P2= 3.56" 8.8 1,478 0.0305 2.81 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 3.3 1,724 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 24.7 3,352 Total Subcatchment Ex-1: Ex WS #1 Hydrograph J L L ___ __ __J _ ___i____ 1-_ __ __�_ ___L_ _ I I I I I I 300 I I I I I p Runoff 271.46cfs I , r r 280= - ,- I � 240- ' r Type-0-24;hr 260= _ �� 1 1 OO-Year 4ainfall;7.86 I 220- " 0 -4 L _;j �___RunoffA4rea=_78.97.0-a.c- - I I I 200, r ,I unoff Volume=2'F 306 of iso= " - L Runoff De t • X160 unof ph53. ;4 ' --- - - -- - ---- 0 140-3"" " -- J_ -- Flow length=3 352 120 I ' Tc=24._7_ min_ 100] I I I O I I C N=63- 80� I I 0 I I I 60-° � 1 '� i#0 1 1 _ J L J 1 J L_ J_ 20= " I .000OO,,,,''��Z./,O,,,,,, X0000/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type 1124-hr 100-Year Rainfall=7.86" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 7 ' Summary for Subcatchment Ex-2: Ex-2 Runoff = 44.91 cfs @ 12.14 hrs, Volume= 3.197 af, Depth> 4.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 9.600 70 Woods, Good, HSG C 9.600 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 75 0.0133 0.07 Sheet Flow, Shallow Woods: Light underbrush n= 0.400 P2= 3.56" 2.0 529 0.0775 4.48 Shallow Concentrated Flow, Shallow Unpaved Kv= 16.1 fps 21.0 604 Total Subcatchment Ex-2: Ex-2 Hydrograph I I 1----H-- I I 50. I I 1 I ___I_ _ - 1 I I I I ___ _I__ __ 1 _ _ _ . 48 -- -, + I a , I + I -+- Runoff I I I 44.91 cfs 1 1 I I 1 1 46= I T , -r -r r r I 1 44 J � 0 Ty -24;hr--- 42 , I 1 r 1 - - 1 - 1 ;)$ - --1OÔ-YarRainfaII=786" - I 40_- - ;' Runoff-Area=9.-§00lac- 34- y - r --{ -t- -1 . I -- 32= I I -- i-Ru h off�Vo��YY._.Al6:=3_-,1-9 7y1 al: 30?- 1- 26= - -L -1- i 1- Runoff_ D- 'Oth-,4: ,0--- 244 � r I-- 1 i - -r 22_ 1- _J. A ,-1 - -1--- - 1 -- Flo*Length-604'- 20-_- • --1 , 1 ',-- ! .10 :- -4 18°- 1 1 i 1 I 1 ' , - '--- =2'11 , 1 1fj I , I TC'2 f.0-min-- 16. 17 1--- 1 Y--- 1_ 14=' 1 - 1 1 1 _ 1 --- - N-170 - 10 /� Ia 1 1 1 I I 1 -"41--- 8- 1 - +1I I 1 6i - IL %� O04 I 4- .4pOOOOUO'W'' G1lOOpOpO000000000. ' , • • 1 1 I 1 i 1 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type II 24-hr 100-Year Rainfall=7.86" Prepared by Cardno Printed 3/17/2017 HydroCAD® 10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment Ex-HH: Ex HH Runoff = 48.97 cfs @ 12.26 hrs, Volume= 4.410 af, Depth> 3.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.86" Area (ac) CN Description 13.290 70 Woods, Good, HSG C 13.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.9 148 0.0200 0.09 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.56" 1.7 458 0.0740 4.38 Shallow Concentrated Flow, Shallow Conc Unpaved Kv= 16.1 fps 1.3 646 0.0210 8.58 231.62 Channel Flow, Ex Channel Area= 27.0 sf Perim= 16.4' r= 1.65' n= 0.035 30.9 1,252 Total Subcatchment Ex-HH: Ex HH Hydrograph / 1 1 I I I 1 1 ®Runoff 48.97 cfs 50-- 10 Type Il 24hr 45 G 10_0-Year Ralnfalh7.86 - I I I I 1 i 40= Runoff Asea=13.290 'ac --- r -- -r r 1 7 35 - 10 Runoff LVolume=4.410;of w 30- Runoff Depth>3.98" A j' 25 19.1 Flow Length;1,252° 20 Tc;=300 ;.9 min 15 Yl CN=70 - T - - '15 -' -- T 5 1 1 ✓moo(/f, iJ7-'. `✓s / 6 7 8 9 10 11 1'2 13 14 15 16 17 18 19 20 Time (hours) Potter Road SWM-Culvert 2 Type 1124-hr 100-Year Rainfall=7.86" Prepared by Cardno Printed 3/17/2017 HydroCAD®10.00-19 s/n 08568 ©2016 HydroCAD Software Solutions LLC Page 9 Summary for Link 1L: (new Link) Inflow Area = 101.860 ac, 0.00% Impervious, Inflow Depth > 3.41" for 100-Year event Inflow = 360.46 cfs @ 12.19 hrs, Volume= 28.913 af Primary = 360.46 cfs @ 12.19 hrs, Volume= 28.913 af, Atten= 0%, Lag= 0.0 min Primary outflow= Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 1L: (new Link) Hydrograph I I I I I 1 I I I I I 400 l -� , , 1 3 Inflow r ❑Primary iso , i ;__ 360.46 cfs -;Inflow-Areal=101-.1360 ac-- 340 �! I 1.i I I _____ I _ _I _ 320 _ J L J L J t°` _L 1 L 1 I 300 ,'_ + i�' 280 ,' I I . I,�-X 1 I I I fr- 260 I c"/ ' 1 I 1 240 I I 1 - ' r T 220 I I 1/° 1 1 j 1 3 200 _ J 1 J 1 /� I I L___J 1 2 LL 180 ,1 , 160 i 140 * V T,.; 120 100 r r - {/ IOk i 60 - I 1 40 L 1 - 1 1 ' I 1 ' ' 1 5 6 7 8 9 10 11 12 13 14 15 16 17 16 19 20 Time (hours) Addington Crossing - .. .ii:"?' .. .= a .E:: d . ; °D... dAPPEI IX ,emse �r . I • • •�' HYD RAU LIC ANA�Lqa-YSi S • ag��• . .7,;...:a....,...„.. .F. L.---- . , , . . . .. . . . ,.. . , , . March 17,2017 Oardno,Inc. C-1 2017_0315_Addington_SW Management Report Appendix C Storm Water Management Plan Hydrologic Analysis Addington Crossing Appendix C Hydraulic Analysis C.1 HydraFlow Calculations C.2 Culvert Master Calculations March 17,2017 Cardno,Inc. C-1 2017_0315_Addmgton_SW Management Report Storm Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 CB101 113 526 060 068 3.16 50 007 55 740 2334 2379 24 0013 31650 111 61740 61705 791 62409 2 CB 102 0 37 1.29 0 60 0 22 0 77 5 0 0 43 5 1 7 54 5 84 12 19 15 0.012 202 135 3 04 626 09 619 95 7 75 630 25 3 CB 103 0 92 0 92 0 60 0 55 0.55 5 0 0 09 5 0 7.57 4 18 4 96 15 0 012 23 835 0 50 626 31 626 19 4 53 630.25 4 CB 104 2 84 2 84 0 60 1 70 1 70 5 0 0 06 5.0 7 57 12 91 18 78 24 0 012 23 842 0 59 619 34 619 20 6.23 624 09 Project File CALATL1603-PROPOSED STORM 100-JMW stm Number of lines 4 Date 3/14/2017 NOTES Intensity=73 40/(Inlet time+12 20)A 0 80--Return period=10 Yrs , **Critical depth Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) 619 12 4 69 627 07 2 91 627 19 2 69 62063 275 Project File CALATL1603-PROPOSED STORM 100-JMW stm Number of lines 4 Date 3/14/2017 NOTES **Critical depth Storm Sewers Storm Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 