Loading...
HomeMy WebLinkAbout20051068 Ver 3_More Info Requested - Email_20170318Strickland, Bev From: Homewood, Sue Sent: Saturday, March 18, 2017 11:16 AM To: 'Kevin Caldwell' Subject: RE: Afton Ridge Kevi n, I have some questions/comments regarding the SMP. I hope these will be simple to resolve/submit. • Please provide a contact name, company and mailing address for the responsible party for the SMP. • A properly executed Operation and Maintenance Agreement is required. • The new MDC for wet ponds requires that the dam structure be vegetated with non -clumping turf grass but the plans call for a riparian seed mix. • The new MDC indicates that the inlet and the outlet should be designed in a manner to avoid short circuiting, however one of the forebays is adjacent to the outlet structure. • The plans must include a construction sequence for complete clean out of the sediment basin and conversion to the final wet pond dimensions and specifications. Thanks, Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue.Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 -5�*�Nothmq Compares.] Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kevin Caldwell [mailto:kcaldwell@geosciencegroup.com] Sent: Thursday, March 16, 2017 4:19 PM To: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: Afton Ridge Sue, Attached are the calculations. The first "section" is for erosion control which has already been permitted through the Mooresville Regional Office. Please let me know if you have any questions? Thanks Kevin S. Caldwell, P.E. Senior Vice President GEOSCIENCE GROUP, INC. 500-K Clanton Road Charlotte, NC 28217 USA (704) 941-2252 (Direct) (704)-661-2210 (Cell) kcaldwellg geoscience group. com