Loading...
HomeMy WebLinkAbout20170172 Ver 1_NEP Area 2-Revised Details_20170314Zaw OJU pzw <o. Z11~ 2,7, Uxw 0 o0m Ua0 oZw -o wCc, N 0 zzw Z DOm o m, x U_¢ F, 0Y1 waw D_ woo °w¢ o.w Dzo< o Ow o wG� w w�Q wiz 6'o wn¢ >00 WIZ w3< wF� xao �zw w0< a ¢� H zlz :2w 0 z Do zo w °n_ .0 U p00 Y N Q z U 00F, '10 xww SOzmF EROSION CONTROL MATTING FILTER FABRIC (CLASS B) EXIST BANK r� 2.0' 1.5' DE-WAT IMPERVIOI DII SILT BAG LOCATION S 1.5' CHANNEL SEEDING 1. EACH RIP RAP PLACEMENT SHALL BE BEDDED IN LAYER OF FILTER FABRIC. PLACEMENT OF RIP RAP SHALL IMMEDIATELY FOLLOW THE PLACEMENT OF THIS LAYER. KEEP VOIDS TO A MINIMUM AND FORM A DENSE WELL GRADED MASS OF STONE. DO NOT DISLODGE THE UNDERLYING BASEOF FABRIC WHEN PLACING STONE. 2. MAXIMUM SLOPE OF THE CHANNEL BANK SHALL NOT EXCEED 1.0 HORIZONTAL TO 1.0 VERTICAL. FINISHED GRADE OF THE RIP RAP IS TOBLEND WITH THE SURROUNDING AREA. 3. INSPECT RIP RAP PERIODICALLY FOR SCOUR OR DISLODGED STONES(ESPECIALLY AFTER SEVERE STORMS) AND WEED BRUSH GROWTH. 4. THE MINIMUM THICKNESS OF THE RIP RAP LAYER SHALL BE 24 INCHES OF CLASS B. MATCH EXISTING STREAM BED GRADE L° CREEK CROSSING STABILIZATION NOT TO SCALE TEMPORARY SEED MIX LATE WINTER/EARLY SPRING -RYE (GRAIN) @ 120 LB/ACRE SUMMER -GERMAN MILLET @ 40 LB/ACRE -SUDANGRASS @ 50 LB/ACRE (AS A SUBSTITUTE) FALL -RYE (GRAIN) @ 120 LB/ACRE PERMANENT RIPARIAN SEED MIX (IDEALLY PLANTED EITHER AUG -SEPT OR MAR-APR) -REDTOP @ 7 LB/ACRE -SWITCH GRASS @ 50 LB/ACRE -SEDGE @ 10 LB/ACRE -RICE CUTGRASS @ 20 LB/ACRE NOTE: ALTERNATIVE SPECIES MAY BE USED UPON APPROVAL BY THE ENGINEER. ULASSA61UNE EXISTING GROUND DISCHARGE 15' TO 20' HOSE STABILIZED OUTFALL CLASS A STONE CONSTRUCTION NOTES: 1. INSTALL EROSION CONTROL MEASURES AND TREE PROTECTION AS SHOWN ON PLAN. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSION CONTROL MEASURES TO MAKE ADJUSTMENTS FOR UNFORESEEN FIELD CONDITIONS. ALL RELOCATION SHALL HAVE THE APPROVAL OF THE ENGINEER. 2. CLEAR AND GRUB AREA OF ALL TRASH AND EXOTIC/INVASIVE VEGETATION. 3. STABILIZE GRADED BANKS WITH SEED AND MULCH. 4. INSTALL COIR FIBER MAT PER MANUFACTURER'S INSTRUCTION. 5. INSTALL PLANTS AS DESCRIBED IN PLANTING NOTES ON THIS SHEET. NOTES (_'RAVGI CI IRCTRATF A HOSE 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. PUMP AROUND 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM PUMP FLOW US DIKE 2GE HOSE D BE KEPT AREA FILTER FABRIC 8" OF CLASS A STONE EXISTING NOTES: CHANNEL SILT BAG PROFILE 1. BAG SHALL BE SIZED CORRECTLY FOR FLOW RATE OF PUMP. 2. CONTENTS COLLECTED BY SEDIMENT BAG SHALL BE DISPOSED OF AT AN ACCEPTABLE LOCATION. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 200 FEET MAY BE DISTURBED AT ANY ONE TIME. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING PUMP SIZE SUFFICIENT TO PUMP BASE FLOW. 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 5. THE CONTRACTOR SHALL PERFORM CULVERT WORK IN ACCORDANCE WITH THE PLAN. 6. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 8. ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. STREAM BYPASS DETAIL NOT TO SCALE EROSION CONTROL MATTING MAXIMUM WIDTH OF DISTURBANCE N LIMITED TO 15' A STREAM BED CONTROL - PLAN VIEW MATCH EXISTING CHANNEL FULLBANK WIDTH BANKFULL ELEVATION 1.5' MIN. INVERT SET AT PROFILE GRADE FILTER 2.T 5' FABRIC P. GRAVEL SUBSTRATE GRADE CONTROL ROCK 50 / 50 MIX OF IN SITU SOIL AND # 5 STONE 50 / 50 MIX CLASS B / 1 RIP RAP TOP OF RIFFLE (MATCH EXISTING ELEV.) SLOPE VARIES FILTER ---- FABRIC GRAVEL SUBSTRATE 50 / 50 MIX OF IN SITU SOIL AND # 5 STONE STREAM BED CONTROL - SECTION A -A FLOW Now DESIGN BED SURFACE GRADE CONTROL ROCK 50 / 50 MIX CLASS B / 1 RIP RAP STREAM BED CONTROL - PROFILE B -B STREAM BED CONTROL DETAIL NOT TO SCALE NOTE: EROSION CONTROL MATTING BANKFULL ELEVATION BOTTOM OF RIFFLE - (MATCH EXISTING ELEV.) MIN ^I 11.5'M PRIOR TO ANY LAND DISTURBING ACTIVITIES, CONTRACTOR SHALL CLEARLY MARK WITH ORANGE FABRIC FENCING ALL WETLANDS, STREAMS, SURFACE WATERS, AND RIPARIAN BUFFERS LOCATED ON THE PROJECT SITE WHERE IMPACTS ARE NOT ALLOWED. J z O z O Q z 0 fr O O U 0 z Q UJ W cr cr O LL Q Cz G J W n� DWK DICKSON community infrastructure consultants 401 4TH STREET SW SUITE 201 HICKORY, NC 28602 (t) 828-327-6911 (f) 828-327-9164 WWW.WKDICKSON.COM NC LICENSE NO.F-0374 PROFESSIONAL SEAL �m J_ Q w ❑ ❑ U) o O Q a w >- L) fr m cin LU OLLI Q ❑ _W w cn D= ❑ W ❑ ❑ Q r` Lu C M 1 I -I o H w 3 U) O z CL O U) U) C/) 2 > J W F Q I- U m W cj W 0 Z O H <Q m W N EE z J ~ a 0 Cn X Q w >Q W c H N Q c/) w U Q IL W 2 Z Z U Z w O Q cr cr d ❑ PROJ. MGR.: RH DESIGN BY: CH DRAWN BY: CH/NS PROJ. DATE: JAN 2017 DRAWING NUMBER: D.7 OF 49 WKD PROJ. NO.: 20150198.00. H I