HomeMy WebLinkAbout20051068 Ver 3_More Info Requested - Email_20170318Strickland, Bev
From:
Homewood, Sue
Sent:
Saturday, March 18, 2017 11:16 AM
To:
'Kevin Caldwell'
Subject:
RE: Afton Ridge
Kevi n,
I have some questions/comments regarding the SMP. I hope these will be simple to resolve/submit.
• Please provide a contact name, company and mailing address for the responsible party for the SMP.
• A properly executed Operation and Maintenance Agreement is required.
• The new MDC for wet ponds requires that the dam structure be vegetated with non -clumping turf grass but the
plans call for a riparian seed mix.
• The new MDC indicates that the inlet and the outlet should be designed in a manner to avoid short circuiting,
however one of the forebays is adjacent to the outlet structure.
• The plans must include a construction sequence for complete clean out of the sediment basin and conversion to
the final wet pond dimensions and specifications.
Thanks,
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
-5�*�Nothmq Compares.]
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Kevin Caldwell [mailto:kcaldwell@geosciencegroup.com]
Sent: Thursday, March 16, 2017 4:19 PM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: Afton Ridge
Sue,
Attached are the calculations. The first "section" is for erosion control which has already been permitted
through the Mooresville Regional Office.
Please let me know if you have any questions?
Thanks
Kevin S. Caldwell, P.E.
Senior Vice President
GEOSCIENCE GROUP, INC.
500-K Clanton Road
Charlotte, NC 28217 USA
(704) 941-2252 (Direct)
(704)-661-2210 (Cell)
kcaldwellg geoscience group. com