Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3170303 (9)
IDI ICI 10m 10� \Xs W 1 1 2 1 3 1 4 5 771TR v i CLASS A - 3000 PSI :aa,La:)a1� AK AI x x I� w * FOR DESIGN PRESSURE=200 PSI TYPICAL SECTION SIZE SCHEDULE TEE OR BEND CLASS A CLASS A z 1 2 L 1 2 L 3000 PSI 3000 PSI CONCRETE CONCRETE UNDISTURBED UNDISTURBED cN ® EARTH EARTH 1., 7'o/(\\\%\ CONCRETE THRUST BLOCK SCHEDULE PIPE rc BEND m SIZE 90 TEE 45' w 22 1 Z 11 1/4' INCHES H L H L H L H L 2" .75' 1.5' .50' 1:0' .50' .75' .50 .50' 4" 1.5' 3.0' 1.0' 2.5 1.0' 1.5' 1.0 1.0' 6" 2.0' 4.0' 1.5' 3.5' 1.0' cc 8° 2.5' S.0' 2.5' 4.0' 1.5' 3.5' 1.0' 2.5' 10" 3.0 6.5' 2.5' 5.0' 2.0' 4.0' 1.0' 3.0' 12" 3.5 B.0' 3.0' S.0'1.5' zz U 3.5' PLAN - TEE THRUST BLOCKING NO SCALE DUCTILE IRON MJ TEE W/ 6" BRANCH OR HYDRANT TEE / I � i I PLAN - BEND AS DIRECTEDAS DIRECTED PU PER NOZZLE TO FACE STREET AT 90'\ VALVE .BOX- 1 6" GATE VALVE 6" 0 DIP PIPE PROVIDE TWO 3/4"0 RODS 1Q 3/4"0 TIE BOLT © 3/4"0 TIE BOLT NUT n PIPE UNDIS EARTH AMERICAN -DARLING 5 1/4" MOD. B -84-B-5, OR MUELLER SUPER CENTURION, 5 1/4", OR MUELLER MODERN CENTURION, 5 1/4", ALL THREE WAY. f1/2 CY MIN. `NO. 67 STONE .rq T- BOLTS K PIPE RANGE 30 3/4"0 ROUND WASHER CaJ :F-/ L® �® ® 3/4"0 THEADED ROD T (COATED WITH COAL TAR) HARNESS DETAIL (MIN.4 EACH/HYD) FIRE HYDRANT ASSEMBLY NO SCALE ' I ms o NO s .w MSIFYYu+r Ur Y . 9 R N Ta MB�IM' AND o u4FY"m�Nw IN I,41 . "Wu NooN T ¢ mr,Wprt irivxm FANSE VRM'IOm "MSW IM N0. W%® IN MIpE dt PMR. NOTE: FOR VERTICAL BEND (DOWN) IN EXCESS OF 11 1/4' ANCHORAGE SHALL BE AS DESIGNED BY AN ENGINEER. TYPICAL CONCRETE THRUST COLLAR. MIN. OF 12" INTO UNDISTURBED MATERIAL ALL AROUND. TYPICAL BEND - TRENCH BOTTOM TYPICAL CONCRETE THRUST COLLAR. MIN. OF 12" INTO UNDISTURBED SOIL - RESTRAINED JOINT PIPE MAY BE USED IN PLACE OF THRUST COLLAR. MIN. W VA THRUST COLLAR NO SCALE HNtTt (UNDER) (OVER) III I �MAINR III ` SEWERSANITARY WA ER MAIN Iv,T SEE WAS NOTE MAIN SANITARY SEWER MIN• SEWERY _ I - II SANITARY r SEE NOTE SEVER (OVER) MALAR I _ -� T T I BTk�SEE1'AP," SNITARY EWER NOTE: WHEN THE WATER MAIN IS ABOVE THE SANITARY SENOR, BUT WITH UE THAN 24' CLEARANCE, OR WHEN THE SANITARY SEWER IS ABOVE THE WATER MAIN. BOTH THE WATER MAIN AND THE SANITARY SEWER UNE SHALL BE CONSTRUCTED 0 DUCTWE IRON PIPE WITH JOINTS EWIVAI TO WATER MAIN STANDARDS FOR A MINIMUM IATERAL DISTAMM. MEASURED AT RIGHT ANGLES TO THE SEWER, OF 10 f ON EACH SIDE OF THE CROSSING. CROSSING REQUIREMENTS NO SCALE 1 2 3 4 5 •91 L•] 0 MIG\ t ASC MIDLAND, LLC °z rc zz m n g 7 ti w z Z_ v 2 0 JLU F U LU O IS x ae 0 THRUST COLLAR NO SCALE HNtTt (UNDER) (OVER) III I �MAINR III ` SEWERSANITARY WA ER MAIN Iv,T SEE WAS NOTE MAIN SANITARY SEWER MIN• SEWERY _ I - II SANITARY r SEE NOTE SEVER (OVER) MALAR I _ -� T T I BTk�SEE1'AP," SNITARY EWER NOTE: WHEN THE WATER MAIN IS ABOVE THE SANITARY SENOR, BUT WITH UE THAN 24' CLEARANCE, OR WHEN THE SANITARY SEWER IS ABOVE THE WATER MAIN. BOTH THE WATER MAIN AND THE SANITARY SEWER UNE SHALL BE CONSTRUCTED 0 DUCTWE IRON PIPE WITH JOINTS EWIVAI TO WATER MAIN STANDARDS FOR A MINIMUM IATERAL DISTAMM. MEASURED AT RIGHT ANGLES TO THE SEWER, OF 10 f ON EACH SIDE OF THE CROSSING. CROSSING REQUIREMENTS NO SCALE 1 2 3 4 5 •91 L•] 0 MIG\ t ASC MIDLAND, LLC = � jEAL = 4 6 1, jINE ; AS YYAII11111100 I JI T ulo. MI MI °z rc zz m n g 7 ti w z Z_ v 2 0 JLU F U LU O IS x ae 0 O� N UX dR n 0 cc O 4 D Uy a w� J 111 m p LL O Wa zz U I- O Iz o o M om Huai a� LU rn ¢ U r Z c 0 N 0 W gLUz O = F g~= K E O Q Z O M a rc Ip Q, Q Q 0 0 rc w v Y = � jEAL = 4 6 1, jINE ; AS YYAII11111100 I JI T ulo. MI MI °z rc zz m n g 7 ti U) z Z_ v 2 0 JLU F U LU O IS x ae J O� N UX dR n cc O 4 D Uy aN w� J 111 m p LL O Wa zz � I- O Iz o o M om Huai a� LU rn ¢ U r Z c 0 N W gLUz O = F g~= K E Q Z O v = � jEAL = 4 6 1, jINE ; AS YYAII11111100 I JI T ulo. MI MI �_ 0 U) N W Z_ H 2 0 JLU F U LU O IS i a SHEET NUMBER CD7 I"I m 8" '. UFT F TOP OF RISER RIM ELEV: 517.25 OPEN TOP W/ VARMINT SCREEN FOR ANTI -SIPHON CONTROL 8" SCH. 80 PVC WATER QUALITY CONTROL DEVICE INV. = 515.00, SLOPE SURFACE OF LINER & COVER SOIL TO 12" BELOW WATER QUALITY CONTROL ORIFICE IN FRONT OF RISER. LINER SHALL BE TURNED DOWN 12" AND SEALED TO CONCRETE RISER W/ GRANULAR BENTONITE ON ALL FOUR SIDES. 8" PVC CAP W/ 4.0" DIA. ORIFICE PLACED AT BOTTOM OF WATER QUALITY CONTROL DEVICE, 12" BELOW NORMAL POOL FOR TRASH PROTECTION NOTE: CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OF OUTLET STRUCTURE I1 -3m I0' m FHIS CMNW9 M MIN NELNN TIE pROppIIY OF O BERS ENWNEFIUNO. M R NWO ML 4VMY U •TRJRV IND= PE4WaID RIBHIB XiCWNNH T6 CCPMWF TffPEfO. X. OIMFBHME FORNIdEm�A O]%EO W WXNE OR YMI. 1 2433EM, 48" WIDE X 6" HIGH ORIFICE ON FRONT SIDE ONLY, INV ELEV: 516.25 FWn FRONT ELEVATION RISER STRUCTURE DETAIL SCALE 1"=2' 2 111 1 � i I AND HIGH BLACK PRE ALUMINUM PICKE / r � 10:1 SLOPE, 6" SOIL (MIN) I INV: 515.00' '.,. REAR OF RISER BOX, -__________________________________ SEDIMENT STORAGE I tO *92.80' - 24" RCP "O-RING 5' HIGH, 17 WIDE 1� GASKETED JOINT" AT 0.50% WET POND O 0:51. 1� ----*----- BLACK PREFINISHED NOTE: PROVIDE WATER TIGHT 1 SEAL AROUND PIPE JOINTS TO - r,. x ALUMINUM PICKET 6" PERMANENT POOL RISER W/ NON -SHRINK GROUT BENTONITE 6" SCH. 80 PVC PIPE ® 0.50% i I i FENCE DOUBLE LEAF I f DRAIN) W/ SCREEN AT INLET l / DETAIL ON SHEET C09 3 I 1 • • +••a • a�j••� • a' 'a • a 'las+•a • a• • • •i la a a a 2:1 SLOPE BELOW • • i '„ `FI WATER LEVEL (TYP) Y 1 l'• I ' �( � � 10:1 LITTORAL SHELF FOR WATERn f • � L��h ��, QUALITY, REF. PLANTINGS BELOW / FOR BAY (SHELF AREA: 7,485 SF) \ 1 r • i a• AEA � q` k � \ j 24" RCP BEYOND IN r OVIL MOA 01ANUXRU MUI,IUR 10:1 SLOPE, 6" SOIL (MIN) INV: 515.00' '.,. REAR OF RISER BOX, -__________________________________ SEDIMENT STORAGE I tO *92.80' - 24" RCP "O-RING 5' HIGH, 17 WIDE INV ELEV: 510.90 GASKETED JOINT" AT 0.50% WET POND O 0:51. - ----*----- BLACK PREFINISHED NOTE: PROVIDE WATER TIGHT N SEAL AROUND PIPE JOINTS TO - r,. x ALUMINUM PICKET 6" PERMANENT POOL RISER W/ NON -SHRINK GROUT BENTONITE 6" SCH. 80 PVC PIPE ® 0.50% INV: 510.90' I i FENCE DOUBLE LEAF DRAIN, INV ELEV: 511.00 (GCL) LINER W/12" DRAIN) W/ SCREEN AT INLET CONCRETE FILL INSIDE ' ) ACCESS GATE W/ LOCK 6" SLUICE GATE W/ LIFTING ROD BOTTOM OF RISER, SLOPE TO RCP INVERT CUTOFF TRENCH, PROPOSED BERM, ATTACHED PER MANUFACTURERS D REF. DETAIL PROPOSED i REQUIREMENTS, NORMALLY CLOSED CONCRETE BASE - 6'X6' STANDARD PROCTOR 12" THK. W/ 10/10 6X6 WWM 1 STORM DRAIN r ' WIDE CONCRETE UNDISTURBED SOIL SECTION A -A D SCALE 1"=5' ' .DRIVEWAY PAN DRI 3 4 m STORMWATER BMP ACCESS & MAINTENANCE EASEMENT t� u. 4 � 5 I � � f. I / 390_95'_Ar -x—x—x-Nape-,y4k3�80=x—x—x—x—x`�, x—x—x—x—x—X#x—x—x x—x I I *92.80 LF OF 24" "O-RING I I �GASKETED JOINT' ® 0.= \ IPRECAST CONC. RISER STRUCTURE, RIM BEV. 517.25' I 6" PERMANENT POOL DRAIN. SEE SECTION NEW FOR RED'S FOREBAY BAFFLE, SEE i DETAIL ON SHEET CD9 s+• ii a a A I • FOREBAY 'r • a AREA i [o7 PROPOSED STORM DRAIN STORM -524- z` 48" WIDE X 6" HIGH ORIFICE ON FRONT SIDE ONLY, INV: 517.25 8" SCH 80 PVC WATER QUALITY CONTROL DEVICE, 8" SLUICE GV INSIDE RISER W/ T -HANDLE UP 1HROUGH RISER GRATE SLOPE GCL LINER AND COVER SOIL TO 12" BELOW WATER QUAUTY CONTROL ORIFICE IN FRONT OF BOX TO ALLOW CLEARANCE FOR 8" PVC WATER QUALITY RISER. GCL SHALL BE TURNED DOWN 1T' AND SEALED TO CONCRETE RISER W/ GRANULAR BENTONITE ON ALL FOUR SIDES. GCL & COVER SOIL,-/ REF. DETAIL TYPICAL POND SECTION B -B SCALE 1"=5' ALUM. BAR GRATING 1"Xd" BEARING BARS. FASTEN W -CUPS ATTACHED TO A 1 "X1}"Xlr GALVANIZED UAE FRAME MORTAR FRAME TO TOP OF OUTLET STRUCTURE, W/ 2' SQUARE ACCESS HATCH & LOCK 8" SLUICE GATE VALVE W/ LIFTING ROD ATTACHED PER MANUFACTURERS REQUIREMENTS 10 MIN --I rno nP nnu• son nn' 3 1 NCY SPILLWAY, 3.50 3 5' HIGH BLACK PREFINISHED ALUMINUM PICKET FENCE INV: 510.35' MI -M I ASC MIDLAND, LLC = 514.50' OVIL MOA 01ANUXRU MUI,IUR 10:1 SLOPE, 6" SOIL (MIN) INV: 515.00' ON LITTORAL SHELF 2 1 r -__________________________________ SEDIMENT STORAGE I tO *92.80' - 24" RCP "O-RING CLEANOUT LEVEL 511.00' _ _ _ GASKETED JOINT" AT 0.50% WET POND O 0:51. - ----*----- a NOTE: PROVIDE WATER TIGHT N SEAL AROUND PIPE JOINTS TO - 0 RISER W/ NON -SHRINK GROUT BENTONITE 6" SCH. 80 PVC PIPE ® 0.50% INV: 510.90' GEOSYNTHETIC CLAY SLOPE (PERMANENT POOL (GCL) LINER W/12" DRAIN) W/ SCREEN AT INLET CONCRETE FILL INSIDE SOIL COVER 6" SLUICE GATE W/ LIFTING ROD BOTTOM OF RISER, SLOPE TO RCP INVERT CUTOFF TRENCH, PROPOSED BERM, ATTACHED PER MANUFACTURERS D REF. DETAIL COMPACT SOIL 98% REQUIREMENTS, NORMALLY CLOSED CONCRETE BASE - 6'X6' STANDARD PROCTOR 12" THK. W/ 10/10 6X6 WWM UNDISTURBED SOIL SECTION A -A D SCALE 1"=5' 2 3 4 NCY SPILLWAY, 3.50 3 5' HIGH BLACK PREFINISHED ALUMINUM PICKET FENCE INV: 510.35' MI -M I ASC MIDLAND, LLC m01 W o_ QCD C tO Oco N a N 0 c _Z 0 O F D Z U D O m O Y H2 V Q w 0 0 w m m01 SHEET NUMBER CD8 5 W o_ QCD C tO Oco N N LU c _Z W O F D Z U D O SHEET NUMBER CD8 5 BEADING STONE FOR RCP USE / 57 STONE PIPE SIZE T 12' tit 15'-35' e WINES FOR HDPE USE ME uPNUPACMsees ePEaFICP,110N5 MOMEVER. (15' MIN) \ NDFE 91ALL NGT BE IllaWll WMIX WE SReEi NMT -GF -WAY. D NOTES: -T r \ TX A MINNUM OF 1Y FRON OUTSIDE DIAMETER OF PIPE TO SIDE OF TRENCH MUST BE ALLown, FOR COMPACTION OF FILL MATERIAL SAOKFlWNG OF TRENCHES SHALL BE ACCOMPLISHED IMMMKMY AFTER ME THE PIPE IS WD. ME FILL AROUND ME PIPE SHALL BE PLACED IN LAVERS NOT TO EXCEED V. UNDER NO CIRCUMSTANCES SHALL WATER BE PERWTTED TO NY IN UN- BACKFlIIED TRENCHES AFTER ME PIPE HAS BEEN PLACED. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY ME USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY IAYER OF BACKFlLL SHALL BE PLACED LOOSE AND THOROUGHLY COMPACTED INT) PLACE ALL BAMRUL MATERIAL SHALL HAVE AN IN PLACE DENSITY OF 1001 TO A DEPTH 1Y BELOW THE FINISHED GRADE OF ME BACKFlLL MATEMAL, AND 951 AT DEPMS saEATER MAN tit BELOW GRADE MAINTAIN A MINIMUM OF 2 FEET OF COVER OVER PIPE STORM DRAIN PIPE BEDDING DETAIL NO SCALE 1. Cleat, give;aad atnP the meslindee Ms wbanktsientofall t'egemuon end roar mat Remo eall smfau cod comalwgWgh azuonots.ofmgavumatru. and atockpd dcP odislpaoltsea opsiaamunwO mNwameJumaebjma contact a wmasiuen bi laxx ba.min.eeded Z. Ensare teat RIL DLtesol E. tba emhaclovi nt I. free of LoPPt woody regeianom mgwc mace, aed ad er otgecteaableihmcaat Pl poelfwBE, in fibs aottoexceM9mebes,amlmscMveeompacEn Ovys RDi\eeMbept<meut 6mdms m allP» far aettlwem C. 3 Shape tlw Baam rodu apenBed dmunsro44 Ft4YW}Tf6PMdmmBTg device from seuHnS aeM the orad bT excavatmga aLaliRW p'jkrmds ftie aktauve, ptrndmgaloa snppw mels, the'skuwvmar$nm thh6ec 4. Pleaettrbamt (typ&say 3-incRSCLemdedfl.PVGPon Nfmgsmootfi. fmmdationbfimpervionssol, Donot..peiviarsmatmaelisais.Ael, ,avec, or cnasbed scone as backfUl monad Mpipe.. Pteee4mfdf haretial aromW the Pipe yiliway m 4-ind1 Is and compact M under And aroasi thepipe m at least rise -sera amaty sada 8djacmf-embaukmem: C.. befakm not to taiaeUsa pipe Bamthe firm codhctxiW its foedafien'wheh eampaetiug sv W ex ahepipe liawebe;. PI.. inansen, deptls oft feecofwmpagedba kB3tm�#be g�e;splliway bd'mtcrossivg it with mvsmavism agmpmes, 7. so ease shot" the Pito cmduabeinimelad by comes awash Brough Nedam agar the:Rabookmec4 iaoomplem: S. Annuble the aq'mmec &M -Wing the mmilecuneas xm a*.o is R, de4gved. d La} the assembled skmasser oa We botrom. of the balm nmh the Raxibie toms at the inter of the bamt pipe. AtiBch the Bexsbledmnl to UW beret pipe andpaasRon the-kranue axrerda axaw,sad pstai si>PpoM. Hewre a mtach a rape'he Il Skimmer ed.4eto i a ffie as nfWptreVid_ tins wdlpe used b pull tire; skimmer to me code tai mamwuec e_ S. liseut iubargenatermrotliebummama�errmpreuNutemP3cn Us: B tmup.styA . drams ox ivetaicns wahoutle(puit" MAhaclaedisma- 1ad9u wamrm fibs appereedo£thepoo7 ares m+mpinsy(biuuNsSctepey' (Refexrnrea: JO]no,QCm,troT Madswvs and Ondei;Pop. 9. HmSton the shucaue ss, pix this 40wittsed wisp ICI. ,imam d. Diver, surface water aw,V from befe aT�. CompTsie fids emballonwt before the area u cleaced StaWtiTc Be DlDmdaaFT u+tg. ambauko ens cod all amm dsstmhed amv above the Ahl 4 *,T, w4 spdt»wY>mmstntefy afleecmrs&Dcbmn (Refecegcmi:SLT/gcY � ." }.: 10. Imtell parauslaffies as sperff dm3haeRtafi;SF,PoPomBglfF¢4,: I1. Abs, CID ifie 9edmseas-produtiug azem bnv8 baeupe�sneutip etafitflaed, rase the Mn]cMe and all the smsabk uNamNd &moot§ the arearo: Need with the sdlammg arses -snit N bare. pmpNiy (E'sPaswCSW.SiVii. Snentuaseu). SKIMMER CONSTRUCTION SPECIFICATIONS NO SCALE Impect stammer sedinvas bastes 0 ie CIE weekly saii saki, eq$ yl$WBeAa1 ( m-heU Inch w gce ter) n m st suint and rspam ammeiflowly, (remove aedlm al and j Ror, du basin to it, engasel divaaia ea Wbea Tedkont aa"Iesci �es to me-hwf the bagbl of We brat beipa Pada dis Ai imaNrtw one stoic ss, that tee. sedmunt sadmu elh it can be expaysted. ,EaesvBk the sedimwtf We betas basin, vat just armed D,,:slcmmer m de, fina C4.: Afaks sure: vegeatioamowingm mebonomoi'tha tiasin doesnot hold dbwn. the. skimmer: R ,., Se, baffi rf they ars damaged. Re aluhor are baL f water I. floicuit,undlwamcieit dica- If4b.,kmane, thebalm,swelb; Tehsng on the iope will make the onasue, bob up: Red don aced 441.1lis.. thedeiwte em8 mmon Row. 1f Nis amu not »mit, pmll floe skmamN' axes m-. Bae sldeoFllxbava and sem.re the debris Alantheekdauneminsidethe: akrmmerm see ifn rs cimggeddw care the debris Uthe sktmmc mm m barrel prpe t 1 geed, We mffice can 6ermwved m3 the nbstructidv xtemed wuh apininb sanake mbp8nskmewrtbwater Be' sora nadmpku ihesdflce txfaarcpmamoa•^"tbez4mmer A Check the fabric limed spHiway far damage andmalre any required repairs. witlafabrie.ifiaf spansthe. tall tVidih of mbyillway. Check aheem6wk,nms; vplhv ys, and oidet1hr crosims Swage. Rail raspct rhe andoad mmt T. piping sed setliernent:.Llake all necessary vepaan.iasmediatety. Remove On trash an,l othsrd bars fmm the skinun. Aadpool mesa Franaa,, swee can result rb ice foimwg in the »vita Same Wtatal precvonons aLbrM, be is in the wmml m peevevt the Nnnan b m: Ptaggwg withiGc. SKIMMER MAINTENANCE SPECIFICATIONS NO SCALE P rem wIGNFF ®�� �� , FA as Alto SH04i. � R, IAw. sutmam oxo craw Ns.Dm Nems nwv,mlen rte wPawwrr Mawm. � �E 1�4 FN,M � � � a�R COPED N MMaIE pr PNIr. 1 2 SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7DAYS NONE HIGH QUALITY WATER (HOW) ZONES 7DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE IV OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED. SLOPES 31 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 5TH IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES. A 11 _DEC=Ll. _rkfM LI 3" Fairc%th Skimmer® Cut Sheet J. W. Faircloth & Son, Inc. www.FairclothSkimmer.com Aluminum straps 4" Soh 40 with Blue lip\ Inlet suspending inlet coupling \\1 connection' 3' pvc Boal 29" 2 2'Sch 40 SOLID pvc Bartel Or °amt° SUPPLIED BY USER a 29" 2 73s Skimmer shown in floating positionY hose. as clamps T Inlet HEAD on center 2- threaded male nipple eXswS m 4 of inlet and ordiico on outlet end 1. Coupling can be removed and hose attached to outlet using the threaded 2" nipple. Typical methods used: on a metal structure a steel slubout welded on the side at the bottom with a 2" threaded coupling or reducers; on a concrete structure with a hole or orifice at the bottom, use a steel plate with a hole cut in it and coupling welded to it that will fit over the hole in the concrete and bolted to the structure with sealant; grout a 4" pvc pipe in a hole in the concrete to connect the skimmer. It Dan be attached to a straight 4" sch 40 pipe through the dam but the pipe needs to be anchored to the bottom at the connection so R is secure. 2. Dimensions are approximate, not intended as plans for construction. 3. Barrel solid not foam core pipe) should be 1.4 times the depth of water with a minimum ( PP) P length of 8' so the inlet can be pulled to the side for maintenance. If more than 10' long weight may have to be added to inlet to counter the increased buoyancy. 4. Inlet tapers down from a 3" maximum inlet to a 2' barrel and hose. Barrel is smaller to reduce buoyancy and tendency to lift inlet but is sufficient for flow through inlet because of slope. The inlet orifice Dan be reduced using the plug and cutter provided to control the outflow rate. S. Inlet is 6" pipe between the straps with aluminum screen door for access to the 3" inlet and orifice inside. 6. Capacity 9,774 cubic feet per day maximum with 3' inlet and 3" head. Inlet Dan be reduced by installing a smaller orifice using the plug and cutter provided to adjust flow rate for the particular basin volume and drawdown time required. 