Loading...
HomeMy WebLinkAbout20160418 Ver 2_More Info Letter_20170321K; Ira. Water Resources Environmental Quality March 21, 2017 The Broadway Group, LLC Attn: Melissa Ballard & Robert M. Broadway 216 West Side Square Huntsville, AL, 35801 Subject: REQUEST FOR ADDITIONAL INFORMATION New Retail Store — Brevard, NC Stormwater Management Plan Dear Ms. Ballard & Mr. Broadway: ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 16-0418-V2 Stormwater Plan Review Transylvania County On November 8, 2016, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the above referenced project. Additional information (signature page & agent authorization form) was received on November 9, 2016. A request for additional information was sent on December 5, 2016. Additional information was received on February 2, 2017. The Division has determined that the stormwater management plan submitted with your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: The Stormwater Management Plan (SMP) must be designed in accordance with either the newly developed Stormwater Design Manual, or with the archived Stormwater BMP manual. Both manuals are available on the Division of Energy, Mineral and Land Resources website. a. Both manuals require that sizing of the stormfilter system shall be in conjunction with upstream closed detention based on designing the system to provide capture and treatment of 75% of the first 1.0" rainfall. Please provide calculations and plans that clearly show the water quality design volume. Please provide specific details regarding the number and configuration of cartridges as well as calculations to support the design criteria of a maximum media flow rate of 1 gpm. The current Stormwater Design Manual indicates that this information can be provided by Contech to the designer. You must specify the type of media to be used in the cartridges. 2. Please provide a complete supplement form for the Stormfilter system. Please note that the supplement form includes a "Required Items Checklist" tab. Please ensure that all items noted on this tab are submitted. State of North Carolina I Environmental Quality 450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105 Phone: 336-776-98001 FAX: 336-776-9797 KTWT1:EJK[@ ;11MK]M Request for Additional Information Page 2 of 2 3. Please provide a properly executed Operation and Maintenance Agreement. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending one copy of all of the above requested information to my attention at the address below. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact me at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston-Salem Regional Office Cc: DWR ARO 401 files DWR 401 & Buffer Permitting Unit ec: Jerry Cargile, P.E. 4Site, Inc. David Brown - USACE Asheville Regulatory Field Office Andrea Leslie — NCWRC Stan Aiken - DEMLR