HomeMy WebLinkAboutNC0004308_Compliance Evaluation Inspection_20170221a
Water Resources
Environmental Quality
February 21, 2017
Mr. Mark Gross
Badin Business Park, LLC
Post Office Box 576
Badin, North Carolina 28009-0576
SUBJECT:' .Compliance Evaluation Inspection
Badin Business Park, LLC
NPDES Permit NC0004308
Stanly County, NC
Dear Mr. Gross:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEIVEDINCDEQIDWR
MAR - 8 2017
WaterQuality
PermittingSection
On February 16, 2017, Roberto Scheller of this Office conducted a compliance inspection at the
subject facility. This inspection was conducted as a Compliance Evaluation Inspection (CEI) to
insure compliance with permit requirements and conditions. At the time of inspection facility
appeared to be well maintained. and operated. We wish to thankyou and the operating staff for
assistance regarding this inspection.
The enclosed report should be self-explanatory; however, should you have any questions, please
do not hesitate to contact myself or Roberto Scheller at (704) 235-2204 or
roberto.scheller@ncdenr..gov.
Enclosed
cc: Wastewater Branch
File
Sincerely,
c
1015
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
�'= ""hlottaina� Co�uapar�s"r_h
State of North Carolina I Environmental Quality
1611 Mail Service Center 1 Raleigh, North Carolina 27699-1611
919-707-9000
I
United States Environmental Protection Agency
Form Approved. .
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report ^' .
Approval expires 6 31-98-
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES - yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 15 1 3 I N00004308 111 12 17/02/17 117 18 I C I 19 I G I 201 I
21111111 1111111111111111111111111 1111111 111 l66
Inspection Work Days Facility Self -Monitoring Evaluation Rating 131 QA Reserved ----
72 i �, �1 73 I I 174 75 80
67 70 71 itIJI- I I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include,
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:54AM 17/02/17
'10/03/01
Badin Business Park, LLC
NO Hwy 740
Exit Time/Date
Permit Expiration Date
Badin NO 28009
12:21PM 17/02/17
13/02/28
Name(s) of Onsite Representative(s)/Tities(s)/Phone and Fax Number(s)
Other Facility Data
Name, Address of Responsible Officialfritle/Phone and Fax Number
Contacted
Mark J Gross,PO Box 576 Badin NO 280090576/Facility
Manager7704-422-5637/7044225776 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Records/Reports Self -Monitoring Program
Facility Site Review Effluent/Receiving Waters Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Roberto Scheller MRO WQ//252-946-6481/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger MRO WQ//704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.�
t
Page# 1
NPDES yr/mo/day Inspection Type (Cont.) 1
31 Nc0004308 I11 121. 17/02/17 17 18 ICI
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Compliance inspection was initiated on January 17, 2017 and rescheduled to compleat on February 16,
2017 due to unforseen illness of inspector. The January 17th inspection consisted of records review.
The second inspection, conducted on February 16, 2017, consisted of outfall review. The following
outfalls were reviewed during the second inspection:
Outfall #012/S12 & 011/S11, effluent consist of groundwater and stormwater discharge. Groundwater
was disccharging at time of inspection. No'foam or floating solids were noted at point of discharge into
Badin Lake.
Outfall #013, effluent consist of groundwater and stormwater discharge. Groundwater was discharging
at time of inspection. Discharge was clear with no visible suspended soilds, no foam or floating solids
at point of discharge.
Outfall #002/S02, stormwater discharge with no flow at time of inspection.
Outfall 004/SO4, stormwater discharge with no flow at time of inspection.
Outfall #005/S05, stormwater and ground water discharge with groundwater discharging at time of
inspection. Effluent was clear with no visible suspended solids. Cursory review of macroinvertebrates
noted at point of discharge, Crayfish and Caddisfly larva. Nerodia sipedon (Northern Watersnake) was
also noted at point of discharge. At time of inspection the discharge from'subject outfall did not appear
to be having a negative impact on surface waters.
Outfall #017, stormwater discharge not discharging at time of inspection.
Outfall #.018, landfill stormwater runoff. East, Center and West outfall ditches were all flowing from
groundwater discharge at time of inspection.
Outfall #020, stormwater discharge not discharging.at time of inspection.
Outfall #019/S19, Brick landfill stormwater runoff. Stormwater pond was not discharging at time of
inspection.
Page#
Permit: NC0004308 Owner - Facility: Badin Business Park, LLC
Inspection Date: 02/17/2017 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
M
❑
❑
❑
application?
M
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment:
Record Keeping
Yes No NA NE
Are records kept and maintained as required by the permit?
M
❑
❑
❑
Is all required information readily available, complete and current?
M
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
❑
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CDCs
Are DMRs complete: do they include all permit parameters?
0
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
0
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
❑
❑
M
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
M
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
0
❑
Is the backup operator certified at one grade less or greater than the facility classification?
❑
❑
0
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
0
❑
Comment.-
Effluent
omment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional? ❑ ❑ M ❑
Is sample collected below all treatment units? ❑ ❑ 0 ❑
Page# 3
Pbrmit: NC0004308 Owner -Facility: Badin Business Park, LLC
Inspection Date: 02/17/2017 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Is proper volume collected?
0
❑
❑
❑
Is the tubing clean?
M
❑
❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
M
❑
.❑
❑
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
M
❑
❑
❑
representative)?
Comment: Facility collects both composite and grab effluent samples.
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained? M ❑ ❑ ❑
Are the receiving water free of foam other than trace amounts and other debris? 0 ❑ ❑ ❑
If effluent (diffuser pipes are required) are they operating properly? 0 ❑ ❑ ❑
Comment: Effluent outfalls for 10 permitted outfalls reviewed.
Page# 4