CB 201 0 28 10 02 0.60 0 17 6.01 5 0 0 06 8 6 6 50 39 07 92 45 36 0 012 23 211 1 64 599 10 598 72 6 92 604 93 2 CB 202 0 02 8 51 0 60 0.01 5 11 5 0 0 38 8 3 6 60 33 68 38 66 30 0 012 187 500 0 76 600 62 599 20 8 19 609 94 3 CB 203 0 01 5 96 0 60 0 01 3 58 5 0 0 12 8 1 6 63 23 70 44 47 30 0 012 46 917 1 00 601 19 600 72 6 44 609 38 4 CB 204 0.87 5 95 0 60 0 52 3 57 5 0 0.12 8 0 6 66 23 77 47 63 30 0 012 50 470 1 15 601 87 601 29 7 14 608 80 5 CB 205 0 65 3 47 0 60 0 39 2.08 5 0 0 42 7 6 6 77 14 09 45 83 24 0 012 171 220 3 50 608 36 602 37 6 85 615 09 6 CB 206 0.10 2 76 0 60 0.06 1 66 5 0 0 39 7 2 6 88 11 39 22 78 18 0 012 210 823 4 01 617 31 608 86 9 03 624 06 7 CB 207 0 59 2 66 0.60 0 35 1 60 5 0 0 38 6 8 6 99 11 15 13 23 18 0 012 161 996 1 35 619 60 617 41 7 20 626 31 8 CB 208 021 116 060 013 070 50 055 63 715 498 819 15 0013 162 708 161 62247 61985 4.93 62905 9 CB 209 0 04 0 95 0 60 0 02 0.57 5 0 0 70 5 6 7 38 4 20 2.01 15 0 013 144 485 0 10 622 71 622 57 3 43 634 98 10 CB 210 0 02 0 91 0 60 0 01 0 55 5 0 0 10 5 5 7 41 4 04 32 18 15 0 013 23 835 24 84 628 73 622 81 4 04 634 98 11 CB 211 0 02 0 89 0 60 0 01 0 53 5 0 0 17 5 3 7 46 3 99 6.43 15 0 013 51 390 0 99 629 34 628 83 5 13 634 29 12 CB 212 0 57 0 87 0 60 0 34 0 52 5 0 0 14 5 2 7 51 3 92 5 09 15 0 013 38 560 0 62 629 68 629 44 4 58 633 86 13 CB 213 0 30 0 30 0 60 0 18 0 18 5 0 0 18 5 0 7.57 1 36 4 95 15 0 013 23 828 0 59 629 92 629 78 2 22 633 86 14 CB 220 0 91 0 91 0 60 0 55 0 55 5 0 0 09 5 0 7.57 4 14 4 95 15 0 013 23 833 0 59 622 37 622 23 4 51 626 31 15 CB219 006 006 060 004 004 50 019 50 757 027 805 18 0013 23817 059 61088 61074 209 61509 16 CB 215 0 82 2 53 0 60 0 49 1 52 5 0 0 06 5 9 7 27 11 04 8 05 18 0 013 23 812 0 59 604 35 604.21 6 25 609.94 17 CB 216 056 171 060 034 103 5.0 076 51 753 772 810 18 0013 200 140 059 60564 604.45 437 61009 18 CB 217 1 15 1 15 0 60 0 69 0.69 5 0 0 13 5 0 7 57 5 23 8 05 18 0 013 23 823 0 59 605 88 605 74 2 96 610 09 19 CB 218 1 61 1 61 0 60 0 97 0 97 5 0 0.07 5 0 7 57 7 32 4 95 15 0 013 23 836 0 59 604 59 604 45 5 96 608 80 20 CB 214 1 23 1 23 0 60 0 74 0 74 5 0 0 09 5 0 7 57 5 59 4 95 15 0 013 23 832 0 59 600 99 600 85 4 56 604 93 Project File CALATL1603-PROPOSED STORM 200-JMW stm Number of lines 20 Date 3/14/2017 NOTES Intensity=73 40/(Inlet time+12.20)A 0 80--Return period=10 Yrs., **Critical depth Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) 601 131 2 83 602 59 6 82 602 85 j 5 69 603 53 4 43 609 71 4 73 61860 525 620 88 5 21 623 37 j 5 33 624 43 11.02 629 54 j 5 00 630 15 3 70 630 50 2 93 , 630 38 2 69 623 25 2 69 611 07 2 71 605 97 4 09 607 97 2 95 608 47 2 71 606 01 2 96 602 24 2 69 Project File CALATL1603-PROPOSED STORM 200-JMW stm Number of lines 20 Date 3/14/2017 NOTES **Critical depth Storm Sewers Storm Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 MH 301 0 01 4 42 0 60 0 01 2 65 5 0 0 04 6 6 7 06 18 73 34 65 24 0 012 15 000 2 00 588 95 588 65 6 74 591 43 2 CB 302 1 06 4 41 0 60 0 64 2 65 5 0 0 31 6 3 7 15 18 93 34 67 24 0 012 136 384 2 00 591 78 589 05 7 45 598 78 3 CB 303 0 19 3 35 0 60 0 11 2 01 5 0 0 34 5 9 7 26 14 59 24 50 24 0 012 146 033 1 00 595 24 593 78 7 23 600 37 4 CB 304 0 13 1 95 0 60 0 08 1 17 5 0 0 66 5 3 7.48 8 75 25 71 24 0 012 186 167 1 10 597 39 595 34 4 68 602 43 5 CB 305 0 69 1 82 0 60 0 41 1 09 5 0 0 18 5 1 7 54 8 23 29 07 24 0 012 56 854 1 41 598 29 597 49 5 34 603 28 6 CB 306 1 13 1 13 0 60 0 68 0 68 5 0 0 10 5 0 7.57 5 14 18 78 24 0 012 23 836 0 59 598 53 598 39 4 01 603 28 7 CB 307 1 21 1 21 0 60 0 73 0 73 5 0 0 11 5 0 7 57 5 50 18 78 24 0 012 23 842 0 59 595 62 595 48 3 74 600 37 Project File CALATL1603-PROPOSED STORM 300-JMW stm Number of lines 7 Date 3/1/2017 NOTES Intensity=73 40/(Inlet time+12 20)^0 80--Return period=10 Yrs , **Critical depth Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) , 590 51 j 0 48 593 34 5 00 596 62 3 13 598 44 j 3 04 599 31 2 99 599 33 j 2 75 596 45 2 75 Project File CALATL1603-PROPOSED STORM 300-JMW stm Number of lines 7 Date 3/1/2017 NOTES **Critical depth Storm Sewers Storm Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 CB 401 0 67 7 34 0 60 0 40 4.40 5 0 0 06 8 3 6 59 29 01 55 76 36 0 012 21 828 0 60 587 93 587 80 5 83 594 00 2 CB 402 1 45 6 67 0 60 0.87 4 00 5 0 0 06 8 2 6 60 26 42 55 35 36 0 012 23 847 0 59 588 17 588 03 6 63 594 00 3 CB 403 0 54 5 22 0 60 0 32 3 13 5 0 0 64 7.6 6 77 21 21 77 05 30 0 012 253 049 3 01 595 88 588 27 6 58 601 27 4 CB 404 0 31 3 88 0 60 0 19 2 33 5 0 0 34 7 2 6 87 15 99 28 97 24 0 012 133 780 1 40 597 85 595 98 6.54 603 11 5 CB 405 0 31 3 57 0 60 0.19 2 14 5 0 0 26 7 0 6 94 14 87 18 92 24 0 012 100 629 0 60 598 55 597 95 6 51 603 58 6 CB 406 0 39 2.68 0 60 0 23 1 61 5 0 0 30 6 7 7 03 11 30 18 90 24 0 012 99 159 0 59 599 24 598 65 5 50 604 06 7 CB 407 0 43 2 29 0 60 0 26 1 37 5 0 0 49 6 2 7 18 9 86 18.98 24 0 012 160 056 0 60 600 30 599 34 5 49 604 84 8 CB 408 0 51 0 51 0 60 0 31 0 31 5 0 1 20 5 0 7.57 2 32 8 15 18 0 013 199 428 0 60 601 60 600 40 2 76 605 81 9 CB 409 1 35 1 35 0 60 0 81 0 81 5 0 0 08 5 0 7 57 6 14 8 04 18 0 013 23 863 0 59 600 63 600 49 5 01 604 84 10 CB 410 0 58 0 58 0 60 0 35 0 35 5 0 0 11 5 0 7 57 2 64 8 05 18 0 013 23 850 0 59 599 38 599 24 3 57 603 59 11 CB 411 0 80 0 80 0 60 048 0 48 5 0 0 09 5 0 7 57 3 64 4 95 15 0 013 23 853 0 59 597 33 597 19 4 41 601 27 Project File CALATL1603-PROPOSED STORM 400(2)-JMW stm Number of lines 11 Date. 3/1/2017 NOTES Intensity=73 40/(Inlet time+12 20)A 0 80--Return period=10 Yrs , **Critical depth Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) 589 67 3.07 