7. Shipped assembled. User glues inlet extension and barrel, installs vent, cuts orifice in plug and attaches to outlet pipe or structure. Includes flexible hose, rope, orifice cutter, etc. 3mchCut TM 11-07 November 14, 2007 3.0" FAIRCLOTH SKIMMER DETAIL NO SCALE STEEL POSTS PLASTIC SLOPE DRAIN PIPE (PRACTICE STANDARD 6.32) OR GEOTEXTILE LINING TEMPORARYOR . PERMANENT DITCH COIR FIBER BAFFLES - (PRACTICE STANDARD 6.65) RISERSTRUCTURE TRASH SKIMMER --)• RISER STRUCTURE STONEPAD PLAN VIEW (belowskimmerl WOOD STAKE OR METAL POST TOP OF EMBANKMENT STONE ENERGY DISSIPATOR ---- ......� EMERGENCY SPILLWAY CLASS B STONE PAD 1-R`T CUT-OFF ANTI SEEP (4'X4'X r MIND ANTIFLOTATION BLOCK SECTIONAL VIEW LTRENCHCOLUR SFABIUZED 2' DEEP OUTLET 1.1 NOTES 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIORAND EXTERIOR SIDESLOPES. 2. INSTALLA MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. NOT TO SCALE 2 SEDIMENT TRAP DETAIL NO SCALE 3 r W �NATIIRAL GRADE .. ... PIPE DIAMETER • ` AJC .. 1 �-r1 �1i11r/ t Al 36" 7.2" 9.0' 20' 23.0' 16.2' C 0 NQIES 1. CIASS OR MEMAN SIZE OF RIPRAP AND LENGTH. WIDTH AND DEPTH OF APRON PER RIPRAP APRON DATA BLOCK SHOW BELOW. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF ME PIPE OR CULVERT AT THE DISMARGE OUrLET AT A MAT(MUM SLOPE OF 2:1 ANDA HEIGHT NOT LESS THOU TNG MM ME PIPE DIAMETER OR CULVERT HEIGHT. d. THERE SHALL BE NO OVERFLOW MOM ME END OF THE APRON TO THE SURFACE OF WE RECEIVING CHANNEL THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO WAT ME INVERT OF ME APRON Swill BE AT ME SAME DRAW (RUSH) WIM THE SURFACE OF THE RECEIVING CHANNEL ME APRON SHALL HAVE A CUTOFF OR TOE WALL AT ME DOWNSMFAM END. 4. ME WIDTH OF ME END OF ME APRON SHALL SE EOUI To ME BOTTOM WIDTH OF ME RECEIVING CHANNEL MAXIMM TAPER TO RECEMNG CHANNEL 5:1 S. ALL SUBGRADE FOR SMUCMRE TO BE COMPACTED To 951 OR GREATER. 6. ME PLADMG OF RU- EITHER LOOSE OR COMPACTED IN ME RECEMNG CHANNEL SHALL NOT BE AUDWED. 7. NO BENDS OR CURVES IN ME HORDWAL AIJMMMt OF ME APRON WILL BE PEIiNIf1E0. APRON DESIGNATION PIPE DIAMETER d50 RIPRAP STONE SIZE Do L W t Al 36" 7.2" 9.0' 20' 23.0' 16.2' A2 36" 7.2' 9.0' 20' 23.0' 16.2" A3 24" 10.8" 6.0' 21' 23.0' 24.3•' Do= Width of Apron at Outlet of Pipe (3xDia) RIP RAP APRON DETAIL NO SCALE SEEDING MIXTURE RATE (Ib/acre) Species 200 (4-5/1,000Re) Tall Fescue NURSE PLANTS Between May 1 and Aug. 15, add 10 /b/acre Sudangress or 10 Ib/acre German millet. Prior to May 1 or after Aug. 15 add 40 /b/acre rye (grain). SEEDING DATES Best: August 25 - October Passible: February - April 15 Avoid seeding from Nov. to Jan. if seeding must be done at this time, add 4016/acre rye grain and use a channel lining that offers maximum protection. SOIL AMENDMENTS Apply lime and fertilizer according to soil tests, or apply 4,000 Ib/acre ground agricultural limestone and 1,000 /b/acre 10-10-10 fertilizer. Operate tillage equipment across the waterway. MULCH Use Jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of Bow. On channel side slopes above this height, and in drainages not requiring temporary linings, appy 4,000 /b/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes whore they can clog drainage devices. MAINTENANCE Inspect and repair mulch frequently. RefertRize in late winter of the following year, use soil tests or appy 150 Iblacre 10-10-10. Mow regularly to a height of 2-4 inches. Refer to Appendix 8.02 for botanical names. GRASS LINED DITCH SPECIFICATIONS NO SCALE GENERAL NOTES: 1. DRIVE 5' STEEL POST AT LEAST 24" INTO SOLD GROUND. USE STAPLES 1' APART HORIZONTALLY 2. AND VERTICALLY TO ATTACH THE COR MESH FABRIC TO THE WIRE FENCE. 3. SPACE THE BAFFLES ACCORDING TO THE APPROVED PLAN. 4. THE FLOOR OF THE BASIN IN THE OUTLET ZONE AND BERMS SHOULD BE SEEDED IMMEDIATELY AFTER THE BASIN IS CONSTRUCTED. S INSPECT BAFFLES WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL REPAIR IMMEDIATELY. 111 � / •t ✓iii' ffil5 .111A1�d.,;§i IEARTH If B f 4•-0' M1%.. �X X/X .. 5• SIFEL POST FLOW B' X e' TROw N PENCE A AND COSAPACT FENCE PNDMC BURIED M MOM SEDIMENT TRAP BAFFLES NO SCALE 4 5 WINTER/SPRING SEEDING MIXTURE RATE (Ib/acre) Rye (groin) 120 Annual kaspedeza (Kobe in Pmdmant and Coastal Plain, Korean in Mountains 50 Omit annual hapedezo when duration of temporary cover is not to extend beyond June. SEEDING DATES Mountains - Above 2500 feet Feb. 15 - May 15 Below 2500 fest Feb. 1 - May 1 Piedmont - Jon. 1 - May 15 Coastal Pon - Dee. 1 - Apr 15 SOIL AMENDMENTS Follow recommendations, of Roll tests Or appy 2,000 /bl acro ground agriculture/ limestone and 750 /b/ acre 10-10-10 fertilizer. MULCH Appy 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disc with blades set neatly straight can be used as a mulch anchoring tool. MAINTENANCE Referb7fze 8 growth is not fu/y adequate Reseed, oder thin and mulch immediatey following erosion or other damage. SUMMER SEEDING MIXTURE RATE (Ib/acre) German Millet 40 In the Piedmont and Mountains, a small - stemmed Sudantgress may be substituted at a rate of 50 Ib/ acre. SEEDING DATES Mountains - May 15 - Aug. 15 Piedmont - May 1 - Aug. 15 Coastal Plan - Apr. 15 - Aug. 15 SOIL AMENDMENTS Follow recommenciaHans of soil tests or apply 2,000 Ib/ acre ground agdcuflumf limestone and 750 fill acre 10-10-10 fertilizer. MULCH Appy 4,000 /b/acre sWw. Anchor strew by tacking with asphalt, netting, or a mulch anchoring tool A disc with blades set nmr/y stmight can bei used as a mulch anchoring tool. MAINTENANCE Referti/ize IT growth is not fully adequate. Reseed, rifertilize and mulch immediately following mesion or other damage. FALL SEEDING MIXTURE RATE (Ib/acre) Rye (Grain) 120 SEEDING DATES Mountains - Aug. 15 - Dec. 15 Coastal Plan d: Piedmont - Aug. 15 - Dec. 30 SOIL AMENDMENTS Follow mtl tests or apply 2,000 /bl acre ground agricultural limestone and 1,000 lbl acre f0 -f0-10 fertilizer. MULCH Apply 4,000 /b/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disc with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE Repair and refmBlize damaged areas immediately. Topdre s, with 50 /blocs of nitrogen in March. K It is necessary to extend temporary cover beyond June 15, overseed with 50 Abl. Kobe (Pladmont and Coastal Plan) or Korean (Meant.,.) lespedeza in February or may, March. TEMPORARY SEEDING SPECIFICATION NO SCALE SEEDING MIXTURE RATE (Ib/acre) Tall Fescue 100 Sericea Leopedeza 30 Kobe Lespedeza 10 SEEDING NOTES In Eastern Piedmont, add 25 Ib/acre Pensacola Bahiagrass or 10 Ib/acre common Bermudagross. Use common Bermudogross only where is is unlikely to become a pest. After Aug. 15 use unsaadfied Barked seed. Where a neat appearance is desired, omit series. and substitute 40 Ib/acre Bahiagmss or 15 Ib/acre Bermudograss. To extend spring seeding dates into June, add 15 Ib/acre hulled Bermudagrass. However, after mid -Apr. it is preferable to seed temporary cover. NURSE PLANTS Between May 1 and Aug. 15, add 10 Ib/acre German millet or 15 Ib/acre Sudangross. Prior to May 1 or after Aug. 15 add 40 Ib/acre Ore (grain). SEEDING DATES Best Passible Falk Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late Winter. Feb. 15 - Mar. 21 Feb. 1 - Apr. 15 Fall is best for tall fescue and late winter for /espedezns. Overseeding of Kobe /espedeza over fall -seeded tall fescue is very effective. SOIL AMENDMENTS Appy lime and fertilizer awarding to soil tests, or appy 4,000 Iblacre ground agricultural limestone and 1,000 Iblacre 10-10-10 fertilizer. MULCH Appy 4,000 Ib/acre grain straw or equivalent cover of another maToble mulch. Anchor straw by tacking with asphaft; netting, or roving or by crimping with a mulch anchoring tool. A disc with blades set nearly straight can by used asa mulch anchoring tool Netting is the preferred anchoring method on steep slopes. MAINTENANCE Refertn7ize in the second year unless growth is fuly adequate. May be mowed once or twice o year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately Reference: Table 6. Ilk from NC Erosion and Sediment Control Planning and Design Manuel, 1988. PERMANENT SEEDING_ SPECIFICATION NO SCALE 5 I]' [N I FIN JI MIDLAND, LLC seAL ' F4�A i 'YGTNBE.•;,1, rr4l FLI JI t 11TAAA CiZ w Z0 DO 2 n O Z 0 o Z _ 3 a 5 I- U r 0 ~ X W� f 0 Z XX On N UX �N O_ p c pYm rL o li I q U E 6th C m p IiiM w m N 90 al p o al OZW N W. O.Q NQ 0 r J 0 QDo JQ rc a00 Cr ❑ C N W gWz F-7 d �rj K E 0 aDO 0 =J C® V z 0 a U 0 K seAL ' F4�A i 'YGTNBE.•;,1, rr4l FLI JI t 11TAAA CiZ w Z0 DO 2 n O Z 0 o Z _ 3 a 5 I- U r 0 ~ X W� f 7 Z XX On N UX �N j p c pYm o li I q U E 6th W 6 m p IiiM w m 90 al p o al OZW N W. O.Q NQ IL 8 r J 0 QDo JQ a00 Cr ❑ C N W gWz F-7 d �rj K E aDO 0 =J C® V seAL ' F4�A i 'YGTNBE.•;,1, rr4l FLI JI t 11TAAA SHEET NUMBER CD6 0 N _ 3 a 5 LU DO D ❑ F LU W J_ Q E - LU ❑ D 0 Of f SHEET NUMBER CD6 IO IC ie SPI RIP FLOW 2 S A W 5 WASHED STONE I PLAN B aFLOW W (SPILLWA MIN 2/3 STREAI 2 " ` ••••^•� STONE SECTION A- L = D19M SO TMT ELEVATION OF DOWNSREW OAW SPILLWAY IS EQUAL TO ELEVATION OF UPSIRDAI TOE OF DAM. L L 1' MIN. BELOW LOWEST BANK LEVEL (MIN) RIPRIP FILTER FABRIC NOTES 1. PLACE STONE ON ALTER FABRIC TO UNES AND GRADES SHOWN ON PLANS 2. KEEP CORER SECTDN 1' MN. BELOW NATURAL GROUND IL141 AT CHANNEL BANKS. 3. EXID81 STONE AT (FAST 15 BEYOND DITCH BANKS 4 USE 2 M 15' STONE, CLASS A OR B EROSION CONTROL STONE 5. KEY THE STONE INTO THE DOW BANKS A MINIMUM OF 18" TO RAID WASHOM FIKM OJE MM. MAINTENANCE NOTES: 1. INSPECT CHECK DAMS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT, STRAW, LIMBS OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS- SECTION. STONE CHECK DAM NO SCALE STAKES dd1�P 'essz� aAP �1VOOD STAKES $5 WASHED STONE / (1/4' 70 1/2' GRID OPENING) WIRE .MESH CONCRETE BLOCK 1me DM W IS IH iNemuMFM W s CE Axe sXNI REMI.In WE ReG aF aNYBEnS EN9mFlNW. PA RFt. ML Ca1NN1 LAI. eGMdN N6) a1XP RFBER+ID R. NDIIMND The CORANM TIEREIa eNlf&S aMER1Y AAMICED �REPRODUCEDR CDPIE9 N W WIE ee PMI.eteeX m rac�xcxrxpll 1 BLOCK & GRAVEL INLET PROTECTION NO SCALE USED FOR AREA INLETS IN PAVED SURFACES DROP INLET WITH GRATE 2 HARDWARE F1 STORAGE AREA CATCH 3 GENERAL NOTES, 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 UNE WIRES WITH 12' STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE 4. WASHED STONE SHALL BE USED TO BURY SKIRT WHEN SILT FENCE IS USED ADJACENT TO A CHANNEL, CREEK OR POND. 5. TURN SILT FENCE UP SLOPE AT ENDS. 6. WHEN FABRIC IS USED WITH WIRE MESH 8' CENTERED POSTS MAY BE USE GENERAL NOTES, I. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY. THE FABRIC SHALL BE REPLACED PROMPTLY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT OR SILT FENCE SHOULD BE REPLACED. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. SILT FENCE DETAIL NO SCALE STEEL POST FILTER FABRIC STANDARD SILT FENCE SECTION A -A WIRE MESH INLET PROTECTION NO SCALE USED ON PA 3 JT ER )N STONE 4 Shope surf. shall be smooth before pincementfar propersatlwnat. 5tapiir9ponem05 Min,2" w e,N acturere seeds recammeNMdtiow, y� be rat stretch bMNxtstnmttieW tight the railsto wnformto oRY irregular For shapes less than 3H:IV, roils nary he pieced in horim t l strips. If there is a berm at the top of slope,oEwhorupolopeef the berm. 0!%^ Anchorin 6'xb' mm. Trench and staple 012' Hner.h, _.� Mia 6' overlap �S}apleoverlapz max. 5'spocing, Bring material down to a IeveTarce, turn the erd under 4°o stapie at 12° me ak. Lime, ferHBze, end seed before iRetellvtloa Phoning of alwbs, trtss, ete. sHwldaccur after mockNon. Ree. Nos 6.10.11 MV IIJTT.RFNCE .. INSPECT ROLLED EROSION CONTROL PRODUCTS WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL E\ENT PND REPAIR IMMEDIATELY. 2. CODE, CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT ,,,000R BENEATH THE RECP. 3. AN." AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. tl EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND CO\ER IS ESTABLISHED. TEMPORARY SLOPE MATTING DETAIL NO SCALE SOIL STABILIZATION FABRIC UNDER COARSE AGGREGATE z s � 'm U m a NOTES 1. A STABILIZED ENTRANCE PAD OF 2"-3' SIZE COARSE AGGREGATE SHALL BE LOCATED WHERE TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE MAY BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABIUZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN. 6. SOIL STABILIZATION FABRIC (AS SPECIFIED BY THE DESIGNER) SHALL BE USED. 19-IXiArr u.unm.ac nnru SILT TEMPORARY CONSTRUCTION ENTRANCE NO SCALE CONSTRUCTION SPE«FICATGHS 1. UNIFORMLY GRADE A SHALLOW DEPRESSION ARPROACHING WE BASIN 2 DRIVE Y STEL POSTS 2 FEET INTO THE GROUND SURRWNDMG THE INLET. SPACE POSTS EVENLY AUM WE LENGTH W WE BASK A MAX. OF 4' APART. 3. ATTACH MIRE MESH HARDWARE CLOTH TO POSTS, SECURING AT WE TOP, MIDDLE, AND BOTTOIA. PIACENG A 2' RA OF WE WIRE MESH UNDER THE GAVEL FOR ANCH«UNG IS RECOMMENDED. 4- PLACE CLEAR GRAVEL (NC DOT 05 OR pT STONE) ON A 21 %OPE WTI A HEIGHT OF le ALONG THE UPSTREAM SDE OF THE WIRE AND SMOOTH TO AN EVEN GRADE- 5. RADES ONCE WE CONTRIBUTING DRANAG: AREA HAS BEEN STABNZET. REMOVE ACCUMULAIED SEDIMENT AND ESTABLISH FINAL GRADING EIEVATONS G. COMPACT ME AREA PROPERLY AND STABIU2E IT WTH GROUNDCGAD?. MAINTENANCE NOTES 1. INSPECT BASIN AT LEAST WEEKLY AND AFTER EACH SMIFICANT (.5 INCH OR GREATER) RAINFALL EVENT. CI PM WE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR WINNALHENT RAINS TAKE CARE NOT TO DAMAGE OR UNDEMWT THE WRE MESH DURING SEGMENT REMOVAL REPLACE STONE AS NEEDED. STONE OUTLET DETAIL NO SCALE T FENCE STEEL POST -GUAGE HARDWARE CLOTH MESH OPENINGS) CI DI OI ASC MIDLAND, LLC nA SEAL � - t 40366 FA'GINS A' F ArAIl J1111\ W C� O a w 0z QQ n F UUS N z J Z 0 J ED 2 U H ILL O_ O O w OL x a 6n J 2 v. -m O OX vx O D O G.w m $ w s Q E G_ O 0 1 z =" ¢ 6 U ofN w c m m0 w li p w w a o ZU U m m U o m W m 0 O yN W z W A0 (=qm 66g m< 0 IL w > Haim U a n C8E Ra J R CD 'N C F- o- Z❑ w n< w m m Y E a wo QZU v �'® `v r a 0 0 a h v rc nA SEAL � - t 40366 FA'GINS A' F ArAIl J1111\ W C� O a w 0z QQ n F UUS N z J Z 0 J ED 2 U H ILL O_ O w OL x a 6n J 2 v. -m O OX vx D O G.w m $ w s Q E O 0 1 z =" ¢ 6 U 01 a N w c m m0 w li p w w a o ZU U m m U o m W m 0 O yN W z W A0 (=qm 66g m< IL w > Haim U a n C8E Ra J R CD 'N C F- 6 Z❑ Q UU Z W SS F Y E wo QZU v �'® `v nA SEAL � - t 40366 FA'GINS A' F ArAIl J1111\ W C� I QQ O N N W J Z 0 J ED 2 U H ILL O_ O OL SHEET NUMBER CD5 �C IC I� v p m M , MOO o rom-jvl Mm-IZ �i=D =m>>m = O O O Zoo" 0 D --I D <� O Z III o z O G) Z DO N � _ i -1 1 =mz x C9 CA -I v D IT N 0 H T Z O 72 02 v pm "m m y O O m Z H = D =oznm 2 m O 0 ZI,y0 O>>> <-4 fO Z .ENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH MEWS OVER W-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DAMNING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC FOUR, 2" KEYWAY, OR N4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, AGO TO BLAB AS SHOWN ON STO. