HomeMy WebLinkAbout20170081 Ver 1_More Info Received - Email_20170321Carpenter,Kristi
From: Hood, Donna
Sent: Tuesday, March 21, 2017 7:13 PM
To: Thompson, Larry B; Carpenter,Kristi;
'crystal.c.amschler@usace.army.mil'
Cc: Howard, Joel M; Haywood, Luther G; Boland, Timothy M
Subject: RE: More Information Needed, DWR 20170081, Replace Bridge 52
on SR 1822
Follow Up Flag: Follow up
Flag Status: Completed
Larry,
Thank you for yours and Joel time today as well as the stream measurements. With the
actual stream width varying from 6 to 8 feet and not 10 feet as submitted in the PCN,
this design should be able to meet the permit requirements of not altering existing
stream dimensions.
Regards,
Donna
From: Thompson, Larry B
Sent: Tuesday, March 21, 2017 1:34 PM
To: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov>;
'crystal.c.amschler@usace.army.mil' <crystal.c.amschler@usace.army.mil>; Hood,
Donna <donna.hood@ncdenr.gov>
Cc: Howard, Joel M<jhoward@ncdot.gov>; Haywood, Luther G
<ghaywood@ncdot.gov>; Boland, Timothy M <tboland@ncdot.gov>
Subject: RE: More Information Needed, DWR 20170081, Replace Bridge 52 on SR 1822
Kristi and Crystal:
Joel and I met with Donna at Bridge No. 52 in Anson County (17BP.10.R.13) this morning
to survey the stream width for this unnamed tributary of Jones Creek. The average
upstream width was 7' S" and the average downstream width was 6' 9" (see attached
measurements — note that fractions were used to work in Excel).
The upstream section has been altered in the past from past anthropogenic activities.
Per our conversation with Donna, this will satisfy the question regarding stream width
on this project as it relates to the proposed structure. It appears as if the consultant did
not survey stream width in the planning stages of this project and assumed an average
stream width of 10 feet, which is incorrect.
I forwarded my original email with the signed PCN attachment from January 20t'' to
Donna yesterday and she has confirmed that the signature is visible in this copy.
This should satisfy the requests from the On Hold letter issued on March 20th. Thank
you for your help with this!
La rry
Larry Thompson, PWS, LSS
Division Environmental Officer
North Carolina Department of Transportation
704-983-4437 office
704-301-4881 mobile
Ithomqson(a�ncdot.qov
716 W. Main Street
Albemarle, NC 28001
_���r �:
_ �. ;,:- �_
�r ; _ -
� .� f ;.>'
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Carpenter,Kristi
Sent: Monday, March 20, 2017 1:13 PM
To: Thompson, Larry B <Ithompson@ncdot.�ov>; 'crystal.c.amschler@usace.army.mil'
<crvstal.c.amschler@usace.army.mil>; Hood, Donna <donna.hood@ncdenr.�ov>
Subject: More Information Needed, DWR 20170081, Replace Bridge 52 on SR 1822
All,
This email is being sent to you because you have been identified as an electronic copy
recipient of the subject project. If you have any questions about this email or the attached
document, please contact Donna Hood at 704-235-2193 or donna.hood(a�ncdenr.�.
If you have General Certification questions please use the following link to access the site
map for General Certifications on our Website: https://deq.nc.�ov/about/divisions/water-
resources/water-resources-permits/wastewater-branch/401-wetlands-buffer-permits/401-
general-certifications.
Certified Mail Article Number 7008 1300 0000 1124 2562
Sincerely,
Kristi Lynn Carpenter
Kristi Lynn Carpenter
Administrative Assistant
Transportation Permitting Unit
NCDEQ/Division of Water Resources — Wetlands Branch
919.707.8785 office
kristilynn.carpenter ncdenr.gov
512 N Salisbury Street, 12�'' Floor
1617 Mail Service Center
Raleigh, NC 27699-1617
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.