589 83 2 83 597 44 2.89 599 29 j 3 26 599 94 3 03 600 45 j 2 82 601 42 2 54 602 18 j 2.71 601 61 2 71 600.00 j 2 71 598 13 2 69 Project File CALATL1603-PROPOSED STORM 400(2)-JMW.stm Number of lines 11 Date 3/1/2017 NOTES **Critical depth Storm Sewers Storm Rpt Pagel Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 CB 501 0 87 5 21 0 60 '0 52 3.13 5 0 0 06 6 1 7 20 22 50 33 74 30 0.012 22 540 0 58 587 37 587 24 5 97 592 27 2 CB 502 1 35 4 33 0 60 0 81 2 60 5 0 0 06 5 9 7 28 18 90 34 03 30 0 012 23 868 0 59 587 61 587 47 6 19 592 27 3 CB 503 1 17 2 98 0 60 0 70 1.79 5 0 0 38 5 5 7 40 13 23 49.76 30 0 012 117 969 1 25 589 19 587 71 5 17 594 09 4 CB 504 1 81 1 81 0 60 1 09 1.09 5 0 0 51 5 0 7 57 8 23 29 98 24 0 012 147 000 1 50 591 49 589 29 4 82 596 24 5 CB 505 0 01 0 01 0 60 0 01 0 01 5 0 1 13 5 0 7 57 0 05 5 11 15 0 013 87 972 0 63 589 48 588 93 1 29 593 42 Project File CALATL1603-PROPOSED STORM 500-JMW stm Number of lines 5 Date 3/14/2017 NOTES Intensity=73 40/(Inlet time+12.20)A 0 80--Return period=10 Yrs , **Critical depth Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) 588 98 2 40 589 081 2 16 590 41 j 2 40 592 51 j 2 75 589.56 2 69 Project File CALATL1603-PROPOSED STORM 500-JMW stm Number of lines 5 Date. 3/14/2017 NOTES **Critical depth Storm Sewers Storm Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ftls) (ft) 1 CB 600 1 20 1 91 0 60 0 72 1 15 5 0 0 07 5,8 7 31 8 38 18 69 24 0 012 17 182 0 58 593 54 593 44 4.21 596 85 2 CB601 032 071 060 019 043 50 013 56 736 313 1878 24 0012 23846 059 59378 59364 299 59685 3 CB 602 0 21 0 39 0 60 0 13 0 23 5 0 0 48 5 2 7 52 1 76 5 00 15 0 013 105 137 0 60 594 51 593 88 3 62 598 71 4 CB 603 0 18 0 18 0 60 0 11 0 11 5 0 0 16 5 0 7 57 0 82 4 95 15 0 013 23 870 0 59 594 75 594 61 2 54 598 71 Project File. CALATL1603-PROPOSED STORM 600-JMW stm Number of lines.4 Date. 3/9/2017 NOTES Intensity=73 40/(Inlet time+12 20)^0 80--Return period=10 Yrs., **Critical depth • Storm Sewers Storm Rpt Page 2 HGL Cover Up Up (ft) (ft) 594 57 1 31 594 40 1.07 595.04 2 95 595 10 j 2 71 Project File CALATL1603-PROPOSED STORM 600-JMW stm Number of lines 4 Date 3/9/2017 NOTES **Critical depth Storm Sewers StormStora, Rpt Page 1 Line Inlet Drng Total Runoff Incr Total Inlet Pipe Tc i ,Total Capac Line n-val Line Line Invert Invert Vel Gnd/Rim No. ID Area Area Coeff CxA CxA Time Travel Sys Runoff Full Size Pipe Length Slope Up Dn Ave El Up (ac) (ac) (C) (min) (min) (min) (in/hr) (cfs) (cfs) (in) (ft) (%) (ft) (ft) (ft/s) (ft) 1 MH 801 0 01 19 70 0 40 0 00 9.85 5 0 0 13 5 3 7 47 73 58 84 93 42 0 012 65 887 0 61 602 65 602 25 8 74 612 22 2 DI 802 0.02 19 69 0 50 0 01 9 85 5 0 0.27 5 0 7 56 74 46 84 52 42 0 012 149 655 0 60 603 55 602 65 9 38 610 04 3 EX 24 19 67 19 67 0 50 9 84 9 84 5 0 0 03 5 0 7 57 74 50 37 57 24 0 012 46 800 2.35 608 39 607.29 23 72 0 00 Project File. CALATL1603-PROPOSED STORM 800-JMW stm Number of lines 3 Date 3/10/2017 NOTES. Intensity=73 40/(Inlet time+12.20)A 0 80--Return period=10 Yrs., **Critical depth Storm Sewers Storm Rpt Paget HGL Cover Up Up (ft) (ft) 605 33 6 07 606 25 2 99 613 62 n/a Project File CALATL1603-PROPOSED STORM 800-JMW stm Number of lines 3 Date 3/10/2017 NOTES **Critical depth Storm Sewers Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk,Inc. Monday,Feb 6 2017 Swale out of Bypass Northern Pod Trapezoidal Highlighted Bottom Width (ft) = 3.00 Depth (ft) = 0.56 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 13.91 Total Depth (ft) = 1.00 Area (sqft) = 2.62 Invert Elev (ft) = 606.00 Velocity (ft/s) = 5.31 Slope (%) = 5.32 Wetted Perim (ft) = 6.54 N-Value = 0.035 Crit Depth, Yc (ft) = 0.70 Top Width (ft) = 6.36 Calculations EGL (ft) = 1.00 Compute by: Known Q Known Q (cfs) = 13.91 Elev (ft) Section Depth (ft) 608 00 2 00 607 50 1 50 607 00 1 00 606 50 - 0 50 _ ________ _:-- r---1 606 00 0.00 605 50 -0 50 0 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc Wednesday,Feb 8 2017 Swale into Basin 1 Trapezoidal Highlighted Bottom Width (ft) = 6.00 Depth (ft) = 0.67 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 20.48 Total Depth (ft) = 1.00 Area (sqft) = 5.37 Invert Elev (ft) = 618.78 Velocity (ft/s) = 3.82 Slope (%) = 2.00 Wetted Perim (ft) = 10.24 N-Value = 0.035 Crit Depth, Yc (ft) = 0.64 Top Width (ft) = 10.02 Calculations EGL (ft) = 0.90 Compute by: Known Q Known Q (cfs) = 20.48 Elev (ft) Section Depth (ft) 620 00 1 22 619 50 'S7' 0.72 _ - 619 00 0 22 _ - - - 618 50 -0.28 ------ ____618.00 -0.78 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc Wednesday,Feb 8 2017 <Name> Trapezoidal Highlighted Bottom Width (ft) = 6.00 Depth (ft) = 0.76 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 25.74 Total Depth (ft) = 1.00 Area (sqft) = 6.29 Invert Elev (ft) = 618.78 Velocity (Ws) = 4.09 Slope (%) = 2.00 Wetted Perim (ft) = 10.81 N-Value = 0.035 Crit Depth, Yc (ft) = 0.74 Top Width (ft) = 10.56 Calculations EGL (ft) = 1.02 Compute by: Known Q Known Q (cfs) = 25.74 Elev (ft) Section Depth (ft) 620 00 1.22 61950 072 619 00 0.22 618 50 -0 28 618.00 -0.78 0 2 4 6 8 10 12 14 16 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc Wednesday,Mar 15 2017 Start of Ehanched Swale #1 Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.29 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 3.180 Total Depth (ft) = 0.80 Area (sgft) = 0.83 Invert Elev (ft) = 639.20 Velocity (ft/s) = 3.82 Slope (%) = 6.90 Wetted Perim (ft) = 3.83 N-Value = 0.035 Crit Depth, Yc (ft) = 0.36 Top Width (ft) = 3.74 Calculations EGL (ft) = 0.52 Compute by: Known Q Known Q (cfs) = 3.18 Elev (ft) Section Depth (ft) 641 00 1.80 640.50 1 30 640 00 0 80 __ _ 639.50 _._. m_ ____ ____ ® T___.