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOP 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLOB. OVER 8'-0" TO 15'-0" IN HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST WANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE MONS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. SECTION Y -Y RISER HT. VARIES o -I - 11 6" WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES A WHERE 42" TO 54" PIPE IS USED SECTION X -X SEE i SECTION J -J WHERE 30" TO 36" PIPE IS USED PLAN 43"NOTE: MERE 42" TO 54" PIPE IS USE TYPE "E", "F" AND "G" GRATE m OF BOX WIDTH & PIPE MIN. HEIGHT UNLESS OTHERWISE NOTED. Z TIIE OPAMtM M M 0751 MV OF EFMICF AVD 91001 "d NN 1!l STA�TNOW AHGOTTER RpM9 "XCTIO'IIMD ME 1M'kTGO 'L4 ORNRWRE PR0.ICFD N'�R Omp1YCED AOR CV%kD IN WXq£ OR P/M. PLAN FRAME,GRATE, & HOOD ASSY -1 Err 3 3'-0" 31�" SECTION - KK ALIGN FRAME WITH INSIDE EDGE OF WALL TO ALLOW FOR VERTICAL ADJUSTMENT WALL SECTION SECTION - BB 2 SECTION - LL SECTION - PP 2 o= W Iy L'I N 3 papa = a v 47 owe Q � F 07 W - = OC N GO _ J O z Z W z ow f P -I P H0 .00. L Ja -_ LNZ z UL a a F- O t0 -I r N N 0 - 0nUL O � SECTION - MM0O"GO a p Z 7 t 1R 1r a8 m� - C OO T T SECTION - NN HOOD ELEVATION SECTION - JJ 5%" 3 fl Jar, 44'0" SECTION - RP D G HZH o p a = m 0 Z Z H Q a U O O in N CC W p z Q DO N o F. W W J O 2 = W � CC O LL O pm � OIG -4 Z m rOO 0 m9m mZ=D ti =oTgm = In O O Z yOrm L'Dyn FL In M OMti O Z SST R MERE 42" TO 54" PIPE IS USED WIIN XO RISER m OF BOX WIDTH & PIPE MIN. HEIGHT Y _ Z YIN. HEIGHT H COVER DIMENSION E F O Hy BAPS -W W. LENGTH A Z CONC. IN BOX BOTTOM TOT. CO W. SLABAPIXIYW NF1 N DEDUCTIONS GNP PIPE C.Y, 12" 3'-0" DO .. -- 2'-9" p 9 = -- -- -- °1 -- fi" "W" BARS -i♦D_ 0.295 0.7i2 0.015 =m DO Z NEWS 2'-2" �C-)n 3'-0" 0. WE#S m 011 0.048 24" 01 10, 1 3'-0" O 0 0.285 0.829 0.023 0.036 18" PUN 2'-2" 2 SECTION - LL SECTION - PP 2 o= W Iy L'I N 3 papa = a v 47 owe Q � F 07 W - = OC N GO _ J O z Z W z ow f P -I P H0 .00. L Ja -_ LNZ z UL a a F- O t0 -I r N N 0 - 0nUL O � SECTION - MM0O"GO a p Z 7 t 1R 1r a8 m� - C OO T T SECTION - NN HOOD ELEVATION SECTION - JJ 5%" 3 fl Jar, 44'0" SECTION - RP D G HZH o p a = m 0 Z Z H Q a U O O in N CC W p z Q DO N o F. W W J O 2 = W � CC O LL O pm � OIG -4 Z m rOO 0 m9m mZ=D ti =oTgm = In O O Z yOrm L'Dyn FL In M OMti O Z SST R v v m M � H' Z woo F- o �I_4m MZ�=n =�Zym =07000 Z ymrm pOm Canna <i 078 f O Z c z C13 Z DO N _ m M > �mz v CA) v O 0 �> m Z Z r- G) -1 o m 4 BAR Lpryltp/; y DOWEL PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP 6. USE ON FLAT ELEV. EXPANSION JOINT GRADES 2N AND UNDER _ DEPRESSED GUTTER LINE EXPANSION JOINT I I ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES E%PANSION JOINT NORMAL GUTTER LINE 11 TOP USE ON GRADES OVER 29 EL V. -10rr I DEPRESSED GUTTER LINE EXPANSION JOINT 6'-0' iL�Orr IMI MAX. II ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES AND QUANTITIES FOR DROP PLAN OF TOP SLAB WIIN XO RISER m OF BOX WIDTH & PIPE MIN. HEIGHT C7 Z YIN. HEIGHT H COVER DIMENSION E F O r BAPS -W W. LENGTH TOTAL LBS. Z CONC. IN BOX BOTTOM TOT. CO W. SLABAPIXIYW NF1 N DEDUCTIONS GNP PIPE C.Y, 12" 3'-0" DO .. -- 2'-9" p 9 = -- -- -- -- -- fi" "W" BARS -i♦D_ 0.295 0.7i2 0.015 =m DO Z NEWS 2'-2" �C-)n 3'-0" 0. WE#S m 011 0.048 24" 01 10, 1 3'-0" O 0 0.285 0.829 0.023 0.036 18" 3'-0" 2'-2" 0.222 3'-3" 0.925 D g 0.092 SECTION 11-11m -v W 1ti Y E a m 0.235 0.887 0.0.93 0.048 24" 3'-0" N 9'-8" N w ILL O o Z O 0.235 1.001 O. D69 S v v m M � H' Z woo F- o �I_4m MZ�=n =�Zym =07000 Z ymrm pOm Canna <i 078 f O Z c z C13 Z DO N _ m M > �mz v CA) v O 0 �> m Z Z r- G) -1 o m 4 BAR Lpryltp/; y DOWEL PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP 6. USE ON FLAT ELEV. EXPANSION JOINT GRADES 2N AND UNDER _ DEPRESSED GUTTER LINE EXPANSION JOINT I I ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES E%PANSION JOINT NORMAL GUTTER LINE 11 TOP USE ON GRADES OVER 29 EL V. -10rr I DEPRESSED GUTTER LINE EXPANSION JOINT 6'-0' iL�Orr IMI MAX. II ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES ^." WEEP HOLES I Y -J PLAN WITH GRATE & FRAME REMOVED CATCH BASIN/ AREA INLET DETAILS NO SCALE 3 SECTION X -X Y621NG1ULNIAL) -FVATION - 1 0.180 0.386 2.387 0.297 0.601 RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT GENERAL NOTES: USE CLASS "8" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH SID. ORAWING 640.86. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY WE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADO TO SLAB AS SHOWN ON STD. No. 840.00. CONSTRUCT WITH PIPE GROANS HATCHING. SEE STANDARD DRAWINO &40.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. ]BY STONE IN A POROUS FABRIC BAS OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER CHAMFER ALL EXPOSED CORNERS 1". ORAW1% HOT TO SCALE. 0.16 FRAME v r ry��#4 BAR B:. B B" OI I L=-+ DOWEL NOTE) MAX. PIPE THIS SIDE SECTION Y -Y DIMENSIONS AND QUANTITIES FOR DROP NIXINIIIE DIMENSIONS AN OUAXTSTIES FOR CONCRETE CATCH SASIX SASEO ON MIN. HEIGHT H WIIN XO RISER DIMENSIONS PIPE SPAN OF BOX WIDTH & PIPE MIN. HEIGHT PIPE O DIMENSIONS OF BOX AND PIPE SPAN WIDTH WIDTH SPAN p B C G YIN. HEIGHT H COVER DIMENSION E F BARS -U NO. LENGTH BARS -V NO. LENGTH BAPS -W W. LENGTH TOTAL LBS. CU.YOS. TOP SLAB CONC. IN BOX BOTTOM TOT. CO W. SLABAPIXIYW NF1 N DEDUCTIONS GNP PIPE C.Y, 12" 3'-0" 2'-2" .. -- 2'-9" -- -- -- -- -- -- -- -- -- -- 0.295 0.7i2 0.015 0.02r02 6 15" 3'-0" 2'-2" D -N 3'-0" 0. 0.033 0.048 24" 01 10, 1 3'-0" 0 0.285 0.829 0.023 0.036 18" 3'-0" 2'-2" 0.222 3'-3" 0.925 I O_ 0.092 0.127 H Y E a 0.235 0.887 0.0.93 0.048 24" 3'-0" 2'-2" 9'-8" w ILL O o 0.235 1.001 O. D69 0.086 90" 3'-0" 2'-2" 9'-4" 4'-3" V-2" 4'-0" 4 1'-5" 2 9'-9" 3 W-9" 39 0.123 0.321 1.433 0.092 0.127 38" 3'-0" 2'-2" 3'-10" 4 -8 1' 3" 0' 0" 4 1' 11" 3 3'-9" 3 W-9" 43 0.161 0.358 1.]14 0.192 0.178 d2" 3'-0" 2'-2" 4'-6" 5 -9 i'-6" 3'-2" 9 1'-8" 2 2'-H" 3 V-11" 32 0.112 0.318 1.]38 0.180 0.249 48" W-0" 2'-2" 5'-0" 5'-8" 2'-O" 3'-2" 4 2' 3" 3 2'-1 t" 3 2'-11" 95 0.145 0.352 2.052 0.295 0.31> 54" 3'-0" 2'-2" 5'-i" 6'-3" 2'-7" 3'-2" 4 2'-10" 5 2'-11" 3 2'-11" 4 ^." WEEP HOLES I Y -J PLAN WITH GRATE & FRAME REMOVED CATCH BASIN/ AREA INLET DETAILS NO SCALE 3 SECTION X -X Y621NG1ULNIAL) -FVATION - 1 0.180 0.386 2.387 0.297 0.601 RISER HAS .228 CUBIC YARDS OF CONCRETE PER FOOT HEIGHT GENERAL NOTES: USE CLASS "8" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH SID. ORAWING 640.86. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY WE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADO TO SLAB AS SHOWN ON STD. No. 840.00. CONSTRUCT WITH PIPE GROANS HATCHING. SEE STANDARD DRAWINO &40.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. ]BY STONE IN A POROUS FABRIC BAS OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER CHAMFER ALL EXPOSED CORNERS 1". ORAW1% HOT TO SCALE. 0.16 FRAME v r ry��#4 BAR B:. B B" OI I L=-+ DOWEL NOTE) MAX. PIPE THIS SIDE SECTION Y -Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS PIPE SPAN OF BOX WIDTH & PIPE MIN. HEIGHT CUBIC YARDS WHO. IN BOX DEDUCTIONS FOR ONE PIPE D A B H BOTTOM SLAB WALL PER FT. HT. c'w umilwl c 12" W-0" 2'-0" 2'-0 0.222 0.222 0.582 U 0.015 0.028 15" 2-9 h ZX OUx 0648 .703 0.029 0.036 18" a 2--6 D -N F - 0. 0.033 0.048 24" 01 10, 1 3'-0" 0 0.814 0.059 0.085 30" 3'-0" 1 2'-0" 1 3'-8' 0.222 0.222 0.925 I O_ 0.092 0.127 3 z Om Q Q "OCD LLJy"7 O O O = Q m 0 w r TRF Ly0J 0Oy0 z j¢ LUap W O p Z UL 1i I3 N 3 m Fa4 = a 0o H v 0 V � Q W = F- F - U) H W; =CCN 07 0,- N Z iO V z O O f Q a H wcD U W Ja""Z Comm Wp6E <2 = TRF -,_0w 0O cl) a Z ? w P] a" J WO O Q O W CD J z Z w Q ~ H x d a 0 O o O = m O: W9 Q W = F - GO W __ =D:N O L% •• Z JO z V OF 1 . 44 17I �I �1 L ASC MIDLAND, LLC SEAL 40366 ... ......... "e W ? 0 GO n O Z c U x o o U Fx O) w� r o h ZX OUx O° Z a D -N F - w w^ G 0 U p a ti m I O_ H Y E a 1 0 � O � w w ILL O o ¢ o Z 1 Fw F N F U, m Z m N Z O q w !D3 y rn O rn N N z OF 0 w w m a s m a WED OI Ez m LC em Ua n J f`a c OFGO N m W < Z W = 0 FZ a1 0 0 W a z J Com® v SEAL 40366 ... ......... "e W O N . O) LU -I GO Z a F - w G 0 U J I O_ O a f SHEET NUMBER CD4 IED Ic ID 1 2 3 4 5- -- — -- -----, r 18" DIA. CONCRETE COLLAR SIDEWALK/ PAVING SECTION OR EARTH r THREADED BRASS CLEANOUT PLUG I MARKED SANITARY CLEANOUT COORDINATE LOCATION OF CLEANOUTS WITH OWNER w rc \� COMPACTED rc H �j BACKFILL IN 6" LAYERS <-45 ELBOW � � �� 95% srANDARO K 3\j PROCTOR ririFpii o o \//\ T ,Ip V n `LATERAL PIPE AS REQUIRED `WYE l-r=I Irrr fa, I PVC CLEANOUT DETAIL NO SCALE Rn 'II PLAN VIEW +I{[ I 9-1/2" I �I I 2" 44" �IB-1/2• I I I» a •• 17 VOW. Box I 27"o -I SECTION VIEW A—A VALVE PROTECTION RING NO SCALE PIPE _0" MIN. 1'-0" TOP 6", 100% STANDARD MIN T PROCTOR 6" Z "TYPE III" NOTES 1. FOR USE WFIH ALL PVC GRAVITY SEWER AND SEWER FORCE MAIN PIPE AND WHEN CONDOIONS OF POOR OR SATURATED SOIL OR ROCK ARE PRESENT, REGARDLESS OF PIPE MATERIAL. 2. TRENCH SIDE SLOPES SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS. SUPPORT OR SHORE WHEN TRENCH IS MORE THAN 5' DEEP AND 8' LONG. BEGIN SIDE SLOPE, IF USED, APPROX. 18" ABOVE TOP OF PIPE. 3. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS WD. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE IN 6" LAYERS AND THOROUGHLY COMPACTED INTO PUCE. 4. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. 5. ALL MATERIAL SHALL HAVE AN IN PLACE DENSITY OF 100% TO A DEPTH 6" BELOW THE FINISHED GRADE OF THE BACKFILL MATERIAL, AND 95% AT GREATER THAN 6" BELOW GRADE. "TYPE III" BEDDING DETAIL NO SCALE iX6 pUMN4 " /N I".I.WEf" OF .FR'IICE AND SIWL RFYYR TIC so°AOpiu W MD Om RORRI NRORPen DINDRDmE m01Frw10NDxi.. UN ESS MOFA R E PRN WL FOR OR NPIm IN NfKKE OR PMT. gS9EY.lUtlS�.1P 1 TOP 6", 100% STANDARD PROCTOR SLOPE OR SHORING PER OSHA CLEAN BACKFILL (NO MATERIAL LARGER THAN 2') 1 2" MIN. HAND —r EXCAVATION NOTES: 1. FOR USE WITH ALL DIP, RCP AND VCP UNLESS CONDITIONS OF POOR OR SATURATED SOIL OR ROCK ARE PRESENT. 2. HAND EXCAVATE TO CONFORM TO PIPE BARREL 3. EXCAVATE AT PIPE BELLS SO BELL DOES NOT SUPPORT PIPE. 4. TRENCH SIDE SLOPES SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS. SUPPORT OR SHORE WHEN TRENCH IS MORE THAN 5' DEEP AND 8' LONG. BEGIN SIDE SLOPE, IF USED, APPROX. 18" ABOVE TOP OF PIPE. 5. BACKFILL OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS WD. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE IN 6" LAYERS AND THOROUGHLY COMPACTED INTO PLACE. 6. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PIACED. 7. ALL MATERIAL SHALL HAVE AN IN PUCE DENSITY OF 100% TO A DEPTH 6" BELOW THE FINISHED GRADE OF BACKFILL MATERIAL, AND 95% AT GREATER THAN 6" BELOW GRADE. "TYPE I" BEDDING DETAIL NO SCALE TOP 6" - 100% STANDARD PROCTOR �\ SLOPE OR SHORING PER OSHA. COMPACTED BACKFILL -IN 6" LAYERS, 95% STANDARD PROCTOR. CLEAN BACKFILL (NO MATERIAL LARGER THAN 2') AGGREGATE NO. 67 BEDDING -7 PIPE O.D. BELOW PIPE (MIN. 6') AND UP TO PIPE MIDPOINT NOTES: __.. 1. FOR USE WITH ALL PVC WATER PIPE, UNLESS CONDITIONS OF POOR OR SATURATED SOIL OR ROCK ARE PRESENT. 2. TRENCH SIDE SLOPES SHALL BE IN ACCORDANCE WITH OSHA REQUIREMENTS. SUPPORT OR SHORE WHEN TRENCH IS MORE THAN 5' DEEP AND 8' LONG. BEGIN SIDE SLOPE. IF USED. APPROX. 18" ABOVE TOP OF PIPE. 3. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER THE PIPE IS LAID. COMPACTION REQUIREMENTS SHALL BE ATTAINED BY THE USE OF MECHANICAL TAMPS ONLY. EACH AND EVERY LAYER OF BACKFILL SHALL BE PLACED LOOSE IN 6" LAYERS AND THOROUGHLY COMPACTED INTO PLACE. 4. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED TO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PLACED. 5. ALL MATERIAL SHALL HAVE AN IN PLACE DENSITY OF 100% TO A DEPTH 6" BELOW THE FINISHED GRADE OF THE BACKFILL MATERIAL, AND 95% AT GREATER THAN 6" BELOW GRADE. "TYPE II" BEDDING DETAIL NO SCALE 3 O C o DIM v) G *SIDEWALK TAPERS DOWN h Too Z 5' BACK FROM DpIVEWAY. D fy.IO m BUILD THIS PORTION OF DRIVEWAY PAVEMENT Z = U r O T_j QO ONLY AT LOCATIONS WHEN DIRECTED. LL J O w ITIZMO T O5Rm *5'-0" WIDTH OF DRIVEWAY *5'-0" W Q Z LL - �1y90 QO¢Oo-V,-I m"m m 1 I NHLLZO J O w I *SIDEWALK *SIDEWALK I 2 w n n n n i (OPTIONAL) (OPTIONAL) ; Z O H Q Q Q~ -I DISSIPATE CUflB I DISSIPATE CURB 6~. R>"I y O BETWEEN THESE LIMITS BETWEEN THESE LIMITS W O Z p pADUI3 3'-0" Op A H N PLAN AS ASHOWN N N ON L S SHOPLANS r i GRASS GRASS Z AREA AREA m; CURB ) LL oIRRR c� Nm "EXPANSION JOINT 11"EXPANSION JOINT IZ-I 0 y C DO STREET PAVEMENTS Q 2.. o E D c } y C > CCF F } O < C p Z a 0 A PLAN VARIABLE SEE SHEET 8" 2'-0 h S m Z f DETAIL OF DRIVEWAY I 2 OF 2 FOR DRIVEWAY GRADES) O> C Z 2" DEEP SAW CUT ml 2" 0) yEXISTING DRIVEWAY - PROPOSED DRIVEWAY PAVEMENT VARIABLE PROPOSED W PAVEMENT PAVEMENT pADIU3 3'-0" OR AS SHOWN ON PLANS METHOD OF TIE IN DRIVEWAY TURNOUT WHEN EXISTING DRIVEWAY PAVEMENT IS CONCRETE, SAW CUT 2" DEEP JOINT AT THE POINT OF TIE-IN. BUILD THIS PORTION OF DRIVEWAY SAW JOINT PERPENDICULAR TO EDGE OF EXISTING PAVEMENT ONLY AT LOCATIONS DRIVEWAY PAVEMENT. WHEN DIRECTED. SHEET 1 OF 2 SECTION C -C SHEET 1 OF 2 848.02 848.02 O om M � woo 1 T> " m hlZ1=n _ m Z D m Z= z 1. Ml m D D D DO y 0 O Z Ta Z vco co O M x .14 < QD QD m Z D x 0 m > z N O � O T O x HEET 2 OF 2 848.02 DESIRABLE DRIVEWAY GRADES k+2$ GRADE WHEN *+2% GRADE MLION THIS THIS IS SIDEWALK IS SIDEWALK LOCATION LOCATION +15a+ OR FLATTER +159s OR FLATTER - - +89 OR FLATTER- -2% OR FLATTER 8$ OR F- - - - - - _ Tom` OR FLATTER •SIDEWALK LOCATION (DO NOT PLACE SIDEWALK ON BERMS LESS THAN 6' WIDE.) DESIRABLE OR MAXIMUM DRIVEWAY GRADES BERNUWIDTH W *+2% GRADE WHEN *+2% GRADE WHEN THIS B THIS IS SIDEWALK IS SIDEWALK. LOCATION GIST. GRADE8' OR LESS LOCATION o +25s - 2'-6" +5$8' OR LESS - 1- ~ U 8'-6" +2$*12' F- LU O L e -a4__ F 5'-0" 1L & OVER F m zx !]X 7'-0" +2$` 4 2 O LL 2 ~ 3 O w CC o CC 2 ori Or } ZaW H co cc W x H O IN -I Q J 0 Z W 0 0 MIDLAND, LLC O W *+2% GRADE WHEN *+2% GRADE WHEN THIS z 0z THIS IS SIDEWALK IS SIDEWALK. LOCATION m LOCATION o +25s - OFm z - 1- ~ U +16% - F U F- LU O L e -a4__ F 5'-0" 1L F m zx !]X -754 '�- dN IL 0 4 2 O LL 2 ~ 3 O w CC o CC 2 ori Or } ZaW H co cc W x H O IN -I Q J 0 Z W 0 0 MIDLAND, LLC ```AAP 111 IIIIIQ �''' 6 :q H9lY/, SEAL = 40366 GINe '% �A O W w z 0z m CQ o j F OFm z U) 1- ~ U Z p J F U F- LU O L U F f 1L F m zx !]X Oo � dN IL 0 F � Y E F 1 O o K m mo tii N o w 4 m U w z V m G 9 O n z o% m O o z w65 m m d Q Y i y m "s c o Q c rya D F N m W Q Z W H 41 F W IU)0 0 Q Z J E v Cr® 0 z O a 0 U 0 K N n v n n n a ```AAP 111 IIIIIQ �''' 6 :q H9lY/, SEAL = 40366 GINe '% �A O W w z 0z m CQ o j F OFm z U) 1- ~ U Z p J F U F- LU O L U F f 1L F zx !]X Oo � dN IL F � Y E F 1 O o N z- m mo tii uJ—. v o w 4 m U w z V m G 9 O n z o% m o z w65 m m d Q uN-i a i y m "s c o Q c rya D F N m W Q Z W H 41 W IU)0 0 Q Z J E v Cr® ```AAP 111 IIIIIQ �''' 6 :q H9lY/, SEAL = 40366 GINe '% �A SNEET NUMBER CD3 W � CQ OFm U) N w TJ Z p J F U F- LU O O_ O f 1L SNEET NUMBER CD3 1 [N �4 1 2 3 4 Typical r°ler Cut Edge Maximum1.6" W 2.4' Slope" O.C. E.W. Curb -Ramp \ 0.4' SECTION CUT EDGE PLAN VIEW Delectable Truncated Dame Specifications: • BoRomdlameteroMAIn. • Tap diameter of 0.4 in. • Height of 0.2 in. • Center -to -center spacing of 1.6 in to 2.4 in. • Visual contest. • Detectable warning surFace shall extend from edge to edge of walkway entering the Crosswalk, at steel level. TRUNCATED DOME DETAIL VAtll OKE our W flt]i( eM 8 ACCESSIBLE SPACE. BUI HOT IES 1HUH ONE, IS IRED TO BE VAN ILCFSSB4E PARKING SPACE PAVEMENT MARKINGS O VAN a7 -E. ppNl(ING M D PARK N3D ACCESSIBLE 1218• 12119' MOIm RESERVED R7-80 PARKING PASSFHOBR 12119' ® 12NU LOAgxo 117 e 12118• ONLY REWIRED ACCESSIBLE MAXIMUM RESOMP. PNA(IWI 5NN PENALTY tYR• $- zsD MAXIMUM PENALTY 12; $ 250 1 t I VAN I 1/2' ACCESSIBLE ,U -D 1/ D RESERVED A PARKING HANDDICAAPPED ONLY 'nM E MAXIMUM WT. PENALTY 2-1/4 $250 2b' W-1• HANDICAP SIGNAGE REQUIREMENTS NO SCALE ALTERNATE RAMP VIEWS ISOMETRIC VIEW /L' B=BISTANCE FRIXA FADMECOEOF9ICEWKK 'BAtl(OF$CKOFSPOINTOF 1R:1 l2AMIAOPF. ICEWALI(ORW REWIIiEO FORALL a0PE5. R4xCI(OF X0FSx a0E W ALK TROP REOI11RE9 FOR aeEWALK SLaPESO.oa 'NOTE AURAMPSSN^1LBECTHICK W aICaW m m. A B unLlrcsl nNIxRI oMN. pwgW aaiaw IIT�awnwwlal �� � �- SECTION B -B ea AMa Fa amore sm EuenBnrM smruanema T9W TRRMOI oat luwnml OwF NT SECTION A -A NOTES: 1. ALL RAMPS SHALL BE W THICK MINIMUM. 2. CROSSWALK WIDTHS AND CONFIGURATION VARY BUT MUST CONFORM TO TRAFFIC DESIGN STANDARDS. 3. ALL STREET CURBS BEING CONSTRUCTED OR RECONSTRUCTED FOR MAINTENANCE PROCEDURES, TRAFFIC OPERATIONS, REPAIRS, CORRECTION OF UTILITIES OR ALTERED FOR ANY REASON SHALL PROVIDE WHEELCHAIR RAMPS FOR THE PHYSICALLY DISABLED AT ALL INTERSECTIONS WHERE BOTH CURB AND GUTTER AND SIDEWALKS ARE PROVIDED AND AT OTHER POINTS OF PEDESTRIAN FLOW. IN ADDITION, SECTION 226 OF THE 1973 FEDERAL AID HIGHWAY SAFETYACT REQUIRES PROVISION OF CURB RAMPS ON ANY CURB CONSTRUCTION AFTER JULY 1,1976 WHETHER A SIDEWALK IS PROPOSED INITIALLY OR IS PLANNED FOR A FUTURE DATE. THE AMERICANS WITH DISABILITIES ACT (ADA) OF 1990 EXTENDS TO INDIVIDUALS WITH DISABILITIES. COMPREHENSIVE CIVIL RIGHTS PROTECTIONS SIMILAR TO THOSE PROVIDED TO PERSONS ON THE BASIS OF RACE, SEX, NATIONAL ORIGIN AND RELIGION UNDER THE CIVIL RIGHTS ACT OF 1964. THESE CURB RAMPS HAVE BEEN DESIGNED TO COMPLY WITH TITLE III OF THE ADA BECOMING EFFECTIVE JANUARY 26. 1992. 4. WHEELCHAIR RAMPS SHALL BE PROVIDED AT LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. WHEELCHAIR RAMPS SHALL BE LOCATED AS DIRECTED BY THE ENGINEER WHERE EXISTING LIGHT POLES, FIRE HYDRANTS, DROP INLETS, ETC. AFFECT PLACEMENT. WHERE TWO RAMPS ARE INSTALLED NOT LESS THAN 2 FEET OF FULL HEIGHT CURB SHALL BE PLACED BETWEEN THE RAMPS. DUAL RAMPS SHOULD BE PLACED AS NEAR PERPENDICULAR TO THE TRAVEL LANE BEING CROSSED AS POSSIBLE. 5. NO SLOPE ON THE WHEELCHAIR RAMP SHALL EXCEED 1'/l'(12:1) IN RELATIONSHIP TO THE GRADE OF THE STREET. 6. THE WIDTH OF THE WHEELCHAIR RAMP SHALL BE 48" (4') OR GREATER FOR DUAL RAMPS AND 60" (5'-0') OR GREATER FOR DIAGONAL RAMPS. 7. A1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE CONCRETE WHEELCHAIR RAMP JOINS THE CURB. 8. THE INSIDE PEDESTRIAN CROSSWALK LINES SHALL BE SET NO CLOSER IN THE INTERSECTION THAN WOULD BE ESTABLISHED BY BISECTING THE INTERSECTION - RADII, WITH ALLOWANCE OF A 4' CLEAR ZONE IN THE VEHICULAR TRAVELWAY WHEN ONE RAMP IS INSTALLED. (SEE NOTE 13) 9. THE CURB CUT AND THE PEDESTRIAN CROSSWALK LINES SHALL BE COORDINATED SO THE FLOOR OF THE WHEELCHAIR RAMP WILL FALL WITHIN THE PEDESTRIAN CROSSWALK LINES. DIAGONAL RAMPS WITH FLARED SIDES SHALL BE PLACED 5024"OF FULL HEIGHT CURB FALLS WITHIN THE CROSSWALK MARKINGS ON EACH S1DE OF THE FLARES. 10. THE MINIMUM WIDTH OF THE PEDESTRIAN CROSSWALK SHALL BEG FEET. A CROSSWALK WIDTH OF 10 FEET OR GREATER IS DESIRABLE. 11. STOP LINES, NORMALLY PERPENDICULAR TO THE LANE LINES, SHALL BE USED WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH VEHICLES ARE REQUIRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN OR OTHER LEGAL REQUIREMENT. AN UNUSUAL APPROACH SKEW MAY REQUIRE THE PLACEMENT OF THE STOP LINE TO BE PARALLEL TO THE INTERSECTING ROADWAY. 