HomeMy WebLinkAboutNC0000396_60 BOD Submittal Cover Letter_20170321DUKE
ENERGY,
s<v aoutR Murcn Street:
favi) Cod. EMM
Unanotte, Mortf1 Zarohna zazUz
ae0-3r3-554V
March 17, 2017
Mr. Landon Davidboi,
North Carolina Department of Environmental Quality
Ashville Reginal OfiicE
zv50 U.S. ,0 Highway
S..annan.,a, NC 28778
Sulljeci: Asheville Steam Electric Plant
Interim A�tizn Plan - Basis of Design Report- Second Subminat
Dear Mr. Davidson:
Inclosed is the second submittal of the Interim Action Plan Basis of Design Report for the
AshuvIlIG Steam E luctric Plant (Asheville Plant. This submittal incorporates the 60"i., design as
well ds comment responses to the pieviuos sobmittal (30% design). The next and final Basis -.f
Design submittal is expected .,ane 20 1 ,.
If you have any questions on the enclosed information. please contact John Tuapfer at
joh,-I.tuapfa.0duke-energy.com or at 919-546-7863 al your convenience.
S' CerGly,
Jeremy J. Pruett, PE
Lead Engineer - vvaste a Groandwa[er Programs
Environmental, Health & Safety
cc/unc: Mr. Steve Lanter - DE4a
1636 Mail So, vice Cantel
Raleigh.. NC ztSW—W-1036
Cc. Mr. Jim Wells - Dake Energy
Mr. Kevin Kirkley - Duke Energy
Ms. Teresa W;lliams - Doke Energy
Mr. Ed Sullivai - Doke Energy
Ms. Tine Wuud..ard - Duke Energy