__ 0.30 639.00 -0 20 638 50 -0 70 0 1 2 3 4 5 6 7 8 9 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD®Civil 3D®by Autodesk, Inc Wednesday,Mar 15 2017 Start of Ehanced Swale #2 Trapezoidal Highlighted Bottom Width (ft) = 2.00 Depth (ft) = 0.40 Side Slopes (z:1) = 3.00, 3.00 Q (cfs) = 4.550 Total Depth (ft) = 0.90 Area (sgft) = 1.28 Invert Elev (ft) = 635.10 Velocity (ft/s) = 3.55 Slope (%) = 3.97 Wetted Perim (ft) = 4.53 N-Value = 0.035 Crit Depth, Yc (ft) = 0.44 Top Width (ft) = 4.40 Calculations EGL (ft) = 0.60 Compute by: Known Q Known Q (cfs) = 4.55 Elev (ft) Section Depth (ft) 637.00 1.90 636 50 1 40 :::: 0 90 ___ 0.40 635 00 -0 10 634.50 -0 60 0 1 2 3 4 5 6 7 8 9 10 Reach (ft) Culvert Designer/Analyzer Report Culvert BP-1 - FE Peak Discharge Method User-Specified Design Discharge 40.60 cfs Check Discharge 61 02 cfs Grades Model.Inverts Invert Upstream 616.75 ft Invert Downstream 614 25 ft Length 350 86 ft Slope 0 007125 ft/ft Drop 2 50 ft Headwater Model Allowable HW/Height Headwater Depth/Height 1 20 Tailwater Conditions Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity x Tnal-1 1-36 inch Circular 40.60 cfs 620 24 ft 8 67 ft/s Title Addington Crossing Subdivision Project Engineer Robert.Cash w\...\stormwater\potter culvert bypass#1 fe.cvm Cardno TBE CulvertMaster v3 3[03 03 00.04] 03/16/17 03:36 37 PIS®Bentley Systems, Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert BP-1 - FE Design Trial-1 Solve For Headwater Elevation Culvert Summary Allowable HW Elevation 620 35 ft Storm Event Design Computed Headwater Elevw 620 24 ft Discharge 40 60 cfs Headwater Depth/Height 1 16 Tailwater Elevation N/A ft Inlet Control HW Elev. 620.08 ft Control Type Entrance Control Outlet Control HW Elev 620 24 ft Grades Upstream Invert 616.75 ft Downstream Invert 614 25 ft Length 350 86 ft Constructed Slope 0 007125 ft/ft Hydraulic Profile Profile S2 Depth,Downstream 1.89 ft Slope Type Steep Normal Depth 1.89 ft Flow Regime Supercritical Critical Depth 2.08 ft Velocity Downstream 8.67 ft/s Critical Slope 0.005455 ft/ft Section Section Shape Circular Mannings Coefficient 0 013 Section Material Concrete Span 3 00 ft Section Size 36 inch Rise 3 00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 620.24 ft Upstream Velocity Head 0.94 ft Ke 0 50 Entrance Loss 0 47 ft Inlet Control Properties Inlet Control HW Elev 620.08 ft Flow Control Unsubmerged Inlet Type Square edge w/headwall Area Full 7 1 ft2 K 0 00980 HDS 5 Chart 1 M 2 00000 HDS 5 Scale 1 C 0 03980 Equation Form 1 Y 0 67000 Title Addington Crossing Subdivision Project Engineer Robert Cash w.\ \stormwater\potter culvert bypass#1 fe cvm Cardno TBE CulvertMaster v3 3[03.03.00 04] 03/16/17 0336 37 PMg Bentley Systems,Inc Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 2 of 2 Culvert Designer/Analyzer Report Culvert BP-1 - FE Peak Discharge Method User-Specified Design Discharge 40 60 cfs Check Discharge 61.02 cfs Grades Model:Inverts Invert Upstream 616 75 ft Invert Downstream 614 25 ft Length 350 86 ft Slope 0 007125 ft/ft Drop 2 50 ft Headwater Model Allowable HW/Height Headwater Depth/Height 1.20 Tailwater Conditions Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity x Tnal-1 1-36 inch Circular 61 02 cfs 621 72 ft 9.63 ft/s Title Addington Crossing Subdivision Project Engineer Robert Cash w\ \stormwater\potter culvert bypass#1 fe.cvm Cardno TBE CulvertMaster v3.3[03.03.00 04] 03/16/17 03.37 12 PMD Bentley Systems,Inc Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert BP-1 - FE Design.Tnal-1 Solve For Headwater Elevation Culvert Summary Allowable HW Elevation 620 35 ft Storm Event Check Computed Headwater Elevw 621 72 ft Discharge 61 02 cfs Headwater Depth/Height 1 66 Tailwater Elevation N/A ft Inlet Control HW Elev. 621.72 ft Control Type Inlet Control Outlet Control HW Elev 621 39 ft Grades Upstream Invert 616.75 ft Downstream Invert 614.25 ft Length 350 86 ft Constructed Slope 0.007125 ft/ft Hydraulic Profile Profile M2 Depth,Downstream 2.52 ft Slope Type Mild Normal Depth N/A ft Flow Regime Subcntical Critical Depth 2 52 ft Velocity Downstream 9.63 ft/s Critical Slope 0.008030 ft/ft Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 3 00 ft Section Size 36 inch Rise 3.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 621.39 ft Upstream Velocity Head 1.22 ft Ke 0.50 Entrance Loss 0.61 ft Inlet Control Properties Inlet Control HW Elev. 621.72 ft Flow Control Submerged Inlet Type Square edge w/headwall Area Full 7.1 ft2 K 0.00980 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 1 C 0.03980 Equation Form 1 Y 0 67000 Title Addington Crossing Subdivision Project Engineer Robert.Cash w\...