Loading...
HomeMy WebLinkAbout20151279 Ver 2_More Info Received_20170312Action History (UTC -05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/12/2017 10:51:54 PM (Supplemental Submital) Approve by Montalvo, Sheri A 3/13/2017 10:59:23 AM (NON -DOT Project) VV W supplemental Information Upl Staff Review: Updated ID#: 20151279 Updated Version: Project Modification Addl Info Request Reviewers Email Address: Jennifer.Burdette@ncdenr.gov Karen.Higgins@ncdenr.gov Submitted Information: Is this a public transportation project? r Yes f• No What type of project is this? r E)asting Project r Pre -Application Information Existing Project Information: ................................................................... ID# 00151279 DAR DA AQ N inber Version: Project Modification Addl Info Request Project Name: Hathaway Project Permit Mod County: Nash Name: Anna Lambert Who is subrritting the information? Email Address: alambert@res.us Water Resources ENVIRONMENTAL QUALITY Describe the Jennifer, attachments: I have attached the site plan for the Hathaway Switching Station which includes the stormwater management plan (see page 13). 1 have also attached the approval letter from the City of Rocky Mount. If you have any questions or need any additional information, please let me know. Best, Anna Stuart Anna Stuart Lambert Angler Environmental, A RES Company 804-729-8984 Please upload all files that need to be submited. Hathaway Site Plan.pdf 6.7MB Hathaway Switching Station GP III 4th review.pdf 24.35KB Only pdf files are accepted. PF By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act) • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the Supplemental Information form. Signature: 4 kx� Revisions PELINO D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d \ A p p r . W B S E n g r . N o . W B S L a b o r N o . SUBSTATION EQUIPMENT LAYOUT EMBANKMENT : MATERIALS : BENCHING : SITE PREPARATION : PREFACE DOMINION SITE PREPARATION PERFORMANCE SPECIFICATIONS w w w . d o m . c o m R I C H M O N D , V I R G I N I A 2 3 2 1 9 7 0 1 E A S T C A R Y S T R E E T O N E J A M E S R I V E R P L A C E , 1 2 t h F L O O R 1 2 3 VICINITY MAP 6 LESS THAN 40 PERCENT AND A PLASTICITY INDEX LESS THAN 15. REFERENCED TO ASTM D-698 STANDARD PROCTOR. SOILS SHALL HAVE A LIQUID LIMIT MATERIALS SHALL POSSESS A MAXIMUM DRY DENSITY OF 100 #/CU.FT. OR GREATER UNIFIED SOIL SYSTEM, ASTM D-2487 AS GW, GP, SW, SP, SM, AND SC. THESE SATISFACTORY MATERIALS SHALL COMPRISE THOSE CLASSIFIED IN ACCORDANCE WITH THE ORGANIC MATERIAL. FROZEN MATERIAL WILL NOT BE PERMITTED IN THE FILL. APPROVED SOILS USED IN COMPACTED FILLS SHALL BE FREE OF DEBRIS AND FIBROUS THE DRAWINGS. MATERIAL ABOVE THE NATURAL GROUND OR OTHER SURFACE IN CONFORMANCE WITH EMBANKMENT WORK SHALL CONSIST OF THE PLACEMENT AND COMPACTION OF FILL SLOPES STEEPER THAN 4:1 BUT NOT STEEPER THAN 1•:1, THE BENCH SHALL BE AT LEAST 6 FT. IN WIDTH. AS FOLLOWS : BENCHING SHALL BE REQUIRED FOR ALL FILL EMBANKMENTS PLACED ON EXISTING SLOPES OF THE OPTIMUM. SPECIFIED, EXCEPT MOISTURE CONTENT SHALL BE MAINTAINED WITHIN 10 PERCENT OF THE PREVIOUS CUT. SATISFACTORY MATERIAL REMOVED DURING THIS OPERATION SHALL BE RECOMPACTED ALONG WITH THE NEW EMBANKMENT MATERIAL AS GENERALLY OF THE EXISTING SLOPED SURFACE AND CONTINUING AT EACH VERTICAL INTERSECTION BENCHING SHALL CONSIST OF A SERIES OF HORIZONTAL CUTS BEGINNING AT THE TOE SOFT MATERIALS ENCOUNTERED SHALL BE COMPLETELY EXCAVATED AND REPLACED WITH APPROVED FILL MATERIALS. OR WITH SIMILAR APPROVED CONSTRUCTION EQUIPMENT. DONE AFTER A SUITABLE PERIOD OF DRY WEATHER TO AVOID DEGRADING THE SUBGRADE. PROOFROLLING SHALL BE PERFORMED WITH A HEAVILY LOADED DUMP TRUCK PROOFROLLED TO DETECT UNSUITABLE SOIL CONDITIONS. PROOFROLLING SHALL BE THE EXPOSED SUBGRADES OF THE BUILDING PAD AND ROADBEDS SHALL BE WHICH RECEIVE COMPACTED FILL SHALL BE DRAINED AND ALLOWED TO DRY. AVOID OPERATING EQUIPMENT ON SATURATED SOILS. ANY WET SUBGRADE AREAS IF EARTHWORK OPERATIONS ARE PERFORMED DURING WET SEASONS, CONTRACTOR SHALL ALL TOPSOIL AND SURFACE SOILS CONTAINING ORGANIC MATERIAL SHALL BE REMOVED LIMITS FOR CLEARING AND/OR GRUBBING SHALL BE AS DEFINED ON THE DRAWINGS. GROUND SURFACE. ALL CLEARED AREAS WILL BE GRUBBED UNLESS OTHERWISE NOTED. EXCAVATION : EXCAVATION SHALL BE ACCOMPLISHED BY CUTTING ACCURATELY TO THE CROSS SECTIONS, ROCK EXCAVATION SHALL BE MATERIAL WHICH REQUIRES THE USE OF PNEUMATIC FROM THE GRUBBED AREA. TOPSOIL SHALL BE STOCKPILED FOR FUTURE USE IN SOFT, UNSTABLE, OR OTHERWISE UNSATISFACTORY MATERIALS ENCOUNTERED AT THE PROPERLY COMPACTED MATERIAL. REQUIRED GRADES SHALL BE REMOVED AS DIRECTED AND REPLACED WITH APPROVED, LOGS, STANDING TREES AND SNAGS, OTHER GROWTH AND ANY ITEMS THAT WOULD INTERFERE WITH CONSTRUCTION OPERATIONS. CONTROLLED LAND. CLEARING SHALL CONSIST OF REMOVAL AND DISPOSAL OF BRUSH, DOWNED TIMBER, GRUBBING SHALL CONSIST OF REMOVAL AND DISPOSAL OF STUMPS, BURIED LOGS, APPROVED LOCATIONS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. TOPSOIL SHALL NOT BE USED AS, OR MIXED WITH, FILL MATERIAL IN THE CONSTRUCTION OF EARTH EMBANKMENTS UNLESS OTHERWISE SHOWN ON THE DRAWINGS. TOPSOIL MATERIAL USED AS A SURFACE DRESSING SHALL BE REASONABLY FREE OF CINDERS, DEBRIS, AND STONES. UNSUITABLE AND EXCESS TOPSOIL MATERIAL SHALL BE DISPOSED OFFSITE. GRADES, AND ELEVATIONS SHOWN ON THE DRAWINGS. HAMMERS AND/OR EXPLOSIVES FOR REMOVAL. SHOWN ON THE DRAWINGS. THE CONTRACTOR WILL RECOGNIZE AND ABIDE BY ALL TERMS ROOTS GREATER THAN •" DIAMETER, AND ANY OTHER ORGANIC MATERIAL BELOW THE COMMON EXCAVATION SHALL INCLUDE ALL MATERIAL WHICH CAN BE REMOVED BY COMMON EARTH EXCAVATION EQUIPMENT, OTHER THAN SOLID ROCK OR BOULDERS AND DETACHED PIECES OF ROCK, EACH EXCEEDING 2 CUBIC YARDS IN VOLUME. AND CONDITIONS OF PERMITS, EASEMENTS, AND AGREEMENTS RELATING TO THE PROJECT. OTHERWISE, DISPOSAL SHALL BE OUTSIDE THE LIMITS OF DOMINION WRITTEN APPROVAL IS OBTAINED FROM LOCAL AUTHORITIES AND DOMINION. CLEARING AND GRUBBING TOPSOIL EARTHWORK DISPOSAL OF CLEARED/GRUBBED MATERIAL BY BURNING SHALL ONLY BE USED WHEN IT IS THE INTENT OF THESE SPECIFICATIONS TO HAVE A COMPLETELY PREPARED SITE FOR THE CONSTRUCTION OF AN ELECTRICAL FACILITY AT THE COMPLETION OF THE "WORK" AS INDICATED ON THE DRAWINGS, SPECIFICATIONS, OR OTHER DOCUMENTS PROVIDED. ANY SPECIFICATIONS OR INSTRUCTIONS APPEARING ON THE DRAWINGS SHALL HAVE THE REGULATIONS OF ALL LOCAL, STATE, OR FEDERAL GOVERNMENTAL BODIES HAVING JURISDICTION OVER THE WORKING AREAS SHALL BE OBSERVED AT ALL TIMES. ALL "WORK" SHALL BE PERFORMED WITHIN THE LIMITS OF THE PROPERTY / RIGHTS-OF-WAY PRECEDENCE OVER THE WRITTEN SPECIFICATIONS WHICH APPEAR HEREIN. IN THE EVENT FOR RESOLUTIONS. ALL "WORK" SHALL BE PERFORMED IN A MANNER CONSISTENT WITH THE BEST PRACTICES OF THE TRADES INVOLVED. THAT A DISCREPANCY OR OMISSION HAS OCCURRED, DOMINION SHALL BE CONSULTED UNSATISFACTORY SOILS INCLUDE THOSE CLASSIFIED AS PT, OH OR OL, CH, MH, CL AND ML, AS REFERENCED TO ASTM D-2487. OTHER MATERIALS, WHEN APPROVED BY ENGINEERING, MAY BE PERMITTED IN FILL AREAS. COMPACTION EQUIPMENT SHALL CONSIST OF VIBRATORY OR TAMPING ROLLERS, SHEEPSFOOT ROLLER, PNUEMATIC-TIRED ROLLERS, THREE-WHEEL POWER ROLLERS, WALK BEHIND VIBRATORY ROLLERS, VIBRATORY PLATE OR OTHER APPROVED EQUIPMENT WELL APPROVED FILL MATERIAL SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS OF EACH SUCCESSIVE LIFT WILL BE PLACED ON FIRM APPROVED SUBGRADE OR COMPACTED FILL. WHERE PREVIOUS LIFTS ARE FOUND TO BE UNACCEPTABLE, THE AREA WILL BE SCARIFIED, AERATED OR MOISTENED, RECOMPACTED OR REMOVED, AND REPLACED AS REQUIRED. PROCTOR MAXIMUM DRY DENSITY ( ASTM D-698 ), WITH MOISTURE CONTENT RANGING GENERALLY, FILLS SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD BETWEEN LESS THAN 3 PERCENT UP TO THE OPTIMUM AS DETERMINED BY THE PROCTOR DENSITY TEST. THE UPPER 12" OF ROADBEDS AND CONTROL ENCLOSURE BUILDING PADS DRAINAGE : THE FILL SURFACE SHALL BE ADEQUATELY MAINTAINED DURING CONSTRUCTION. THE SURFACE SHALL BE SLOPED TO ACHIEVE SUFFICIENT DRAINAGE, AND TO PREVENT WATER COMPACTION : FINISHED GRADE TOLERANCES : THE TOP OF EARTHWORK FOR SUBSTATION PAD AND ROADWAY TRAVEL AREAS SHALL BE WITHIN 0.10 FT. ABOVE OR BELOW THE THEORETICAL GRADE. EXCAVATED SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO EARTH SLOPES : PROVIDE HORIZONTAL RIDGES AND GROOVES HAVING AN AVERAGE DEVIATION NO GREATER THAN 0.75 FT. FROM THE THEORETICAL LINE OF THE TYPICAL CROSS EXCAVATED SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. EMBANKMENT SLOPES STEEPER THAN 3:1 SHALL BE ROUGH GRADED IN A MANNER TO PROVIDE HORIZONTAL RIDGES AND GROOVES NOT MORE THAN 0.50 FT. FROM THE EMBANKMENT SLOPES 3:1 OR FLATTER SHALL BE UNIFORMLY FINISHED AND SHALL NOT DEVIATE FROM THE THEORETICAL PLANE SURFACE BY MORE THAN 0.50 FT. ROCK SLOPES : SHALL NOT DEVIATE FROM A PLANE SURFACE BY MORE THAN 2.0 FT. AND SHALL MANUFACTURERS' ITEMS : ITEMS REFERENCED TO SPECIFIC MANUFACTURERS OR BRAND NAMES SHALL BE SUBJECT TO ANY RECOMMENDATIONS OR LIMITATIONS PERTAINING TO THEIR INSTALLATION OR USE. FROM PONDING ON THE FILL. IF PRECIPITATION IS EXPECTED WHILE FILL CONSTRUCTION IS TEMPORARILY HALTED, THE SURFACE SHALL BE ROLLED WITH RUBBER- TIRED OR STEEL-DRUMMED EQUIPMENT TO IMPROVE SURFACE RUNOFF. FOR PLACEMENT DURING OR AFTER DIFFICULT WEATHER CONDITIONS, WET OR FROZEN MATERIAL SHALL NOT DEVIATE FROM THEIR THEORETICAL LOCATION BY MORE THAN 2.0 FT. MEASURED ALONG ANY LINE PERPENDICULAR TO THE THEORETICAL SLOPE LINE. BE REMOVED. SUITED TO THE SOIL BEING COMPACTED. SECTION. THEORETICAL LINE OF THE TYPICAL CROSS SECTION. REQUESTS FOR SUBSTITUTIONS MUST BE APPROVED BY ENGINEERING. SUFFICIENT REQUIRE 98 PERCENT COMPACTION REFERENCED TO ASTM D-698, WITH MOISTURE CONTENT MAINTAINED WITHIN 2 PERCENT OF THE OPTIMUM. ON THE DRAWINGS SHALL CONFORM TO THE REQUIREMENTS OF THEIR LATEST STANDARDS AND SPECIFICATIONS. INFORMATION REGARDING REQUESTS MUST BE RECEIVED BY ENGINEERING 10 DAYS IN ADVANCE OF APPROVAL. APPROXIMATELY 8" DEPTH (LOOSE MEASUREMENT), EXCEPT FOR ROAD MATERIALS ABOVE SUBGRADE ELEVATION AND THE UPPER 12" OF BUILDING