Loading...
HomeMy WebLinkAbout20110089 Ver 3_More Info Received - Email_20170315I c - L- rrouf9 CES Group Engineers, LLP 274 N. Hwy. 16, Suite 300 Denver, NC 28037 Phone: (704) 489-1500 FAX (704) 489-6500 TO: Stormwater Permitting Proqram 1612 Mail Service Center Raleigh, INC 27699 WE ARE SENDING YOU: LETTER OF TRANSMITTAL �lA-r 3 Date: Fe4fteFy 144; 2017 Attention: Karen Higgins RE: Airlie Industrial Park (Phase 1) DWQ# 11-0089 MAR 15 2017 AS REQUESTED DRAWINGS BY UNITED PARCEL SERVICE X FOR YOUR REVIEW PRINTS BY US MAIL FOR YOUR INFORMATION CHANGE ORDER Hand Delivered THE FOLLOWING ITEMS: COPIES DATED DESCRIPTION 1 O&M for Drainage areas 1 and 2 REMARKS: This submittal is for Lot #1 in Airlie Park, parcel ID 91411, as a condition of the 401 approval issued April 5, 2011. The SWM package for Lot #1 was submitted back in June 2015 and put on hold. The O&M forms were not submitted at that time, but are included herein. Since this project falls within the overall approval for Airlie Industrial Park (Phase 1), we were instructed by Mr. Alan Johnson that there is no application needed or fee. The prior approval # is referenced above. If additional information is needed, please do not hesitate to contact me. Thank you. SENDER: .f.• David Lutz From: Burdette, Jennifer a Sent: Tuesday, January 17, 2017 2:35 PM To: David Lutz (dlutz@ces-group.net) Cc: Johnson, Alan Subject: RE: Airlie Industrial Park (Phase 1) DWQ#11-0089 David, Laura Alexander forwarded your email to me. From our document filing system, it looks like the review was discontinued after you indicated that the contractor wanted to hold off on providing a signed 0&M agreement until it could be provided by the eventual property owner. You can review all of the information on the project here. You will need to re -submit a request for stormwater plan review. From a cursory review of the file, it would be very helpful to provide a summary of the project's permitting and stormwater plan review history with the request. It looks like a stormwater plan was reviewed and approved in 2014. 1 couldn't tell if this request is for a modification of the previous approval or a plan for a new phase of the project. Please send the request to Karen Higgins attention at the mailing address below and include the project number. No fee is required for stormwater approvals. Thanks, Jennifer Jennifer Burdette 401/Buffer Coordinator Division of Water Resources - 401 & Buffer Permitting Branch Department of Environmental Quality 919 807 6364 office jennifer.burdetteCa)_ncdenr.gov 1617 Mail Service Center Raleigh, NC 27699-1617 (Physical Address: 512 N. Salisbury St, Raleigh, NC 27604 - 9"' FlrArchdale Bldg — Room 942F) a -,-�-,-Nothinq Compares.11. . Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Alexander, Laura Sent: Tuesday, January 17, 2017 9:42 AM To: Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov> Cc: Montalvo, Sheri A <sheri.montalvo@ncdenr.gov> Subject: FW: Airlie Industrial Park (Phase 1) DWQ#11-0089 Good Morning Jennifer, Bradley thinks this question might be directed to your program since there is a DWQ # listed on the attached form. Our records don't show receiving the plans for this project. Thanks, Laura From: David Lutz [mailto:dlutz@ces-group.net] Sent: Monday, January 16, 2017 4:20 PM To: Alexander, Laura <laura.alexander@ncdenr.gov> Subject: Airlie Industrial Park (Phase 1) DWQ#11-0089 Good afternoon Laura, Touching base regarding the attached project that is located in the Airlie Industrial Park, Lincoln County. I have a record of the attached transmittal, but no record of a response/approval. I have a new computer, so not sure I have access to all my archived emails though. Can you advise if you show any record of the attached? Thank you, David S. Lutz, P.E. Partner / Principal Civil Engineer CES GROUP ENGINEERS, LLP engineers planners surveyors scientists DBE / WBE / SBE/ NC HUB / WBENC / WOSB / SPSF 274 N. Hwy. 16, Suite 300 Denver, NC 28037 Office: 704.489.1500 Ext. 1002 Fax: 704.489.6500 Mobile: 704.840.5133 Direct: 704.313.0389 dlutzRces-group.net www.ces-grour).net Permit Number: (to be provided by DWQ) Drainage Area Number: Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: Entire BMP Trash/debris is present. How I will remediate the problem X� Remove the trash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as applicable) pavement surface. possible. Perimeter of sand filter Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the sediment and depth of greater than six inches. remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. Form SW401-Sand Filter O&M-Rev.4 2009Septl7 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: Filter bed and underdrain Water is ponding on the surface for Check to see if the collector system is collection system more than 24 hours after a storm. clogged and flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Repair or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water Quality have occurred at the outlet. 401 Oversight Unit at 919-733-1786. Form SW401-Sand Filter O&M-Rev.4 2009Sept17 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Airlie Park Spec Buildin BMP drainage area number: Print name: Title: V% e-.' Address: 23'�.: /v. rl,, y ��,,,,��� ,✓� 22 o 3 7 Phone: Signature: Date: r 2 Zd 7 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 4? C t C?. CP Vy aq , a Notary Public for the State of �JrA� 0(.L J o �j, No_, County of L. , do hereby certify that —To�rneS �. F_Yln�r Son personally appeared before me this 0 day of _QrC\ OI ,and acknowledge the due execution o he forgoing s d filter maintenance requirements. Witness my hand and official seal, SEAL My commission expires (� o? gmm,m� �% �,dwvw.�.:,rmrg Form SW401-Sand Filter O&M-Rev.4 2009Sept 17 Page 3 of 3 C n y rMC SEAL My commission expires (� o? gmm,m� �% �,dwvw.�.:,rmrg Form SW401-Sand Filter O&M-Rev.4 2009Sept 17 Page 3 of 3