\stormwater\potter culvert bypass#1 fe.cvm Cardno TBE CulvertMaster v3 3[03.03 00.04] 03/16/17 03.37:12 Ply Bentley Systems,Inc Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 2 of 2 Culvert Designer/Analyzer Report Culvert BP-2 FE Peak Discharge Method User-Specified Design Discharge 232 73 cfs Check Discharge 360 46 cfs Grades Model Inverts Invert Upstream 583.00 ft Invert Downstream 581 50 ft Length 90 00 ft Slope 0.016667 ft/ft Drop 1.50 ft Headwater Model*Allowable HW/Height Headwater Depth/Height 1 20 Tailwater Conditions Constant Tailwater Tailwater Elevation 581 50 ft Name Description Discharge HW Elev Velocity x Tnal-1 2-60 inch Circular 232 73 cfs 588 04 ft 9.84 ft/s Title Addington Crossing Subdivision Project Engineer Robert Cash w\ \stormwater\potter culvert#1 fe.cvm Cardno TBE CulvertMaster v3.3[03.03.00 04] 03/17/17 11 04-03 Alves Bentley Systems,Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert BP-2 FE ,Design.Trial-1 Solve For Headwater Elevation Culvert Summary Allowable HW Elevation 589.00 ft Storm Event Design Computed Headwater Eleva 588.04 ft Discharge 232 73 cfs Headwater Depth/Height 1.01 Tadwater Elevation 581 50 ft Inlet Control HW Elev. 587.62 ft Control Type Entrance Control Outlet Control HW Elev. 588.04 ft Grades Upstream Invert 583.00 ft Downstream Invert 581 50 ft Length 90.00 ft Constructed Slope 0.016667 ft/ft Hydraulic Profile Profile S2 Depth,Downstream 2.90 ft ' Slope Type Steep Normal Depth 2 90 ft Flow Regime Supercritical Cntical Depth 3.08 ft Velocity Downstream 9 84 fUs Critical Slope 0.013905 ft/ft Section Section Shape Circular Mannings Coefficient 0.024 Section Matenal CMP Span 5.00 ft Section Size 60 inch Rise 5.00 ft Number Sections 2 Outlet Control Properties Outlet Control HW Elev 588.04 ft Upstream Velocity Head 1.31 ft Ke 0.50 Entrance Loss 0.65 ft Inlet Control Properties Inlet Control HW Elev. 587.62 ft Flow Control N/A Inlet Type Headwall Area Full 39.3 ft2 K 0.00780 HDS 5 Chart 2 M 2.00000 HDS 5 Scale 1 C 0 03790 Equation Form 1 Y 0 69000 Title Addington Crossing Subdivision Project Engineer Robert.Cash w:\..\stormwater\potter culvert#1 fe.cvm Cardno TBE CulvertMaster v3.3[03.03.00.04] 03/17/17 11:04 03 Alm Bentley Systems,Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 2 of 2 Culvert Designer/Analyzer Report Culvert BP-2 FE Peak Discharge Method:User-Specified Design Discharge 232.73 cfs Check Discharge 360 46 cfs Grades Model:Inverts Invert Upstream 583 00 ft Invert Downstream 581.50 ft Length 90 00 ft Slope 0.016667 ft/ft Drop 1.50 ft Headwater Model.Al lowable HW/Height Headwater Depth/Height 1.20 Tailwater Conditions Constant Tailwater Tailwater Elevation 581 50 ft Name Description Discharge HW Elev. Velocity — x Tnal-1 2-60 inch Circular 360.46 cfs 589.66 ft 11.12 ft/s Title Addington Crossing Subdivision Project Engineer Robert Cash w\...\stormwater\potter culvert#1 fe.cvm Cardno TBE CulvertMaster v3.3[03.03.00.04] 03/17/17 11:04:49 AMO Bentley Systems,Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert BP-2 FE Design Tnal-1 Solve For:Headwater Elevation Culvert Summary Allowable HW Elevation 589.00 ft Storm Event Check Computed Headwater Elevz 589.66 ft Discharge 360.46 cfs Headwater Depth/Height 1.33 Tailwater Elevation 581.50 ft Inlet Control HW Elev. 589.60 ft Control Type Outlet Control Outlet Control HW Elev. 589.66 ft Grades Upstream Invert 583.00 ft Downstream Invert 581.50 ft Length 90.00 ft Constructed Slope 0.016667 ft/ft Hydraulic Profile Profile M2 Depth,Downstream 3 85 ft Slope Type Mild Normal Depth 4 05 ft Flow Regime Subcritical Cntical Depth 3.85 ft Velocity Downstream 11.12 ft/s Critical Slope 0.018547 ft/ft Section Section Shape Circular Mannings Coefficient 0.024 Section Material CMP Span 5.00 ft Section Size 60 inch Rise 5.00 ft Number Sections 2 Outlet Control Properties Outlet Control HW Elev. 589.66 ft Upstream Velocity Head 1.74 ft Ke 0.50 Entrance Loss 0.87 ft Inlet Control Properties Inlet Control HW Elev 589.60 ft Flow Control Submerged Inlet Type Headwall Area Full 39.3 ft2 K 0 00780 HDS 5 Chart 2 M 2.00000 HDS 5 Scale 1 C 0.03790 Equation Form 1 Y 0.69000 Title Addington Crossing Subdivision Project Engineer Robert.Cash w\. \stormwater\potter culvert#1 fe cvm Cardno TBE CulvertMaster v3.3[03.03 00 04] 03/17/17 11 04:49 ANO Bentley Systems,Inc. Haestad Methods Solution Center Watertown,CT 06795 USA +1-203-755-1666 Page 2 of 2 Addington Crossing . / APPENDIX D , , ,i REFERENCE MATERIAL March 17,2017 Cardno,Inc. C-1 2017_0315_Addington_SW Management Report Appendix D Storm Water Management Plan Hydrologic Analysis Addington Crossing Appendix D Reference Material D.1 Web Soil Survey—Soils Group Report D.2 NOAA Atlas 14— Precipitation Information March 17,2017 Cardno,Inc. C-1 2017_0315_Addington_SW Management Report Hydrologic Soil Group—Union County,North Carolina (Full WS Area) o P 517100 527400 527700 528700 528300 5286J0 528800 529200 523500 5238W 530100 35°2'0"N • » tit 1 w .3 s • • 4,.-1, . y• y / ..� 32 I'!f y' " i )': J3 1..r: ,•rs s' t i' ,, �'per. Z J3 �r i ^ r �\ \°f , i.. ib! _ - •-v.,... : i. ',-143..= L, it, `tt +T t , LII ! t ✓ -;�T• • k`' - 't • .. } Ml' f/R ,- 4 BaZi t �• fi !f *- - �• • • .„•,s , 4lr ., + r. st i 7 ,M M " : " . 2 'L rrTI 'R. e , , ,1 '}Y^ i + • � e,..,i, t. , "a ' BN 4ri' F#-",..- " t`' '.0�.' :."J, '� r3-. - 1,7 R , ,,,. .49 .,4ii4?,.., , , ,,, • i• .. 12 b pt,02 4, �7'r p. ... c„. , ' +.,. ... . ...., . _ . ‘„ ,, .„ -t.1. tor: - r 't',S''8 ' 4t �' �.A -e- /� .x,14'4 '1 r , 2 r f,,f r•.! T i 4i r. " ��` Utah II-church7 .44-• j.T .7a'^',2 a ,'r-,- '-i y yR sr= ,a�''1,.. x' :---....---r:'`t t',.- ,,„. , ...., -is;._ ...r ., r3d3c0, rt, 5- • .-5..;55 4. 