PADS WHICH REQUIRE 6" LIFTS. WHERE WALK BEHIND ROLLERS AND VIBRATORY PLATE COMPACTORS ARE USED, THE LIFT THICKNESS SHALL NOT EXCEED 4". MATERIALS / INSTALLATION A V E MORNING STAR CHURCH RD E B A T T L E B O R O R A I L R O A D S T 4 301 1412 1407 SITE HATHAW AY ST B A T T L E B O R O R D. R E D O A K LOCATE EXISTING UTILITIES PRIOR TO BEGINNING WORK. THE CONTRACTOR IS RESPONSIBLE FOR CALLING THE NC ONE CALL CENTER AT 811 TO17. TO THE INSTALLATION OF GAS OR ELECTRIC UTILITIES. THE PROPERTY OWNER SHALL PROVIDE AN EXECUTED RIGHT-OF-WAY EASEMENT PRIOR16. OF BORINGS, CONDUIT, PAVEMENT PATCHING AND LANDSCAPING REPLACEMENT. FOR UNDERGROUND UTILITIES, THE DEVELOPER/OWNER IS RESPONSIBLE FOR ALL COSTS15. RELOCATION OF ANY EXISTING UTILITIES. THE DEVELOPER/OWNER IS RESPONSIBLE FOR ALL COSTS RELATED TO THE14. PUBLIC UTILITIES. OF ELECTRIC SERVICE TO THE POINT OF DELIVERY IDENTIFIED BY ROCKY MOUNT THE ELECTRIC CUSTOMER SHALL OWN AND BE RESPONSIBLE FOR THE INSTALLATION13. SERVICES. SERVICES AND 252/467-4827 TO COORDINATE THE INSTALLATION OF NATURAL GAS UTILITIES AT 252/467-4808 TO COORDINATE THE INSTALLATION OF ELECTRIC CONTRACTOR/OWNER/DEVELOPER SHALL CONTACT CITY OF ROCKY MOUNT PUBLIC12. CONSTRUCTION. INSPECTOR BILL PRIDGEN AT 252/343-3156 ONE WEEK PRIOR TO BEGINNING CONTRACTOR/DEVELOPER SHALL CONTACT CITY OF ROCKY MOUNT CONSTRUCTION11. BASE FLOOD (100-YEAR) ELEVATION IS 91 FEET. SITE LIES IN FLOOD ZONE X, PER FEMA FIRM #372038600J DATED NOVEMBER 3, 2004.10. AND REFERENCE VERTICAL DATUM IS NAVD 88. PARCEL ID:040252 ON SEPTEMBER 3, 2015. REFERENCE HORIZONTAL DATUM IS NAD 83 PERFORMED BY BOWMAN CONSULTING ON JULY 24, 2015 AND ADDITIONAL CONTOUR ON THESE PLANS WERE OBTAINED FROM AN ACTUAL FIELD SURVEY9. AGREEMENTS, AND DRIVEWAY PERMITS. CONSTRUCTION. THIS INCLUDES APPROVED CONSTRUCTION PLANS, ENCROACHMENT BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING COPIES OF ALL PERMITS AND APPROVED PLANS MUST BE KEPT ON SITE IN A PERMIT8. TO ANY GRADING OR CONSTRUCTION ON THE SITE. FORMAL SEDIMENTATION AND EROSION CONTROL PLAN AND PERMIT IS REQUIRED PRIOR THE DISTURBED AREA FOR THIS PROJECT IS GREATER THAN 1.0 ACRE. THEREFORE, A7. AS THE POST-DEVELOPED NUTRIENT LOADINGS ARE WITHIN THE REQUIRED LIMITS. NUTRIENT MANAGEMENT FOR THIS PROJECT IS NOT REQUIRED FOR THIS PROJECT,B) DETENTION POND DETENTION FOR THIS PROJECT IS ACCOMPLISHED UTILIZING A STORMWATERA) SELECT THE APPLICABLE STATEMENT(S) BELOW TO COMPLETE NOTE 4: STORMWATER DETENTION AND NUTRIENT MANAGEMENT ARE TYPICALLY REQUIRED. THE DISTURBED AREA FOR THIS PROJECT IS GREATER THAN 0.5 ACRE. THEREFORE,6. LANDSCAPE MAINTENANCE BOND. THIS PROJECT UNTIL THE DEVELOPER OR CONTRACTOR PROVIDES A THE CITY OF ROCKY MOUNT WILL NOT ISSUE A CERTIFICATE OF OCCUPANCY FOR5. LAND DEVELOPMENT CODE. ALL SIGNS SHOWN ON THIS PLAN SHALL CONFORM TO TABLES 7-6 AND 7-7 OF THE4. THIS PLAN IS VALID FOR TWO (2) YEARS FROM THE DATE OF APPROVAL2. EDITION. LAND DEVELOPMENT CODE AND MANUAL OF SPECIFICATIONS AND DETAILS, LATEST ALL REQUIRED IMPROVEMENTS SHALL CONFORM TO THE CITY OF ROCKY MOUNT'S1. CITY OF ROCKY MOUNT STANDARD NOTES (REVISED 12/21/2011) ITEMS REFERENCED TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SHOWN NCDOT : SITE DATA: C I T Y O F R O C K Y M O U N T , N O R T H C A R O L I N A H A T H A W A Y S W I T C H I N G S T A T I O N G E N E R A L P L A N L E V E L 3 INFORMATION. FOR SUPPORTING STORMWATER FOR HATHAWAY SUBSTATION MANAGEMENT CALCULATIONS REFER TO THE STORMWATER Sheet 1 of 12 Total Sheets(NTS) 4 5 SCALE: 1"=2,000' BREAKERS 6 DISTRIBUTION ENCLOSURE 5 CONTROL TROUGH 4 CABLE BACKBONE 3 TRANSMISSION 2 ALUMINUM BUS 1 TRANSFORMER LEGEND 1-800-623-4949 UTILITIES TO LOCATE UNDERGROUND LAND DISTURBANCE "ONE CALL" BEFORE CALL NORTH CAROLINA IMPORTANT: SERVICE AND RELIABILITY TO THE REGION AND THE OVERALL TRANSMISSION GRID. THIS PROJECT IS CONSTRUCT A SWITCHING STATION TO PROVIDE IMPROVED ELECTRICAL PROJECT DESCRIPTION: N/A N/A 12.00 ACRES 4.13 ACRES 3.40 ACRES 0.73 ACRES PRIOR TO ISSUANCE OF LAND DISTURBANCE PERMIT. NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY REQUIRED TAR-PAMLICO CITY OF ROCKY MOUNT LAND DISTURBANCE PERMIT IS REQUIRED. MUST HAVE AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. ANY OFFSITE LAND DISTURBING ACTIVITY ASSOCIATED WITH THIS PROJECT MAP NO. 3720386300J, NOV. 3, 2004 ZONE: X, FEMA FRIM COMMUNITY PANEL NUMBER 3863 1.20 ACRES IMPACTED NONE 37.39 ACRES ELECTRICAL SWITCHING STATION 386312875252, 386312864681, 386312863225 A-1, I-2 36°2'33.66"N, 77°45'9.19"W HATHAWAY ROCKY MOUNT, NC 27809 4815 CREPE MYRTLE STREET PARKING SPACES PROVIDED: PARKING SPACES REQUIRED: TOTAL DISTURBED AREA: (POST CONSTRUCTION): TOTAL IMPERVIOUS AREA PROPOSED IMPERVIOUS AREA: EXISTING IMPERVIOUS AREA: STORMWATER DISCHARGE PERMIT: RIVER BASIN: LAND DISTURBANCE PERMIT: OFFSITE LAND DISTURBANCE: FLOODPLAIN: WETLANDS: WATER AND SEWER: TOTAL SITE ACERAGE: USE: PARCEL IDENTIFICATION NUMBER: ZONING: LAT. - LONG.: MAGISTERIAL DISTRICT: ADDRESS: STORMWATER QUANTITY ESTIMATED PEAK DISCHARGE SUMMARY REVIEW COMMITTEE. ROCKY MOUNT DEVELOPMENT REQUESTED BY THE CITY OF OTHER THAN THOSE WERE MADE TO THIS PLAN CHANGES OR MODIFICATIONS NO ADDITIONS, DELETIONS, RICHMOND, VA 23220 2501 GRAYLAND AVENUE DOMINION VIRGINIA POWER (804) 201-1225 MATTHEW G. GOODLOE (UNTIL INSPECTOR IS ASSIGNED BY DVP) NCDEQ SELF-INSPECTION RALEIGH, NC 27607 SUITE 430 2501 BLUE RIDGE ROAD GEOSYNTEC CONSULTANTS OF NC, PC (804) 767-2206, FAX (804) 767-2182 KYLE E. LACLAIR, PE CIVIL ENGINEER: RICHMOND, VIRGINIA 23219 701 EAST CARY STREET ONE JAMES RIVER PLAZA, 12TH FLOOR DOMINION VIRGINIA POWER (804) 771-6145 AMANDA MAYHEW SR. SITING AND PERMITTING SPECIALIST: REVISED: 01 JULY 2016 DATE: 29 FEBRUARY 2016 PERMITS, ETC. CONTROL PLANS, ENCROACHMENT AGREEMENTS, DRIVEWAY PERMITS, WATER/SEWER CONSTRUCTION. THIS INCLUDES APPROVED CONSTRUCTION PLANS, APPROVED EROSION BOX THAT IS CONSPICUOUSLY LOCATED AND EASILY ACCESSIBLE DURING COPIES OF ALL PERMITS AND APPROVED PLANS MUST BE KEPT ON SITE IN A PERMIT12. CITY STANDARDS AND PROVIDED PRIOR TO FINAL PLAT APPROVAL. RECORD DRAWINGS FOR ALL UTILITIES SHALL BE PREPARED IN ACCORDANCE WITH11. REPRESENTATIVE PRIOR TO PLACEMENT OF STONE BASE. BE WITNESSED AND APPROVED BY CITY ENGINEERING DEPARTMENT FOR CONFORMANCE WITH PAVEMENT DESIGN CONDITIONS AND A PROOF-ROLL MUST SUB-GRADE SOIL CONDITIONS MUST BE EVALUATED BY A GEOTECHNICAL ENGINEER10. PROCEDURES AND REPORTS SHALL BE IN ACCORDANCE WITH CITY STANDARDS. PLACEMENT OF ANY ROADWAY IMPROVEMENTS. ALL GEOTECHNICAL TESTING PROFESSIONAL ENGINEER MUST BE APPROVED BY THE CITY ENGINEER PRIOR TO THE GEOTECHNICAL REPORT AND PAVEMENT DESIGN SEALED BY A REGISTERED PAVEMENT SECTION IS REPRESENTATIVE OF THE ROADWAY GEOMETRY ONLY. A9. APPROVAL. NCDOT ENCROACHMENT AGREEMENT IS REQUIRED FOLLOWING CONSTRUCTION PLAN8. PLAN APPROVAL. NCDOT AND/OR CITY DRIVEWAY PERMIT IS REQUIRED FOLLOWING CONSTRUCTION7. IMPROVEMENTS) OR (ISSUANCE OF CO). ENGINEERING PRIOR TO (APPROVAL OF THE SUBDIVISION PLAT AND ACCEPTANCE OF TO PROPERTY OWNERS ASSOCIATION MUST BE PROVIDED TO THE DIRECTOR OF OF RELEASE FROM LIEN HOLDER ON COMMON PROPERTY AND DEED OF TRUST WELL AS COPIES OF RECORDED PROPERTY OWNERS ASSOCIATION DOCUMENTS, DEED ATTACHED BMP MAINTENANCE PLAN) AND CONSERVATION EASEMENT DOCUMENTS, AS RECORDED ORIGINALS OF REQUIRED OPERATION & MAINTENANCE AGREEMENTS (WITH6. PERMITS HAVE BEEN PROVIDED TO THE DIRECTOR OF ENGINEERING. COPIES OF ALL REQUIRED BUFFER ENCROACHMENT APPROVALS AND WETLAND5. ONSITE OR OFFSITE MEASURES OR SOME COMBINATION THEREOF. PREVIOUS DEVELOPMENT. SUCH PROJECTS MAY ACHIEVE THESE LOADS THROUGH NITROGEN LOADING AND NO INCREASE IN PHOSPHORUS LOADING RELATIVE TO THE A NET INCREASE IN BUILT UPON AREA SHALL ACHIEVE A 30 PERCENT REDUCTION IN THAT REPLACE OR EXPAND EXISTING STRUCTURES OR IMPROVEMENTS RESULTING IN RESIDENTIAL), THEREFORE NUTRIENT MANAGEMENT REQUIREMENTS APPLY. PROJECTS THE DISTURBED AREA IS GREATER THAN (1/2 ACRE COMMERCIAL, 1 ACRE4. THE SITE. BE PUT IN PLACE AS NEEDED TO INSURE THAT NO SEDIMENT IS RELEASED FROM SHOULD BE REGARDED AS MINIMUM REQUIREMENTS; ADDITIONAL MEASURES SHALL SITE AT ALL TIMES. THE APPROVED SEDIMENTATION & EROSION CONTROL PLAN APPROVAL. A COPY OF THE APPROVED EROSION CONTROL PLAN MUST BE KEPT ON CONTROL PLAN APPROVAL WAS REQUIRED AS A CONDITION OF CONSTRUCTION PLAN DISTURBED AREA IS IN EXCESS OF 1 ACRE AND FORMAL SEDIMENTATION & EROSION3. AT WWW.NCGS.STATE.NC.US. (BOLDED ONLY APPLICABLE TO SUBDIVISIONS). OPERATIONS. THE NORTH CAROLINA GEODETIC SURVEY CAN BE REACHED ON THE WEB PROJECT CONTROL MONUMENT(S) FROM DISRUPTION DUE TO CONSTRUCTION PROPERTY CONTROL CORNER. IN ALL CASES THE CONTRACTOR SHALL PROTECT WAY TO FACILITATE CONSTRUCTION CONTROL BUT MAY BE INCORPORATED AS A THE PROJECT CONTROL MONUMENTS SHALL BE LOCATED ON THE STREET RIGHT OF IDENTIFIED AS A PART OF THE CITY OF ROCKY MOUNT GEODETIC CONTROL SYSTEM. MARKED PLAINLY WITH THE BENCH POINT, THE MONUMENT NUMBER AND STANDARD METAL PLATE IMBEDDED IN ITS TOP OF NONCORRODIBLE MATERIAL TOP FLUSH WITH THE FINISHED GROUND. EACH MONUMENT SHALL HAVE A OR SQUARE, NOT LESS THAN THREE (3) FEET IN LENGTH AND INSTALLED WITH THE BE CONSTRUCTED OF CONCRETE AND BE AT LEAST FOUR (4) INCHES IN DIAMETER SURVEYOR AND SHALL BE FIELD LOCATED BY THE ENGINEER. ALL MONUMENTS SHALL AS SPECIFIED HEREINAFTER ARE INSTALLED BY A REGISTERED PROFESSIONAL LAND FOR ENSURING THAT A MINIMUM OF TWO (2) PROJECT CONTROL MONUMENTS AND Z (ELEVATION). THE CONTRACTOR SHALL BE RESPONSIBLE THE MONUMENTS USED SHALL BE SHOWN IN X (EASTING) AND Y (NORTHING) SYSTEM SURVEYS. THE POSITIONS OF BOTH THE REFERENCED CORNERS AND THE PROCEDURES USED SHALL CONFORM TO 21NCAC 56.160 GLOBAL POSITIONING (CLASS A). WHERE THE CORNERS ARE TIED USING GPS SURVEYING METHODS, SURVEYS PARAGRAPH (1) URBAN AND SUBURBAN VERTICAL CONTROL SURVEYS SURVEYS (CLASS AA) AND 21 NCAC 56.1605 CLASSIFICATION OF VERTICAL CONTROL (CLASSIFICATION OF BOUNDARY SURVEYS), PARAGRAPH (1) LOCAL CONTROL NETWORK AND NAD 83 HORIZONTAL DATUM TO THE ACCURACY SPECIFIED IN 21 NCAC 56.1603 PROJECT PLANS AND BENCHMARKS ARE BASED ON NAVD 88 VERTICAL