Loading...
HomeMy WebLinkAboutNC0000396_60 BOD Submittal Cover Letter_20170321DUKE ENERGY, s<v aoutR Murcn Street: favi) Cod. EMM Unanotte, Mortf1 Zarohna zazUz ae0-3r3-554V March 17, 2017 Mr. Landon Davidboi, North Carolina Department of Environmental Quality Ashville Reginal OfiicE zv50 U.S. ,0 Highway S..annan.,a, NC 28778 Sulljeci: Asheville Steam Electric Plant Interim A�tizn Plan - Basis of Design Report- Second Subminat Dear Mr. Davidson: Inclosed is the second submittal of the Interim Action Plan Basis of Design Report for the AshuvIlIG Steam E luctric Plant (Asheville Plant. This submittal incorporates the 60"i., design as well ds comment responses to the pieviuos sobmittal (30% design). The next and final Basis -.f Design submittal is expected .,ane 20 1 ,. If you have any questions on the enclosed information. please contact John Tuapfer at joh,-I.tuapfa.0duke-energy.com or at 919-546-7863 al your convenience. S' CerGly, Jeremy J. Pruett, PE Lead Engineer - vvaste a Groandwa[er Programs Environmental, Health & Safety cc/unc: Mr. Steve Lanter - DE4a 1636 Mail So, vice Cantel Raleigh.. NC ztSW—W-1036 Cc. Mr. Jim Wells - Dake Energy Mr. Kevin Kirkley - Duke Energy Ms. Teresa W;lliams - Doke Energy Mr. Ed Sullivai - Doke Energy Ms. Tine Wuud..ard - Duke Energy