5 rf'... `1*.5i:11'51.555,7 8 'le:„v ''1.' • ' X ,c32 Tr r ..., . , a y r x..t r. *+ry ire • : ,I. I ''''1, a4 � t 1 �, i may\ —,. �" • 0» • if, -. k " ':� .. : I '! F� -�y :fly' ., `r `k;‘,:-.,_ ,J,. ' 35°0'49"N ,-4. .. ti1A.. i3'i 4J' +.. S I - t 35°0'49"N 527100 527400 5277W 528700 528300 528300 528900 529200 5241500 529900 530100 3 3 v v Map Scale:1'15,400 if punted on A landscape(11"x 8.5")sheet. g Meters § No 200 400 800 1200 Feet /V 0 500 1000 2000 3000 Map projecbon:Web Mercator Corner coordinates:WC,S84 Edge tics:LIMM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 2/9/2017 Conservation Service National Cooperative Soil Survey Page 1 of 4 , Hydrologic Soil Group—Union County,North Carolina (Full WS Area) MAP LEGEND MAP INFORMATION Area of Interest(AOI) El C The soil surveys that comprise your AOI were mapped at In Area of Interest(AOI) C/D 1.24,000 el Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons 0 D measurements. n A 0 Not rated or not available Source of Map: Natural Resources Conservation Service pi A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System. Web Mercator(EPSG 3857) 0 B Maps from the Web Soil Survey are based on the Web Mercator Transportation I-1 B/D projection,which preserves direction and shape but distorts 4-t-P Rails distance and area A projection that preserves area,such as the F-7 c ,tee Interstate Highways Albers equal-area conic projection,should be used if more n C/D accurate calculations of distance or area are required. „... m US Routes El D This product is generated from the USDA-NRCS certified data as Major Roads of the version date(s)listed below. n Not rated or not available Local Roads Soil Survey Area' Union County,North Carolina Soil Rating Lines Background Survey Area Data Version 16,Sep 20,2016 "` A ® Aerial Photography Soil map units are labeled(as space allows)for map scales ,. A/D 1:50,000 or larger. .tee,. B Date(s)aerial images were photographed: Feb 11,2011—Feb ,,. B/D 13,2011 The orthophoto or other base map on which the soil lines were "° C compiled and digitized probably differs from the background ,. . CID imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident ,..k.. D . 0 Not rated or not available Soil Rating Points O A O ND O B O B/D USDA Natural Resources Web Soil Survey 2/9/2017 '� Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Union County,North Carolina Full WS Area Hydrologic Soil Group Hydrologic Soli Group—Summary by Map Unit—Union County,North Carolina(NC179) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Badin channery silt C 30 8 5 3% loam,2 to 8 percent slopes BaC Badin channery silt C 5 9 1 0% loam,8 to 15 percent slopes BdB2 Badin channery silty C 138 1 24 0% clay loam,2 to B percent slopes, moderately eroded BdC2 Badin channery silty C 42 7 7 4% clay loam,8 to 15 percent slopes, moderately eroded CM Chewacla silt loam,0 to B/D 40 3 7 0% 2 percent slopes, frequently flooded CmB Cid channery silt loam,1 D 9 2 1 6% to 5 percent slopes GfB2 Georgevdle silty clay B 44 5 7 7% loam,2 to 8 percent slopes,moderately eroded GoC Goldston very channery D 0 3 0 1% silt loam,4 to 15 percent slopes GsB Goldston-Badin 0 13 B 2 4% complex,2 to 8 percent slopes MeB2 Mecklenburg sandy clay C 0 7 0 1% loam,2 to 8 percent slopes,moderately eroded TbB2 Tarrus gravelly silty clay B 229 3 39 8% loam,2 to 8 percent slopes,moderately eroded TbC2 Tarrus gravelly silty clay B 17 2 3 0 loam,8 to 15 percent slopes,moderately eroded W Water 1 4 0 2% WyB Wynott gravelly loam,2 D 1 4 0 2% to 8 percent slopes Totals for Area of Interest 676.6 100.0% USDA Natural Resources Web Soil Survey 2/9/2017 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Union County,North Carolina Full WS Area Description Hydrologic soil groups are based on estimates of runoff potential.Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation,are thoroughly wet,and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups(A,B,C,and D)and three dual classes(A/D,B/D,and C/D).The groups are defined as follows Group A Soils having a high infiltration rate(low runoff potential)when thoroughly wet.These consist mainly of deep,well drained to excessively drained sands or gravelly sands These soils have a high rate of water transmission. Group B Soils having a moderate infiltration rate when thoroughly wet.These consist chiefly of moderately deep or deep,moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C.Soils having a slow infiltration rate when thoroughly wet.These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture.These soils have a slow rate of water transmission. Group D.Soils having a very slow infiltration rate(high runoff potential)when thoroughly wet.These consist chiefly of clays that have a high shrink-swell potential,soils that have a high water table,soils that have a claypan or clay layer at or near the surface,and soils that are shallow over nearly impervious material These soils have a very slow rate of water transmission If a soil is assigned to a dual hydrologic group(ND,B/D,or C/D),the first letter is for drained areas and the second is for undrained areas.Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method Dominant Condition Component Percent Cutoff None Specified Tie-break Rule Higher iiNatural Resources Web Soil Survey 2/9/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14,Volume 2,Version 3 B Location name:Wesley Chapel,North Carolina, *.,,,, USA* s •; i • 1. Latitude:35.0071°,Longitude:-80.6745° r i Elevation:611.41 ft** 6 �4'�.. •source ESRI Maps `'°'. **source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin,D Martin,B Lin,T Parzybok,M Yekta,and D Riley NOAA,National Weather Service,Silver Spnng,Maryland PF tabular I PF graphical I Maps & aenals PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals(in inches/hour)1 Duration Average recurrence interval(years) 1 2 5 10 25 50 100 200 500 1000 5-min 5.03 5.94 6.89 7.58 8.38 8.93 9.43 9.88 10.4 10.8 (4.63-5 46) (5 46-6 46) (6 32-7 50) (6 95-8 23) (7 66-9 08) (8 11-9 68) (8.53-10.2) (8 89-10 7) (9 26-11 3) (9 52-11 7) 10-min 4.01 4.75 5.51 6.07 6.68 7.11 7.49 7.83 8.22 8.47 (3 70-4 36) (4.37-5 17) (5 06-6 01) (5 56-6 58) (6 