DATUM2. DEVELOPMENT CODE AND THE MANUAL OF SPECIFICATIONS AND DETAILS. ALL IMPROVEMENTS SHALL CONFORM TO THE CITY OF ROCKY MOUNT'S LAND1. STORM DRAINAGE OR OTHER SITE IMPROVEMENTS ON THIS PLAN. MOUNT PRIOR TO CONSTRUCTION OF ANY STREET, WATER AND/OR SANITARY SEWER, REQUESTED ON MOST PLANS. THIS PLAN MUST BE APPROVED BY THE CITY OF ROCKY MAY REQUIRE ADDITIONAL NOTES NOT INCLUDED HEREIN. THESE ARE TYPICAL NOTES NOTES. NOT ALL OF THESE NOTES WILL APPLY TO ALL PROJECTS, AND SOME PROJECTS THE FOLLOWING ARE THE CITY OF ROCKY MOUNT ENGINEERING DEPARTMENT STANDARD ENGINEERING DEPARTMENT STANDARD GENERAL NOTES: CONSTRUCTION DETAILS12. OPEN CHANNEL, CULVERT & STORM SEWER PROFILES11. STORMWATER MANAGEMENT PLAN, PROFILE AND DETAILS10. BURROWS STREET EXTENSION CROSS SECTIONS9C. BURROWS STREET EXTENSION CROSS SECTIONS9B. BURROWS STREET EXTENTION PLAN, PROFILE & DETAIILS9A. CONTROL PLAN (BORROW AREA) SITE, GRADING, DRAINAGE & PHASE II EROSION & SEDIMENT9. CONTROL PLAN (SUBSTATION) SITE, GRADING, DRAINAGE & PHASE II EROSION & SEDIMENT8. (STOCKPILE & BORROW AREA) PHASE I EROSION & SEDIMENT CONTROL PLAN7. (SUBSTATION & STREAM RELOCATION) PHASE I EROSION & SEDIMENT CONTROL PLAN6. EROSION & SEDIMENT CONTROL DETAILS (SHEET 2 OF 2)5. EROSION & SEDIMENT CONTROL DETAILS (SHEET 1 OF 2)4. NOTES AND NARRATIVE EROSION & SEDIMENT CONTROL GENERAL 3. OVERALL EXISTING CONDITIONS2. COVER SHEET, SPECIFICATIONS/GENERAL NOTES1. DRAWING LIST GINGER C. MAYNARD ISAAC SMITH, JR. & 9 5 95 1 1 0 105 105 105 100 100 100 100 100 9 5 9 5 95 CSX TRANSPORTATION RAILROAD COMPANY 1 3 5 2 4 6 5 3 1 2 4 6 1 3 5 2 4 6 5 3 1 2 6 4 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 5 3 1 2 6 4 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 1 3 5 2 4 6 1 3 5 2 4 6 1 3 5 6 4 2 1 3 5 2 4 6 1 3 5 2 4 6 5 3 1 2 4 6 G G G CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 T X # 2 1 3 5 6 4 2 1 3 5 2 4 6 CAPACITOR VOLTAGETYPE TEVF 245 DWG#21010496-04 G S S S S S S S S S S 1 3 0 ' ' S S S T R E A M D I T C H D I T C H D I T C HDIT C H ST RE A M S T R E A M STREAM STREAM DITCH STREAM DITCH STREAM STREAM D D AREA SWAMPY G IPF IPF IPF IPF POST POST POST P P N C P V B 6 5 /0 1 7 2 6 P P N C P W B 0 7 P P 3 1 6 F 7 /0 1 7 2 6 /W B 1 6 PP WD34 METER POLE DILAPIDATED SHED/BARN B UI L DI N G SIGN NO TRESPASSING PP XA05 S H E D 1 2 " R C P 2 4 " R C P 12" RCP CSX TRANSPORTATION RAILROAD COMPANY E T H R I D G E S T R E E T H A R O L D S T R E E T Z O N E "X " (H A T C H E D ) Z O N E "X " PP WA88 (6 0 ' P U B L I C R /W ) (5 0 ' P U B L I C R / W ) EX B EX A EX C EX E EX F EX G EX I EX J 2 4 "R C P 12"RCP 3 0 " R C P EX 2 EX 4 EX 5 EX 6 EX 7 B E E C H B R A N C H RAILROAD TRACKSRAILROAD TRACKS D IRT ROAD DIRT ROAD DIRT ROAD INV.=105.29' INV.=106.72' INV.=94.11' HARDWOOD LARGE HARDWOOD LARGE HARDWOOD LARGE SS1 SS SS2 E E1 A G E WIRE GUY WIRE GUY DIRT ROAD T R E S P A S S I N G S I G N N O CSX TRANSPORTATION RAILROAD COMPANY A DI R T R O A D E N D # 2058/07 # 2056/324 ELECTRIC TOWER WOODS (TYP.) EDGE OFA WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF EX 1 EX 3 F E N C E F E N C E F E N C E WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER EX K EX L 18" R C P INV.=102.19 INV.=104.14 U N A B L E T O O B T A I N C O N N E C T I O N D I R E C T I O N O N L Y DIRT ROAD END D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D DIRT/GRAVEL ROAD DIRT/GRAVEL ROAD S T E E L S T R U C T U R E 8 0 /0 8 E2 EX H E1 WOODS (TYP.) EDGE OF 18" METAL INV= 91.60 INV= 91.17 3 6 " R C P INV = 104.23 0 1 7 2 6 /V B 9 8 P P 3 1 5 T A 3 1 6 RC #3 RC #4 RC #1 MON FD. NCDOT D I T C H D I T C H DITCH WOODED WOODED WOODED WOODED WOODED WOODED WOODED DIRT ROAD GRAVEL A N D P A D S ( T Y P.) C O N C R E T E P I E R ( R T. 1 4 1 2 ) R E D O A K B A T T L E B O R O R O A D C O N C R E T E B R I D G E S T R U C T U R E A S P H A L T C O V E R E D GRASS/SHRUBS GRASS/SHRUBS GRASS/SHRUBS STREAM #2056 325 2058 09 METAL POLE ASPHALT PILE CONCRETE PAD S EX M EX D (TYP.) POSTS BEECH BRANCH ZONE "X" (HATCHED) SS1 6'-12' TALL PINE CUTOVER PARCEL TWO" "TRACT FOUR TITLE COMMITMENT # 2 0 5 8 /0 7 # 2 0 5 6 /3 2 3 E L E C T R I C T O W E R L A R G E P IN E T R E E L IN E 6'-12' TALL CUTOVER PINE L A R G E P I N E T R E E L I N E L A R G E P I N E T R E E L I N E WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF AREA AND SWAMPY THICK BRIARS CUTOVER MAINLY WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF BH-6 BH-1 BH-2 BH-4 BH-7 BH-9 BH-3 BH-5 BH-8 BH-10 1 0 0 1 0 0 9 5 9 5 95 95 130 13 0 1 2 5 1 2 5 125 125 125 125 125 125 125 120 120 120 120 120 120 1201 2 0 120 120 120 1 2 0 1 2 0 1 2 0 120 120 120 120 120 12 0 1 2 0 120 120 120 115 1 1 5 115 1 1 5 1 1 5 115 115 115 115 115 115 1 1 5 115 1 1 5 115 115 115115115115115 115 115 115 115 1 1 0 1 1 0 1 1 0 110 1 1 0 110 110 110 110 1 1 0 1 1 0 1 1 0 110 110 110 110 110 1 1 0 110 110 110110110 110 1 1 0 110 105 105 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 10 5 105 1 0 5 105 105 1 0 5 105 105 105 10510 5 105 105 105 105 105 105 100 1 0 0 100 100 100 100 100 100 100 100 100 100 100 10 0 100 1 0 0 100 1 0 0 1 0 0 1 0 0 9 5 9 5 9 5 9 5 9 5 9 5 9 5 9 5 95 95 9 5 9 5 95 9 5 9595 9 5 90 I N S W A M P Y A R E A S T R E A M C H A N N E L #2 RC (TYP.) WOODS EDGE OF FEM A FLO O D PLA IN ZO N E "X " 2 5' F R O N T S E T B A C K 10' SIDE SETBACK 1 0 ' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 30' REAR SETBACK 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 3 0' R E A R S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 5 0' F R O N T S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' FR ON T S E T BA CK 1 5 ' S I D E S E T B A C K 30' REAR SETBACK 5 0' F R O N T S E T B A C K 1 5 ' S I D E S E T B A C K AREA SWAMPY BH-11 EX Q P EX R EX A S P H A L T A S P H A L T D R I V E PATCH ASPHALT 24" PINE (2) 36" OAK MYRTLE 12" CRAPE M Y R T L E 1 2 " C R A P E 8" PEAR S S S S O EX PP WCO1 LANDSCAPING VAULT C O N C . 4 ' W O O D F E N C E H A T H A W A Y S T (U .S . R O U T E 3 0 1 ) 6 0 0 ' ± T O E A S T L I N E O F W O O D F E N C E F O PP 01726 C O N C . 4 ' W O O D F E N C E PP 01726 F R O M C O U N T Y G I S P L A N S U N D E R G R O U N D W A T E R L I N E T A K E N INV.=94.34' DRC 07/01/16KEL 0000-000 200'100'0 SCALE 1"=100' 2 12 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION OVERALL EXISTING CONDITIONS 10'REAR SETBACK: 10'SIDE SETBACK: 25'FRONT SETBACK: N/ALOT WIDTH: ZONING REQUIREMENTS: (I-2)10. 30'REAR SETBACK: 15'SIDE SETBACK: 50'FRONT SETBACK: 100'LOT WIDTH: ZONING REQUIREMENTS: (A-1)9. CONTOUR INTERVAL = 1'8. 3, 2015. JULY 24, 2015 AND ADDITIONAL PARCEL ID: 040252 ON SEPTEMBER TOPOGRAPHIC SURVEY WAS COMPLETED BY BOWMAN CONSULTING ON 7. AND DEPTHS OF ALL UTILITIES PRIOR TO ANY CONSTRUCTION. TIME OF THIS SURVEY. CONTRACTORS SHALL VERIFY THE LOCATION NO UNDERGROUND UTILITIES WERE MARKED OR LOCATED AT THE 6. EFFECTIVE DATE NOVEMBER 3, 2004. NORTH CAROLINA, COMMUNITY-PANEL NUMBER 3720386300J, AS SHOWN ON FEMA FLOOD INSURANCE RATE MAP FOR NASH COUNTY, AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOOD) THAN 1 FOOT OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE MILE; AREAS OF 1% ANNUAL CHANCE FLOOD WITH AVERAGE DEPTHS OF LESS AND ZONE "X" (HATCHED)(AREAS OF 0.2% ANNUAL CHANCE FLOOD; DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) 100-YEAR FLOODPLAIN. IT LIES IN ZONE "X" (UNSHADED)(AREAS THE SURVEYED PROPERTY SHOWN HEREON IS NOT IN A 5. COMPANY, COMMITMENT NO. 15GB099604, DATED MARCH 13, 2015. COMMITMENT FOR TITLE INSURANCE FROM CHICAGO TITLE INSURANCE HEREWITH. BOWMAN CONSULTING GROUP, LTD. WAS PROVIDED A ALL COVENANTS AND RESTRICTIONS OF RECORD AND THOSE RECORDED TO THE SURVEYED PROPERTY AS SHOWN HEREON IS SUBJECT 4. NORTH CAROLINA. BOOK 2520, PAGE 570 AMONG THE LAND RECORDS OF NASH COUNTY, BOUNDARY INFORMATION AS SHOWN HEREON IS BASED ON DEED 3. SOLUTION AND TIED TO NGS MONUMENT "BATTLEBORO". CAROLINA STATE GRID, NAD83 (2011) BASED OFF AN OPUS VERTICAL DATUM IS NAVD 88 AND HORIZONTAL DATUM IS NORTH 2. 040252 IS ZONED I-2. AT THE CITY OF ROCK MOUNT TAX ASSESSMENT MAP PARCEL ID ADDITION SURVEYED PROPERTIES DELINEATED HEREON ARE LOCATED 022200, 037306, & 040250 AND ARE ZONED A-1 AND R-10. IN AT NASH COUNTY TAX ASSESSMENT MAP PARCEL ID 018274, 020042, THE SURVEYED PROPERTIES DELINEATED HEREON ARE LOCATED 1. NOTES: CONTROL EL: 105.51' E: 2,368,193.15 N: 837,403.93 ROD & CAP SET R/C #1 EL: 98.45' E: 2,368,542.82 N: 837,007.72 ROD & CAP SET R/C #2 EL: 112.60' E: 2,368,141.08 N: 837,762.62 ROD & CAP SET R/C #3 EL: 119.84' E: 2,368,453.88 N: 838,022.37 ROD & CAP SET R/C #4 EX EX 4 EX 5 EX EX J EX 3 2 6 M EX N L EX EX 7 EX EX K EX C EX D B EX EX EX 1 A EX EX H I EX G E EX EX F OUT=120.58 (12"RCP To 2) STORM INLET TOP=123.68 OUT=120.43 (12"RCP To 3) IN=N/A (12"RCP Fr 1) STORM INLET TOP=123.16 INVERT=115.23 (12"RCP Fr 2) STORM CULVERT OUT=115.96 (24"RCP To 5) STORM MANHOLE TOP=119.86 IN=115.52 (30"RCP To 7) IN=N/A (12"RCP Fr 6) IN=115.66 (24"RCP Fr 4) STORM MANHOLE TOP=120.10 OUT=118.13 (12"RCP To 5) STORM MANHOLE TOP=121.23 INVERT=115.17 (30"RCP Fr 5) STORM CULVERT OUT=91.17 (12"DIP To B) IN=92.02 (12"DIP Fr WEST) SANITARY MANHOLE TOP=97.17 OUT=91.87 (8"DIP To C) IN=92.02 (12"DIP Fr A) SANITARY MANHOLE TOP=97.17 OUT=90.86 (12"TC To D) IN=91.43 (12"TC Fr E) IN=91.08 (8"DIP Fr B) SANITARY MANHOLE TOP=98.58 OUT=90.27 (12"TC To M) IN=90.46 (12"TC Fr C) SANITARY MANHOLE TOP=97.17 OUT=98.81 (12"TC To C) IN=99.21 (12"TC Fr H) IN=99.29 (8"TC Fr F) IN=99.27 (12"DIP Fr WEST) SANITARY MANHOLE TOP=103.91 OUT=100.26 (8"TC To E) IN=100.32 (8"TC Fr G) SANITARY MANHOLE TOP=104.43 OUT=100.53 (8"TC To F) IN=100.63 (8"TC Fr NORTHEAST) SANITARY MANHOLE TOP=103.93 OUT=100.02 (12"TC To E) IN=100.08 (12"TC Fr I) SANITARY MANHOLE TOP=106.07 OUT=103.66 (12"TC To H) IN=103.69 (12"TC Fr J) SANITARY MANHOLE TOP=110.94 OUT=106.49 (12"TC To I) IN=106.51 (12"TC Fr K) SANITARY MANHOLE TOP=112.35 OUT=108.01 (12"TC To J) IN=108.06 (12"TC Fr L) SANITARY MANHOLE TOP=116.51 OUT=108.36 (12"TC To K) IN=108.46 (12"TC Fr EAST) SANITARY MANHOLE TOP=115.36 OUT=89.17 (12"TC To N) IN=89.25 (12"TC Fr D) SANITARY MANHOLE TOP=97.07 IN=81.10 (12"TC Fr M) SANITARY MANHOLE TOP=97.14 D.B. 828, PG 227 50' VEPCO POWER LINE R/W D.B. 838, PG. 624 100' VEPCO POWER LINE R/W AS SHOWN IN P.B. 16, PG. 574 30' ACCESS EASEMENT AS SHOWN IN P.B. 16, PG. 574 150' VEPCO POWER LINE R/W (APPROXIMATE LOCATION) D.B. 1022, PG. 199 30' SEWER EASEMENT (APPROXIMATE LOCATION) P.B. 16, PG. 574 30' SEWER EASEMENT (APPROXIMATE LOCATION) D.B. 945, PG 566 15' GAS EASEMENT (APPROXIMATE LOCATION) D.B. 1013, PG. 395 30' SEWER EASEMENT STORM & SANITARY TABLE EASEMENT LEGEND L1 4 8 0. 