Loading...
HomeMy WebLinkAbout20170081 Ver 1_FW PCN for 17BP 10 R 13 (Bridge 52 - Anson County)_20170320Carpenter,Kristi From: Thompson, Larry B Sent: Monday, March 20, 2017 3:49 PM To: Carpenter,Kristi; Hood, Donna Cc: Haywood, Luther G; Howard, Joel M; Amschler, Crystal C CIV USARMY CESAW (US) Subject: FW: PCN for 17BP.10.R.13 (Bridge 52 - Anson County) Attachments: 17BP.10.R.13 PCN (Bridge 52 - Anson County).pdf Importance: High Hi Kristi, We are in receipt of the "on hold" letter for 176P.10.R.13 that was received today. Just for clarification, the attached file was sent on January 20t" and it does contain an applicant signature. If you are not able to see the signature, please let me know this. Thank you! Larry Larry Thompson, PWS, LSS Division Environmental Officer North Carolina Department of Transportation 704-983-4437 office 704-301-4881 mobile Ithompson@ncdot.gov 716 W. Main Street Albemarle, NC 28001 _���� �`�, _� � �- J #'l �= _: �/'~� � ti� � •� .� �FY, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Thompson, Larry B Sent: Friday, January 20, 2017 12:59 PM To: Hood, Donna <donna.hood@ncdenr.gov>; Amschler, Crystal C CIV USARMY CESAW (US) <Crystal.C.Amschler@usace.army.mil>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Cc: Howard, Joel M<jhoward@ncdot.gov>; Haywood, Luther G <ghaywood @ ncdot.gov> Subject: PCN for 17BP.10.R.13 (Bridge 52 - Anson County) Importance: High Crystal, Kristi and Donna: Attached you will find a PCN for the 17BP.10.R.13 bridge replacement project in Anson County. The proposed project would replace an existing timber-decked bridge with a 3 barrel culvert (3 barrels at 7' x 7') on SR 1822 Thomas, or more accurately, Covington- Thomas Road over N. Fork Jones Creek in Anson County. The design will keep the existing stream width by utilizing a single 7' x 7' barrel as the low-flow barrel. Flood plain benches will be constructed to restrict flow to the two overflow barrels. It should be noted that the consultant who prepared the PCN indicated that there would not be an increase in impervious area as a result of this project being constructed. I am not sure that this is totally accurate but any increase in impervious area would be in the single digits. We obtained mitigation coverage for 78 linear feet of permanent impacts in 2012 (attached). The length of the proposed culvert is 63 feet. Please let me know if you have any questions regarding the attached. Charges may be made to 17BP.10.R.13. Thank you! La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 716 West Main Street Albemarle, North Carolina 28001 704-983-4437 office 704-301-4881 mobile Ithompson@ncdot.�ov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.