10-7 24) (6 46-7 70) (6 77-8 12) (7 04-8 50) (7 33-8 93) (7 49-9 22) 15-min 3.34 3.98 4.65 5.11 5.64 6.00 6.32 6.59 6.90 7.09 (3 08-3.63) (3 66-4 33) (4 27-5.06) (4 69-5 55) (5.15-6 12) (5 46-6 50) (5 71-6 84) (5 92-7 14) (6 15-7 50) (6 27-7 72) 30-min 2.29 2.75 3.30 3.70 4.18 4.52 4.84 5.13 5.49 5.74 (2 11-2.49) (2 53-2 99) (3 03-3 60) (3.40-4 02) (3 82-4 53) (4.11-4.90) (4 37-5 24) (4 61-5.56) (4 89-5 96) (5 08-6 25) 60-min 1.43 1.72 2.12 2.41 2.78 3.06 3.33 3.60 3.94 4.19 (1 32-1 55) (1 59-1 88) (1 95-2 31) (2 21-2 62) (2 54-3 02) (2 78-3 32) (3 01-3 61) (3 23-3 90) (3 51-4 28) (3 71-4 56) 2-hr 0.826 0.999 1.24 1.42 1.66 1.84 2.02 2.19 2.43 2.60 (0 757-0 903) (0 914-1 09) (1 13-1 36) (1 29-1 55) (1 50-1 81) (1 66-2 00) (1.81-2.19) (1 96-2 39) (2 14-2 65) (2 28-2.85) 3-hr 0.584 0.705 0.880 1.02 1.20 1.34 1.49 1.64 1.84 2.01 (0 535-0 642)(0 646-0 776) (0 804-0 967) (0 924-1 11) (1 09-1 31) (1 21-1 47) (1 33-1 62) (1 45-1 79) (1 61-2 01) (1 74-2 19) , 6-hr 0.352 0.425 0.530 0.613 0.726 0.816 0.908 1.00 1.14 1.24 (0 322-0 386)(0 389-0 466) (0 485-0 581) (0 559-0 671) (0 658-0 791) (0 735-0 888) (0 812-0 988) (0 889-1 09) (0 992-1 23) (1 07-1 35) 12-hr 0.207 0.250 0.313 0.364 0.434 0.491 0.550 0.612 0.700 0.770 (0.190-0 227)(0 229-0 275) (0 287-0 343) (0 332-0 398) (0 393-0 474) (0 441-0 535) (0 490-0 599) (0 539-0 666) (0 606-0 760) (0 658-0 837) 24-hr 0.123 0.148 0.186 0.217 0.258 0.292 0.327 0.364 0.416 0.457 j (0 114-0 133)(0 137-0 161) (0 172-0 202) (0 200-0 235) (0 237-0 280) (0 267-0 317)(0 298-0 355) (0 331-0 395) (0 375-0.452) (0 410-0 498) 2-day 0.072 0.087 0.109 0.126 0.150 0.169 0.188 0.209 0.238 0.261 (0 067-0 078) (0 081-0 095) (0 100-0 118) (0 116-0 136) (0 137-0 162) (0 154-0 183) (0 172-0 205) (0 190-0 227) (0 215-0 260) (0 234-0 286) 3-day 0.051 0.061 0.076 0.088 0.104 0.118 0.131 0.145 0.165 0.181 (0 047-0 055) (0 057-0 067) (0 071-0 083) (0 081-0 095) (0 096-0 113) (0 108-0 127) (0 120-0 142) (0 132-0 158) (0 150-0 180) (0 163-0 198) 4-day 0.041 0.049 0.060 0.069 0.082 0.092 0.102 0.113 0.129 0.141 (0 038-0 044) (0 045-0 052) (0 056-0.065) (0 064-0 075) (0 075-0 088) (0 085-0 099) (0 094-0 111) (0 103-0 123) (0.1.17-0 140) (0 128-0 154) 7-day 0.027 0.032 0.039 0.045 0.052 0.059 0.065 0.072 0.081 0.089 (0 025-0 029) (0 0.30-0 034) (0 036-0 042) (0 042-0 048) (0 049-0 056) (0 054-0 063) (0 060-0 070) (0 066-0 077) (0 074-0 087) (0 081-0 096) 10-day 0.021 0 026 0.031 0.035 0.040 0.045 0.049 0.054 0.060 0 065 (0 020-0 023) (0 024-0 027) (0 029-0 033) (0 033-0 037) (0 038-0 043) (0 042-0 048) (0 046-0 053) (0 050-0 058) (0 055-0 065) (0 060-0 070) 20-day 0.014 0.017 0.020 0.022 0.026 0.028 0.031 0.034 0.037 0.040 (0 014-0 015)(0 016-0 018) (0 019-0 021) (0 021-0 024) (0 024-0 027) (0 027-0 030) (0 029-0 033) (0 031-0 036) (0 035-0 040) (0 037-0 043) 30-day 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.025 0.028 0.030 (0 011-0 012) (0 013-0 015) (0 015-0 017) (0 017-0 019) (0 019-0 021) (0 021-0 023) (0 022-0 025) (0 024-0 027) (0 026-0 030) (0 028-0 032) 45-day 0.010 0.012 0.013 0.015 0.016 0.017 0.019 0.020 0.021 0.023 (0 009-0 010) (0 011-0 012) (0 013-0 014) (0 014-0.015) (0 015-0 017) (0 016-0 018) (0 018-0.020) (0 019-0 021) (0 020-0 023) (0 021-0 024) 60-day 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 (0 008-0.009)(0 010-0.011) (0 011-0 012) (0 012-0 013) (0 013-0 015),(0 014-0 016) (0 015-0.017) (0 016-0 018) (0 017-0 019) (0 018-0 020) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration senes(PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5% Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values Please refer to NOM Atlas 14 document for more information Back to Top http://hdsc.nws.noaa.gov/hdsc/pfds/pfdsprintpage.html?lat=3 5.0071&ion=-80.6745&data... 3/15/2017 10/19/2016 Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 a-% Location name:Wesley Chapel, North Carolina, .°'°°' ,, USA* € nom i�' Latitude:35.0071°, Longitude:-80.6745° fi Elevation:611.41 ft** , 5, •source ESRI Maps k'`°'••m',t` **source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G M Bonnin,D Martin,B Lin,T Parzybok,M Yekta,and D Riley NOAA,National Weather Service,Silver Spnng,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 0.419 0.495 0.574 0.632 0.698 0.744 0.786 0.823 0.866 0.896 5-min (0 386-0 455) (0 455-0 538) (0 527-0 625) (0 579-0 686) (0 638-0 757) (0 676-0 807) (0 711-0 851) (0 741-0 893) (0 772-0 941) (0 793-0 976) 0.669 0.791 0.919 1.01 1.11 1.19 1.25 1.30 1.37 1.41 10-min (0 616-0 726) (0 728-0 861) (0 844-1 00) (0 926-1 10) (1 02-1 21) (1 08-1 28) (1 13-1 35) (1 17-1 42) (1 22-1 49) (1 25-1 54) 0.836 0.994 1.16 1.28 1.41 1.50 1.58 1.65 1.72 1.77 15-min (0 770-0 908) (0 915-1 08) (1 07-1 27) (1 17-1 39) (1 29-1 53) (1 36-1 63) (1.43-1 71) (1 48-1 79) (1 54-1 87) (1 57-1 93) 1.15 1.37 1.65 1.85 2.09 2.26 2.42 2.56 2.74 2.87 30-min (1 06-1 25) (1 26-1 50) (1 52-1 80) (1 70-2 01) (1 91-2 27) (2 05-2 45) (2 19-2 62) (2 31-2 78) (2 45-2 98) (2 54-3 12) 1.43 1.72 2.12 2.41 2.78 3.06 3.33 3.60 3.94 4.19 60-min (1 32-1 55) (1 58-1 88) (1 95-2.31) (2 21-2 62) (2 54-3 02) (2 78-3 32) (3 01-3 61) (3 23-3 90) (3 51-4 28) (3.71-4 56) 2-hr 1.65 2.00 2.48 2.84 3.31 3.67 4.03 4.38 4.85 5.21 (1.51-1 81) (1 83-2 19) (2 26-2 71) (2 59-3 10) (3 01-3 61) (3 32-4 00) (3 62-4 39) (3 92-4 78) (4 29-5 29) (4 56-5 69) 3-hr 1.75 2.12 2.64 3.05 3.60 4.03 4.47 4.92 5.54 6.02 (1.61-1 93) (1 94-2 33) (2 41-2 90) (2 78-3 34) (3 26-3 94) (3 63-4 40) (4 00-4 87) (4 37-5 37) (4 85-6 04) (5 22-6 58) 6-hr 2.11 2.54 3.17 3.67 