12. PARKING SHALL BE ELIMINATED A MINIMUM OF 20 FEET BACK OF PEDESTRIAN CROSSWALK 13. ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION AND ANY APPLICABLE VDOT OR LOCAL CODES. 14. ALL WHEELCHAIR RAMPS SHALL HAVE TRUNCATED DOMES IN ACCORDANCE WITH DETAIL 02.05.04. HANDICAP RAMP DETAILS NO SCALE TXn UM W IS IN I MMrNT OF SEZICE Axo sINLL RpWx THE of cwWme DcxLVWIP. w xErABBw AAL cOMMox as UNP 0"�"O"ew'n &WL " ""Nes M M "x164 MEPNHE M10.6ip Pd1 M MMIYp. �WJ / YOWA[VVaN MT PoIE OR9TPNBMB NC BO G4VAHRFD II CXWIHEL SEE M. 20.23 GENERAL NOTES: 1. SEE FORMER NCDOT STANDARD 310.01 FOR DETAILS. 2. REINFORCEMENT SHALL CONFORM TO TRE RMUIREMENTS OF REINFORCED CONCRETE PIPE OF UKE DIAMETER PER AASHTO M170, TABLE 2. WALL B. 3. ALL CONCRETE TO BE 3800 P.S.I COMPRESSIVE STRENGTH. 4. PROVIDE TONGUE OR SPIGOT JOINT AT INLET END BECTON. 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 6. TIE OIMFNSIONB FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE TABLE. MINOR VARIATIONS WILL BE PERMITTED BASED ON THE MANUFACTURER'S STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USED IN NCDOT MAINTAINED RIGHT OF WAY. y IEND 4 VfVI 2024 DRIP RAP APRON, SEE EROSION SHEETS FLARED END SECTION DETAIL NO SCALE EXPANSION CONTROL CONTROL CONTROL JOINT JOINTJOINT -JOINT 4" 4000 psi FORM PLAT EXPANSIO CONCRETE JOINT JOINT SECTION A -A A L 30' 101 1/2" I I 1/2' TWICE OF OMFNSIONB ,U -D 1/ D T A B C E L WT. 12 2-1/4 R 2b' W-1• r-0• r-1' 1b 1S• 2-1 4 8' 2-3' X-10• r -O• W-1• T30 tY 2-1/r T 2--S 3 -ID' W -O' 8'-1' 1120 24' 3' IT 3•-8• r-6' 4'-O' e'-2' 17)0 30' Y1/Y 1'-0' 4'-6' 1'-a• 5' W-2' 2380 4 t-3' s-3• 2'-11' W-0• V-2' 5320 4r 4-1/1' 1'-V 5--3' r-11' W -C 8'-2• 5220 0. S 2'-V 8 -z' Y-0• W-2' )4T1 54• 5-1/T r-3• 5'b• r-10 -AI• B-4' WIG IT 8' 2'-8• W -O' S -T W -W V' - 11180 ea 6-1/2- Y -O' 8'-O' r-3' W-6• 12ST0 n ) 3--0 8-e 1'K' r -W a'-3• 13280 GENERAL NOTES: 1. SEE FORMER NCDOT STANDARD 310.01 FOR DETAILS. 2. REINFORCEMENT SHALL CONFORM TO TRE RMUIREMENTS OF REINFORCED CONCRETE PIPE OF UKE DIAMETER PER AASHTO M170, TABLE 2. WALL B. 3. ALL CONCRETE TO BE 3800 P.S.I COMPRESSIVE STRENGTH. 4. PROVIDE TONGUE OR SPIGOT JOINT AT INLET END BECTON. 5. PROVIDE GROOVE OR BELL JOINT AT OUTLET END SECTION. 6. TIE OIMFNSIONB FOR END SECTIONS SHALL SUBSTANTIALLY AGREE WITH THE TABLE. MINOR VARIATIONS WILL BE PERMITTED BASED ON THE MANUFACTURER'S STANDARD FORMS AND TEMPLATES. 7. NOT TO BE USED IN NCDOT MAINTAINED RIGHT OF WAY. y IEND 4 VfVI 2024 DRIP RAP APRON, SEE EROSION SHEETS FLARED END SECTION DETAIL NO SCALE EXPANSION CONTROL CONTROL CONTROL JOINT JOINTJOINT -JOINT 4" 4000 psi FORM PLAT EXPANSIO CONCRETE JOINT JOINT SECTION A -A A L 30' 101 1/2" I I 1/2' U -U A ,U -D 1/ U) UJ > a z z O z m D I g 1/2' 1 CONTROL -FORM PLATE JOINT JOINT GENERAL NOTES: 1. SAW CUT P DEEP CONTROL JOINT @ 5'-0". ONE VC EXPANSION JOINT WILL BE REQUIRED AT20' INTERVALS. A 1/4' EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE OR AS INDICATED ON SITE PLAN, %PANSION JOINT , 5�-O" ,U-� U -U A ,U -D 1/ i a z z O z m D I g m 4 W Z Z Z .4U 'z J H W c m Q x �a w7 f 0. z 37 8� 00 A _j EXPANSION JOINT A fJ VGROOVE JOINT (TOOL JOINT) ACE OF CURB PLAN GFNFRAI NOTES 1. A GROOVE JOINT 1' DEEP WITH 1/3' RADII SHALL BE REQUIRED IN THE CONCRETE SIDEWALK AT 5' INTERVALS. ONE 1/2' EXPANSION JOINT WILL BE REQUIRED AT 40' INTERVALS. A 1/2' EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS A• EXPANSION JOINT, ANY RIGID STRUCTURE SEAL TO MAKE WATER 2. ALL CONCRETE TO BE 4000 P.S.I. COMPRESSIVE STRENGTH. TIGHT 'A' VARIES (4'-6" MIN.) SEE NOTE BELOW GROOVE JOINT (TOOL JT) 1/2 "A" 5' - 7' MARKS 1" SLOPE 1/4' PER FEET R PAVEMENT �.y •( r /• A • GREATER THAN ADDITIONAL GROOVE SHALL BB E REQUIRED AT 1//2 'A' +/- 4' ASPHALT TWO 1/2- THICK PIECES SECTION A -A PATCH S-9 SA BITUMINOUS FIBER REQUIRED 3 CONCRETE SIDEWALK DETAILS NO SCALE GENERAL NOTES: 1. A GROOVE JOINT 1' DEEP WITH 1/8" RADII SHALL BE REQUIRED IN THE CONCRETE SIDEWALK AT 5 INTERVALS. ONE 1/2' EXPANSION JOINT WILL BE REQUIRED AT 45' INTERVALS NOT TO EXCEED 50' AND MATCHING EXPANSION/CONSTRUCTON JOINT IN ADJACENT CURB. A SEALED 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE 2. SIDEWALK AT DRIVEWAY ENTRANCES TO BE 6' THICK. 3. WIDTH OF SIDEWALK SHALL BE AS SHOWN ON CML SITE DRAWINGS/ PIANS OR AS SPECIFIED IN THE CONTRACT DOCUMENTS. 4. CONCRETE COMPRESSIVE STRENGTH SHALL BE 4000 PSI. IN 28 DAYS. . TOOL NT. PROFILE 1/$n GROOVE JOINT (TOOL JOINT) 1/8" RADIUS JOINT SEATER �- JOINT FILLER TRANSVERSE EXPANSiONIE�XPANSiON JOINT IN AT IN SID AALK BACKER ROD & SEALANT - PIPE THRU WALL OR FL( 5 CAST OR CORE DRILL HOLE D PER MFR. REQUIREMENTS DIAMETER AND MATERIAL VARIES RUBBER BOOT W/ STAINLESS STRAP CONCRETE WALL MANHOLE BOOT DETAIL NO SCALE MODULAR MECHANICAL SEAL (ONE FOR WALLS LESS MAN V THICK, TWO FOR WALLS W THICK k LARGER) RECOMMENDED CORE DRILL EXISTING SEAL MFR CONIC FLOOR OR WAIL INTERIOR DRY I BURIED. WET OR NM BOLT HEAD ON ACCESSIBLE SIDE OF WALL OR FLOOR ANNULAR SEAL WALL PENETRATION NO SCALE r: ASC MIDLAND, LLC , S LOU 0 C a z z O z m D I g W Z Z Z .4U 'z J H W c m Q x �a w7 f 0. z 37 8� 00 8x an r m a a �E ao a N z.e rc m 01 O r m O o z ad w k N ao No O w F z 0 0 w h OnIL n LIN j wn a"� O > L O � N M d G g q W Z g a D = F �~� Vir00 E a a ? J � CI a O 0 E rc N O Y N M< in N h Q S LOU 0 C z z O z m D I g W Z Z Z .4U 'z J H W c m a ti x �a w7 f 0. 37 8� 00 8x an r m a �E ao a N z.e m 01 O r m O o z ad w k ao No O w F z 0 0 w h OnIL n LIN j wn a"� yz ma > L 0r- C II QJQ J lL' Oho N C w W Z g W D = F �~� Vir00 E a a ? J � CI a S SHEET NUMBER CD2 LOU 0 CQ � 0 W Z Z Z .4U N W I- ❑ J H W c O f 0. SHEET NUMBER CD2 vJ3 / O3 S`to_r.•m Allen Storage Center Midland A C?. Midland, NC CABARRUS County �� �J Samuel J Smith, PE, Chambers Engineering, PA NCDENR Application Type of application: New Permit Only complete application packages will be accepted and reviewed.A complete package includes all of the items in the checklist below.Add any comments,and indicate the page or plan sheet number where the following information can be found.Please indicate that you have provided the following required information by initialing in the space provided next to each item. Part I:Submittal Checklist Item Notes/Comments Initials 1 Original and one copy of this application form(all worksheets)and the permit SJS application fee For applications submitted to the DEMLR regular permitting program,the fee is$505 payable to NCDENR For Express Review,click on the link below for information and fee schedule Contact the appropriate regional ��� office Express Review Coordinator to schedule the required pre-application meeting �V�( .V`_1 1 Click here for Express Permitting info 2 A USGS map identifying the site location If the receiving stream is reported as �.VV 11 SJS class SA or the receiving stream drains to and is within 1/2 mile of SA waters, then include the 1/2 mile radius on the map 3 A copy of the most current property deed j\ SJS 4 Two copies of additional calculations(as needed) Sealed,signed and dated SJS 5 Two sets of sealed,signed,&dated full-sized plans of the entire site at a SJS readable scale,including a Project name,engineer and firm,revision number and dates. All Sheets SJS b Location map with street names and SR numbers,legend,north arrow, GO 1 SJS scale c Dimensioned property/project boundary with bearings&distances C2 0 SJS d.The boundaries of all surface waters,regulatory flood zones,and protected Note on C3.1 SJS riparian buffers or a note on the plans that none exist. e The boundaries of all vegetated or protected riparian buffers NA SJS f Site layout showing all built-upon areas,drainage features,stormwater C2 0&C3 0 SJS collection systems(inlets,outlets,swales,pipe elevations,slopes and diameters),and SCMs at ultimate build-out. g Existing contours,proposed contours,spot elevations,and finished floor C3 0 SJS elevations h Existing drainage(including off-site),drainage easements,pipe sizes, C3 0 SJS runoff calculations i Drainage area boundaries(included in the main set of plans,not as a C3 1 SJS separate document) j Existing and proposed maintenance access routes,utility easements, C3 0&CD8 SJS drainage easements,public rights-of-way etc k A construction sequence that shows how the SCMs will be protected from C5 0 SJS sediment until the entire drainage area is stabilized 6 Two sets of sealed,signed,&dated full-sized plan details of each SCM(or SJS typical if appropriate)in both plan view and cross-section at a scale of 1"=30'or larger,including a Dimensions,side slopes,length to width ratios and elevations with a CD8 SJS benchmark for clean-out if appropriate b.All applicable conveyance devices,including bypass structure, CD8&CD9 SJS pretreatment area,flow distribution device,underdrains,outlet device,outlet dissipater and level spreader c.A table of elevations,incremental volumes and accumulated volumes(if C5.0 SJS applicable) d Specifications for applicable materials,such as planting media,aggregate, CD8&CD9 SJS sod,underdrains,outlet devices,etc. STORM-EZ 3/9/2017 Version 1 4 Application Page 1 of 4 I 7 Two sealed,signed,&dated planting plans for each SCM(or typical)at a scale SJS of 1"=20'or larger,as applicable,including a The locations of each species and a planting detail CD8 SJS b A table summarizing the size,spacing and total quantity of each plant CD9 SJS species that should be used c The source nursery for the plants TBD SJS d A one-time fertilizer specification to establish plants if necessary CD6 SJS 8 A soils report based on field evaluation indicating the SHWf elevations within NA,pond liner used NRCS Soil the footprints of the proposed SCM(s) Provide a map of the boring locations Report in Calc Package with the existing elevations and boring logs For infiltration SCMs,the report shall include the soil type,infiltration rate and method for determining the infiltration rate Soils information shall be signed and sealed by a licensed soil scientist 9 A copy of the signed and notarized operation and maintenance(0&M) SJS agreement 10 A copy of the proposed deed restrictions protecting the SCMs and limiting the SJS built-upon area so that it does not exceed the capacity of the SCM(s)or the high density threshold(as applicable) NCDENR Deed Restriction Forms 11 For corporations and limited liability corporations(LLC)*Documentation from the SJS NC Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in the Contact Information section The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned NC Dept of the Secretary of State 12 A copy of the lease agreement or pending sales agreement if applicable. NA STORM-EZ 3/9/2017 Version 1 4 Application Page 2 of 4 Part II:General Project and Applicant Information Project Name: Allen Storage Center Midland Date: • Project Street Address NC Hwy 24/27 Lat City Midland Zip 28128 Long• Directions to Project. County CABARRUS (from nearest intersection) NON-COASTAL Project Applicant: (Identify the corporation,organization,property owner,designated government official,etc.which owns the project.) Owner/Signing Officals Name: Rick Allen ^ C �1 (i0(' L Title: Owner /l CZ Address 411 N Central Ave City Locust State. NC Zip 28097 Phone 704-888-1222 Fax Email asc3@bellsouth net Status of applicant: Owner River Basin Yadkin Receiving Stream(s) Rocky River Stream Class(es). C Surface Water Area(ac) NA Coastal wetland area(ac) NA Total property area(ac) 13.44 Total project area(ac) 13 44 Goals/characteristics Volume Matching(LID) Drains to an offsite stormwater system Low Density Within 575'of Saltwater ORW YES High Density Within 5 miles of a public airport Briefly summarize how the stormwater runoff will be treated Stormwater runoff will be treated by a wet pond BMP The pond has been designed to capture runoff from all impervious areas Part III: Permit Information Status of construction' Not Started Other permits needed' YES Sedimentation&erosion control NO 404 Permit/401 Certification NO CAMA Major Permit NO Isolated Wetlands Permit NO Threatened&Endangered Species NO NPDES Industrial Stormwater Permit If an application for this project has been previously returned,provide the original project number and previous name of the project Provide the permit type,number and issue date for any permits that have already been obtained for this project Sediment/Erosion Control Allen Storage Centers-Midland/CABAR-2017-060,2/28/2017 If claiming vested rights,then identify(and attach)the supporting documents and approval dates Approval of a site-specific development plan or PUD Approval date. Valid building permit Issue date Other Date. Not Started Point of Contact Phone number. STORM-EZ 3/9/2017 Version 1 4 Application Page 3 of 4 Part IV:Additional Contact Information (Optional) Additional Contact Person/Orginization Signing Official&Title- Street address City,State,Zip. Phone number(s). Email (Note:Person/Organization noted above maybe contacted for additional project information if applicant cannot be reached.) Part V:Consultant Information Complete this section if you wish to designate authority to another individual or firm so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consultant Samuel J Smith,PE Firm Chambers Engineering,PA Street address. 129 N First Street City,State,Zip Albemarle,NC 28001 Phone number(s). 704-984-6427 Email ssmithce-pa corn Part VI: Property Owner I Applicant Certification I,(the Owner&Applicant listed above), Rick Allen ,certify that the information included on this permit applicant form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictusion and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable state stormwater rules and requirements DIPS4,4,4.71:1C Signature'�g & Sim Date ) t li 7 I, 0.40 L�"l kf.L l� — VC f ,a Notary Public for he State of t\--‘OG (t (_ro(VLA County of ,do hearby certify that IAA Ui5 )c \-P_ U 'UL. personally appeared before me this '))w day of c3a(u-(0..,`'1A , 9(-1 and acknowledge the due execution of thp.,applicapon for a stprmwater3ermit. Witness my hand and official seal, PLIA j7i.61 f4---41366..-- ,000000680,000 (-rt--rt_,00000061°p0® • NOTARY • ,n E� My commission expires y `(LANA_ 11"J /O� Cl PUBOG a`v Sear y v4••°• e / o c-COU �y °°0°a°°o°�000000 STORM-EZ 1/31/2017 Version 1.4 Application Page 4 of 4 f / Allen Storage Center Midland A Storm ° /�� `i Midland,NC CABARRUS County �r NCDENR RAINFALL&CALCULATION DATA • Project County. CABARRUS Project City Midland Rainfall Source Charlotte Storm Event Depth (inches) First Flush/WQV 1 00 NINON'_,a 1 40 Loaded Rainfall: Charlotte P95 1 86 Design Storm. P90 1-yr,24-hr 2 78 Calculation Method Discrete SCS Method, 2-yr,24-hr 3 36 Pre-Post 10-yr,24-hr 4 89 (Minimum Design Storm=P90 for non-SA, 1-yr,24-hr for SA) 25-yr,24-hr 5 80 50-yr,24-hr 6 53 NOTE Please use the Storm-EZ calculation sheets to document the stormwater design 100-yr,24-hr 7 27 and create the O&M Agreement Highlighted Storm is Design Storm PROJECT INFORMATION Total Property Area 13 44 acres Total Impervious Area 7 59 acres Total Coastal Wetlands Area 0 00 acres Project%impervious area 48% Total Surface Water Area 0 00 acres Complete the breakdown of impervious area for the project ALL AREAS ARE IN SQUARE FEET Basin Information Entire Site Receiving Stream name Rocky River Use Worksheet Data? I No Stream Class C Stream Index Number 13-17 Total Drainage Area 692,604 On-Site Drainage Area(sf) 459,652 Offsite Drainage Area(sf) 232,952 Proposed Impervious Area(sf) 330,417 %Impervious Area(total) 48% Impervious Surface Area Entire Site On-Site Buildings/Lots(sf) 165,600 On-Site Streets(sf) 19,067 On-Site Parking (sf) 145,750 On-Site Sidewalks (sf) 0 Other On-Site (sf) Future (sf) 0 Off-site (sf) 0 Existing BUA (sf) 0 Total 330,417 STORM-EZ 3/9/2017 Version 1 4 Project Data Page 5 of 17 If Allen Storage Center Midland Midland,+ NC CABARRUS County � IF E NC®ENR Drainage Area# I of 1 , PRE-DEVELOPMENT LAND USE CALCULATIONS Pre-Development Land Use: Area HSG Land-use CN (sf) (acres) % C Woods 70 585,446 13 44 100 00% Subtotal 585,446 13 44 Note Enter BUA Draining to Permeable Pavement Below User Defined Drainage Areas: Comp Area HSG Description CN Area(sf) (ac.) %Imp 000 000% Subtotal 585,446 13 44 0 00% Existing Permeable Pavement(Infiltration): Soil Gravel Total Orifice Orifice HSG Pavement Area Additional BUA I n Rate'o Void Space Depth/ Has Synthetic D.S Dia Height BUA% Liner? BMP SCM# Description (sf) (st) (in/hr) (%) (in) (in) (in) 1001 Existing Green Roofs' DSD PAW D5, Area DS SCM# Notes SCM# Description (in) (%) (in) (st) (acres) 1501 1 40 0 00 Land Use Summary- Area(sf.) From Land Use Tables 585,446 13 44 acres