2 4' (T IE ) N 3 9 ° 5 4' 4 3 " E 9 8. 8 2' MON. FD. MC/B IPF 1/2" IPF 1/2" IPF PINCHED T-BAR FOUND (ON LINE) IPF (ON LINE) IPF (HELD) IPF BENT IPF (ON LINE) IPF (ONLINE) IPF (HELD) AXLE (HELD) IRF (HELD) IRS 0.47' WEST OF LINE 0.16' WEST OF LINE 1.54' DECK EAST OF LINE IRS (ON LINE) CL STREAM CL STREAM S 23°29'01" W 208.73'S 23°29'01" W 2129.16' (GROUND)375.61' S 23°29'01" W 2129.16' 5 8 9 .7 4 ' (T I E ) (5 9 0 .0 2 ' R E C O R D ) 375.60' N 09°46'12" E N 23°29'01" E 224.96' S 6 4 ° 5 1 '3 1 " E 1 3 3 . 2 4 ' S 6 4 ° 5 3 '2 8 " E 1 5 4 . 0 9 ' N 4 5 ° 3 7' 0 5 " E 1 1 2 6. 2 9' Z O N E : A - 1 Z O N E : R - 1 0 6 0 .0 3 ' N 4 8 ° 0 8' 0 8 " E 2 2 9. 0 0' IPF EAST OF LINE 0.46' FENCE EAST OF LINE 0.37' L 2 L 3 L 4 S U R V E Y T I E L I N E (T Y P .) N 4 5 ° 3 7' 0 5 " E 1 1 2 6. 2 9' S 23°29'01" W 2129.16' IRF EAST OF LINE 0.46' FENCE MON FD. NCDOT MON FD. NCDOT E X I S T I N G R/ W P E R N C D O T P R O J. # U - 3 3 2 9 E X I S T I N G R/ W P E R N C D O T P R O J. # U - 3 3 2 9 MON FD. NCDOT IPF (3.6'EAST) IPF S 23°29'01" W 206.97' 64.09' S 23°29'01" W 128.93' MON. FD. TOWN LINE N 6 5 ° 5 5 ' 1 7 " W 4 1 5 . 4 6 ' ( T O I P F / T I E ) SURVEY TIE LINE (TYP.) (1.1' FROM IPF) MON FD. N05°11'12"E 37.22' N21°42'53"E 95.78' 120.23' 147.85' 93.61' N06°00'48"W N06°00'48"W N 8 7 ° 5 4' 3 1 " W S 8 7 ° 5 4' 3 1 " E 4 9 9. 2 6' ( T I E ) 4 5 8. 7 2' ( T I E ) LINE (TYP.) SURVEY TIE PL S C A L E D T O W N L I N E P E R P .B . 1 9 , P G . 5 7 4 "B A T T L E B O R O " " C I T Y O F R O C K Y M O U N T " CENTERLINE STREAM H A T H A W A Y S T (U .S . R O U T E 3 0 1 ) FROM CORNER N 17°55'34" E 0.19' IPF FROM CORNER N 86°19'01" E 0.69' IPF FROM CORNER N 44°24'37" E 0.46' C E N T E R L IN E S T R E A M CENTERLINE STREAM NCGS "BATTLEBORO" MON S 4 9 ° 5 0 '3 3 " E 6 2 .6 4 ' PL PL PL PL P L PL P L P L P L P L P L P L P L P L P L P L P L P L ZONED: R-10 D.B. 2610, PG. 637 PARCEL ID: 017169 D.B. 1270, PG. 760 PARCEL ID: 020032 ZONED: R-10 D.B. 2442, PG. 401 PARCEL ID: 019026 "SUBDIVISION" HILLSIDE MAYNARD GINGER C. CORPORATION A DELAWARE HOSPIRA, INC. COUNTY NASH ZONED: I-2 B) P.B. 16, PG. 574 (PARCEL PART) PARCEL ID: 040252 (IN ACRES AREA: 51,782 S.F. OR 1.19 ONE" PARCEL FOUR "TRACT COMMITMENT TITLE V I N S O N , J R . N E L S O N P A I G E V I N S O N , J R . N E L S O N P A I G E K A T H Y A . D E B E R R Y L A R R Y T . D E B E R R Y & M Y R T L E W . T H O M A S A L B E R T C . T H O M A S &ZONED: R-10 P.B. 11, PG. 44 P.B. 4, PG. 154 T H O M A S P . B E N S O N , J R . M A R Y E L L E N B E N S O N C H E R Y L T . S E M P L E R O B E R T M . S E M P L E & E L I Z A B E T H B A R N E S B U N N G E O R G E R O G E R B U N N J R . & B A R B A R A W . B A R N E S R O Y R . B A R N E S , J R . & JOAN B. INSCOE LARRY D. BRYANT & JAMES H. BRYANT, JR. KIRBY WAYNE RANDALL ANNE-MARIE HARRISON RANDALL & SHIRLEY S. POST JAMES F. POST ZONED: R-10 D.B. 925, PG. 375 PARCEL ID: 019498 ZONED: R-10 "TRACT ONE" TITLE COMMITMENT D.B. 2520, PG. 570 (TRACT SIX) PARCEL ID: 022200 A E E1 E2 G SS SS1 SS2 GINGER C. MAYNARD ISAAC SMITH, JR. & GINGER C. MAYNARD ISAAC SMITH, JR. & GINGER C. MAYNARD ISAAC SMITH, JR. & GINGER C. MAYNARD ISAAC SMITH, JR. &MOUNT CITY OF ROCKY MOUNT CITY OF ROCKY ZONED: I-2 D.B. 2055, PG. 92 PARCEL ID: 019045 CORPORATION A DELAWARE HOSPIRA, INC. ZONED: I-2 D.B. 2055, PG. 92 PARCEL ID: 019045 SHEETS 6 & 8 SHEETS 7 & 9 CSX TRANSPORTATION RAILROAD COMPANY E T H R I D G E S T R E E T H A R O L D S T R E E T B U R R O W S S T R E E T D.B. 2520, PG. 570 PARCEL ID: 019856 R/C #1 R/C #3 R/C #4 R/C #2 "TRACT THREE" TITLE COMMITMENT ZONED: A-1 P.B. 16, PG. 574 (PARCEL C) D.B. 2520, PG. 570 (TRACT NINE) PARCEL ID: 040250 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. 11889 RED OAK BATTLEBORO ROAD ZONED: I-2 P.B. 16, PG. 574 (PARCEL B) PARCEL ID: 040252 (IN PART) OR 2.26 ACRES AREA: 98.318 S.F. 11875 RED OAK BATTLEBORO ROAD ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) PARCEL 1 & 2) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL ID: 020042 11 DREW HILLS CT. "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 EIGHT) D.B. 2520, PG. 570 (TRACT PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. 4798 BATTLEBORO APTS "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 EIGHT) D.B. 2520, PG. 570 (TRACT PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. 4815 CREPE MYRTLE ST. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 THREE, IN PART) D.B. 2520, PG. 570 (TRACT PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. 4815 CREPE MYRTLE ST Z O N E D : R -1 0 P .B . 4 , P G . 1 5 L O T 4 3 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 2 Z O N E D : R -1 0 L O T 4 2 - P .B . 4 , P G . 1 5 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 7 Z O N E D : R -1 0 L O T 2 4 - P .B . 1 1 , P G . 4 4 D .B . 1 2 6 1 , P G . 3 6 0 P A R C E L I D : 0 1 9 6 7 0 Z O N E D : R -1 0 P .B . 4 , P G . 1 5 4 L O T S 3 9 & 4 0 D .B . 1 5 2 7 , P G . 4 2 0 P A R C E L I D : 0 1 7 0 0 0 Z O N E D : R -1 0 P .B . 1 1 , P G . 4 4 L O T 2 3 D .B . 2 2 3 2 , P G . 2 3 9 P A R C E L I D : 0 1 6 9 5 5 Z O N E D : R -1 0 P .B . 1 1 , P G . 4 4 L O T 2 2 D .B . 2 2 1 1 , P G . 4 2 3 P A R C E L I D : 0 1 8 7 8 6 Z O N E D : R -1 0 P .B . 4 , P G . 1 5 4 L O T S 3 4 & 3 5 D .B . 9 8 8 , P G . 7 1 P A R C E L I D : 0 1 9 7 1 8 Z O N E D : R -1 0 P .B . 4 , P G . 1 5 4 P O R T I O N L O T 3 2 L O T 3 3 & D .B . 8 5 5 , P G . 6 7 9 P A R C E L I D : 0 1 7 2 1 4 Z O N E D : R -1 0 P .B . 1 1 , P G . 4 4 L O T 2 1 D .B . 9 4 3 , P G . 2 3 7 P A R C E L I D : 0 1 6 7 2 1 S S S S S S S S S S S EX K EX L EX J EX I EX H EX E EX C EX D EX M EX F EX G S S EX B EX A EX 6EX 7 EX 5 3 EX EX 4 EX 2 EX 1 EXISTING CONDITIONS LEGEND IPF IRF IPS MON N/F PL S 115 SIGN POWER POLE GUY WIRE TRANSMISSION TOWER SANITARY MANHOLE POST NOW OR FORMERLY IRON ROD SET IRON ROD FOUND IRON PIPE FOUND MONUMENT FOUND OVERHEAD UTILITIES FENCE SANITARY CONNECTION STREAM/DITCH ZONE 'X' FEMA FLOODPLAIN STORM PIPES / STRUCTURES MAJOR INDEX CONTOUR (5 FOOT) MINOR CONTOUR (1 FOOT) WOODS LINE ROADS PROPERTY LINE EASEMENTS SETBACKS EXISTING STREAM EXISTING WETLANDS 07/01/16 OUT=104.46 (8"TC TO O) IN=104.51 (8"TC FR Q) IN=104.51 (8"TC FR R) SANITARY MANHOLE TOP=112.96' OUT=107.95 (8"TC TO P) IN=108.00 (8"TC FR EAST) SANITARY MANHOLE TOP=117.55 OUT=105.62 (8"TC TO P) IN=107.62 (8"PVC FR EAST) SANITARY MANHOLE TOP=110.62 TOP=110.62' OUT=101.52 (8"TC TO O) IN=102.02 (8"TC FR P) SANITARY MANHOLE TOP= 107.02'EX O EX P EX Q EX R Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 07/01/16 N.T.S CMC 0000-000 KEL 07/01/16 SOILS MAP $$$$$$$$$$$SYTIME 99999 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION NOTES & NARRATIVE EROSION & SEDIMENT CONTROL GENERAL 3 12 OR CRIMINAL PENALTIES. FOR CONSTRUCTION ACTIVITIES AND MAY RESULT IN STATE OR FEDERAL CIVIL WILL BE CONSIDERED A VIOLATION OF THE NPDES GENERAL PERMIT NCG010000 CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. FAILURE TO DO SO CONCRETE AND SEDIMENT DO NOT ENTER STREAMS OR STORM DRAINS OR HAVE PRECAUTIONS TO ENSURE THAT PAINTS, LIQUID WASTES, DEMOLITION MATERIALS, THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL TAKE ALL NECESSARY 9: VIOLATIONS MAY RESULT IN FINES TO THE PROPERTY OWNER(S). CODE AND THE N.C. SEDIMENTATION AND POLLUTION CONTROL ACT. SUCH PLAN IS IN VIOLATION OF THE CITY OF ROCKY MOUNT'S LAND DEVELOPMENT ANY GRADING BEYOND THE LIMITS OF DISTURBANCE SHOWN ON THE APPROVED 8: FOR APPROVAL AND ADDITION TO THEIR RECORDS. SUBMITTED TO THE DEPARTMENT OF ENGINEERING WITHIN FIVE BUSINESS DAYS PREVENT OFFSITE SEDIMENTATION, THESE PLANS MUST BE MODIFIED AND IF ADDITIONAL EROSION AND SEDIMENTATION CONTROLS ARE REQUIRED TO 7: ADEQUACY. SUBJECT SITE FOR THE INSPECTION OF SEDIMENTATION AND EROSION CONTROL GRANTED ACCESS UPON REASONABLE REQUEST TO ANY AND ALL AREAS OF THE CITY OF ROCKY MOUNT ENGINEERING DEPARTMENT PERSONNEL MUST BE 6: TO ANY GRADING ACTIVITIES. PRIDGEN AT (252) 343-3156 TO INSPECT EROSION CONTROL MEASURES PRIOR AND GRADING. CONTACT CITY OF ROCKY MOUNT ENGINEERING INSPECTOR BILL IN WRITING FROM ENGINEERING DEPARTMENT STAFF PRIOR TO SITE CLEARING APPROVAL OF CONSTRUCTED EROSION CONTROL MEASURES SHALL BE OBTAINED OR GRADING ACTIVITIES BEYOND THAT NECESSARY TO INSTALL SUCH MEASURES. EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PRIOR TO ANY CLEARING 5: ENSURE THAT NO SEDIMENT IS RELEASED FROM THE SITE. REQUIREMENTS. ADDITIONAL MEASURES SHALL BE PUT IN PLACE AS NEEDED TO THE APPROVED PLAN SHOULD BE REGARDED AS DEPICTING THE MINIMUM 4: LOCATED AND EASILY ACCESSIBLE DURING CONTRUCTION. KEPT ON SITE AT ALL TIMES IN A PERMIT BOX THAT IS CONSPICUOUSLY A COPY OF THE APPROVED SEDIMENTATION & EROSION CONTROL PLAN MUST BE 3: DEPARTMENT OF ENGINEERING UPON RECEIPT. COPIES OF ALL ADDITIONAL APPROVALS MUST BE PROVIDED TO THE BE REQUIRED PRIOR TO AUTHORIZATION TO BEGIN CLEARING AND GRADING. MOUNT ONLY. ADDITIONAL APPROVALS (SUCH AS 401 / 404 WETLANDS, ETC.) MAY APRROVAL OF THIS PLAN CONSTITUTES APPROVAL FROM THE CITY OF ROCKY 2: CONSTRUCTION OF ANY IMPERVIOUS SURFACE OR STRUCTURE. ACTIVITIES LISTED WITHIN THIS PLAN. THIS PLAN DOES NOT PERMIT THE APPROVAL OF THIS PLAN PERMITS ONLY THOSE CLEARING AND GRADING 1: (CITY OF ROCKY MOUNT) GENERAL SEDIMENTATION AND EROSION CONTROL STANDARD NOTES OFF-SITE AREAS ARE NOT ANTICIPATED TO BE USED. OFF-SITE AREAS EAST BY A CSX RAILWAY EASEMENT. BATTLEBORO ROAD RT. 1412, TO THE NORTH BY ETHRIDGE STREET AND TO THE R-6MFA (MULTIFAMILY RESIDENTIAL DISTRICT), TO THE SOUTH BY RED OAK CREPE MYRTLE