Loading...
HomeMy WebLinkAbout20150636 Ver 1_AsBuilt Report Comments by DWR_20170317Strickland, Bev From: Merritt, Katie Sent: Friday, March 17, 2017 1:37 PM To: mherrmann Subject: Re: As -Built Report Review Hey Mike, That sounds good. Submitting a .pdf will be just fine. When you submit the .pdf, please add in the email what you added or changed. Don't forget to show me an approximate location of where you think that additional plot will be located in Zone C. Thank you, Katie From: mherrmann <mherrmann@watershedinvestmentsnc.net> Sent: Friday, March 17, 2017 1:32:02 PM To: Merritt, Katie Subject: RE: As -Built Report Review Hi Katie, The Axiom folks will plan to add an additional veg plot when they go out to do year one measurements within zone C of the Phase 1. When we finish with the other revisions, what do you need for us to submit? Paper copy? Digital? Or both? Thanks for your quick review. Mike -------- Original message -------- From: "Merritt, Katie" <katie.merritt@ncdenr.gov> Date: 3/16/17 14:31 (GMT -05:00) To: mherrmann <mherrmann@watershedinvestmentsnc.net> Subject: As -Built Report Review Hey Mike, I have finalized my review of the Neville Farms AsBuilt Report received on March 10, 2017. The report was very thorough and organized. I have just a few comments that I'd like you to address prior to final approval. Please see comments provided below: As shown on page 3 of 3 of the AsBuilt Survey, there is no plot representing the vegetation in Zone C of Phase I. However, there are multiple plots representing Zone A/B. Please move or add a plot into Zone C. No additional baseline vegetation data is being requested. Submit a brief memo (1 paragraph) to attach to the AsBuilt Report (i will insert the page before Page 1). This memo needs to reference Appendix G and state briefly that there were some changes to the conservation easement boundaries from what was proposed in the BPDP that resulted in changes of buffer and nutrient offset credit amounts. Table 1C needs to be revised to show totals of Preservation separate from Restoration. Additionally, add a reference below this table for Appendix G since that appendix explains the calculation changes and provides the approval from planning. If you have any questions regarding this correspondence, please let me know. Once you have submitted documentation addressing comments 1-3 above, DWR will issue the next credit release. Thank you, Katie