4.34 4.88 5.44 6.01 6.80 7.42 (1 93-2 31) (2 33-2 79) (2 90-3 48) (3 35-4 02) (3 94-4 74) (4 40-5 32) (4 86-5 92) (5 32-6 53) (5 94-7 39) (6 41-8 07) 2.49 3.01 3.77 4.38 5.23 5.92 6.63 7.38 8.43 9.28 12-hr (2 29-2 73) (2 76-3 31) (3 46-4 14) (4 00-4 80) (4 74-5 71) (5 32-6 45) (5 90-7 21) (6 50-8 02) (7 30-9 16) (7 93-10 1) 2.95 3.56 4.47 5.20 6.20 7.01 7.86 8.74 9.98 11.0 24-hr (2 73-3 19) (3 29-3.86) (4 13-4 85) (4 79-5 63) (5 69-6 72) (6 42-7 60) (7.16-8 52) (7 93-9 49) (9 00-10 8) (9 84-12 0) 3.47 4.18 5.22 6.04 7.18 8.10 9.05 10.0 11.4 12.5 2-day (3 21-3 76) (3 87-4 54) (4 82-5 66) (5 57-6 55) (6 60-7 78) (7 42-8 78 8 25-9 82 9 12-10 9 10 3-12 5 ( ) ( ) ( ) (11 2-13 7) 3-day 3.68 4.42 5.49 6.34 7.51 8.46 9.44 10.5 11.9 13.1 (3 41-3 98) (4 10-4 79) (5 08-5 94) (5 85-6 86) (6 92-8 13) (7 76-9 16) (8 63-10 2) (9 53-11 3) (10 8-12 9) (11 7-14 2) 3.89 4.67 5.76 6.64 7.85 8.82 9.83 10.9 12.4 13.6 4-day (3 61-4 20) (4 33-5 04) (5 34-6 22) (6 14-7 16) (7 24-8 47) (8 11-9 54) (9 01-10 6) (9 93-11 8) (11 2-13 4) (12 3-14 7) 7-day 4.50 5.37 6.55 7.49 8.79 9.83 10.9 12.0 13.6 14.9 (4 21-4 83) (5.03-5 76) (6 12-7 02) (6 98-8 03) (8 16-9 43) (9 11-10 6) (10 1-11 7) (11 1-12 9) (12 5-14 7) (13 5-16 1) 5.15 6.14 7.39 8.37 9.71 10.8 11.8 12.9 14.4 15.7 10-day (4 84-5 52) (5 75-6 56) (6 91-7 90) (7 82-8 95) (9 04-10 4) (10 0-11 5) (11 0-12 7) (12 0-13 9) (13 3-15 5) (14 4-16 9) 6.90 8.14 9.62 10.8 12.4 13.6 14.9 16.2 17.9 19.3 20-day (6 50-7 34) (7 67-8 67) (9.04-10 2) (10 1-11 5) (11 6-13 2) (12 7-14 5) (13 9-15 9) (15 0-17 2) (16 6-19 2) (17 8-20 7) 30-day 8.46 9.95 11.6 12.8 14.5 15.8 17.1 18.4 20.1 21.4 (7 99-8 96) (9 40-10 6) (10 9-12 3) (12 1-13 6) (13 7-15 4) (14 8-16 8) (16 0-18 1) (17 1-19 5) (18 7-21 4) (19 8-22 8) 10.6 12.5 14.3 15.7 17.5 18.8 20.2 21.5 23.2 24.5 45-day (10.1-11 2) (11 9-13 1) (13 5-15.0) (14 9-16 5) (16.5-18 4) (17 8-19 8) (19 0-21 2) (20 2-22 6) (21 8-24 5) (22 9-25 9) 60-day 12.7 14.8 16.7 18.3 20.2 21.7 23.1 24.4 26.2 27.5 (12 1-13 3) (14 1-15 5) (16 0-17 5) (17 4-19 1) (19 2-21 2) (20 6-22 7) (21 9-24 2) (23.1-25 7) (24 7-27 6) (25 9-29 0) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5% Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values Please refer to NOAH Atlas 14 document for more information Back to Top http//hdsc nws noaa.gov/hdsc/pfds/pfds_printpage htmPlat=35.0071&lon=-80.6745&data=depth&units=english&series=pds#table 1/4 Precipitation Frequency Data Server Page 2 of 4 PF graphical PDS-based intensity-duration-frequency(IDF)curves Latitude:35.0071°,Longitude:-80.6745° 100.000 111111111111111 Average recurrence interval L 10.000 - - (years) • Vi 1.000 -...._. - — 5 23 ,c — 10 — 25 c 0.100 - \ c ` a - — 50 ,a. �` — 100 w - — 200 ' a` 0.010 — 500 — 1000 0.001 r i i r r r • t s s t T T T T vT T T T T EEEr� t o � .4 3 ma 43 ro v m -0-6° an 6 Um0 N e4,1 ril- r-v• o o o in o , r-I Duration N M v 100.000 r 1 r I r r r 10.000 -. ... ' ••• ••• -'--- - -.- •. — s , `c_ Duration Z. 1000 - .. . ........... ... .. . - ..----- .._ — 5-min — 2-day c — 10-min — 3-day c — 15-min — 4-day 0 y 0.100 — 30 min — 7-day ns .a = 60-min — 10-day v — 2-hr — 20-day a 0.010 .......... ..._ — 3-hr — 30-day • — 6-hr — 45-day . — 12-hr — 60-day 0.001 r I I I r r I — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval(years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Mar 15 17:39:10 2017 Back to Ton http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0071&lon=-80.6745&data... 3/15/2017 Precipitation Frequency Data Server Page 3 of 4 Maps &aerials Small scale terrain . N 1.401140P R6h'L i 0LtP8RT �,f_ -, ir � � tn_d . T 3km 1 ' - �ml d Large scale terrain FanCity :*' �� 1^ %"k—',° °r[•. . 0 \. " .1.r# "..4 ,.. n•Salem. I i ' '°".* ;i; "- Greensbor0 '‘,,t.---:c.,, i' ';k--t-A),„„1-4)•� -+ih•1L 1 hell 1r .` ..,i'-r•,„,' .\�* .. '``YAR, ? Ash I, N TO,R TSH,;C A R`p.L I N A� ;' ' . ar '' , g1rotte Fatetteville.y, �;. _ - reenuiiIIe �.' = �--. '. + .. AL :S 0#11.T it! Alk 6-iii-N.1 Pi - ti • .r_," z-• "'- .=r.: l n `., - �610hii• �' /r" mss, �1''./I- '4 Ni.-;:•,. 1'' ;r Large scale map -_ alem 3 vGreensbor- D than -, Ash''Itte_, �"" -..._.TY North - - Rr_ _ L - Carolina '-'."-.7„,— o /elle !f 'aGre Ilte 1_` . _ „, ("1 ,o Gre ilte 1_I______ - 1� Symbia a 100 `R f/. / -,4• ~�or ksouth n. - -- - http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=35.0071&lon=-80.6745&data... 3/15/2017 Precipitation Frequency Data Server Page 4 of 4 Lar.e scale aerial ' risfoh 5�1 e�rt ,I 4WIT , , •. L �AGreensbor'a Oufia'` .Yr c •Adieville ; c f: _ j :, r• r. North .,� . ,Carolina, :,-" r "‘CHarlotte. • , • r'• +,° Green'iUe •1 y8iyc„t6{ Si whey" iM •� t. t iv: 7�1 1. ~V, Ciluinbla 4 1 i('', .y .,r y41'.lr ti . ., 4th? Back to Top US Department of Commerce National Oceanic and Atmosphenc Administration National Weather Service National Water Center 1325 East West Highway Silver Spnng,MD 20910 -- Questions? HDSC Questions(Mnoaa cloy Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=35.0071&lon=-80.6745&data... 3/15/2017 Addington Crossing r APPENDIX / E .. , : 1 t , ii ,,,/. . t t STORM WATER DESIGN PLANS t March 17,2017 Cardno,Inc C-1 2017_0315_Addington_SW Management Report Appendix E Storm Water Management Plan Hydrologic Analysis Addington Crossing Appendix E Storm Water Design Plans E.1 Pre-Storm Water Tributary Map E.2 Post-Storm Water Tributary Map (WS1) E.3 Post-Storm Water Tributary Map (WS2) EA Post-Storm Sewer Tributary Map E.5 Post-Storm Sewer Tributary Map March 17,2017 Cardno,Inc E-1 2017_0315_Addtngton_SW Management Report