STREET, ZONED R-10 (LOW-DENSITY RESIDENTIAL DISTRICT) AND THE SITE IS BOUND TO THE NORTH AND WEST BY RESIDENTIAL PROPERTIES ALONG ADJACENT PROPERTIES TO PRE-DEVELOPED CONDITIONS. WITH VEGETATED BANKS. THE BORROW AREA WILL BE REVEGETATED AND RETURNED PRIOR TO SWITCHING STATION CONSTRUCTION. THE OUTFALL APPEARS TO BE STABLE TRIBUTARY OF BEECH BRANCH VIA CULVERT. THIS STREAM WILL BE RELOCATED SYSTEMS AND CURBING. THE DETENTION POND WILL OUTFALL TO THE UNNAMMED STORMWATER DETENTION POND TO THE SOUTH VIA SHEET FLOW, UNDERDRAIN IN THE PROPOSED CONDITION, THE SWITCHING STATION AREA WILL DRAIN TO A PROPOSED SITE CHARACTERISTICS REFER TO SHEET 4 FOR TEMPORARY AND PERMANENT SEEDING SPECIFICATIONS. MANUAL. * GENERAL SPECIFICATIONS FOLLOW: NATURAL RESOURCES EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN SPECIFICATIONS OF THE NORTH CAROLINA DEPARTMENT OF ENGINEERING AND TEMPORARY AND PERMANENT SEEDING SHALL CONFORM TO THE LATEST 11. (CURLEX) IMMEDIATELY AFTER CONSTRUCTION. SHALL BE LIMED, FERTILIZED, SEEDED, AND STABILIZED WITH EXCELSIOR BLANKET UNLESS OTHERWISE NOTED, ALL DITCHES AND OTHER GRASS LINED WATER WAYS 10. SHALL BE TOPSOILED WHEN SUFFICIENT MATERIAL IS AVAILABLE. STANDARD ROUGHENING PROCEDURES. ALL AREAS DESIGNATED TO BE SEEDED TOPSOIL SHALL BE APPLIED IN 2-6 INCH LAYERS ON AREAS ROUGHENED USING 9. AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SUBSTATION LOT. TEMPORARY OR PERMANENT SEEDING SHALL BE ACCOMPLISHED WITHIN 7 DAYS 8. ARE COMPLETE. SHALL BE APPLIED AS SOON AS PRACTICAL AFTER FOUNDATION INSTALLATIONS THE SITE STONE IS PART OF THE PERMANENT STABILIZATION OF THE SITE. IT 7. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. COMPACTED, SEEDED, AND MULCHED WITHIN 7 DAYS AFTER BACKFILL. ALL ELECTRIC POWER, TELEPHONE, AND GAS SUPPLY TRENCHES ARE TO BE 6. EXCEPT THOSE CONTINUOUSLY BEING WORKED OR BUILT UPON. NO DISTURBED AREA SHALL REMAIN DENUDED FOR LONGER THAN 7 DAYS, 5. DRAINAGE BEDS FREE OF SILT CAUSED BY EROSION DURING CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO KEEP SURROUNDING 4. PLAN APPROVING AUTHORITIES. WHEN AREAS ABOVE THEN BECOME STABILIZED TO THE SATISFACTION OF THE CEASE TO FUNCTION AS INTENDED. TEMPORARY CONTROLS SHALL BE REMOVED TEMPORARY DEVICES SHALL BE REPAIRED OR REPLACED IMMEDIATELY IF THEY 3. INSTALLED AS THE FIRST STEP OF THE GRADING PROCESS. EROSION AND SEDIMENT CONTROL DEVICES, AS SHOWN ON THE PLAN, SHALL BE 2. AUTHORITY. THE REQUIREMENTS COVERED IN THIS HANDBOOK OR THE CONTROLLING ALL CONTROL DEVICES. THESE DEVICES SHALL MEET OR EXCEED THE HIGHER OF SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. CONTRACTOR NORTH CAROLINA DEPARTMENT OF ENGINEERING AND NATURAL RESOURCES CONTRACTOR SHALL HAVE AVAILABLE A COPY OF THE LATEST VERSION OF THE 1. EROSION AND SEDIMENTATION CONTROL NOTES - DOMINION DUST CONTROL - NC6.843. CONSTRUCTION ROAD STABILIZATION - NC6.802. CHECK DAM - RM3.8a1. OTHER RELATED PRACTICES BUFFER ZONE - NC6.742. VEGETATIVE STREAMBANK STABILIZATION - NC6.721. STREAM PROTECTION (SEE SHEETS E1 THROUGH E9) COMPOST SOCK (OPTIONAL) - NC6.665. SKIMMER SEDIMENT BASIN - NC6.644. TEMPORARY SEDIMENT (SILT) FENCE - RM3.33. DEWATERING BAG - RM3.252. POROUS BAFFLES - RM3.231. SEDIMENT TRAPS AND BARRIERS PIPE INLET PROTECTION - RM3.161. INLET PROTECTION CULVERT OUTLET PROTECTION - RM3.221. OUTLET PROTECTION TEMPORARY DIVERSION BERM - RM3.152. CHANNEL STABILIZATION W/EC MATTING - RM3.121. RUNOFF CONTROL MEASURES ROLLED EROSION CONTROLLED PRODUCTS - NC6.174. MULCHING - NC6.143. PERMANENT SEEDING - NC6.112. TEMPORARY SEEDING - NC6.101. SURFACE STABALIZATION TREE PROTECTION - NC6.056. TOPSOILING - NC6.045. SURFACE ROUGHENING - NC6.034. LAND GRADING - NC6.023. CONSTRUCTION SEQUENCE SCHEDULE - NC6.012. GRAVEL CONSTRUCTION ENTRANCE - RM3.171. SITE PREPARATION MANUAL, WHICH ADHERES TO THE NORTH CAROLINA SEDIMENTATION CONTROL LAW. NATURAL RESOURCES (DENR) EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO THE UNLESS OTHERWISE NOTED, ALL STRUCTURAL AND VEGETATIVE EROSION AND SEDIMENT EROSION AND SEDIMENT CONTROL MEASURES CREPE MYRTLE STREET DURING CONSTRUCTION. SPECIAL CARE SHALL BE TAKEN TO PREVENT SOIL EROSION FROM TRACKING ONTO DISTURBANCE. A MEASURE OF PROTECTION FOR SIGNIFICANT SEDIMENT LEAVING THE LIMITS OF UNNAMED TRIBUTARY OF BEECH BRANCH. MEASURES HAVE BEEN DESIGNED TO PROVIDE DEPOSITS ON DOWN GRADIENT PROPERTIES. THE OUTFALL FOR THE SITE IS THE CONTRACTOR SHALL IMPLEMENT PROTECTIVE MEASURES TO MINIMIZE SEDIMENTATION THIS PROJECT HAS RELATEIVELY LOW RISK FOR EXCESSIVE EROSION; HOWEVER, THE CRITICAL EROSION AREAS SEASONAL HIGH WATER TABLE > 80 INCHES. CONSISTS OF (NoB) NORFOLK LOAMY SAND WITH 2 TO 6% SLOPES, HSG A WITH A SWITCHING STATION AREA AS WELL AS THE MAJORITY OF THE BORROW AREA HIGH WATER TABLE > 80 INCHES BELOW GRADE. THE NORTHEASTERN PORTION OF THE BIBB SOILS, HSG A/D (ASSUMED D IN HYDROLOGIC CALCULATIONS) WITH A SEASONAL THE MAJORITY OF THE SWITCHING STATION DEVELOPMENT AREA IS COMPOSED OF (Bb) SOILS TOTAL DISTURBED AREA: 12.30 ACRES 3720386300J DATED NOVEMBER 3, 2004. CHANCE FLOODPLAIN WITHIN ZONE X PER FEMA FLOOD INSURANCE RATE MAP NO. IMPACTED. THIS SITE IS DETERMINED TO BE OUTSIDE OF THE 0.2% (500-YEAR) ANNUAL CONTROL MEASURES TO ENSURE THAT NO AREAS OUTSIDE OF THE PROJECT LIMITS ARE LIMITS OF DISTURBANCE WILL BE FLAGGED AND PROTECTED BY EROSION AND SEDIMENT THE RAILWAY EASEMENT ALONG THE EAST SIDE OF THE PROPERTIES. THE PROJECT'S BURROWS STREET TO THE NORTHWEST AND (2) AN EXISTING DIRT ROAD ADJACENT TO TWO (2) ENTRANCES EXIST FOR THE SITE: (1) AN EXISTING DIRT ROAD CONNECTING TO THE UNNAMED TRIBUTARY OF BEECH BRANCH DRAINING TO THE SOUTHWEST. TERRAIN HAS VARIABLE SLOPES BETWEEN 1 AND 16% AND CURRENTLY SHEET FLOWS TO GRASSED MEADOW AND FORESTED AREA WITH SOME AREAS OF DIRT ROADS. THE EXISTING PROCESS FOR PURCHASE BY DOMINION POWER. THE EXISTING SITE IS COVERED BY OF CITY OF ROCKY MOUNT PROPERTY. THESE PARCELS ARE CURRENTLY IN THE PROPERTY OWNED BY ISAAC SMITH JR. AND GINGER C. MAYNARD AND A SMALL PORTION THE PROPOSED SWITCHING STATION CONSTRUCTION SITE IS LOCATED ON A VACANT EXISTING SITE CONDITIONS TAR-PAMLICO BASIN. UNDER THE UPPER TAR BEECH BRANCH REGION (03020101) IN THE PIEDMONT OF THE TOWARDS ONE (1) OUTFALL: AN UNNAMED TRIBUTARY OF BEECH BRANCH. THIS SITE FALLS (I-2) AND WILL RESULT IN A DISTURBED AREA OF 12.3 ACRES. SITE HYDROLOGY CONVEYS NORTH CAROLINA. THE SUBSTATION IS ZONED AGRICULTURAL (A-1) AND LIGHT INDUSTRIAL PARCELS LOCATED AT 4815 CREPE MYRTLE STREET WITHIN THE CITY OF ROCKY MOUNT, TO SERVE THE ROCKY MOUNT AREA. THE STATION WILL BE CONSTRUCTED ON VACANT THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT AN ELECTRICAL SWITCHING STATION PROJECT DESCRIPTION CONSTRUCTION. REFER TO SHEET 9 FOR PHASE II EROSION AND SEDIMENT CONTROL SEQUENCE OF CONSTRUCTION. REFER TO SHEET 7 FOR PHASE I EROSION AND SEDIMENT CONTROL SEQUENCE OF CHECKED AND MITIGATED ACCORDINGLY. DAILY AND AFTER EACH SIGNIFICANT RAINFALL. THE FOLLOWING MEASURES WILL BE IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED MAINTENANCE BE CONSTRUCTED ADJACENT TO THE SWITCHING STATION PAD. ROCKY MOUNT STORMWATER DESIGN MANUAL, A STORMWATER DETENTION POND WILL PRE-DEVELOPED FLOWS FOR THE 1-, 10-, AND 25-YEAR STORMS PER THE CITY OF ON SITE. TO MAINTAIN POST-DEVELOPED PEAK FLOWS LESS THAN THE NUTRIENT STRATEGY RULES, THEREFORE, NO WATER QUALITY BMP'S ARE REQUIRED PHOSPHORUS ARE WITHIN THE ALLOWABLE LIMITS ESTABLISHED BY THE TAR-PAMLICO 37.39 ACRES. THE POST-DEVLOPED NUTRIENT LOADINGS FOR NITROGEN AND INCLUDE THE ENTIRE PROPERTY NORTH OF ROUTE 1412 AND IS CALCULATED TO BE THE APPLICABLE SITE AREA FOR THE WATER QUALITY REQUIREMENTS IS ASSUMED TO STORMWATER MANAGEMENT TRAVELING OFFSITE. ONSITE TO PREVENT SURFACE AND AIR MOVEMENT OF DUST PARTICLES FROM DUST CONTROL MEASURES OUTLINED IN NCDEQ STANDARD 6.84 WILL BE USED DUST CONTROL - NC6.84 STANDARD 6.80. PLANS. ALL CONSTRUCTION ROAD STABALIZATION USED WILL FOLLOW NCDEQ AREA, AND ADJACENT TO THE RELOCATED STREAM CROSSING AS SEEN IN THE E&S STABALIZATION WILL BE UTILIZED AT THE ENTRANCE OF THE SITE, NEAR THE BORROW TO PREVENT EROSION FROM CONSTRUCTION VEHICLES, CONSTRUCTION ROAD CONSTRUCTION ROAD STABILIZATION - NC6.80 WILL BE INSTALLED AS SEEN ON THE E&S PLANS ACCORDING TO RM STANDARD 3.8a. TO REDUCE THE VELOCITY OF RUNOFF IN EARTHEN OPEN CHANNELS, CHECK DAMS CHECK DAM - RM3.8a ZONE I BUFFER. SEE THE TAR-PAMLICO BUFFER RULES FOR DETAILED BUFFER RULES. VEGETATED AREA MUST EXTEND 20 FEET OUTSIDE OF THE FURTHEST LIMITS OF THE THE CENTER OF THE STREAM. A ZONE II BUFFER CONSISTING OF A STABLE CONSISTING OF UNDISTURBED VEGETATION MUST EXTEND 30 FEET OUTWARD FROM APPLYING NCDEQ STANDARD 6.74 TO THE TAR-PAMLICO BASIN, A ZONE I BUFFER BUFFER ZONE - NC6.74 E1-E9 FOR STREAM RELOCATION PLANS. STABALIZATION WILL BE USED ACCORDING TO NCDEQ STANDARD 6.72. SEE SHEETS TO PROTECT THE RELOCATED STREAM FROM EROSION, VEGETATIVE STREAMBANK VEGETATIVE STREAMBANK STABILIZATION - NC6.72 STANDARD 6.66. SEEN IN THE E&S PLANS. ANY COMPOST SOCKS USED MUST FOLLOW NCDEQ COMPOST SOCKS MAY BE USED IN PLACE OF DIVERSION DIKES OR CHECK DAMS AS AS AN ALTERNATIVE MEANS OF REDIRECTING RUNOFF DURING CONSTRUCTION, COMPOST SOCK (OPTIONAL) - NC6.66 FOLLOW THE GUIDELINES SET IN NCDEQ STANDARD 6.64. THE SOUTH OF THE SWITCHING STATION AREA. ALL MAINTENANCE PRACTICES SHALL FROM THE DISTURBED AREAS ONSITE DOWNSTREAM OF THE BORROW AREA AND TO TWO (2) SKIMMER SEDIMENT BASINS SHALL BE CONSTRUCTED TO CAPTURE RUNOFF SKIMMER SEDIMENT BASIN - NC6.64 3.5. CAPTURE SEDIMENT RUNOFF DURING CONSTRUCTION ACCORDING TO RM STANDARD SILT FENCES WILL BE PLACED ALONG THE DOWNSTREAM LIMITS OF DISTURBANCE TO TEMPORARY SILT FENCE - RM3.5 SEE STREAM RELOCATION PLANS (BY OTHERS) FOR SEQUENCE OF CONSTRUCTION. DURING THE STREAM RELOCATION CONSTRUCTION ACCORDING TO RM STANDARD 3.25. DEWATERING BAGS WILL BE USED TO PREVENT ACCUMULATION OF GROUNDWATER DEWATERING BAG - RM3.25 PERFORMANCE OF THE BASINS. BASINS TO PREVENT SHORT-CIRCUITING AND IMPROVE THE SEDIMENT REMOVAL POROUS BAFFLES WILL BE INSTALLED PER RM STANDARD 3.23 IN SKIMMER SEDIMENT POROUS BAFFLES - RM3.23 AS SEEN IN THE E&S PLANS ACCORDING TO RM STANDARD 3.16. DEVICES, PIPE INLET PROTECTION WILL BE PLACED AT THE INLET OF SUCH DEVICES TO PREVENT SEDIMENT FROM INTERFERING WITH CONSTRUCTION OF STORMWATER PIPE INLET PROTECTION - RM3.16 6.41. MAINTENANCE PRACTICES SHALL FOLLOW THE GUIDELINES SET IN NCDEQ STANDARD DISLODGED. IMMEDIATELY MAKE ALL REPIARS TO PREVENT FURTHER DAMAGE. ALL AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONE HAVE BEEN SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION CULVERTY OUTLET PROTECTION SHOULD BE INSPECTED WEEKYL AND AFTER CULVERT OUTLET PROTECTION - RM3.22 STANDARD 3.15. DIVERSION BERMS WILL BE USED AS SEEN IN THE E&S PLANS ACCORDING TO RM TO REDIRECT RUNOFF DURING INTERMEDIATE CONSTRUCTION PHASES, TEMPORARY TEMPORARY DIVERSION BERM - RM3.15 PREVENT EROSION ACCORDING TO SPECIFICATIONS IN RM STANDARD 3.12. EARTHEN CHANNELS WITH HIGH VELOCITIES WILL BE LINED WITH EC MATTING TO CHANNEL STABILIZATION W/EC MATTING - RM3.12 VEGETATION USED IN SLOPED AREAS VULNERABLE TO EROSION TO HELP ESTABLISH PERMANENT EROSION CONTROL MATS AND BLANKETS OUTLINED IN NCDEQ STANDARD 6.17 ARE ROLLED EROSION CONTROL PRODUCTS - NC6.17 ALTERNATIVE ACCORDING TO NCDEQ STANDARD 6.14. FOR AREAS REQUIRING ADDITIONAL EROSION CONTROL, MULCH MAY BE USED AS AN MULCHING - NC6.14 E&SC DETAILS IN THIS PLAN. IN ACCORDANCE TO THE GUIDELINES IN THE NCDEQ STANDARD 6.11 AND PER THE IMMEDIATELY FOLLOWING FINISH GRADING, PERMANENT VEGETATION SHALL BE APPLIED PERMANENT SEEDING - NC6.11 FOLLOW THE GUIDELINES SET IN NCDEQ STANDARD 6.10. SHALL ALSO RECEIVE TEMPORARY SEEDING. ALL MAINTENANCE PRACTICES SHALL REDUCE EROSION POTENTIAL. DIVERSION DIKES AND THE SKIMMER BASIN EMBANKMENT AREAS SHALL BE SEEDED TEMPORARILY WITH FAST GERMINATING GRASSES TO CONSTRUCTION. FINISH GRADING WILL OCCUR NEAR PROJECT COMPLETION. THESE CERTAIN AREAS OF THE SITE WILL BE ROUGH GRADED AS A FIRST STAGE OF TEMPORARY SEEDING - NC6.10 FILLING ALONG TREE TRUNKS AND TREE SCARING ARE AVOIDED. SHALL ALSO BE CHECKED TO MAKE SURE TRENCHING, EXCAVATION, SOIL COMPACTION, FENCING/ARMORING TO ENSURE IT IS PROPERLY IN PLACE. TREE PRESERVATION SHALL FOLLOW NCDEQ STANDARD 6.05, REQUIRING INSPECTION OF THE BEING CONVERTED FROM FOREST TO URBAN-TYPE USES. MAINTENANCE PRACTICES NOISE REDUCTION, SHADE AND OTHER ENVIRONMENTAL BENEFITS WHILE THE LAND IS WATERSHED PROTECTION, LANDSCAPE BEAUTIFICATION, DUST AND POLLUTION CONTROL, TREES WHERE THEY WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL, TREE PROTECTION SHALL BE INSTALLED TO ENSURE THE PROTECTION OF DESIRABLE TREE PRESERVATION AND PROTECTION - NC6.05 SHALL FOLLOW THE GUIDELINES SET IN NCDEQ STANDARD 6.04. MEDIUM FOR VEGETATION STABILIZATION. TOPSOILING PLACEMENT AND INSTALLATION AREAS OF THE SITE MAY REQUIRE TOPSOILING TO PROVIDE A SUITABLE GROWTH TOPSOILING - NC6.04 NEWLY GRADED AREAS SHOULD BE ROUGHENED ACCORDING TO DENR STANDARD 6.03. SURFACE ROUGHENING - NC6.03 APPLIED. WILL BE USED IN ALL SEEDED AREAS AFTER SEED, FERTILIZER, AND LIME HAVE BEEN ACCORDANCE WITH STANDARD AND SPECIFICATION 3.32, PERMANENT SEEDING. MULCH SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. SEEDING SHALL BE APPLIED IN ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT LAND GRADING - NC6.02 SEDIMENT CONTROLS WILL BE CLEANED AND REMOVED. AFTER ACHIEVING ADEQUATE STABILIZATION, THE TEMPORARY EROSION AND6. MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. THE JOB SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND5. FLAGS, SIGNS, ETC. AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLOSELY MARKED BY4. AFTER GRADING. TEMPORARY SEEDING OR OTHER STABILIZATION WILL FOLLOW SEVEN (7) DAYS3. INSTALLATION. IMMEDIATELY FOLLOWINGGRADING AND WILL BE SEEDED AND MULCHED THE SITE TEMPORARY SEDIMENT TRAP WILL BE INSTALLED AS A FIRST STEP IN2. AND END AS QUICKLY AS POSSIBLE. CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN1. CONSTRUCTION SEQUENCE SCHEDULE - N/A CONSTRUCTION ENTRANCES WILL BE INSTALLED FOLLOWING NCDEQ STANDARD TRANSPORTED TO ROADWAYS BY VEHICULAR TRAFFIC OR RUNOFF. ALL AND EGRESS AT CREPE MYRTLE STREET TO REDUCE THE AMOUNT OF SEDIMENT ONE CONSTRUCTION ENTRANCE WILL BE INSTALLED AT THE SITE'S VEHICLE INGRESS CONSTRUCTION ENTRANCE - RM3.17 Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval G S S S S S S S S S S 1 3 0 ' ' L1 1 3 0 ' ' S S 77.0'' 1 3 0 .4 '' S T R EAM D I T C H D I T C H D I T C HDITCH STREA M S TR EAM STREAM STREAM DITCH STREAM DITCH STREAM STREAM AREA SWAMPY 480.24' (TIE) N 39°54'43" E98.82' G MON. FD. MC/B IPF 1/2" IPF 1/2" IPF PINCHED IPF IPF IPF IPF T-BAR FOUND (ON LINE) IPF (ON LINE) IPF (ON LINE) IPF (ONLINE) IPF (HELD) POST POST IRS P P N C P V B 6 5 /0 1 7 2 6 P P N C P W B 0 7 P P 3 1 6 F 7 /0 1 7 2 6 /W B 1 6 PP WD34 METER POLE DILAPIDATED SHED/BARN BUILDIN G SIGN NO TRESPASSING PP XA05 SHED 1 2 " R C P 2 4" RCP 12" RCP CSX TRANSPORTATION RAILROAD COMPANY H A R O L D S T R E E T 0.47' WEST OF LINE 0.16' WEST OF LINE Z O N E "X " (H A T C H E D ) Z O N E "X " 1.54' DECK EAST OF LINE IRS (ON LINE) PP WA88 CL STREAM (6 0 ' P U B L I C R /W ) CL STREAM S 23°29'01" W 2129.16'S 23°29'01" W 2129.16' EX B EX A EXC EX E EX F EX G EX I EXJ EX 2 5 8 9 .7 4 ' (T I E ) (5 9 0 .0 2 ' R E C O R D ) S 6 4 °5 1 '3 1 " E 1 3 3 .2 4 ' N 4 5° 37' 0 5" E 1 12 6.29' B E E C H B R A N C H RAILROAD TRACKSRAILROAD TRACKS DIRT ROAD DIRT ROAD N 4 8° 0 8'08" E 2 29.0 0' INV.=105.29' INV.=106.72' INV.=94.11' HARDWOOD LARGE HARDWOOD LARGE HARDWOOD LARGE SS1 SS SS2 E E1 A G E WIRE GUY WIRE GUY DIRT ROAD T R E S P A S S I N G S I G N N O CSX TRANSPORTATION RAILROAD COMPANY A IPF EAST OF LINE 0.46' FENCE EAST OF LINE 0.37' L 2 L 3 L 4 DIR T R O A D E N D S U R V E Y T I E L I N E (T Y P .) N 4 5° 3 7'05 " E 1126. 2 9' S 23°29'01" W 2129.16' # 2058/07 # 2056/324 ELECTRIC TOWER IRF WOODS (TYP.) EDGE OFA WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF EX 1 EX 3 FENCE FENC E FENCE EAST OF LINE 0.46' FENCE WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER EX K EX L 18" R CP INV.=102.19 INV.=104.14 U N A B L E T O O B T AI N C O N N E C TI O N DI R E C TI O N O N L Y DIRT ROAD END D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D DIRT/GRAVEL ROAD DIRT/GRAVEL ROAD S T E E L S T R U C T U R E 8 0 /0 8 E2 EX H E1 18" METAL INV= 91.60 INV= 91.17 3 6 " R C P INV = 104.23 0 1 7 2 6 /V B 9 8 P P 3 1 5 T A 3 1 6 RC #3 RC #4 RC #1 MON FD. NCDOT MON FD. NCDOT MON FD. NCDOT D I T C H D I T C H DITCH WOODED WOODED WOODED WOODED WOODED WOODED WOODED DIRT ROAD GRAVEL A N D P A D S (T Y P.) C O N C R E T E PIE R ( R T. 14 12) R E D O A K B A T T L E B O R O R O A D C O N C R E T E B RID G E S T R U C T U R E A S P H A L T C O V E R E D GRASS/SHRUBS GRASS/SHRUBS GRASS/SHRUBS STREAM #2056 325 2058 09 METAL POLE ASPHALT PILE CONCRETE PAD E XIS TI N G R/ W P E R N C D O T P R OJ.# U- 3 3 2 9 E XIS TIN G R/ W P E R N C D O T P R O J.# U- 3 3 2 9 S EXM EXD MON FD. NCDOT (TYP.) POSTS IPF (3.6'EAST) IPF BEECH BRANCH S 23°29'01" W 206.97'64.09' S 23°29'01" W 128.93' 120' MON. FD. TOWN LINE N 6 5 ° 5 5 '1 7 "W 4 1 5 .4 6 ' (T O I P F /T I E ) SURVEY TIE LINE (TYP.) (1.1' FROM IPF) MON FD. ZONED: I-2 D.B. 2055, PG. 92 PARCEL ID: 019045 A DELAWARE CORPORATION HOSPIRA, INC. N05°11'12"E 37.22' N21°42'53"E 95.78' 120.23' 147.85' 93.61' N06°00'48"W N06°00'48"W N 8 7° 5 4'3 1" W S 8 7 ° 5 4'3 1" E 4 9 9.2 6' ( TIE) 4 5 8.7 2' (TIE) LINE (TYP.) SURVEY TIE PL S C A L E D T O W N L I N E P E R P .B . 1 9 , P G . 5 7 4 ZONE "X" (HATCHED) "B A T T L E B O R O " SS1 ZONED: I-2 P.B. 16, PG. 574 (PARCEL B) PARCEL ID: 040252 (IN PART) AREA: 51,782 S.F. OR 1.19 ACRES ZONED: I-2 P.B. 16, PG. 574 (PARCEL B) PARCEL ID: 040252 (IN PART) AREA: 98.318 S.F. OR 2.26 ACRES "TRACT THREE" TITLE COMMITMENT ZONED: A-1 P.B. 16, PG. 574 (PARCEL C) D.B. 2520, PG. 570 (TRACT NINE) PARCEL ID: 040250 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL 1 & 2) PARCEL ID: 020042 "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT THREE, IN PART) PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT THREE, IN PART) PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT THREE, IN PART) PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. PARCEL ONE" "TRACT FOUR TITLE COMMITMENT 6'-12' TALL PINE CUTOVER PARCEL TWO" "TRACT FOUR TITLE COMMITMENT FROM CORNER N 17°55'34" E 0.19' IPF FROM CORNER N 86°19'01" E 0.69' IPF # 2 0 5 8 /0 7 # 2 0 5 6 /3 2 3 E L E C T R I C T O W E R FROM CORNER N 44°24'37" E 0.46' LARGE PINE TREELINE 6'-12' TALL CUTOVER PINE LAR G E PIN E TRE E LIN E LARGE PINE TR EELINE WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF AREA AND SWAMPY THICK BRIARS CUTOVER MAINLY WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF PL PL PL PL PL PL P L PL PL P L PL P L P L P .B . 4 , P G . 1 5 4 L O T S 3 9 & 4 0 D .B . 1 5 2 7 , P G . 4 2 0 P A R C E L I D : 0 1 7 0 0 0 ZONED: R-10 D.B. 2610, PG. 637 PARCEL ID: 017169 P .B . 1 1 , P G . 4 4 L O T 2 1 D .B . 9 4 3 , P G . 2 3 7 P A R C E L I D : 0 1 6 7 2 1P.B . 4 , P G . 1 5 4 L O T 3 3 & P O R T I O N L O T 3 2 D .B . 8 5 5 , P G . 6 7 9 P A R C E L I D : 0 1 7 2 1 4 P .B . 4 , P G . 1 5 4 L O T S 3 4 & 3 5 D .B . 9 8 8 , P G . 7 1 P A R C E L I D : 0 1 9 7 1 8 P .B . 1 1 , P G . 4 4 L O T 2 2 D .B . 2 2 1 1 , P G . 4 2 3 P A R C E L I D : 0 1 8 7 8 6 P .B . 1 1 , P G . 4 4 L O T 2 3 D .B . 2 2 3 2 , P G . 2 3 9 P A R C E L I D : 0 1 6 9 5 5 L O T 2 4 - P .B . 1 1 , P G . 4 4 D .B . 1 2 6 1 , P G . 3 6 0 P A R C E L I D : 0 1 9 6 7 0 L O T 4 2 - P .B . 4 , P G . 1 5 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 7 P .B . 4 , P G . 