Permeable Pavement+Additional BUA 0 000 acres Green Roofs 0 0 00 acres Preserved Surface Waters&Non-Coastal Wetlands 0 00 acres Preserved Coastal Wetlands 0 00 acres Total Site Area: 585,446 13.44 acres Pre-Development SCMs• Drainage Area WQ Volume Imp Open Provided (st) (sf) Downstream SCM# SCM Type (cf) HSG 0 585446 SCM 200 Design Storm Runoff Fate Summary: Rainfall Volume= 18 82 acre-inches = 68,302 cf Runoff Reduction Components: Natural Infiltration&ET= -18 00 acre-inches = -65,324 cf Disconnected Impervious Surfaces= 0 00 acre-inches = 0 cf SCM Infiltration= 0 00 acre-inches = 0 cf Permeable Pavement Infiltration= 0 00 acre-inches = 0 cf Green Roof ET= 0 00 acre-inches = 0 cf Post Filtration Discharge= 0 00 acre-inches = 0 cf Total Runoff Reduction= -18 00 acre-inches = -65,324 cf SCM Treatment: Treated SCM Outflow= 0 00 acre-inches = 0 cf 1 Untreated Surface Runoff= 0.82 acre-inches = 2,978 cf 1 The Pre-Development project area contains 0 sf of built upon area,resulting in an overall density of 0%. STORM-EZ 3/9/2017 Version 1 4 Pre-Development Page 6 of 17 \ Allen Storage Center Midland 3101 M Midland,NC CABARRUS County ACA NCDENR Drainage Area# 1 of 1 - - POST-DEVELOPMENT LAND USE CALCULATIONS Permeable Pavement Total Infiltration Has Orifice Orifice Down- HSG PvmtT a Pavement Area Additional BUA Rate Void Space Gravel Infiltration Detention Type Depth Synthetic Dia Height stream Check Check SCM# (sf) (acres) (sf) (acres) (in/hr) (%) in Liner? SCM ( ) (in) (in) 500 0 OD 0 DD No Green Roofs' DSD PAW Dgr Area Downstream Retrofit? Downstream SCM# (in) (%) (in) (sf) (acres) SCM# I 600 1 40 0 00 No Residential Lot CN Calculator(Excluding R/W and dedicated open spaces). Lot Area Max Imp I Lot Woods!Lot Open Space I Lot #of Lots %Imp Avg Lot Size (sf) (ac) (sf) (sf) (sh 0 00 Remaining Land Use Area HSG I Land-Use I CN (sf) I (acres) C Impervious 980 330,185 758 56 40% C Open Space(Managed Open Space) 74 0 255,262 5 86 43 60% Permeable Pavement*BUA N/A _ 0 000 00D% Green Roofs N/A 0 000 000% Sub-Total 585,447 13 44 100 00% Land Excluded,or Partially Excluded,from Volume Calculations• (sf) (ac) Surface Waters&Non-Coastal Wetlands 0 0 00 Coastal Wetlands 0 0 00 I Total Site Area 585,447 13 44 Error Site Area does not match pre-development Design Storm Runoff Fate Summary: Rainfall Volume= 1882 acre-inches = 68,302 cf Runoff Reduction Components. Natural Infiltration&ET= -9 18 acre-inches = -38330 cf Disconnected Impervious Surfaces= 0 00 acre-inches = o cf SCM Infiltration= -048 acre-inches = -1,749 cf Permeable Pavement Infiltration= 0 00 acre-inches = o cf Green Roof ET= 0 0o acre-inches = o cf Post Filtration Discharge= 0 0o acre-inches = 0 cf Total Runoff Reduction= -9 66 acre-inches = -35,078 cf STORM-EZ 3/9/2017 Version 1 4 Post Development Page 7 of 17 F' Allen Storage Center Midland StO,YM Midland,NC CABARRUS County Ada E Zl> NC®ENR Drainage Area# 1 of 1 POST-DEVELOPMENT LAND USE CALCULATIONS SCM Treatment: Treated SCM Outflow= -915 acre-inches = -33,224 cf Untreated Surface Runoff= 0 00 acre-inches = 0 cf Pre-Development Runoff= 0 82 acre-Inches = 2,978 cf Difference= -0 82 acre-inches = -2,978 cf The Post-Development project area contains 330185 sf of built upon area,resulting in an overall density of 56 4% STORM-EZ 3/8/2017 Version 1 4 Post Development Page 8 of 17 Allen Storage Center Midland %to Midland,NC CABARRUS County A19. EZ NCDENR Drainage Area# 1 of 1 PROPOSED SIPS 8 STRUCTURAL RUNOFF VOLUME CONTROLS Enter only runoff volume below that will be infiltrated or drawn down over 2 to 5 days. Additional volume provided in devices should not be entered in this worksheet. Drawdown time requirement applies to all storm events Offsite Impervious 0 sf Area Treated STORMWATER CONTROL MEASURES Contributing Area Drainage Total Post Impervious Pervious %of Total %of Total Storage Down- Area Inflow Inflow Infiltration 8 Filtration Treated %of SCM sat (s0 (s0 Impervious Pervious Volume stream SCM Volume Volume ET Outflow Outflow Volume Name Location Type of Device HSG 330,185 255,262 Area Area (c) a (og (ct) tot) (o0 (cf) Utilized 700 I Wet Pond I Wet Detention I Liner 330,185 255,262 100% I 100% 53792 I 34972 I 34972 I 1749 I 0 I 33224 I 65% 255262 sf open space entered 100%of total 1 ouof 330185 sfus area entered tot%al compared to 330185 st total rmperwous compered to 255262 sf total tame/woos 330165 pernous open space area area Design Storm Runoff Fate Summary Rainfall Volume= 1082 acre-inches = 68,302 cf Runoff Reduction Components. Natural Infiltration 8 ET= -918 acre-inches = -33 330 cf Disconnected Impervious Area= 000 acre-inches = 0 cf SCM Infiltration= -048 acre-orches = -1,749 of Permeable Pavement Infiltration= 000 acre-inches = 0 cf Green Roof ET= 000 acre-inches = 0 cf Post Filtration Discharge= 0 00 acre-inches = 0 of Total Runoff Reduction= -9 66 acre Inches = -35,078 cf SCM Treatment Treated SCM Outflow= -915 acre-inches = -33,224 Cf Untreated Surface Runoff= 0 00 acre-Inches = 0 cf Pre-Development Runoff= 0 82 acre-inches = 2,978 cf Difference= -082 acre-inches = -2,978 at **BASIC TREATMENT MET** The Post-Development project area contains 330185 sf of built upon area,resulting In an overall density 0166 4% Warnings Note Large storage devices such as wet/dry detention ponds,constructed wetlands,or infiltration basins may require pond routing calculations The routing calculations should be provided in addition to this spreadsheet STORM-EZ 3/9/2017 Version 1 4 Stormwater Controls Page 9 0117 • Allen Storage Center Midland S orim Midland,NC CABARRUS County wIr EZ NCDENR Drainage Area# 1 of 1 FATE OF RAINFALL Select Storm I P90 BASIC TREATMENT SCALE Compliance Storm=P90 Storm-Rainfall Depth=1 4 inches Basic Treatment Threshold VOLUME MATCHING SCALE P90 Storm-Rainfall Depth=1 4 inches 19 Volume Matching Threshold FATE OF RAINFALL GRAPHS Pre Development Fates Post Development Fates 20036 100% 90% 90% 80% 80% 70% 70% E 60% E 60% 1 r 50% 050% ._.._ _„, F. :e 40% r 40% 30% 30% - . 20% 20% , 10% 10% - . � ' i • 0% 0% Infiltration and Er-65324 d Treated Outflow from RMPs-Cid Untreated Surface Runoff-2978 of Infiltration and ET-35079 of Treated Outflow from BMPs-33224d Untreated Surface Runoff-Od Post Filtration Outflow-Od •Other Is Post Filtration Outflow-0d •Infiltration by BMPsermeable Pavement Infiltration-0 0 Other -Octct is 0 Infiltration by BMPs-1749 d is Disconnected Impervious Infiltration-0d •Green Roof Evapotranspiration-Od U Permeable Pavement Infiltration-O cf •Disconnected Impervious Infiltration-0 d •Infiltration and ET-65324 d •Green Raaf Evapotranspiration-0 d The Fate of Rainfall charts display the hydrologic processes to which rainfall volumes are subjected based on the combinations of land use,soil type,end stormwater controls entered by the user The charts are designed to display the stormwater plan in a form which illustrates changes to the hydrologic cycle which result from urbanization and various stormwater management strategies STORM-ES 3!912017 Version 1 4 Rainfall Fate Graph Page 10 of 17 Allen Storage Center Midland St/ Midland,NC CABARRUS County Drainage Area# 1 of 1 NCEN R ADDITIONAL CALCULATIONS TIME OF CONCENTRATION CALCULATIONS: Pre-Development Length(ft) Slope(ft/ft) Surface Cover Tt(hrs) Sheet Flow 300 0 0133 Woods 0 99 Sheet Flow Shallow Flow 1330 0 0158 Unpaved 0 18 Shallow Flow Flow Area Length(ft) Slope(ft/ft) n-value (ft2) Wetted Perimeter (ft) Tt(hrs) Channel Flow Channel Flow ' IPre-development To= 70.34 min (Minimum 5 minutes) Post Development Length(ft) Slope(ft/ft) Surface Cover Tt(hrs) Sheet Flow 299 0 026 Paved or Bare Sod 0 04 Sheet Flow Shallow Flow 767 0 004 Paved 0 17 Shallow Flow Flow Area Length(ft) Slope(ft/ft) n-value (ft2) Wetted Perimeter (ft) Tt(hrs) Channel Flow Channel Flow (Post-development Tc= 12.50 min (Minimum 5minutes) ADJUSTED CURVE NUMBER CALCULATIONS: , Analysis Area=13.44 Acres(0.021 sq.miles) Pre-Development F.F. P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall(in)= 1 00 1 40 1 86 2 78 3 36 4 89 5 80 6 53 7 27 Q*(1n)= 0 00 0 06 0 19 0 60 0 92 1 96 2 65 3 23 3 84 CNad1= 70 70 70 70 70 70 70 70 70 Post Development F F P90 P95 1-Yr 2-Yr 10-Yr 25-Yr 50-Yr 100-Yr Rainfall(in)= 1 00 1 40 1 86 2 78 3 36 4 89 5 80 6 53 7 27 Q'(,n)= 000 000 000 067 116 251 335 403 473 CNad7= 67 59 52 72 74 77 77 78 78 PEAK FLOW CALCULATIONS: Analysis Area=13.44 Acres(0.021 sq.miles) F.F. I P90 I P95 I 1-Yr I 2-Yr I 10-Yr I 25-Yr I 50-Yr I 100-Yr Pre-Development Q'(in) 0 00 0 06 0 19 0 60 0 92 1 96 2 65 - 3 23 3 84 q„(csm/in) -142 02 142 02 166 07 229 61 229 61 27,3 84 273 84 273.84 273 84 Q(cfs) 0.01 0 18 0.66 2.87 4.45 11.24 15.22 18.58 22.11 Post Development Q*(in) 000 000 000 067 116 251 '335 403 473 qu(csm/in) 270 80 270 80 270 80 - 566 54 566 54 691 71 691 71 691 71 691 71 Q(cfs) 0.00 0.00 0.00 7.99 13.80 36.53 48.66 58.55 68.68 -1000% -100.0% -1000% 178 4% 2101% , 224 9% 2196% 2151% 2107% STORM-EZ 3/9/2017 Version 1 4 Peak Flow Calcs Page 11 of 17 I 'Note To decrease Post-development peak flows-increase storage volume being drawdown or infiltrated or lengthen post- development time of concentration See LID HELP for more information STORM-EZ 3/9/2017 Version 1 4 Peak Flow Calcs Page 12 of 17 Operation & Maintenance Agreement Allen Storage Center Midland Midland,NC CABARRUS County Prepared By: Samuel J Smith,PE,Chambers Engineering,PA _ Cover Page . Maintenance records shall be kept on the following BMP(s) This maintenance record shall be kept in a log in a known set location Any deficient BMP elements noted in the inspection will be corrected,repaired,or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the pollutant removal efficiency of the BMP(s) The BMP(s)on this project include(check all that apply&corresponding O&M tables will be added automatically): Bioretention Cell Quantity. Location(s). Dry Detention Basin Quantity Location(s)• Grassed Swale Quantity. Location(s) Green Roof Quantity Location(s): Infiltration Basin Quantity Location(s) Infiltration Trench Quantity Location(s) Level SpreaderNFS Quantity Location(s) Permeable Pavement Quantity Location(s) Proprietary System Quantity Location(s) Rainwater Harvesting Quantity. Location(s): Sand Filter Quantity Location(s) _ Stormwater Wetland Quantity Location(s). Wet Detention Basin Quantity. 1 Location(s) North of Mini Storage Buildings Disconnected Impervious Area Present No Location(s) _ _ - _ Soil Amendments Present No Location(s) CLICK TO UPDATE O&M MANUAL >>> I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above,and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. *Responsible Party Rick Allen Title&Organization Owner,ASC Midland,LLC Street address. 411 North Central Avenue City,state,zip. Locust,NC 28097 Phone number(s) 704-888-1222 Email. asc3@bellsouth.net Signature. qa.AA, 114B4 /4414444— Date. ) l•)117 I, ac,z -T,trt,�A ,a Notary Public for the State of Yvc . l_ c 1)(L,Aa County of c E. 0 e.6 ,do hearby certify that 42c _t.lt 6. k .Lt_& "AL personally appeared before me this day of )e Juko...(\ `D(1 and acknowledge the due execution of the 0 erations and Maintenance Agreement. JI Witness my hand and official seal, 11/4-641,(1.�-,f.. C v n00000moeh,0 So,\>. 0 Hare ml y\� �v ® Pl :. -• 4 (mac cls 13 'p U OK q5eck� .. ,' . ...°,4--\ My commission expires me°eoe0000000aoae STORM-EZ 1/31/2017 Version 1 4 O&M Manual Page 1 of 1 Wet•Detention Pond The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided Important maintenance procedures: - Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). _ No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. _ If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment(if applicable). The forebay Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems Weeds are present. Remove the weeds, preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. STORM-EZ 3/9/2017 Version 1.4 O&M Manual Page 15 of 17 • - Wet Detention Pond Maintenance Requirements (Continued) - The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. Algal growth covers over 50% Consult a professional to remove and control the algal growth. of the area. Cattails, phragmites or other Remove the plants by wiping them with pesticide (do not spray). invasive plants cover 50%of the basin surface The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair (if applicable) The outlet device Clogging has occurred Clean out the outlet device. Dispose of the sediment off-site The outlet device is damaged Repair or replace the outlet device The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments STORM-EZ 3/9/2017 Version 1.4 O&M Manual Page 16 of 17 17 ����' - Wet,Detentiprif onil.D'es`ign_Surniriary:. <<,r �. z____ 22,' WET POND ID FOREBAY MAIN POND SW Pond Normal Pool El. 515 Normal Pool El 515 Temporary Pool El. 518 78 Temporary Pool El• 518 78 Pretreatment otherNo Clean out depth* 511 Clean out depth 511 than forebay? Sediment Storage El. 511 Sediment Storage El 511 Has Veg Filter? No Bottom El: 510 Bottom El. 510 STORM-EZ 3/9/2017 Version 1.4 O&M Manual Page 17 of 17 �o 1C 1im In 1 CONTRACTION JOINT DETAIL: JOINT BY SOFTCUT METHOD. EASE EDGES OF JOINT CONTRACTION CRACK--.,, 4000 PSI 0 28 DAYS W/ 6x6x6 WWF OR FIBERMESH-\ / a �4 . A d_. d d D SUBGRADE COMPACTED T0_/ 100% STANDARD PROCTOR. CONCRETE PAVING SLAB ON GRADE NO SCALE WIRE & HOSE (OPTIONAL) —\ 4" MULCH 1� BREAK SUBSOIL W/A PICK COMPACTED TOPSOIL PRUNE 1/5 OF LEAF AREA BUT RETAIN NATURAL FORM. SPRAY W/ANT–DESICCANT ACCORDING TO MFR'S INSTRUCTIONS IF FOLIAGE IS PRESENT. GROUND LINE TO BE SAME AS AT THE NURSERY. 9"i- SAUCER W/ – 7" HIGH BERM. --BACKFlLL W/TOPSOIL AND PEATMOSS MIX IN 9" LAYERS WATER EACH LAYER UNTIL SETTLED. DO NOT TAMP. MIN SINGLE—STEM TREE PLANTING NO SCALE FORM SAUCER WIT 3" CONTINUOUS RI SPECIFIED PLANTIT MIX. WATER & TAP TO REMOVE AIR POCKETS SHRUB PLANTING REQUIREMENTS NO SCALE .Ns muN,u IS .H i, IJMFH. 0. YIM1,¢ A"U NNLL M,V," .,R AtN SSISEAS IE ND N S, SISSAS llAS ¢ WM71R TYRO 1XN DPANIIq NWl NR N: bPPOWEm M WPIm IS NICE M V.Vff. INLL4 OIIFANff YROWED WR N WNNN. 1 ul Dom NOTE: NOTE: INSTALL IN SIMILAR FASHION BENEATH SIDEWALKS FINISH GRADE FOR LAWN E)OSTMG SOD, -. ANCHOR FLANGE VINYL EDGING STEP1 STAKIW: DRIVE STARE (MAXIMIJ ANCHOR FLANGE (MAXIMUM SPACING b' O.C.) FPISHGRADEFGRLAWN STAKE TO FIRST BRANCHES AS NECESSARY FOR FIRM SUPPORT WILE SHALL NOT TOUCH OR RUB ADJACENT TRUNKS OR BRANCHES FORM SAUCER WITH 3" CONTINUOUS RIM SPECIFIED PLANTING MLX WATER & TAMP TO REMOVE AIR POCKETS VI BEDBDGWG +/-IU` MULCH OVER NONWOVEN GEDIlDMLEF"RIC SPBCIREDTOPSOIL H- IV, MGLCH OVER NONWOVEN GEOTEXTU.e FABRIC EDGING REQUIREMENTS NO SCALE 3" MULCH l 2 X BALL DIA. 3 5 PLUG 2" X 2" HARDWOOD STAKES DRIVEN FIRMLY A MINIMUM OF 18" INTO THE SUBGRADE PRIOR TO BACKFHl-ING 2 STRAND 12 GAUGE GALV. WERE TWISTED AND ENCASED IN RUBBER HOSE 6 - 9" FROM TOP OF STAKE 2 WIRE SUPPORTS SHALL BE USED ON MAIN STRUCTURAL BRANCHES MULT—STEM TREE PLANTING NO SCALE 2 o A �I WATER A NOM BOX IS TYLER. OR EQUAL CAST IRON VALVE BOX VALVE BOX REQUIREMENTS NO SCALE t/Y RADIUS I 2�0• I 3' RADIUS t/2' RADIUS 1/8" RADIUS 3" RADIUS 1/8' RADIUS SA a` fi 1/2" RADIUS .�� I S RADIUS t/e' RADIu: a d REVERSE CURB S GUTTER REVERSE CURB 8 GUTTER SHALL BE USED IN ALL AREAS SLOPING AWAY FROM CURB & GUTTER I/$- RADIUS (SHOWN SHADED ON PLAN) 1/8' RADIUS d a •d RIBBON CURB CURB NOTE: ADJUST GUTTER DIMENSION FOR 1'-6" CURB CURB AND GUTTER DETAIL NO SCALE 4 EXTENSION B" OF WASHED STONE TAMPED HACKFlL- BTANMRO vALVE BOX B0170M SECTION INSTALLATION VALVE BOX �COVER VALVE BOX INSTALLATION NO SCALE 2" TYPE S-9.56 WEARING SURFACE r 8" TYPE 'A' ABC COMPACTED SUBGRADE, J 98% STANDARD PROCTOR ASPHALT PAVING. HEAVY DUTY NO SCALE 2" TYPE S-9.513 WEARING SURFACE / r 6" TYPE 'A' ABC COMPACTED SUBGRADE, J 98% STANDARD PROCTOR ASPHALT PAVING, STANDARD DUTY NO SCALE Lai C• 0 PAVEMENT 18' 7'x ISx x COVER CONC. PAD � VALVE BOX VALVE BOX NT VALVE B NOT TO CONTACT- YYY TOP SECTION WATER AWN C OR VALVE / TAMPED BACKFlLL J ti ~ v J W� BRICKS OR MER SOLID zxO SUPPORT USE UNDER BOX ADOODONAL. VALVEB VALVE BO%ES FOR EXIENSWNS 0 �SUP-ON SOIL dN PIPE GASM B" OF WASHED STONE TAMPED HACKFlL- BTANMRO vALVE BOX B0170M SECTION INSTALLATION VALVE BOX �COVER VALVE BOX INSTALLATION NO SCALE 2" TYPE S-9.56 WEARING SURFACE r 8" TYPE 'A' ABC COMPACTED SUBGRADE, J 98% STANDARD PROCTOR ASPHALT PAVING. HEAVY DUTY NO SCALE 2" TYPE S-9.513 WEARING SURFACE / r 6" TYPE 'A' ABC COMPACTED SUBGRADE, J 98% STANDARD PROCTOR ASPHALT PAVING, STANDARD DUTY NO SCALE Lai C• 0 SEAL ' °. 40 66 46 _ NGINE : X ;NIp I I I I Jt 1PIXXA 19 gW o W m z KO C z ti ~ v zz W� N zxO N W ]� 0 x dN g D iJ ^ s i F C] m O w W t- 12 m F a a L€ k 0z K ho y» 1- z 0 wU5 N m 4 ¢S N 6M $ LU p �z Q w U r E dnR -1J¢O 0 F- aQ c Z N Z U m m o – N n a s Q ¢Z° L v H 0 a it N rc SEAL ' °. 