-------- Original message -
From: "Rivenbark, Chris" <crivenbark@ncdot.gov>
Date: 03/23/2017 6:53 AM (GMT-05:00)
To: "Steenhuis, Joanne" <joanne.steenhuis@ncdenr.gov>
Subject: FW: B-5304: Bridge No. 203 over Sills Creek on SR 1324 (Crooked Run
Road), Pender County
Good morning Joanne,
I've attached the impact spreadsheet for this one as well.
Chris Rivenbark
NCDOT-Natural Environment Section
(919) 707-6152
From: Rivenbark, Chris
Sent: Wednesday, March 22, 2017 11:57 AM
To: Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil)
<Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>; Lane, Stephen <stephen.lane@ncdenr.gov>;
Cathy Brittingham - Department of Environment and Natural Resources
(cathy.brittingham@ncdenr.gov) <cathy.brittingham@ncdenr.gov>
Cc: Riffey, Deanna <driffey@ncdot.gov>
Subject: B-5304: Bridge No. 203 over Sills Creek on SR 1324 (Crooked Run
Road), Pender County
Good morning,
We're planning to proceed with construction under the latest NW 3 General
Conditions and Water Quality Certification. Additionally, the project does not
cross any AEC's. We are not requesting written approval however the permit
drawings are attached for your files.
Please let us know if you have any questions.
Chris Rivenbark
Natural Environment Section
Technical Services
North Carolina Department of Transportation
919 707 6152 office
crivenbark(a)ncdot.qov
1598 Mail Service Center
Raleigh, NC 27699-1598
1020 Birch Ridge Drive
Raleigh, NC 27610
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third
parties.
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 11+48 LT, RT RIP RAP APRON < 0.01
1 11+36 to 12+93 LT, RT BRIDGE CONSTRUCTION 0.01 0.01 0.04 < 0.01 0.03 12 80
1 12+93 to 13+91 LT APPROACH FILL < 0.01 0.01
TOTALS*: < 0.01 0.01 0.02 0.04 < 0.01 0.03 12 80 0
*Rounded totals are sum of actual impacts
NOTES:
<0.01 ac of Permanent SW Impacts due to proposed piers.
<0.01 ac of Temporary Fill in Wetlands in the Hand Clearing areas for erosion control measures.