1 5 L O T 4 3 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 2 D.B. 2520, PG. 570 PARCEL ID: 019856 ZONED: I-2 D.B. 2055, PG. 92 PARCEL ID: 019045 D.B. 1270, PG. 760 PARCEL ID: 020032 ZONED: R-10 P.B. 11, PG. 44 P.B. 4, PG. 154 BH-6 BH-1 BH-2 BH-4 BH-7 BH-9 BH-3 BH-5 BH-8 BH-10 1 0 0 100 9 5 9 5 95 95 130 130 125 1 2 5 125 125 125 125 125 125 120 120 120120 120 120 120 120 12 0 1 2 0 120 120 120 1 2 0 120 120 120 115 1 1 5 115 115 115 115 115 115 115 115 115 1 1 5 115 115 115 115 115115115115 115 115 115 115 1 1 0 110 1 1 0 110 1 1 0 110 110 110 110 110 1 1 0 110 110 110 110 110 110 110 110 110 110110110 110 110 110 105105 1 0 5 1 0 5 1 0 5 10 5 1 0 5 10 5 105 105 105 10 5 105 105 1 0 5 105 105 105 105105 105105 105 105 105 105 100 10 0 100 100 100 100 100 100 100 100 100 100 100 100 100 1 0 0 100 1 0 0 1 0 0 1 0 0 9 5 9 5 95 9 5 9 5 9 5 9 5 9 5 95 95 95 95 95 9 5 9595 9 5 90 IN SW AM PY A R EA S T R EAM CHANN EL #2 RC (TYP.) WOODS EDGE OF FEM A FLOO DPLA IN ZONE "X " AREA SWAMPY BH-11 EX Q P EX A S PHA LT A S P H A L T D R I V E PATCH ASPHALT 24" PINE (2) 36" OAK MYRTLE 12" CRAPE MYRT LE 12" CRA PE 8" PEAR S S S O EX PP WCO1 LANDSCAPING VAULT C O N C . 4 ' W O O D F E N C E H A T H A W A Y S T (U .S . R O U T E 3 0 1 ) 6 0 0 ' ± T O E A S T L I N E O F WO O D F E N C E FO PP 01726 C O N C . 4 ' W O O D F E N C E PP 01726 FROM COUNTY GIS P LANS UND ERGROUND WAT ERLINE TAKEN ( 6 0' PUBLIC R/W) CENTERLINE STREAM C EN T ER LINE S T RE A M CENTERLINE STREAM INV.=94.34' (6 0 ' P U B L I C R /W ) GrB Bb BBDpB Rb GrB GyC NoB NoB NoB 07/01/16 N.T.S. CMC KEL 07/01/16 0000-000 4 12 99999 TP PS M TS RECP TS TS CITY OF ROCKY MOUNTY, NORTH CAROLINA HATHAWAY SWITCHING STATION (SHEET 1 OF 2) EROSION & SEDIMENT CONTROL DETAILS SSB SSM *Basin to be graded to fInal grades in accordance with SWM Facility A grading plan on Sheet 8. B A S I N # 1 2 A R E A ( A C R E S ) D R A I N A G E ( C U . F T . ) S T O R A G E R E Q ' D S E D I M E N T ( C U . F T . ) P R O V I D E D V O L U M E E L E V A T I O N C L E A N O U T S E D I M E N T E L E V A T I O N S P I L L W A Y P R I N C I P A L ( F T . ) W E I R L E N G T H S I Z E ( I N . ) S K I M M E R ( I N . ) O R I F I C E S I Z E 4.28 7,704 12,876 109.6 112.0 22 3 1.5 4.10 7,938 24,353 94.6 96.00 8 3 1.5 SKIMMER SEDIMENT BASINS NOTE: FAIRCLOTH SKIMMER OR APPROVED EQUIVALENT REQUIRED. LS 14 FT MIN. 6" NCDOT ABC STONE ADDITIONAL DETAILS NOTE: REFER TO SPEC. 6.80 FOR STABILIZATION NC STD. 6.80 TEMPORARY CONSTRUCTION ROAD 6" CRS GEOTEXTILE FABRIC 8 OZ. WOVEN Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 07/01/16 N.T.S. CMC KEL 07/01/16 0000-000 5 12 99999 CITY OF ROCKY MOUNTY, NORTH CAROLINA HATHAWAY SWITCHING STATION (SHEET 2 OF 2) EROSION & SEDIMENT CONTROL DETAILS SF CD DW CE TD COP CSEM PIP PB CWO L a W C L A S S T O N S A 4.5'10'11.5'9"A d ( i n . ) 3 d o A 4.5'10'11.5'9"A 5.0 5.0 B 14'N/A 18"B 22.5 N/A 18'N/A 9"A 38 A 6'9'9"A 2.25 CULVERT TYPE OUTLET PROTECTION * DIMENSIONS MODIFIED TO FIT GEOMETRY AT DOUBLE CULVERT SEE TABLE BELOW S T R . N O . 4 9 12 13&14 15 T Y P E O U T L E T B N/A 3' C O M M E N T - - - K1/11 DETAIL - Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval S S 1 3 0 ' ' L1 S T R E A M D I T C H D I T C H ST RE A M IPF (HELD) IRS METER POLE PP XA05 2 4 " R C P PP WA88 CL STREAM S 23°29'01" W 2129.16' EX C 5 8 9 .7 4 ' ( T I E ) ( 5 9 0 .0 2 ' R E C O R D ) INV.=94.11' SS1 SS SS2 E WIRE GUY WIRE GUY # 2058/07 # 2056/324 ELECTRIC TOWER A WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D DIRT/GRAVEL ROAD DIRT/GRAVEL ROAD S T E E L S T R U C T U R E 8 0 /0 8 E2 E1 18" METAL INV= 91.60 INV= 91.17 D I T C H DITCH WOODED WOODED WOODED GRAVEL GRASS/SHRUBS CONCRETE PAD E X I S T I N G R/ W P E R N C D O T P R O J. # U - 3 3 2 9 EX D (TYP.) POSTS MOUNT CITY OF ROCKY 64.09' S 23°29'01" W 128.93' MON. FD. TOWN LINE 147.85' 93.61' N06°00'48"W N06°00'48"W 4 9 9. 2 6' ( T I E ) LINE (TYP.) SURVEY TIE S C A L E D T O W N L I N E P E R P .B . 1 9 , P G . 5 7 4 " B A T T L E B O R O " " C I T Y O F R O C K Y M O U N T " SS1 ZONED: I-2 P.B. 16, PG. 574 (PARCEL B) PARCEL ID: 040252 (IN PART) AREA: 98.318 S.F. OR 2.26 ACRES GINGER C. MAYNARD ISAAC SMITH, JR. & "TRACT THREE" TITLE COMMITMENT ZONED: A-1 P.B. 16, PG. 574 (PARCEL C) D.B. 2520, PG. 570 (TRACT NINE) PARCEL ID: 040250 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL 1 & 2) PARCEL ID: 020042 6'-12' TALL PINE CUTOVER PARCEL TWO" "TRACT FOUR TITLE COMMITMENT WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF PL P L P L BH-6 BH-1 BH-2 BH-4 BH-7 BH-3 BH-5 BH-8 1 0 0 9 5 9 5 9 5 95 110 1 1 0 110 10 5 105 105 105 1 0 0 100 100 100 100 100 100 1 0 0 100 9 5 9 5 95 9 5 95 I N S W A M P Y A R E A S T R E A M C H A N N E L #2 RC (TYP.) WOODS EDGE OF CSX TRANSPORTATION RAILROAD COMPANY FE M A FL O O D PL A IN Z O N E "X " 2 5' F R O N T S E T B A C K 10' SIDE SETBACK 1 0 ' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 30' REAR SETBACK 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 3 0' R E A R S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K BH-11 INV.=94.34' 60' SCALE 0 30' SYMBOL DESCRIPTION DRC KEL 07/01/16 07/01/16 1"=30' 0000-000 6 12 EXISTING STREAM EXISTING WETLANDS BH-5 PROPOSED SOIL BORING LOCATION LIMITS OF DISTURBANCE LIMITS OF CLEARING NO. SPEC. KEY SYMBOL TITLE TO TOPSOILINGTO TP TP TS TEMPORARY SEEDINGTS RECP TD TD RECP SF SSB SKIMMER SEDIMENT BASIN DW DWB BZ BZ BUFFER ZONE CRS STABILIZATION CONSTRUCTION ROAD CRS CD CHECK DAM PB POROUS BAFFLES NC6.05 NC6.10 NC6.17 RM3.15 BERM TEMPORARY DIVERSION RM3.22 RM3.3 (SILT) FENCE TEMPORARY SEDIMENT RM3.25 DEWATERING BAG RM3.8a NC6.04 NC6.64 RM3.23 & PROTECTION TREE PRESERVATION NC6.74 NC6.80 CONTROLLED PRODUCTS ROLLED EROSION PROTECTION CULVERT OUTLET CONTROL LEGEND - NORTH CAROLINA EROSION AND SEDIMENTATION COP DRAINAGE AREA SKIMMER SEDIMENT BASIN CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION STREAM RELOCATION) AND DEMOLITION PLAN (SUBSTATION & PHASE I EROSION & SEDIMENT CONTROL GENERAL LEGEND SEQUENCE OF CONSTRUCTION EROSION AND SEDIMENT CONTROL REFER TO SHEET 7 FOR PHASE I MATCHLINE SHEET 7 M A T C H L I N E S H E E T 7 SHEET 7. WILL BE PLACE IN THE TOPSOIL STOCKPILE LOCATED ON TOPSOIL CLEARED FROM SUBSTATION AREA ON THIS SHEET8. STREAMBANK STABILIZATION (VSS) MEASURES. PLANS BY ANGLER ENVIRONMENTAL FOR VEGETATIVE REFER TO HATHAWAY SWITCHING STATION STREAM MITIGATION7. BASIN IS 4.10 ACRES. DRAINAGE AREA FOR THE PHASE II E&SC SKIMMER SEDIMENT 6. IN STABILIZED AND FULLY FUNCTIONAL. WITH SILT FENCE BARRIER UNTIL THE RELOCATED STREAM STREAM DURING THIS PHASE. PROTECT EXISTING STREAM DO NOT CONNECT PROPOSED GRADING TO THE EXISTING 5. SHEET 8 AND 11. POSSIBLE. CULVERT DESIGN INFORMATION IS SHOWN ON DOUBLE 48" CULVERTS, SOUTH HEADWALL AND FILL AS IN ORDER TO CONSTRUCT AS MUCH OF THE PROPOSED RECONFIGURE DIRT/GRAVEL ROAD AS SHOWN ON THIS PLAN, 4. CONSTRUCTION BEGINNING OF EACH WORK DAY, AS NECESSARY, DURING DEWATER GRADED AREA FOR STREAM RELOCATION AT THE 3. OF ENGINEERING DETAILS. RM DENOTES CITY OF ROCKY MOUNT DEPARTMENT AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. ENVIRONMENT AND NATURAL RESOURCES (DENR) EROSION NC DENOTES THE NORTH CAROLINA DEPARTMENT OF2. REFER TO SHEET 2 FOR EXISTING CONDITIONS LEGEND.1. NOTES: Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval (SEE NOTE 6) PHASE I E&SC SKIMMER SEDIMENT BASIN #2 3.52 ACRE DRAINAGE AREA CONVEYS TO SEE NOTE #3 SEE NOTE #5 SEE NOTE #5 SEE NOTE #4 SEE NOTE #4 SEE NOTE #4 SOIL STOCKPILE STRUCTURAL FILL 48" RCP T D T D T D T D TD T D TDT D T D T D T D T D TD T D T D T D TD T D T D T D T D T D T D T D T D T D T D T D T D TD RECP DIVERSION CLEANWATER TD RECP DIVERSION CLEANWATER TD RECP DIVERSION CLEANWATER DWB DW CRS CRS CD CD #2 RECP RECP RECP RECP RECP TD TD TD TD TD RECP TD RECP TD RECP TD RECP TD RECP TD RECP TD RECP TD TD RECP RECPTD RECPTD R E C PT D TD TD TD TD TD TS TS TS TS TS CLEARING LIMITS OF TP CLEARING LIMITS OF TP PB PB PB PB PB PB TS TS TS ENVIRONMENTAL (SEE NOTE 7) MITIGATION PLANS BY ANGLER HATHAWAY SWITCHING STATION STREAM REFER TO SHEETS E1 THROUGH E9 FOR SSB R E C P B Z T D R E C P T D R E C P R E C P T D T D R E C P T D R E C P T D B Z COP TS BZ BZ BZ B Z OTHERS REMOVE BY 105 110 100 95 95 95 1 0 0 1 0 0 1 0 0 B Z B Z B Z BZ BZBZ BZ BZ BZ BZ BZ BZ BZ BZ B Z B Z B Z B Z BZ BZ BZ BZ B Z B Z B Z B Z B Z B Z B Z BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ B Z BZ BZ TS TS TS TS TS TS TS TS AND AREAS STABILIZED CULVERTS ARE FULLY FUNCTIONAL RELOCATION AND NEW DOUBLE 48" REMOVE 24" PIPE AFTER STREAM 100' SCALE 0 50' DRC KEL 07/01/16 07/01/16 1"=50' 0000-000 7 12 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION PLAN (STOCKPILE & BORROW AREA) PHASE I EROSION & SEDIMENT CONTROL MATCHLINE SHEET 6 M A T C H L I N E S H E E T 6 LIMITS OF DISTURBANCE NO. SPEC. KEY SYMBOL TITLE TO TOPSOILINGTO TP TP CE TS TEMPORARY SEEDINGTS RECP TD TD RECP SF SSB SKIMMER SEDIMENT BASIN BZ BZ BUFFER ZONE CRS STABILIZATION CONSTRUCTION ROAD PB POROUS BAFFLES NC6.05 RM3.17 NC6.10 ENTRANCE GRAVEL CONSTRUCTION NC6.17 RM3.15 BERM TEMPORARY DIVERSION RM3.22 RM3.3 (SILT) FENCE TEMPORARY SEDIMENT NC6.04 NC6.64 RM3.23 & PROTECTION TREE PRESERVATION NC6.74 NC6.80 CONTROLLED PRODUCTS ROLLED EROSION PROTECTION CULVERT OUTLET COP LSNC6.40 LEVEL SPREADER RM3.16 PIP PIPE INLET PROTECTION CONTROL LEGEND - NORTH CAROLINA EROSION AND SEDIMENTATION STANDARD 6.10. APPLY TEMPORARY SEEDING IN ACCORDANCE WITH NCDEQ 12. PHASE I E&SC PLANS. INSTALL REMAINING STRUCTURAL E&SC PRACTICES SHOWN ON 11. AND PLANCE IN STOCKPILE SHOWN ON SHEET 6. MOVE STRUCTURAL FILL FROM STREAM RELOCATION EXCAVATION 10. RELOCATION. SEE SHEETS E1-E9 FOR DETAILS. CLEAR AREAS ADJACENT TO STREAM TO ALLOW FOR STREAM 9. THERE. STATION AREA SO THAT BORROWED SOIL MAY BE PLACED REMOVE TOPSOIL AND OTHER VEGETATION TO CLEAR SWITCHING 8. ADJACENT TO THE PROPOSED SWITCHING STATION AREA. INSTALL SKIMMER SEDIMENT BASIN #2 AND PERIMETER CONTROLS 7. STREAM AS SEEN IN SHEET 6. CONSTRUCTION OF THE DOUBLE 48" PIPE CROSSING ALONG THE REROUTE EXISTING DIRT ROAD TO ALLOW FOR THE 6. WITHIN THE LOD. PLACE SILT FENCES ALONG BOTH SIDES OF EXISTING STREAM 5. CONSTRUCTION ROAD. BORROW AREA WITH THE ASSOCIATED DIVERSION AND CONSTRUCT THE SKIMMER SEDIMENT BASIN #1 ADJACENT TO THE 4. E&S PLAN. INSTALL CONSTRUCTION ENTRANCE AS SHOWN ON THE PHASE I 3. PRE-CONSTRUTION MEETING. WILL BE CHECKED BY THE ENVIRONMENTAL INSPECTOR AT THE DISTURBANCE SHOWN ON THE PHASE I E&SC PLANS. FLAGGING PRIOR TO PRE-CONSTRUCTION MEETING, FLAG LIMITS OF 2. PRIOR TO COMMENCEMENT OF CONSTRUCTION. AND SCHEDULE THIS CONFERENCE A MINIMUM OF ONE(1) WEEK BE REQUIRED PRIOR TO BEGINNING CONSTRUCTION. PLEASE CALL ROCKY MOUNT CONSTRUCTION INSPECTOR (252-343-3158), WILL A PRE-CONSTRUCTION CONFERENCE WITH ALLEN GOFF, CITY OF 1. PHASE I E&SC SEQUENCE OF CONSTRUCTION CRS STATION WILL BE REQUIRED. WILL BE KEPT CLEAN AT ALL TIMES. IF NOT, A WASHING ALL STREETS AND ROADS ADJACENT TO THIS PROJECT7. AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. THE CITY OF ROCKY MOUNT PRIOR TO FINAL INSPECTION RIGHT-OF-WAY MUST BE INSPECTED AND APPROVED BY ALL AREAS DISTURBED WITHIN BURROWS STREET6. STABILIZATION DETAIL. REFER TO SHEET 4 FOR CONSTRUCTION ROAD5. PAD SITE. USE AS STRUCTURAL FILL ON THE SWITCHING STATION DISTURBANCE INDICATED ON THIS PLAN AS NEEDED TO BEGIN EXCAVATING BORROW AREA WITHIN LIMITS OF4. ON THIS SHEET. IN THE TOPSOIL STOCKPILE LOCATED WILL BE PLACED TOPSOIL CLEARED FROM SUBSTATION AND BORROW AREAS 3. OF ENGINEERING DETAILS. RM DENOTES CITY OF ROCKY MOUNT DEPARTMENT AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. ENVIRONMENT AND NATURAL RESOURCES (DENR) EROSION NC DENOTES THE NORTH CAROLINA DEPARTMENT OF2. REFER TO SHEET 2 FOR EXISTING CONDITIONS LEGEND.1. NOTES: S E E N O T E S 6 & 7 G S S S S S D I T C H D I T C H D I T C HDIT C H ST RE A M S T R E A M STREAM STREAM DITCH S T R EAM 4 8 0. 