40 66 46 _ NGINE : X ;NIp I I I I Jt 1PIXXA 19 gW o 0 1- m z KO C z ti ~ v zz W� N zxO N W ]� 2 x dN g D iJ ^ s i F C] m p a w W t- 12 m F a L€ k 0z 2 ho y» 1- z 0 wU5 N m 4 ¢S N 6M $ LU p �z Q C C U r E dnR -1J¢O F- aQ c Z N Z U e W Z W O = F ¢Z° L v SEAL ' °. 40 66 46 _ NGINE : X ;NIp I I I I Jt 1PIXXA 19 KO C O N J W Z 2 _ g D w F C] I W 12 F a SHEET NUMBER CD1 1 1 2 3 4 NARRATIVE: / /�1�, - �� 1 �\ ) V A \ \ V A\ \\ The proposed project Is for the construction of a mini storage facility with supporting Infrastructure. This project is located at the intersection of NC Hwy LEGEND (/ / / % _ - J t \ \ \ \ \ \ \ \ 24/27 and Loving Road in Midland, Cabanas County, NC. Total disturbed area sr Temporary Sediment Basin for this project Is 11.30 acres. The scope of work Includes Installation of erosion p y control measures, clearing, grading, driveway/ parking construction, site utilities, Temporary Sediment Fence LIMITS OF CONSTRUCTION BEYOND building erection, and atom drainages PROPERTY BOUNDARY IN Limits of Construction CONSTRUCTION SEQUENCE: AGREEMENT W/ QUEENS UNIVERSITYr'APRON A-3, 1. Obtain plan approval and permits prior to beginning work. \ f I ! 1 / n Temporary Inlet Protection J / / REF. DETAILS SEDIMENT BASIN SB -1, \ \ 2. Flag the work limits to prevent unnecessary clearing. APRON A-1, t // / % % / ( 13 3. Hold re -construction meeting at least one week prior to starting construction. J / 1 / f --_.� DIM: VARIES \ \ P 9 P g ► Stone Check Dam REF. DETAILS // J J / / ! SILT FENCE, �� 18864 CF TOTAL VOLUME O WEIR \ Notify NCDEQ 48 hours prior to meeting. J l 1 / / TYP. AS SHOWN /' 19042 SF SA O WEIR \\ \ 4. Install temporary construction entrance. ® Rip Rap/ Stone LINE 5. Clear enough vegetation to Install perimeter erosion measures. VEGETATED CHANNEL VC -1, /'I \ ✓ / t SN - BOTTOM ELEV: 511.00' \ ) 6. Install silt fence and atone outlets. Slope Matting W/ STRAW WITH NET IMMEDIATELY i - I t I I ® g / / SKIMMER ELEV. 51I \ 7. Construct SB -1 and all remaining perimeter erosion control measures AFTER CONSTRUCTION - ii y! t r "'-'f SPILLWAY ELEV: 518.50' \ \ D 8. Stabilize construction slopes immediately after construction. /� r - 516 r --' -" TOP OF DAM ELEV..520.0' \ \` 9. Clear and grub remaining site as required. STONE CHECK DAM,. 7. Clear and grub area as required. TYP. AS SHOWN 3.0" SKIMMER W/ 2.4" DIA. 8. Grade and fill areas to proposed grades shown. Contractor shall not disturb more -^DISCHARGE` 1 area than necessary. Install slope matting as shown on plans. Seed slopes In \ h -ORIFICE. TO ICS. R OUTLET ORIFICE/ accordance with seeding detail. / / i r"' '� } ( t COIR MESH BAFFLES, 9. Install storm drain and rip rap aprons. // /i / J TYP. AS SHOWN 10. Install Inlet protection as required Immediately after storm construction. _ 11. Provide groundcover on exposed slopes as Indicated on the Soll Stabilization Table shown on the details sheets following completion of any phase of grading. LIMITS OF 12. Perform all to grading. 13. Remove all temporary erosion and sediment control structures after vegetation is CONSTRUCTION established on all disturbed areas and following NCDEQ approval. STONE OUTLET, REF. p v 14 pond�atruct atormwater riser structure and pond as required for final stormwater DETAIL FOR RED'S r MAINTENANCE PLAN: SILT FENCE, rTYP. AS SHOWN The following maintenance plan shall e followed until the site is completely stabilized after construction. During construction the Contractor shall be responsible for inspection and maintenance of all erosiononandnd sediment control / Ni f' 'seg structures 1. A log must be kept for the site documenting each rainfall event and measures taken to repair or replace any damaged erosion control measures. All NPDES rules shall apply. 2. All erosion control measures shall be checked for stability and operation following any rainfall producing runoff and at least once every week. Any needed repairs shall be made immediately so that all erosion control measures are maintained as designed. 3. The sediment traps shall be cleaned out when the level of sediment reaches the mid -depth point below the weir '/ r --/' ' t B" elevation. Washed atone shall be cleaned or replaced when the sediment pool no longer drains properly. 4. All seeded areas will be fertilized, reseeded as necessary, and mulched in accordance with the seeding specifications in order to maintain a dense vegetative cover. Any sediment deposits remaining in INLET PROTECTION, 5. Sediment deposits shall be removed from sediment fence after each storm event or sediment fence should be replaced. �J FUTURE BUILDING 5 They must be removed when deposits reach approx. half the height of the barier. / i' FRE: 52427 place after the sediment fence is removed shall be dressed to conform . to the existing grade, prepared and seeded. TYPE VARIES. REF. DETAILS FOR 6. Inspect check dams and channels for damage after each storm event. Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation. Add stones to dams as needed to maintain design height and cross section. 'ter iAPRON A-2, 1 ' FUTURE BUILDING 6 C 7. Temporary erosion and sedimentation control measures shall remain in place until the site has been stabilized and aFFE: 524.27 representative of the NC DEQ Mooresville Regional Office Land Quality Section has approved their removal. / I 2J REF. DETAILS INLET PROTECTION, TYPE VARIES. REF. DETAILS FOR REQ'S - / x-524- Axle Found projecting 8" above ground - ( / / FUTURE BUILDING 3 FEE: 524.27 / Pro/ac 4. 5' /ren pip \ - Obol- fano 1 Re// {J /6' b '.. Found FUTURE BUILDING 4 projeg6 5" above ground FEE: 524.27 !! 7 � J/ INLET PROTECTION, `. TYPE VARIES. DETAILS FOR REVS v l / BUILDING 7 // J FEE: 524.27 / 1j ce 10 JJ �r J BUILDING 2 52427 I A I rns ow.xwe a ar uelwElwr a sxao<rxE awi aoEv, wE rrmremr a owm6 aceeae. FA muaa .uL mWwsml,loR( wo anu IR4Mm CMO d wOnwEHS OMPEffiM IA M MIMt W'aMFla d 1 J 4 ;r• -7 A / t'� L LIMITS OF CONSTRUCTION BEYOND PROPERTY BOUNDARY IN / /� v Sea �t / ��AGREEMENT W/ QUEENS UNIVERSITY / w' SILT FENCE, / _7 - - AS SHOWN STONE OUTLET, REF. y d � DETAIL FOR REQ'S RCPvert not ° acd°es ?sible °is_ 0.0' S2j\ 526` - a -sjY pCe \ Catch Basin 82 LIMITS OF / ( r d, 'S''9ti -'p �' -" ' Grata 5 60 Elev 525.16 CONSTRUCTION \ `. 1 da 4� - - l pfa r Inv s21. r � ) \L, D >+) L - d1„ Catch Basin TEMPORARY CONSTRUCTION t52j. 1 ENTRANCE nv4 Pole I W 4 27 02T �--. ``-533 .` - - tect 6�09� corner to _.� cu3g5 Nati Y_ +Elev531.27 pro ' lib be set E`.Y Utility Pole a7. ATCH GRADE Catch BCarO -'-Bev 535.02 T EXISTING EDP Grate 535.0 5 Bev s3sa7 -}- 2 3 4 5/8" Rebar Found flush with ground I D C 3 Q 9C = SEAL i 4036 rrtllnnllPPO =ME Q W LU a J m FN N w Z 0 O Zco Z Z O 0 0 Z U 0 W IX �7 O O LU E (L Fw- V) W v m m o- Ev n a Q r v 0 a m 0 tt cv n a m m n Q Q 9C = SEAL i 4036 rrtllnnllPPO =ME SHEET NUMBER 0 2" MMENi SCALE 1" = 60' C5.0 Q LU a J m FN N w Z O Zco Z O 0 Z U 0 W IX �7 O O LU E (L Fw- V) SHEET NUMBER 0 2" MMENi SCALE 1" = 60' C5.0 In IC IB Ie1 E >w aawe a xr om�ort a mxe xm eru serve nc rarma a no'm�ixi°ww°aiic m°'�,wenaixnw.v ra ow°Yiboes'p1"ru°�xor a w°A°"vxoolmF°ax arm . wxur a me. uua onus>c mwuo ax n wmxa 1 Axle Found projecting 6' above ground Pr°iactn9 5" °^ pip / -16 / z / / 0.21 / 5 � , 1 / 1 1 / 1 / 1 1 1 1 / / / 1 ' / corner to 1 be set utility Pole=_ _— Gatch Bas 05 Oav 535.47 + +Dev 535.02 Grote 35 70 2 Catchment — AREA: 0.11 C TOC 5 /Catchment — (15) AREA: 0.95 Ace C 0.35 IOC 9 MIN. a i G -- A AREA. att` Catdlment — (49) I1 � , J 0.98 AREA: 0.18 Am/( / j� JAN. &tchm OAS TOC 5 MIN. ° / AREA: 0.0 Il l 0: 0. / tchm t (45) / 1 EN .1 Am ^ C. 0 ^ ^ MIN. ^ ^ ^ FUTUR BUILDING 5 FF 524.27 11 chm t (47) ^^^ Cat / • .1 Acre ^ M C. 0 MIN. ^ ^ ^ ^ _ Ol , A 44) ttMIN (43) Acre, ^ . ^ ^FUTUR BUILDING 3 IF' 524.27 chm ^ ^ cat ^ AR ^ ^ ^ 5/8 ab Found )ING 1 524.27 /A +Elev 531.27 3 FFE 4 r' r 'i r , , MIN. / FUTURE BUIL ING 6 ^ FFE 52 27 / / 5) ^ / ^ ^ ^ FUTURE BUIL ING 4 FFE: 52 .?7 / 3 (�o &27 Aae 0.50 5 MIN. rn m Ace 50 ri IN. r � \ hment — (2) \ 1: 0.53 A. I C 01w, I )0: 5 MIN. 1 I I \� I I \ I r -! / / Catchment —(3) / AREA: 0.41 Acre C: 0.50 / TOG` 5 MIN. / Catchment —(4) / MEN 0.19 Aero C 0.90 / TOC 5 MIN. Catchment — (5) AREA: 0.15 Am C 0.50 1100 5 MIN. 0 I NOTE: NO SURFACE WATERS, REGULATORY FLOOD ZONES, OR PROTECTED RIPARIAN BUFFERS EXIST IN PROJECT VICINITY. IC C u m SEAL MIN. / - 4036 / 5/8" Rebar Found &/17 \\ f flush with ground% sy�..�!NE i / Catchment — (12) AREN 0.13 Acs / C 0.90 / TOC 5 MIN: NC 6\11 . c6.66 4 /g0021 N�ppT p RAW V orib�e -sze and Invert not accessible utility 1— (Catch Bao 82 Gro"521 Elev 525.16 Inv 52 60 + 5 0 1" 2' SCALE 1" = 60' 0 w Z G i 0 77---- U.1 Z_ W o Z O = Z U a I r U Qx G _ _ Uo Cn f x a ¢� 0 Ox X ❑ w px z an o�w o o€ r p Z s i o U�� a m w e m 0 li m W a w Qo p W zk 0 mm p o N l z m H w Lu _ ❑ U epi a ¢ m g 6 W 0 c a va J �a -ww Cna N W gwz U r ` � o: � E m U)000 Q J ? ° Cf4 0 V 0 a h 0 rc E m SEAL MIN. / - 4036 / 5/8" Rebar Found &/17 \\ f flush with ground% sy�..�!NE i / Catchment — (12) AREN 0.13 Acs / C 0.90 / TOC 5 MIN: NC 6\11 . c6.66 4 /g0021 N�ppT p RAW V orib�e -sze and Invert not accessible utility 1— (Catch Bao 82 Gro"521 Elev 525.16 Inv 52 60 + 5 0 1" 2' SCALE 1" = 60' 0 w Z G i 0 U.1 Z_ W o Z O = Z U a I r U Qx G _ _ Uo Cn f x a ¢� 0 Ox X ❑ w px an o�w o o€ r p Z s i o U�� a m w e m 0 li m W o w Qo p W zk 0 mm p o N l z m H F ZI J Lu _ ❑ U epi a ¢ m g 6 W Em c a va J -ww Cna N W gwz U r ` � o: � E m U)000 Q J ? ° Cf4 V m SEAL MIN. / - 4036 / 5/8" Rebar Found &/17 \\ f flush with ground% sy�..�!NE i / Catchment — (12) AREN 0.13 Acs / C 0.90 / TOC 5 MIN: NC 6\11 . c6.66 4 /g0021 N�ppT p RAW V orib�e -sze and Invert not accessible utility 1— (Catch Bao 82 Gro"521 Elev 525.16 Inv 52 60 + 5 0 1" 2' SCALE 1" = 60' SHEET NUMBER 03.1 g Z G N aQ U.1 Z_ W Z O = Z U Ud H G O a. Cn f SHEET NUMBER 03.1 ME 10■ 10■ L I Pipe Table NAME SIZE LENGTH SLOPE MATERIAL UP STRUCT. DN STRUCT. UP INV. DN INV. PIPE 1 18" 34.45 0.41% RCP CB1 CB2 520.32 520.18 PIPE 2 18" 81.50' 0.39% *RCP CB2 CB3 520.18 519.86 PIPE 3 24" 60.00' 0.40% RCP CB3 CB4 519.36 514.12 PIPE 4 24" 60.00' 0,40% RCP CB4 C95 519.12 518.88 PIPE 5 24" 60.00' 0.40% RCP CBS CB6 518.88 518.64 PIPE 6 24" 60.00' 0.40% RCP C86 CB7 518,64 518.40 PIPE 7 30" 60.00' 0.40% RCP CB7 CBS 517,90 517.66 PIPE 8 30' 60.00' 0.40% RCP CBS CBS 517.66 517.42 PIPE 9 1 30" 60.00' 0.407 1 RCP C89 C810 517.42 517.18 PIPE 10 30" 60.00' 0.40% RCP CB10 CB11 517.18 516.94 PIPE 11 30" 60.00' 0.40% RCP C611 CB12 516.94 516.70 PIPE 12 30" 60.00' 0.40% RCP CB12 CB13 516.70 516.46 PIPE 13 30" 81.50' 0.407 RCP CB13 CB47 516.46 516.13 PIPE 14 12" 66.50' 0.41% RCP 0814 CB10 518.70 518.43 PIPE 15 12" 66.50' 0.41% RCP CST OB10 518.70 518.43 PIPE 16 18" 101.85' 0.407 'RCP CB76 CB17 519.83 519.42 PIPE 17 18" 60.00' 0.40% RCP CB17 C818 519.42 519.18 PIPE 18 24" 60.00' 0.40% RCP CB18 CB19 518.68 518.44 PIPE 19 24" 60.00' 0.40% RCP C919 CB20 518.44 518.20 PIPE 20 24" 60.00' 0.40% RCP CB20 CB21 518.20 517.96 PIPE 21 24" 60.00' 0.40% RCP C821 C822 517.96 517.72 PIPE 22 24" 60.00' 0.40% RCP CB22 'CB23 517.72 517.48 PIPE 23 24" 60.00' 0.40% BOB CB23 CB24 517.48 517.24 PIPE 24 30" 60.00' 0.40% RCP CB24 CB25 516.74 516.50 PIPE 25 30" 60.00' 0.40% RCP CB25 CB26 516.50 516.26 PIPE 26 30" 60.00' 0.40% RCP CB26 CB27 516.26 516.02 PIPE 27 30" 105.19' 0.40% RCP CB27 CB28 516.02 515.60 PIPE 28 36" 21.41' 0.47% RCP CB28 FES2 515.10 515.00 PIPE 29 15" 66.52' 0.41% RCP CB29 CB2 520.70 520.43 PIPE 30 12" 105.19' 0.40% RCP CB30 CB31 520.34 519.92 PIPE 31 12" 60.00' 0.40% RCP CB31 0832 519,92 519.68 PIPE 32 15" 60.00' 040% RCP CB32 CB33 519.43 519.19 PIPE 33 15" 60.00' 0.407 RCP CB33 CB34 519.19 518.95 PIPE 34 18" 60.00' 0.40% RCP CB34 C835 518.70 518.46 PIPE 35 1 18" 60.00' 0.40% RCP CB35 CB36 518.46 518.22 PIPE 36 18" 60.00' 0.40% RCP CB36 CB37 518.22 517.98 PIPE 37 18" 60.00' 0.40% RCP CB37 CB38 517.98 517.74 PIPE 38 18" 60.00' 0.40% RCP CB38 CB39 517.74 517.50 PIPE 39 24" 60.00' 0.40% RCP C639 CB40 517.00 516.76 PIPE 40 24" 60.00' 0.40% RCP C840 C841 516.76 516.52 PIPE 41 30" 105.19' 0.40% RCP CB41 CB42 516.02 515.60 PIPE 42 36" 21.41' 0.47% RCP CB42 FEST 515.10 515.00 PIPE 43 1 12" 66.50' 0.41% RCP CB43 CBS 519.91 519.64 PIPE 44 18" 66.50' 0.41% RCP CB44 CBS 519.41 519.14 PIPE 45 12" 66.50' 0.41% I RCP CB45 CB34 519.47 519.20 PIPE 46 12" 66.50' 0.41% RCP CB46 CB38 518.51 518.24 PIPE 47 30" 66.50' 0.39% RCP C847 CB48 516.13 515.87 PIPE 48 36" 66.50' 0.41% RCP Cm CB42 515.37 515.10 PIPE 49 12" 66.50' 0.41% RCP CB49 CB20 519.47 519.20 PIPE 50 12" 66.50' 0.41% RCP C850 CB24 518.51 518.24 PIPE 51 1 12" 66.50' 0.41% RCP CB51 CB28 517.87 517.60 SW OUTFALL I 24" 92.80' 0.50% RCP SW RISER SW FES 511.00 510.54 *CLASS IV RCP ixs mxvx a .w nmmxtxr a sores a0 xvu mwx me moron rc ax,ma xnemma. m xxewo x� faxox w. n*m,mr xn m,cv wmnm mx°'xxv x xMp�px� an wrt; m'�Dix�aMIr ®rix i°fmuxE mxox,® on 1 i We Found projecting 8" above ground / r / / 1 / I r II / 1 I. I 1 r L=156.36, R=456.23 / e=19.6364 j CB28 RIM: 523.44 INV IN: 515.60 INV IN: 517.60 INV OUT. 515.10 N70' 39' 35.47"W RIM:523.44 INV I14:516.02 INV OUT: 516.02 CB26/ / RIM: 523.46 INV IN:516.26 2 INV OUT:516.26'" 4� -- ar i CB25 S r RIM:523.44 / INV IN:516.50 INV OUT: 516.50 CB24 RIM: 523.44 INV IN:517.24 INV IN:518.24 INV OUT: 516.74 CB23 RIM:523.44 INV IN: 517.48 INV BUT: 517.48 N19' 15' 21.20"E, 741.03' CB22 RIM: 523.44 INV IN: 517.72 INV OUT. 517.72 CB21 RIM: 523.44. INV IN: 517.96 INV OUT: 517.96 CB20 RIM: 523.44 --INV 1N: 518.20' INV I*549.20 INV OUT:518.20 Pro tin Iron \ RI INV 4 INV OL �1NVI \\ INV` L \ \ \l CB1 \ `�� RIM: 523.4 ? INV IN: 519.4 r IN`A OUT. 519.4 � / 1 1 1 / / S70'/44' 38.1 ( 61 S79' 44' 381 95 / RIM: ' r / INV 0 :511 i S 1 1 1 \ 1 1 t� \ 1 \ 57 I" Corner to ,plr - ole 4i= 5g5 be set _,.,_.. v' '.m , .. r�yq,74 utility Pala ¢1 ATCH GRADE Catch gasi 05 Bev 535.47 + +Bev 535.02 T EXISTING EDP Grate 530 2 2 4 5 Fes% A, IIt �' I ///1 !l/lj1/! ! // // Thr `•t v, v\ vv vv SW FES RIM: I IN: 510.54 SW RISER _ RIM: 513.09 i� r 10 INV OUTr.51'hO0 A V - ZB48 ` RIM: 523.44 _ _ - _ INV IN; 515.87 bt2 / _ O I INV OUT:515.37 STORMWATER-POND, J 2 1 / REF. DETAIL FOR REQS / P r /P � l r 15 0"E 3S�g54.'�c i FEV1 _ INV:515.00 S70'44' 38.80' /'/Pf M4 4 R523.44 21.10' 2 f CB47 -- RIM:523.44 ' INVrIN:515.10 INV IN:516.13 Prr'f 4B '� / NV IN: 515.60 INI V OUT:516.13 I+V OUT: 515.10 CB13 52q ;>,�` / CB41 RIM: 523.87 RIM:523.44 INV IN:516.46!, INV IN:516.52 INV OUT:516.46 1111 INV OUT: 516.92 FUTURE BUILDING 5 GET 2 RIM: 523.87 FFE: 524.27 INV IN: 516.70 INV OUT516.70 i CB50 I t RIM:524.55 i INV OUT:518.51 CB10 FUTURE BUILDING 6 o ,I RIM: 523.87 FFE: 524.27 4W f INV IN: WAS INV IN: 518,43 a OSR `-522' INV IN: 51843 CB11 ? UT:517AS RIM: 523.87 INV IN: 516.94 _ \52q INV OUT: 516.94 h _502;;---"' 0814 a`v - - C8404 RIM: 524.55 4 S? INV IN: 516.76 rQa / INV OUT:518.70 INV nuro s19 is RIM: 524.55 �'�� r-\ R" p / INVOUT: 518.70 / CB39 RIM: 523.44 RIM: 523.87 4r i C89 s2 W "'INV -IN: 517.50 / 4 INV IN: 517.42 aINV OUT: 517.00 j( g C i S2 INV OUT: 577.42 ? r C846 yR RIM: 524.55' / 4 FUTURE BUILDING 3 INV OUT.518.51 rte/ FFE 524.27 CBS / 9 RIM 52387 C849 INV IN 517.66 2y 38 / 2 r RIM:.524.55 4INV OUT:817.66 w .j�x RI 23.44 INV OUT: 519.47 4' 3 ry r s // INV I :517.74 608" yb Found C86 FUTURE BUILDING 4 'n b INV IN. 78.24 �roje n 5" abo e ground RIM.523.87 FEE. 524.27 INV OU 517.74 BT0 PrP INV IN:518.64 4 �L'a' CB37 �1 C s�� INV IN: 519.14 2r RIM: 523.44 INV IN:519.64 .519.64 UT: 578.64 C87 NV IN: 517.9 rvr RIM: 523.87 NV OUT: 51 .98 „'j dam/ / 52a 52a INV IN: 518.40 �: Qr i INV OUT: 517%0 W C836 4 ' ! C. Q OS i RIMS 44 S2' / RIM: 524INV I 518.22 l air r CB44 52, INV OUT. -519.91f • R1r INV UT:518.22 RIM: 524.55 v. r lar r INV OUT.519.41 _Q / RIM: 523.87 52a 4S ¢ S?R RM3523. r INV IN: 518.88 INV IN: 18.46 n r INV OUT: 518.88 A INV 0 :518.46 BUILDING 1 CB45 h / q r ; FFE: 524.27 RIM: 524.55/ Q4( RB :523.4523.44 / INV OUT: 519.47 C84 4 02 I .95 r RIM: 523.87 ? V IN: 519.20 r f INV IN:519.12 .>p4 INV OUT: 518.70 INV OUT:519,12 BUILDING 2 .�^�: / CB33 /- FFE 524.27 2� -,( / 525 RIM: 523.44 L+� INV IN:519.19 S2 INV OUT:519.19 Tp ry�5 083 >Fr ,524 5/8" Rebar Found RIM: 523.57 - flush with ground 9 4 / 52 INV OUT. Q� // r !/ (/ INV OUT: 519.36 Y RIM: 523.$4525 A S r? INV'OUT:511 111 s •fix j INV OUT:51 ¢3 , CB31 P I I 93 9 .�'O , P PipF 29 s2a 5 RIM: S?:5.44g211 215 28}W IpvonT5199z I s69 2 RIM: 522.54 1 RCP 1Pvert 1 INV OUT. 526.32 �7\, \ \ .�,\. P • 13� 5 - 1 _ f size accessible n \ \ L C830 S ✓. 093 not CB2 \ ti, RIM: 623.44 tilifY�°� 1 RIM:523.44- -- a�g \ IIINV IN: 520.43 `s �-�N� T:52b- ` 2S NV",�U28 fid'^�.... ..� c�`,•Pm6 ��_ 130.84 µ _f --g,e\ mat 52482 S \ CB2 4d v i Inv 521.60 +Ele 525.16 RIM:5 tlitY' 15.00"W INV OUT: _70 6y G c e 52Sn�0.94' Inv 524.11 U ttFt Pale NC l4\0. 2466gp02T -I-Bev 531.27 N0p0T �arfolej ibie R/W 3 T 4 5 0 1" 2" SCALE 1" = 60' 0 C L Will 0 z Q CQ a i C N 2 � a Z z 2 J Z U LU Q) W H O f O a 0) 8Rx ti x n 0 O? h U3� ItR m n 0 1 0 1 0 m a c LL m ui z k h h x m m p p z o $ W C6$ U C C 2 v Q�ar �Km w ❑ F N c W z g W o=ru 0 j a 0 00 E E CO <Z zJ i L NI' w n a rc � +k Q r 0 z F a N 0 Y a n a in w n Q Will .T"; 40366 = /rp/1 n dn?M`k� W t7 0 z Q CQ 0 i C N 2 � a Z z 2 J Z U LU Q) W H O f O a 0) 8Rx ti x n O? h U3� ItR m n 0 1 0 1 w z v m c LL m ui z k h h x m m p p z o $ W C6$ U C C 2 v Q�ar �Km `a ❑ F N c W z g W o=ru 0 j 0 00 E E CO <Z zJ i L NI' .T"; 40366 = /rp/1 n dn?M`k� W t7 0 o Q CQ C N 2 N W M a Z z 2 J Z U LU Q) W H O f O a 0) SHEET NUMBER C3.0 In IC 111m 1 ms waw M r wrmwxr rc zwm .wo swu wwx na navAr ar ONIPk16 p'IFllMO. M IEiNwi Ml iMwM W. 8M11MfM M0 OIIIA RLL4R�fl1 6�M➢ N QI MAI. YNEE OIIV,aH PNTd M M A�MI]� RM[NCEO M 1 2 Azle Found projecting 8" above ground 3 U U U /tU � jTr tt ! e !! !f j Y f1 if / r fl Jf / 11 It !I if i fl It n 1 FUTURE BUILDINI 524.27 6QOO,/� / FUTURE ROAD SHOWN DASHED 5' HIGH BLACK PREFINISHED !! !! m N ALUMINUM PICKET FENCE— AROUND ENCE AROUND FACILITY 24" CONIC. CURB & GUTTER (TYP) STANDARD DUTY ASPHALT PAVING, REF. DETAIL 36" CONCRETE APRON 5"n P above FUTURE SHOWN D. LIFT GATE KIOSK VERIFY FINAL LO( END PAVING AND CURB. GRADING ONLY BEYOND THIS POINT. 1 4" PVC SLEEVE,, REF. DETAIL HEAVY DUN ASPHALT PAVING SHOWN STIPPLED, REF. DETAIL I 24" CONIC. CURB & GUTTER (TYP) 1 7-- 1 'anal / 60p 7 r /8" Reb Found rojectin 5" above ground / f 3 J ^A � m /te BUILDING 1 FFE: 524.27 v / oh P a i 42' AUTOMATIC LIFT GATE, COORDINATE MODEL/ MANUFACTURER WITH OWNER HC PARKING SPACE, AISLE, AND I �✓ SIGN. REF. DETAIL FOR RED'S J 1 50 (TYP) 1 R1B3.50 I II 4" PARKING LOT STALL MARKINGS, COLOR 'TRAFFIC' WHITE (TYP) 1 i I 1 11 u w 1 1 1 � 1 ,may. corner t0v F'd po) be set _ �, k7 � ., 33474 Utility Po) I COteh B°5 05 elev s3s.a7 + +BBO s3s.o2 Grate 53 2 LIFT GATE KIOSK, AFFIX TO BUILDING. SITE VERIFY FINAL LOCATION 42' AUTOMATIC LIFT GATE, DEFLECT AS +Elev 531.27 5' HIGH, 12' WIDE BLACK PREFINISHED ALUMINUM PICKET FENCE DOUBLE LEAF ACCESS GATE W/ LOCK FOR BMP MAINTENANCE ACCESS. REF. DETAILS & GRADING SHEET STANDARD DUTY ASPHALT PAVING, REF. DETAIL rs 34 00 „zo 5 aii1=' \ o o- 4000 , �138.00_� TURE BUILDING 3 FFE: 524.27 0 0 N FUTURE BUILDING 4 FFE. 524.27 0 0 BUILDING 27 1/ 1! / 0 I.So a / Inv 1 C HW 24/2--7 466p02T NDD\jlet6g NCoribleRAW 0 ! to DUN ASPHALT REF. DETAIL -RCP sze and Invert not accessible Ut111ty 1 $ IC,ate 2482 Inv 521 60 +Bev 525.16 4 5' HIGH BLACK PREFINISHED 'ALUMINUM PICKET FENCE AROUND FACILITY 24" CONIC. CURB & GUTTER (TYP) STANDARD DUTY ASPHALT PAVING, REF. DETAIL 36" CONCRETE APRON 5/8" Rebar Found flush with ground E 5 N 0 1" 2" SCALE 1" = 60' u rs] ,ASC MIDLAND, LLC 71 1011111 N /! & !/ U o z O j 1- m w m F U z T Z W LULU in f4 0 � /1 Il O 0 1 'anal / 60p 7 r /8" Reb Found rojectin 5" above ground / f 3 J ^A � m /te BUILDING 1 FFE: 524.27 v / oh P a i 42' AUTOMATIC LIFT GATE, COORDINATE MODEL/ MANUFACTURER WITH OWNER HC PARKING SPACE, AISLE, AND I �✓ SIGN. REF. DETAIL FOR RED'S J 1 50 (TYP) 1 R1B3.50 I II 4" PARKING LOT STALL MARKINGS, COLOR 'TRAFFIC' WHITE (TYP) 1 i I 1 11 u w 1 1 1 � 1 ,may. corner t0v F'd po) be set _ �, k7 � ., 33474 Utility Po) I COteh B°5 05 elev s3s.a7 + +BBO s3s.o2 Grate 53 2 LIFT GATE KIOSK, AFFIX TO BUILDING. SITE VERIFY FINAL LOCATION 42' AUTOMATIC LIFT GATE, DEFLECT AS +Elev 531.27 5' HIGH, 12' WIDE BLACK PREFINISHED ALUMINUM PICKET FENCE DOUBLE LEAF ACCESS GATE W/ LOCK FOR BMP MAINTENANCE ACCESS. REF. DETAILS & GRADING SHEET STANDARD DUTY ASPHALT PAVING, REF. DETAIL rs 34 00 „zo 5 aii1=' \ o o- 4000 , �138.00_� TURE BUILDING 3 FFE: 524.27 0 0 N FUTURE BUILDING 4 FFE. 524.27 0 0 BUILDING 27 1/ 1! / 0 I.So a / Inv 1 C HW 24/2--7 466p02T NDD\jlet6g NCoribleRAW 0 ! to DUN ASPHALT REF. DETAIL -RCP sze and Invert not accessible Ut111ty 1 $ IC,ate 2482 Inv 521 60 +Bev 525.16 4 5' HIGH BLACK PREFINISHED 'ALUMINUM PICKET FENCE AROUND FACILITY 24" CONIC. CURB & GUTTER (TYP) STANDARD DUTY ASPHALT PAVING, REF. DETAIL 36" CONCRETE APRON 5/8" Rebar Found flush with ground E 5 N 0 1" 2" SCALE 1" = 60' u rs] ,ASC MIDLAND, LLC 71 1011111 HE SEAL i 40366 GINEE.'' z W U' & m o z O j 1- m w m F U z T Z W LULU in 0 0 � X O 0 ,2 1 UX LLN w ^ O i w m oy E 4 0 U l Z rn z v -0 w e m o E ma j w w a m z m r m o z g r Z OJ �Zm U ¢ r E J N g W Z W ❑_ = F L ~ ZE m (Ui)UUU a Z J ° C44 v HE SEAL i 40366 GINEE.'' SHEET NUM6ER C2.0 W U' o O 1- W z w m O g0 Q IS Z W LULU in 0 0 � SHEET NUM6ER C2.0 1 2 3 4 5 1$allen ` — _ — \ \ `\ \ \ \ \ \ Storage Centers `.I \ \ t, ASC MIDLAND, LLC TTTm_ D D Ar Pvc 1W 510A4 5 .... /^! `` !J l•r /// !!� r� 11.38 ,, % \ / 0 EMpVE &J ANG \ I/'t J� 1 Ig FVC PIP / .�i/ r/ R 1COAG /// J FARM TiOAD _ -- r o a C C 0 1 // h +Dev 529.95 z .. IV m A1de Found projecting ma v x za 0 0 8" above ground / REMOVE EXISTING / /Y // S1g;17_ FAR//M/ROAD l j 1 I / 1 1 % // b 04 0 m 0 x �Oi x a m •Sg+E _•REMOVEI EXISTIN }� MN ........ ..... / 200. PO Pro B5'4' Ir k°ty9 5"�° PIP. F / \ / / r J t 1 (61 ! / o obove °ontl I i N > o a ui 44' ry N nd b0, .`•p37 \ \ ,S ti w O Io i a 9 / / A4j \00• �/8" Rebar �ound / \\I € _ ro tin 5 .b 9 v _ A /3 I A Jlt ✓I// /f // /S' z 'm"L �o vv''V Av l 2 0 NU, �•, V i /'7 j j rl / /ti \ OW om hm n°2 ma <€ >+ X ,��� I \ I // •! GENERAL DEMOLITION NOTES:IL 1. INFORMATION INCLUDED WITHIN THIS DRAWING WAS SUPPLIED FROM A SURVEY PROVIDED`\ \ // m1 \ I j L �. ,. (� // / Q e ¢a 8 BY DENT H. TURNER, JR. PROFESSIONAL LAND SURVEYOR. THIS SURVEY IS INCLUDED IN THE CONTRACT DOCUMENTS AS SHEET CO EXISTING CONDITIONS. THE CONTRACTOR `. \ ! / f I I _ / / U 0 1- r8 al SHALL RENEW THE INFORMATION CONTAINED HEREIN AND VISIT THE SITE TO VERIFY ITS ACCURACY IN ACCORDANCE NTH THE CURRENT I _ B CONDITIONS. NEITHER THE ARCHITECT / ( OR ENGINEER ASSUME ANY RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF \ \ / DATA INCLUDED WTHIN THIS SURVEY. B Z W Z aJ ` J I \ \\ U FZ 2 CONTRACTOR. SHALL REMOVE ALL EXISTING WALKS, CURB AND GUTTER (WHERE SHOWN), \ l I i j1 �� If �� i iJ F V) SI GRAVEL DRIVES, WALLS, TREES, SHRUBS AND OTHER STRUCTURES WITHIN THE OWNER'S 1 \ i 1 0 qy, _ _1 i \ / PROPERTY INDICATED AS SHOWN ON THE DRAWINGS OR REQUIRED I i 1 �� U U 0 AS TO PREPARE THE / %qN I \ SITE FOR THE NEW CONSTRUCTION. CONTRACTOR SHALL VISIT THE SITE TO FAMILIARIZE 1. I ( / p i� /..� / N Z O < V HIMSELF NTH ALL ON-SITE CONDITIONS WHETHER SPECIFICALLY INDICATED ON THE DEMOLITION DRAWING OR NOT. 3. UNDERGROUND UTILITIES NTH UNKNOWN LOCATIONS MAY EXIST ON THE SITE. CONTRACTOR SHALL HAVE ALL UNDERGROUND UALIAES INCLUDING. BUT NOT LIMITED TO GAS, POWER, TELECOMMUNICATIONS, WATER AND SEWER LOCATED. t 4. COORDINATE ALL DRIVEWAY REMOVALS AND SIDEWALK/CURB REPLACEMENT WTH OWNER, CITY OF LOCUST, AND NC DOT. PROVIDE BARRICADES AND SIDEWALK CLOSURE SIGNAGE 9r AT ALL EXCAVATIONS TO PROVIDE FOR SAFE PEDESTRIAN MOVEMENT. SCHEDULE WORK W i / / /� \ // \ \\ TO MINIMIZE TRAFFIC INTERRUPTION AND PROVIDE CONSTRUCTION WARNING SIGNAGE AND / c o. - _ SEAL = v' "MUTCD" I \ \ BARRICADES. TRAFFIC CONTROL SHALL BE IN ACCORDANCE NTH THE AND/ // ANY OTHER APPLICABLE AUTHORITY AND CODES. / j f/k { J \ r5/S Rebar Found 5. CONTRACTOR SHALL PROTECT UTILITY POLES, UNDERGROUND UTILITIES, MANHOLES, VALVE ;, / , / /,yb qK / Pr I __ / r flush with ground BOXES, RAMPS, WALKS AND OTHER ITEMS TO REMAIN FROM DAMAGE. CONTRACTOR / 4036,6�Iz7 `• F2/Y�l! ,�,y�••.....•• 1ct•,. ',/����I ,,z r / / e_� r / "� SHALL REPAIR, REPLACE AND PAY FOR ANY DAMAGES CAUSED BY =` r/'�.( i J / r "'t DEMOLITION/CONSTRUCTION WORK. �4% InI01' / / I 6. CONTRACTOR SHALL COORDINATE ALL WORK WITHIN HIGHWAY AND ROAD RIGHT-OF-WAYS WITH THE NCDOT AND GTY OF LOCUST. PROTECT ALL EXISTING PUBLIC UTILITIES WITHIN 2.A5. W RIGHT-OF-WAYS FROM DAMAGE DURING DEMOLITION WORK. / /%� / J r�� J+� 7. CONTRACTOR SHALL COORDINATE REMOVAL OF WATER METERS, LIGHT POLES, GAS METERS, SEWER LINES, ELECTRICAL LINES AND OTHER UTILITIES PREVIOUSLY SERVING / / �; 00\ '- d I 1 / �,` — -, I THE SITE NTH LOCAL UTILITY COMPANIES. SEE SITE PLAN, CIVIL DRAWINGS AND G / / �",I� +T' I` i i / \ -- { W (D o Z ` _ t ELECTRICAL SITE PLAN FOR UTILITIES TO SERVE NEW BUILDINGS I ! / H7 / i !/ \ \ -. _. RCP Invert / RE OVE EXISTING — and Q Q \ - I_ I size sible \ 7� \\ O to J yam,= not occes e. SEE EROSION CONTROL DRAWINGS FOR ADDITIONAL WORK. COORDINATE ALL WORK "�t / h �' • \ / ! \\ SIG �... 8935 gt'y0n 0 O SHOWN ON DEMOLITION DRAWING NTH THAT SHOWN ON EROSION CONTROL DRAWINGS. — l3• \ Utti / BACKFILL DEPRESSIONS LEFT BY REMOVAL OF WALL FOOTINGS, SIDEWALKS, GRAVEL, ( I i m, \•. \ _ W H at UNDERGROUND UnUnES AND LARGE TREES NTH SUITABLE COMPACTED EARTH 66� �\ ��" C°tcb 52482 �'ID L� = g J ACCORDING TO GRADING PLAN. I tl 1 �/1 _ d�"P -. ,1� ^--- 1 1 REMOVEI EXISTING BUILDINGS & DRIVES. \ " d '� o� +11 Grote +Elev 525.16 1 '� Inv rL 0 Z A VERIFY EXISTING INFRASTRUCTURE AND '^. c ' ' J6 20.94' \�1� F D TERMINATE AS REQ'D (TYP) d/ REMOVE EXISTING ( /1 1 Catch Seat .9 w SIGN 1 / \ 1 REMOVt, EXISTING UTILITY POLE AND Grate 411-1 52 . LLI REMOVE EXISTING CURB AS '� \\ ' OVERHEAD UTILITIES. COORDINATE W/ Oie Inv P 0 d 1- REQ'D FOR NEW DRIVEWAY \\ 1 PROVIDER. GC SHALL COORDINATE.d HWS( 24'6 / NC 66gp02T corner to l ' p1e GUS Jj Eav 531.27 pro \ NCDDT P R/W Voriple be set —UtLR Elev 533.95 �- �` Dev 53}7d Utility Pp1e 47 0 t" 2" SNEET NUMBER C1.0 nes wvw a iv vswwvrt or mows mo svu wxvx m nmrvwr a awevs uso,maW, w mr"nc "i muwx w. mmo" "" m�u wmcm woos riwweo m wv nart mama ms owvmo nvu xm a wrwnm a5351n Elev 535.02 '+ SCALE = GO5.G5 Elav 535.47 +Groteote 53 1" 60' 1 2 3 4 5 1119 IC I /Gl 1 ra onNw N rx emNNva rc moa xN awi NaxN nN NmNm a awuvo wvmnNo. n nmaa" x� ca box wr. sruNmr.wo Doan N.cem iGEY NYF OAR NAI OII�NIxEE MO.MO M N aNIK. RFMAYID W 1 2 3 4 Cv \ \ \ f/ �/ //Jrj \--J \ \ \ \ It 0 el 54 / / 1 I ' I 11111/ lr �I / ( +B. 528.85 Axle Found projecting 3 7 8" above ground 7 4"",36" \ 3/4» Ira �O g� = \ / / / / / / / ///� �o \ proJec*?9 5., PP, Found �_ .. \ / / / Z �l�// fam; obo P o/ \ ve ground � 6/8„ Rebar Found r/ \ \l I Jll3r/ \ \ projecting 5" I�/ / pond' above ground I ,\ ,//l� 1,+`/ ✓/ 41 t , r / / �1 F yarn o ( / / g // / 1. ` �aC Jra / tO Dag / age / �. cP., I 1 ! iZe� o<o /_ / �Oe<� / / o\ \,r, 0 co e 2 �/ �OgA V �5 e 5 69 tjO �9 RCP Invert house 0�o - \ ' P�90 o I \ 5� p� r- .-pele�- not accessible G�('7 e — rb Catch B24 82 2- -� u" 525.16 \ 9 m d ut Grate atch /Basin Inv 521.60 cur brat 52-7-31 G / W 72= — senit pol�^ � Inv 524.119 N W�ec 4 6 669005 rner Uti""' a iter—`'ybj.9553,.2] NCDOI \Jarjb,e ft/� 0 to I V o set be pole utility Gatch Bin Bev 535.4] +Elev 535.02 ' �.,.ta 535 0 + E 3 0 5/8" Rebar Found flush with ground 5 V 0 SCALE 1" = 60' CI 01 MR a 5 SEAL = 40366 = W C9 _o U) 'o O o N a r cl Z C z 5 m O C7 Z U, m o W z 0 x o� a y O� UX LLN a r i c m ~ LL U QY Z C 0 o ¢o Y o N M< m m 6 r Q JO � C C p F N � Z g W U ` 0~ M E �0 o i zJ L 0 0 a U a Y a 5 SEAL = 40366 = W C9 _o U) 'o O o N __� r cl Z C z 5 m O C7 Z U, m o W z x o� a y O� UX LLN r i c m ~ LL QY Z C o ¢o 6 J JO � C C p F N W Z g W U ` 0~ M E �0 o i zJ L a 5 SEAL = 40366 = W C9 _o U) 'o O o N N W r cl Z C z 5 z �U) W O C7 Z U, 0 0 d W SHEET NUMBER LLO-�O 0 C 0 A 1 GEOTECHNICAL REFER TO REPORT OF GEOTECHNICAL EXPLORATION FOR RECOMMENDATIONS. CONTRACTOR RESPONSIBILITIES ANY EXISTING CONDITIONS FOUND TO BE A VARIANCE WITH THESE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER. 2. THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION IN SUCH A MANNER AS TO PROTECT STRUCTURES WITHIN PROJECT LIMITS, ADJACENT EXISTING STRUCTURES AND OTHER SITE ELEMENTS WHICH ARE TO REMAIN IN SERVICE. UTILITIES IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL UTILITIES WHETHER SHOWN ON THE PLANS OR NOT. 2. INFORMATION SHOWN ON THESE PLANS CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING THE NECESSARY UTILITY COORDINATION AND MAKING A DETERMINATION AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND .PIPELINES, CONDUITS, STRUCTURES AND OTHER FACILITIES BY CONTACTING THE OWNERS AND PROTECTING IN ADVANCE OF ANY OPERATIONS THAT MAY IMPACT UTILITIES WITHIN THE PROJECT LIMITS. EROSION CONTROL ALL CONSTRUCTION WORK SHALL BE PERFORMED IN SUCH A MANNER AS TO CONTROL EROSION AND PREVENT SEDIMENTATION FROM LEAVING THE SITE. 2. EROSION CONTROL MEASURES AND PRACTICES SHALL BE INSTALLED PRIOR TO LAND—DISTURBING ACTIVITIES. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL RULES AND MSDS REGULATIONS. I-9_1ya Vg CONTRACTOR IS FULLY RESPONSIBLE FOR THE SAFETY OF ALL ITS EMPLOYEES AND SUB—CONTRACTORS AND WILL PERFORM ITS WORK IN SUCH A MANNER THAT WILL ENSURE THE SAFETY OF EMPLOYEES AS WELL AS RAILROAD PERSONNEL AND TRAIN OPERATIONS IN THE DESIGNATED PROJECT AREA. 2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH RULES, REGULATIONS, PROCEDURES AND SAFE PRACTICES OF OSHA AND ALL OTHER GOVERNMENT AGENCIES HAVING JURISDICTION OVER THE PROJECT. ME FFRIY O"f CH MPEA °OETDw W�YAI°OMD, rNCw ROGRON'C A�iL muu°"xTMi.Ew Tl9A OW�MNRITURNiff O ANI?—.10. NOT BE F V . ON C°�m IX . R I OTHERWISE FENCED RP IN VAMNIL 1 2 2 SHEET INDEX SHEET NUMBER DESCRIPTION GO.0 Cover Sheet GO.1 General Notes—Sheet Index CO.0 Existing Conditions C1.0 Site Demolition Plan C2.0 Site Layout Plan C3.0 Site Grading Plan C4.0 Site Utilities Plan C5.0 Site Erosion Control Plan C6.0 Site Landscaping .Plan CD1 Details CD2 Details CD3 Details CD4 Details CD5 Details CDS Details CD7 Details CDB Details CD9 Details 3 3 0 5 STATE OF NORTH CAROLINA LOCUST QUADRANOLE UNITED STATES DEPARTMENT OF NATURAL RESOURCES NORTH CAROLINA DEPARTMENT OF THE INTERIOR AND COMMUNITY DEVELOPMENT 7.5 MINUTE SERIES (TOPDORAPHIC) g+ rtVminnTCai_ AIIRvTCv RALEIGH, NORTH CAROLINA aw NUAV.i. nxOU goleNm W and l06#d &!s SM OIC NCaro! ea'zle p.5 NATIONAL CONTOUR INTERVAL 10 FEET �In@rslleR1 ��LLS Rosh, l Si[Hubn ysb (LIMOR fwmil NC) AL ONAL GEODEI C VERTICAL DATUM OF IPM 100Pnsurvbs9l Tisma AlelraNpa 17 027 xnxn A INN. "' \J LOCUST, N. C. The aiXemrcebeexen1IRP %NTAmw binnin mwN ltranflzm 1. Fill Ann, I. AT aEh .171C 710 nss. mnnnv.ceetOu�wN er+:ww ..az OebVn d 1983 MAD 83) TV 7.5mFNlel1 t is e'wen in GEER °'. TRE NAV DDNm1EG wax NATmu1 NM ACWRnLY MUCAR. TPUL AT IF Aw. BLI 1815. Tin NO) 83 is sbmn by di synd ea =nems FOR SAIF BV U. S GEOLOGICAL SURVEY lln,00.11.1. 1983 DENVER, COLORA00 9OEi6.OR RESTON, Vni 2MB] FTN rea aeslel l' MORIN, zelaleUf Ann l'141ina wM1eie Ngmapr MJMre CttlrCnYA.etllG�ges.aDSEmVIDB° ganNElly vlalde on aazul pnuNynpM YMS. IPmdL n I5 UncXCC4ea P WIOfA OnERMNA TOPoGM%IIC ILVS AND SYL . Is ANARAIR. ON NEWEST pflpTglµSAEC(EG!B83 DNA On. V ins F.R. vs4 4 SITE/ VICINITY MAP, NTS 5 9 CI M T SEAL e 40366 t ?jt► f7:' W I o � Z W W 6 W w z 0) Z n0 Q Ox U~ D U X W 0 ZO , a L7N CIX 6 N yN m 0 s W 3 6 11 � Jo of 6 N Z._ W O J W rc om om U, F Z agogg rN-na 6R UI eco QW e E _EE i! 0 N m Y gwz M < Q o=U d �r� E QZO U N R° v a 0 0 rc N 0 Y N M< N tp n Q T SEAL e 40366 t ?jt► f7:' W I o � Z W W 6 N w Z W O a w z 0) Z n0 Q Ox U~ D U X W ZO , a L7N CIX 6 N yN m 4 s W 3 6 QE � Jo of 6 N Z._ W O J W om om U, F Z agogg rN-na 6R UI eco QW e E _EE i! N m gwz W o=U d �r� E QZO U N v T SEAL e 40366 t ?jt► f7:' W I o � Z W W F`0 _y Z C J O S N w Z W O a J C6 O Z J LU W Z W SNEET NUMBER G0.7 SITE DEVELOPMENT PLANS ALLEN STORAGE MIDLAND MINI for CENTERS STORAGE ASC MIDLAND, LLC 411 North Central Avenue Locust, NC 28097 February, 2017 Proj. No. 2016-1041 HE 4036 _ chambers Fh'GINEE�'' EL JIS engineering, pa 129 North First Street Albemarle, NC 28001 704.984.6427 ph www.ce-pa.com } ASC MIDLAND, LLC 411 North Central Avenue Locust, NC 28097 February, 2017 Proj. No. 2016-1041 HE 4036 _ chambers Fh'GINEE�'' EL JIS engineering, pa 129 North First Street Albemarle, NC 28001 704.984.6427 ph www.ce-pa.com DAM AND EMBANKMENT CONSTRUCTION 1.) GENERAL -THE POND AND DAM AREA SHALL. BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL AND TOPSOIL PRIOR TO DAM CONSTRUCTION. D THE DISPOSAL OF TREES, STUMPS, CONSTRUCTION DEBRIS, VEGETATIVE MATERIAL, ETC. SHALL NOT BE PERMITTED IN THE DAM OR POOL AREA, WHEN BLASTING IS USED TO REMOVE ROCK FROM THE POOL AREA, THE BLASTED AREA SHALL BE OVER -EXCAVATED TO A DEPTH OF AT LEAST TWO FEET (2') BELOW FINISHED GRADE AND BROUGHT BACK TO FINISHED GRADE WITH CLEAN RELATIVELY IMPERVIOUS SOIL MATERIAL COMPACTED IN PLACE. 2.) EARTH FILL DAMS A) THE CONSTRUCTION OF THE DAM SHALL FOLLOW THE STANDARDS OF THE NCDENR DAM SAFETY. ITEMS LISTED BELOW ARE MINIMUM, BUT WILL BE VOID IF NCDENR REQUIREMENTS ARE MORE STRINGENT REQUIREMENTS. B) SOIL MATERIALS USED FOR EARTH FILL WHICH ARE HIGHLY PERMEABLE OR WHICH EXHIBIT SIGNIFICANT SHRINKAGE SWELL OR DISPERSION SHALL NOT BE USED IN THE EMBANKMENT. C) A CUTOFF TRENCH (CORE TRENCH) SHALL BE PROVIDED WITH A MINIMUM WIDTH OF FIVE FEET (6). THE CENTERLINE OF THE CUTOFF TRENCH SHALL BE LOCATED DOWNSTREAM OF THE INSIDE TOP OF SLOPE OF THE DAM. THE CUTOFF TRENCH SHALL BE CAREFULLY BACK-FILLED WITH HIGHLY IMPERMEABLE MATERIAL AND COMPACTED AT LEAST NINETY-EIGHT PERCENT (98%) OF STANDARD PROCTOR DENSITY. D) THE MINIMUM TOP WIDTH OF THE DAM SHALL BE TEN FEET (10') AND SLOPES SHALL NOT BE STEEPER THAN 3:1 (THREE HORIZONTAL TO ONE VERTICAL ON THE DAM OR UPSTREAM SIDE OF THE EMBANKMENT WITH 2:1 SLOPE ON THE DOWNSTREAM SLOPE OF THE DAM. THE SLOPES AROUND THE POND WILL BE 3:1 FOR EASE OF MAINTENANCE AND ACCESS OF THE POND. E) ALL DISTURBED GROUND AREAS AND EMBANKMENTS SURROUNDING THE POND SHALL BE MECHANICALLY STABILIZED OR HAVE PERMANENT SEEDING SCHEDULE. 3.) LANDSCAPING AREAS AROUND THE POND A) THE LANDSCAPING WILL BE INSTALLED AND MAINTAINED PER THE REQUIREMENTS OF THE CURRENTS STORMWATER BMP MANUAL PER NCDENR WATER QUALITY SECTION. B) THE SOIL IN THE LITTORAL SHELF WILL HAVE AMENDMENTS PER NCDENR REQUIREMENTS PER CHAPTER 6 OF JULY 2007 OR CURRENT MANUAL FOR GOOD CONDITIONS TO MAINTAIN THE AQUATIC PLANTING REQUIRED FOR THE WATER QUALITY FEATURE. C) THE ENGINEER WILL COORDINATE WITH THE OWNER AND TOWN OF HARRISBURG ENGINEERING DEPT. FOR APPROPRIATE AGREEMENTS, COVENANTS, AND OTHER PAPER WORK REQUIRED FOR THE CERTIFICATION OF THE WATER QUALITY MEASURE. ENGINEER MUST MONITOR CONSTRUCTION, AND CERTIFY THE MEASURE AND PROVIDE AS-BUILTS UPON COMPLETION. OPERATION AND MAINTENANCE MAINTENANCE OF THE POND WILL FOLLOW THE NCDEQ STANDARD MAINTENANCE REQUIREMENTS AND MAINTENANCE WILL BE DONE AS PART OF THE NEW STANDARDS SET UP BY THE STORMWATER BMP MANUAL AND CERTIFICATION FOR MAINTENANCE BY THE STATE OF NC AND LOCAL ORDINANCE REQUIREMENTS INSPECTION EVERY MONTH OR AFTER A 1.0" RAINFALL EVENT: 1. REMOVE DERIS FROM THE OUTLET STRUCTURE. 2. CHECK AND CLEAR THE ORIFICES OF ANY OBSTRUCTIONS. 3. CHECK THE POND SIDE SLOPES; REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. C INSPECTION EVERY 3 MONTHS TO INCLUDE THE FOLLOWING: 1. INSPECT THE COLLECTION SYSTEM (I.E. CATCH BASINS, PIPING, GRASSED SWALES) FOR PROPER FUNCTIONING. CLEAR ACCUMLUATED TRASH FROM BASIN GRATES AND BASIN BOTTOMS, AND CHECK PIPING FOR OBSTRUCTIONS. 2. CHECK POND INLET PIPES FOR UNDERCUTTING, REPLACE RIPRAP, AND REPAIR BROKEN PIPES. 3. RESEED GRASS SWALES TWICE A YEAR AS NECESSARY. REPAIR ERODED AREAS IMMEDIATLEY. 4. CHECK THE SLOPE ON THE DOWN STREAM SIDE OF THE DAM AND THE AREA BELOW THE EMERGENCY SPILLWAY FOR ERODED AREAS. REPAIR ANY AREAS WHERE EROSION MAY OCCUR IMMEDIATELY. INSPECTION EVERY 6 MONTHS TO INCLUDE THE FOLLOWING: 1. REMOVE ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE OUTLET STRUCTURE. 2. CHECK POND DEPTH AT VARIOUS POINTS IN THE POND. IF DEPTH IS REDUCED TO 75% OF ORIGINAL PERMANENT SEDIMENT STORAGE DESIGN DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 3. OWNER IS RESPONSIBLE FOR MAINTENANCE AND CLEAN OUT OF THE FORESAY AREA AS NECESSARY FOR ROUTINE SEDIMENT REMOVAL AND TRASH. 4. OPERATE SULICE GATE DRAIN VALVE FROM FULLY OPEN TO FULLY CLOSED POSITION TO MAKE SURE THE VALVE IS WORKING PROPERLY. MAINTENANCE AS REQUIRED: 1. MOW THE SIDE SLOPES ACCORDING TO THE SEASON. MAXIMUM GRASS HEIGHT WILL BE 6". 2. WETLAND PLANTS AS SHOWN AND OTHER INDIGENOUS WETLAND PLANTS ARE ENCOURAGED ALONG THE POND PERIMETER. HOWEVER THEY MUST BE REMOVED OR TRIMMED IF THEY COVER THE ENTIRE SURFACE OF THE POND. CATTAILS ARE NOT ALLOWABLE WETLAND PLANTS. IF THEY BECOME PART OF THE POND, REMOVE THEM IMMEDIATELY. 3. THE ORIFICE IS DESIGNED TO DRAW DOWN THE POND IN A 2 TO 5 DAY TIME PERIOD. IF THE DRAWDOWN IS NOT ACCOMLISHED IN THAT TIME, THE SYSTEM MAY BE CLOGGED. THE SOURCE OF THE CLOGGIN MUST BE FOUND AND ELIMINATED. 4. ALL COMPONENTS OF THE DETENTION POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER. MAINTENANCE & INSPECTION LOGS: 1. THE OWNER SHALL KEEP A MAINTENANCE RECORD FOR THIS BMP. THE RECORD SHALL BE KEPT IN A LOG IN A KNOWN SET LOCATION AND MADE AVAILABLE FOR INSPECTION AT THE REQUEST OF THE CITY OF CONCORD OR NC DENR. 2. THE LOG SHALL RECORD THE DATES OF ALL INSPECTIONS AND ANY PERFORMED MAINTENANCE. 4" TOPSOIL & SEED IMPERMEABLE LAYER (REFER TO BASIN TYPICAL SECTION) SHALLOW LAND SHALLOW W7074BED HERBACEOUS PLANTS EMERGENT PLANTS OF TOPSOIL VEGETATED SHELF MAINTENANCE SCHEDULE Immediately efrer the wet detention basin is established, the plants on the vegetated shelf and perimmtw of the basin should be watered twice weekly if needed, ru" the plants become established (comaWiily six weeks). No poYhonof the wet detentioopond should be fertilised after the first initial A fertilization that is required to establislTthe plants MT the vegetated shelf. LITTORAL SHELF CROSS SECTION NO SCALE TLS WUM1xo is /N WEfXUwFN! se SERVICE NIU sxNl N'W W TIE Sf TI1CR! AND OWR R64MID RC'NIRB'SMCWNxUYM'N ME GPoUR,WG 1�ksE50. W. OT.. I.. TORN MMR. NVIm W MxNE M PMr. 3 3 NOTE: PROVIDE 18' MIN. COVER SOIL DEPTH ON LITTORAL SHELF POND BOTTOM ELEV. VARIES) FOR WETLAND PLANTINGS COVER SOIL. 12" MIN, REF. NOTES BELOW GCL MATTING, -BENTOMAT CL" OR APPROVED EQUAL, PLACED WITH POLYPROPYLENE MEMBRANE AGAINST SUBGRADE MIN PREPARED SUBGRADE MATERIAL t REQ'D, REF. NOTES BELOW OR UNFINISHED ROCK � I ' f:11Ay�1147712(4771g1[l111� NOTE: Liner, subgrade and Cover material shall be prepared and installed under dry conditions. Contractor may install liner after Seasonal High Water Table (SHWT) has receded to levels permitting work. If SHWT does not sufficiently recede under natural Conditions, then Contractor shall be responsible for any and all dewatering required to perform work. SUBGRADE PREPARATION: Subgrade surfaces consisting of granular soils, gravels or rough stone are not acceptable due to their large void fraction and puncture potential. If the underlying surface Consists of large rocks or other material that Cannot be removed, a 6" min. layer of sand or dean soil shall be prepared as a. subgrade material. Prepared subgrade materials shall have a particle -size distribution of at least 80% finer than the fl60 sieve (0.25 mm) and shall be prepared as follows: 1. The subgrade surface must be smooth and free of vegetation, sharp -edged rocks, stones, sticks and other foreign mater that could Contact the GCL. 2. The subgrade should be rolled with a smooth -drum Compactor to remove any wheel nuts greater than 1" in depth, footprints, or other abrupt changes. 3. All protrusions extending more than 0.5" shall be removed, crushed or pushed into the surface with a smooth -drum Compactor. 4. The GCL may be installed on a frozen subgrade, but the subgrade soil must meet the above requirements in the thawed state. COVER PLACEMENT: GC shall Cover the entire GCL mat with a minimum of 12" of Cover material to provide Confining stress to the GCL, eliminate the potential for seam separation and to prevent damage my equipment, erosion, etc. Cover material shall Conform to the following standards: 1. Cover soils should be free of angular stones or other foreign matter that Gould damage the GCL. GC shall consult manufacturer if Cover soils have high Concentrations of Calcium (limestone, dolomite, gypsum, seashell fragments.) 2. Cover soils shall have a particle size distribution ranging between fines and 1" unless a cushioning geotextile is specified. 3. Cover soils shall be placed over the GCL using construction equipment that minimizes stresses on the GCL. A minimum thickness of 12" of cover soil should be maintained between the equipment and the GCL at all times during the covering process. 4. Soil cover should be placed in a manner that prevents the soil from entering the GCL overlap zones. Soil cover should be pushed up on slopes, not down slopes to minimize tensile forces on the GCL. S. Cyclical wetting and drying of the GCL Can cause overlap separation. Soil cover shall be placed promptly whenever possible. 6. To avoid seam separation, the GCL should not be put in excessive tension by the weight or movement of textured geomembrane on steep slopes. Longitudinal seam overlaps shall be a minimum of 12" to reduce overlap separation. Additionally, supplimental bentonite shall be applied to the seams per manufacturer's recomendations. GEOSYNTHETIC CLAY LINER (GCL) DETAIL NO SCALE LINE FACE OF DAM W112" MIN. #57 WASHED STONE FILTER FABRIC UNDER DAM MIRAFI 500 OR APPROVED EQUAL GCL LINER, COVER SOIL AND PREPARED SUBGRADE, REF. GCL LINER DETAIL 3 KEY DAM INTO EXISTING GRADE TOP OF BAFFLE = 515.5 CLASS I RIP RAP BAFFLE GCL LINER, COVER SOIL AND PREPARED SUBGRADE, REF. GCL LINER DETAIL 215 SAURURUS CERNUUS (UZARD'S TAIL) MIN SIZE: V NA x 5' PLUG SPAUNQ 16' ON CENTER, CWSTERED AT ALT.. INTERVALS MATUWT': 24'-37 W. 10' ___... 20' TYPICAL S 5 *15 WNWS EFFUSUS VAR. PYUFI GENERAL POND CONSTRUCTION NOTE: Y NA x V PWG 1. GCL LINER SHALL NOT BE LEFT IN A PARTIALLY CONSTRUCTED CONDITION. POND MUST 18' ON CENTER, CLUSTERED AT ALT. INTERVALS BE COMPLETED FROM START TO FINISH WITHOUT INTERRUPTION. INSTALLATION OF 12"-36" HT. MATTING SHALL BE PERFORMED WHEN CONDITIONS ALLOW FOR THE CONTINUOUS MIN SM. INSTALLATION OF SUBGRADE MATERIAL, GCL MATTING AND COVER MATERIAL. SPACING: - 2. IN THE EVENT THAT CONDITIONS CANNOT IMMEDIATELY BE MET TO PERMIT B INSTALLATION, CONTRACTOR SHALL GRADE TO THE FULLEST EXTENT POSSIBLE BASED 220 CAREX TENERA ON CONDITIONS AND STABILIZE PER EROSION SEEDING PLANS. 2' DIA x 5' PLUG 3. CONTRACTOR MAY RESUME POND CONSTRUCTION AND GCL LINER INSTALLATION UPON CWSIERED AT ALTERNATING INTERVALS IMPROVEMENT OF CONDITIONS. ANY ACCUMULATED SILT SHALL BE REMOVED PRIOR 12'-80' MT. TO SUBGRADE PREPARATION. a 4. GC SHALL SECURE A BOND IN THE AMOUNT REQUIRED TO COVER FINAL POND O CONSTRUCTION COSTS, PAYABLE TO THE CITY OF CONCORD. �a 5. FINAL POND CERTIFICATION WILL NOT BE PROVIDED UNTIL AFTER INSTALLATION OF GCL AAXEPGS/WC lsl LINER, AND SUBGRADE/ COVER MATERIALS AND FINAL GRADING. 4" TOPSOIL & SEED IMPERMEABLE LAYER (REFER TO BASIN TYPICAL SECTION) SHALLOW LAND SHALLOW W7074BED HERBACEOUS PLANTS EMERGENT PLANTS OF TOPSOIL VEGETATED SHELF MAINTENANCE SCHEDULE Immediately efrer the wet detention basin is established, the plants on the vegetated shelf and perimmtw of the basin should be watered twice weekly if needed, ru" the plants become established (comaWiily six weeks). No poYhonof the wet detentioopond should be fertilised after the first initial A fertilization that is required to establislTthe plants MT the vegetated shelf. LITTORAL SHELF CROSS SECTION NO SCALE TLS WUM1xo is /N WEfXUwFN! se SERVICE NIU sxNl N'W W TIE Sf TI1CR! AND OWR R64MID RC'NIRB'SMCWNxUYM'N ME GPoUR,WG 1�ksE50. W. OT.. I.. TORN MMR. NVIm W MxNE M PMr. 3 3 NOTE: PROVIDE 18' MIN. COVER SOIL DEPTH ON LITTORAL SHELF POND BOTTOM ELEV. VARIES) FOR WETLAND PLANTINGS COVER SOIL. 12" MIN, REF. NOTES BELOW GCL MATTING, -BENTOMAT CL" OR APPROVED EQUAL, PLACED WITH POLYPROPYLENE MEMBRANE AGAINST SUBGRADE MIN PREPARED SUBGRADE MATERIAL t REQ'D, REF. NOTES BELOW OR UNFINISHED ROCK � I ' f:11Ay�1147712(4771g1[l111� NOTE: Liner, subgrade and Cover material shall be prepared and installed under dry conditions. Contractor may install liner after Seasonal High Water Table (SHWT) has receded to levels permitting work. If SHWT does not sufficiently recede under natural Conditions, then Contractor shall be responsible for any and all dewatering required to perform work. SUBGRADE PREPARATION: Subgrade surfaces consisting of granular soils, gravels or rough stone are not acceptable due to their large void fraction and puncture potential. If the underlying surface Consists of large rocks or other material that Cannot be removed, a 6" min. layer of sand or dean soil shall be prepared as a. subgrade material. Prepared subgrade materials shall have a particle -size distribution of at least 80% finer than the fl60 sieve (0.25 mm) and shall be prepared as follows: 1. The subgrade surface must be smooth and free of vegetation, sharp -edged rocks, stones, sticks and other foreign mater that could Contact the GCL. 2. The subgrade should be rolled with a smooth -drum Compactor to remove any wheel nuts greater than 1" in depth, footprints, or other abrupt changes. 3. All protrusions extending more than 0.5" shall be removed, crushed or pushed into the surface with a smooth -drum Compactor. 4. The GCL may be installed on a frozen subgrade, but the subgrade soil must meet the above requirements in the thawed state. COVER PLACEMENT: GC shall Cover the entire GCL mat with a minimum of 12" of Cover material to provide Confining stress to the GCL, eliminate the potential for seam separation and to prevent damage my equipment, erosion, etc. Cover material shall Conform to the following standards: 1. Cover soils should be free of angular stones or other foreign matter that Gould damage the GCL. GC shall consult manufacturer if Cover soils have high Concentrations of Calcium (limestone, dolomite, gypsum, seashell fragments.) 2. Cover soils shall have a particle size distribution ranging between fines and 1" unless a cushioning geotextile is specified. 3. Cover soils shall be placed over the GCL using construction equipment that minimizes stresses on the GCL. A minimum thickness of 12" of cover soil should be maintained between the equipment and the GCL at all times during the covering process. 4. Soil cover should be placed in a manner that prevents the soil from entering the GCL overlap zones. Soil cover should be pushed up on slopes, not down slopes to minimize tensile forces on the GCL. S. Cyclical wetting and drying of the GCL Can cause overlap separation. Soil cover shall be placed promptly whenever possible. 6. To avoid seam separation, the GCL should not be put in excessive tension by the weight or movement of textured geomembrane on steep slopes. Longitudinal seam overlaps shall be a minimum of 12" to reduce overlap separation. Additionally, supplimental bentonite shall be applied to the seams per manufacturer's recomendations. GEOSYNTHETIC CLAY LINER (GCL) DETAIL NO SCALE LINE FACE OF DAM W112" MIN. #57 WASHED STONE FILTER FABRIC UNDER DAM MIRAFI 500 OR APPROVED EQUAL GCL LINER, COVER SOIL AND PREPARED SUBGRADE, REF. GCL LINER DETAIL 3 KEY DAM INTO EXISTING GRADE TOP OF BAFFLE = 515.5 CLASS I RIP RAP BAFFLE GCL LINER, COVER SOIL AND PREPARED SUBGRADE, REF. GCL LINER DETAIL 215 SAURURUS CERNUUS (UZARD'S TAIL) MIN SIZE: V NA x 5' PLUG SPAUNQ 16' ON CENTER, CWSTERED AT ALT.. INTERVALS MATUWT': 24'-37 W. 10' ___... 20' TYPICAL S 5 *15 WNWS EFFUSUS VAR. PYUFI MIN SIZE Y NA x V PWG SPACING: 18' ON CENTER, CLUSTERED AT ALT. INTERVALS MATURITY: 12"-36" HT. 215 IRIS MR(4NICA (BLUE MUG) MIN SM. 2' NA x S' PWC SPACING: 18' ON CENTER, CLUSTERED AT ALT. INTERVALS MATURITY: 12'-38" HT. 220 CAREX TENERA MIN SIZE: 2' DIA x 5' PLUG SPAgNQ CWSIERED AT ALTERNATING INTERVALS MATURITY: 12'-80' MT. 220 ASCLEPIAS INCARNATA MIN SIZE: Y DIA x 5' PWG SPAgNQ CLUSTERED AT ALTERNATING INTERVALS MATURITY: 12'-60' HT. 220 LOBELIA CARDINAUS MIN 512E Y pIA x 5' PWG SPAGNQ CWSTERED AT ALTERNATING INTERVALS MATURITY: 12'-60' HT. KEY TYPE QUANTITY KEY TYPE QUANTITY 00 SHALLOW WATER EMERGENT °z SKALLOW LAND HERBACEOUS N 0 0 o o SOFT RUSH 306 0 SWAMP MILXWEED 319 a 00 O JRMGUS EFFUSUS✓AR. Psi �a AAXEPGS/WC lsl o ti SHALLOW WATER EMERGENT3D6 DZAWS TAIL � -� SHALLOW LAND HERBAGEWs WILL SEDGE 319 <�� 59(/RURUS LERNUUS GA/tIX RT ERA m OXD Ux SHALLOW WATER EMERGENTFLAG$HAOW E 306 LAND HERBACEOUS LLROWER 319 4f 0 cA iAa CARVOAx Is �i BASED ON VEGETATED SHELF AREA: 7,485 SF SHALLOW WATER (LOWER HALF OF SHELF): 3,665 SF SHALLOW LAND (UPPER HALF OF SHELF): 3,820 SF 1. PLANTINGS TO BE MINIMUM 2' DIA x 5" PWG AT TIME OF PLANTING 2. PLANTING SEASON OF PLUGS SHALL BE BETWEEN APRIL 1581 AND OCTOBER 30M. LITTORAL SHELF PLANTING DETAIL NO SCALE 24" THK. BEYOND PIPE, IA. PIPE y Y ANTI -SEEP COLLAR DETAIL NO SCALE POND DAM 5' MIN. TOP WIDTH 4' MIN DEPTH 2 MIN. CUTOFF TRENCH BACKFILL SMALL BE COMPACTED WITH CONSTRUCTION EQUIPMENT. ROLLERS OR HAND TAMPERS TO ASSURE MAXIMUM DENSITY AND MINIMUM PERMEABILITY. (98% STANDARD PROCTOR) CUT OFF TRENCH DETAIL NO SCALE FOREBAY BAFFLE DETAIL NO SCALE 4 0 CI 0 0 E SEAL 40 Lu Z u °z m N N 2 O JLL o F o Z i a 0 O �a o ti XW � QO O ]� m OXD Ux O C. n �i rc E a S c. r E m Is h LL 0 W z mk m z 00 RIZ z00 0 O N M a = c CD m 92 7 L Q W W Z J O = H d 0 F j K S U)0C) s a v D O it v v rc N M V IG ,O h Q E SEAL 40 Lu Z u °z m N N 2 O JLL o F o Z i a a O �a o ti XW � QO ]� m OXD Ux O C. �i m E a S c. r E m Is LL 0 W z mk m z 00 RIZ z00 O w = c 92 L N W W Z J O = H d 0 F j K S U)0C) s v E SEAL 40 Lu O N N 2 O JLL W M F U H W ❑ o Q i a SHEET NUMBER CD9