2 4' ( T IE ) N 3 9 ° 5 4' 4 3 " E 9 8 . 8 2' G MON. FD. MC/B IPF 1/2" IPF 1/2" IPF PINCHED IPF IPF (ON LINE) POST P P N C P V B 6 5 /0 1 7 2 6 P P N C P W B 0 7 P P 3 1 6 F 7 /0 1 7 2 6 /W B 1 6 PP WD34 1 2 " R C P 2 4 " R C P 0.47' WEST OF LINE 0.16' WEST OF LINE 1.54' DECK EAST OF LINE PP WA88 EX F EX G EX I EX J N 4 5 ° 3 7' 0 5 " E 1 1 2 6. 2 9' D IRT ROAD INV.=105.29' INV.=106.72' INV.=94.11' SS2 E E1 G E WIRE GUY WIRE GUY T R E S P A S S I N G S I G N N O IPF EAST OF LINE 0.46' FENCE EAST OF LINE 0.37' DI R T R O A D E N D 116.2 117.2117.2 114.8 115.8 116.0 115.9 115.8 115.3 116.8 118.8 118.6 117.7 113.4 114.4 114.5 114.6 114.4 113.7 112.7 113.9 113.6 113.5 111.8 111.5 109.9 108.6 109.8 111.5 113.9 115.7 114.2 111.2 109.6 110.6 113.1 109.4 108.3 108.0 107.9 108.1 107.8 108.9 110.6 113.6 117.1 117.8 121.4 121.8 121.6 121.3 120.9 120.2 121.2 119.0 118.0 119.9 120.5 121.5 122.0 122.5 123.5 123.0 122.5 121.5 122.6 123.2 123.5 124.5 124.5 123.7 122.7 125.8 125.5 125.2 124.9 125.5 124.8 124.1 125.1 124.5 125.3 125.9 125.0 124.9 122.1 123.0 120.4 120.8 123.3 118.6 118.2 114.3 115.5 118.8 114.0 118.1 113.8 111.6 111.9 112.0 115.6 117.5 113.1 111.9 110.8 110.5 109.5 106.6 107.0 106.2 105.0 105.5 104.5 103.4 105.4 105.5 105.8 106.0 107.4 105.3 105.2 104.6 104.6 104.1 103.0 106.5 106.9 105.7 103.6 102.9 100.8 101.3 107.7 110.2 109.3 107.0 108.0 106.1 106.9 105.3 104.3 105.6 104.6 103.7 103.3 102.9 101.9 101.9 101.1 99.5 99.7 107.9 108.5 110.3 110.4 109.7 108.3 108.4 105.9 106.6 111.6 112.4 114.9 116.6 117.8 116.1 116.6 114.8 114.2 112.4 109.5 108.5 109.5 110.9 112.1 113.9 107.8 109.0 111.9 112.6 113.3 113.2 115.2 117.3 120.3 122.8 117.6 115.9 112.7 113.9 112.1 111.6 111.4 107.9 110.4 114.6 112.1 110.8 110.8 101.2 101.2 101.9 102.1 101.8 105.7 110.3 104.6 104.6 100.9 101.0 100.7 100.1 100.2 109.5 108.5 106.7 103.9 106.1 100.1 99.6 99.0 98.3 97.8 97.6 100.0 101.4 102.5 107.9 103.9 101.4 101.9 101.3 98.2 106.4 108.0 108.4 107.8 99.8 109.1 105.6 103.2 98.9 99.6 99.3 100.3 101.7 101.8 96.3 95.6 95.1 99.4 100.8 103.0 100.9 94.9 98.6 98.6 99.0 99.7 98.5 105.3 104.7 104.6 104.7 104.6 104.7 104.6 104.1 103.4 102.6 102.6 102.2 101.7 101.0 100.3 101.9 101.9 102.5 103.4 103.7 104.2 104.3 104.0 104.0 104.1 104.1 104.4 103.5 103.3 103.5 103.5 103.5 103.6 103.5 103.4 102.2 103.0 102.2 102.1 102.8 102.8 102.8 102.7 103.0 102.7 101.5 101.6 102.0 102.1 102.4 102.1 101.8 99.6 99.2 99.3 99.1 95.4 95.5 100.1 101.6 100.6 105.7 106.0 106.3 108.6 108.9108.4 108.3 107.7 108.6 108.9 107.1 107.8 109.8 111.5 111.9 111.9 111.7 111.9 111.5 112.5 111.8 111.8 111.4 110.8 109.5 108.8 109.3 109.2 109.9 110.0 110.0 110.4 110.5 110.5 110.4 111.9 111.8 112.2 111.9 111.5 111.7 112.8 111.8 112.3 108.3 105.8 105.6 105.5 105.2 104.5 103.8 103.0 101.5 100.7 101.4 102.1 103.0 102.5 102.5 101.1 100.2 100.0 99.3 99.0 99.0 99.2 100.5 100.6 103.5 103.9 103.2 104.1 104.6 105.2 104.5 104.6 105.3 106.2 104.7 104.6 106.0 104.3 107.6 107.7 110.0 110.8 110.0 110.7 103.4 106.8 110.3 101.8 100.7 99.7 99.1 99.9 100.4 110.8 110.5 110.8 # 2058/07 # 2056/324 ELECTRIC TOWER IRF F E N C E EAST OF LINE 0.46' FENCE WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER EX K INV.=102.19 DIRT ROAD END D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D 97.0 97.0 96.7 S T E E L S T R U C T U R E 8 0 /0 8 EX H E1 0 1 7 2 6 /V B 9 8 P P 3 1 5 T A 3 1 6 RC #3 RC #4 RC #1 ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL 1 & 2) PARCEL ID: 020042 "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. GINGER C. MAYNARD ISAAC SMITH, JR. & GINGER C. MAYNARD ISAAC SMITH, JR. & "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT THREE, IN PART) PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. GINGER C. MAYNARD ISAAC SMITH, JR. & PARCEL TWO" "TRACT FOUR TITLE COMMITMENT # 2 0 5 8 /0 7 # 2 0 5 6 /3 2 3 E L E C T R I C T O W E R L A R G E P IN E T R E E L IN E 6'-12' TALL CUTOVER PINE L A R G E P I N E T R E E L I N E L A R G E P I N E T R E E L I N E AREA AND SWAMPY THICK BRIARS CUTOVER MAINLY WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF P L P L P L M Y R T L E W . T H O M A S A L B E R T C . T H O M A S & P .B . 4 , P G . 1 5 4 L O T S 3 9 & 4 0 D .B . 1 5 2 7 , P G . 4 2 0 P A R C E L I D : 0 1 7 0 0 0 C H E R Y L T . S E M P L E R O B E R T M . S E M P L E & P .B . 4 , P G . 1 5 4 L O T S 3 4 & 3 5 D .B . 9 8 8 , P G . 7 1 P A R C E L I D : 0 1 9 7 1 8MAR Y E L L E N B E N S O N P .B . 1 1 , P G . 4 4 L O T 2 2 D .B . 2 2 1 1 , P G . 4 2 3 P A R C E L I D : 0 1 8 7 8 6 T H O M A S P . B E N S O N , J R . P .B . 1 1 , P G . 4 4 L O T 2 3 D .B . 2 2 3 2 , P G . 2 3 9 P A R C E L I D : 0 1 6 9 5 5 K A T H Y A . D E B E R R Y L A R R Y T . D E B E R R Y & L O T 2 4 - P .B . 1 1 , P G . 4 4 D .B . 1 2 6 1 , P G . 3 6 0 P A R C E L I D : 0 1 9 6 7 0 V I N S O N , J R . N E L S O N P A I G E L O T 4 2 - P .B . 4 , P G . 1 5 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 7 P .B . 4 , P G . 1 5 L O T 4 3 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 2 V I N S O N , J R . N E L S O N P A I G E GINGER C. MAYNARD D.B. 2520, PG. 570 PARCEL ID: 019856 "SUBDIVISION" HILLSIDE ZONED: R-10 P.B. 11, PG. 44 P.B. 4, PG. 154 BH-9 BH-3 BH-10 1 2 5 1 2 5 125 125 120 12 0 1 2 0 1 2 0 1 2 0 115 1 1 5 115 1 1 5 1 1 5 115 115 115 1 1 5 115 1 1 0 1 1 0 1 1 0 110 1 1 0 110 110 110 110 1 1 0 1 1 0 1 1 0 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 10 5 105 1 0 5 105 105 1 0 5 105 105 1051 0 5 105 105 105 100 100 100 100 100 100 100 1 0 0 100 1 0 0 100 1 0 0 9 5 #2 RC (TYP.) WOODS EDGE OF 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 3 0' R E A R S E T B A C K 5 0' F R O N T S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K AREA SWAMPY EX Q P EX A S P H A L T A S P H A L T D R I V E PATCH ASPHALT 24" PINE (2) 36" OAK MYRTLE 12" CRAPE M Y R T L E 1 2 " C R A P E 8" PEAR S S S O EX PP WCO1 LANDSCAPING VAULT C O N C . 4 ' W O O D F E N C E H A T H A W A Y S T (U .S . R O U T E 3 0 1 ) 6 0 0 ' ± T O E A S T L I N E O F F O PP 01726 C O N C . 4 ' W O O D F E N C E PP 01726 F R O M C O U N T Y G I S P L A N S U N D E R G R O U N D W A T E R L I N E T A K E N ( 6 0' P U B L I C R/ W ) INV.=94.34' (6 0 ' P U B L I C R /W ) B U R R O W S S T R E E T C R E P E M Y R T L E S T R E E T Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval TO SKIMMER SEDIMENT BASIN #1 4.28 ACRE DRAINAGE AREA CONVEYS SEE NOTE #5 SEE NOTE #4 TS 48" RCP CRS CD T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P TD RECP TD RECP TD RECP R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D TS TS R E C P T D BZ BZ B Z BZ BZ BZ B Z BZ BZ BZ BZ BZ B Z B Z BZ BZ BZ B Z BZ BZ BZ BZ BZ B Z B Z B Z B Z B Z BZ B Z B Z B Z B Z BZ B Z BZ BZ BZ BZ BZ BZ B Z BZ BZ BZ B Z BZ BZ BZ BZ BZ OTHERS REMOVE BY 1 0 3 1 0 5 PIP COP T P T P T P T P T P T P T P T P T P T P T P T P T P T P T P T P 1 1 0 1 1 0 1 1 5 1 2 0 1 2 5 T O T E M P O R A R Y T O P S O I L S T O C K P I L E 1 0 0 EXISTING CONTOURS GRADING TO MATCH CONSTRUCTION ROAD CWO INFORMATION PIPE DESCRIPTION AND & 11 FOR CULVERT #15 REFER TO SHEETS 9 CLEARING LIMITS OF TP CRS CRS CRS CRS LS PB SSB #1 TP TP PB PB SF SF CRS SF CE S S 1 3 0 ' ' L1 S T R E A M D I T C H D I T C H ST RE A M IPF (HELD) IRS METER POLE PP XA05 2 4 " R C P PP WA88 CL STREAM S 23°29'01" W 2129.16' EX C 5 8 9 .7 4 ' ( T I E ) ( 5 9 0 .0 2 ' R E C O R D ) INV.=94.11' SS1 SS SS2 E WIRE GUY WIRE GUY # 2058/07 # 2056/324 ELECTRIC TOWER A WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D DIRT/GRAVEL ROAD DIRT/GRAVEL ROAD S T E E L S T R U C T U R E 8 0 /0 8 E2 E1 18" METAL INV= 91.60 INV= 91.17 D I T C H DITCH WOODED WOODED WOODED GRAVEL GRASS/SHRUBS CONCRETE PAD E X I S T I N G R/ W P E R N C D O T P R O J. # U - 3 3 2 9 EX D (TYP.) POSTS MOUNT CITY OF ROCKY 64.09' S 23°29'01" W 128.93' MON. FD. TOWN LINE 147.85' 93.61' N06°00'48"W N06°00'48"W 4 9 9. 2 6' ( T I E ) LINE (TYP.) SURVEY TIE S C A L E D T O W N L I N E P E R P .B . 1 9 , P G . 5 7 4 " B A T T L E B O R O " " C I T Y O F R O C K Y M O U N T " SS1 ZONED: I-2 P.B. 16, PG. 574 (PARCEL B) PARCEL ID: 040252 (IN PART) AREA: 98.318 S.F. OR 2.26 ACRES GINGER C. MAYNARD ISAAC SMITH, JR. & "TRACT THREE" TITLE COMMITMENT ZONED: A-1 P.B. 16, PG. 574 (PARCEL C) D.B. 2520, PG. 570 (TRACT NINE) PARCEL ID: 040250 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL 1 & 2) PARCEL ID: 020042 6'-12' TALL PINE CUTOVER PARCEL TWO" "TRACT FOUR TITLE COMMITMENT WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF PL P L P L BH-6 BH-1 BH-2 BH-4 BH-7 BH-3 BH-5 BH-8 1 0 0 9 5 9 5 9 5 95 110 1 1 0 110 10 5 105 105 105 1 0 0 100 100 100 100 100 100 1 0 0 100 9 5 9 5 95 9 5 95 I N S W A M P Y A R E A S T R E A M C H A N N E L #2 RC (TYP.) WOODS EDGE OF CSX TRANSPORTATION RAILROAD COMPANY FE M A FL O O D PL A IN Z O N E "X " 2 5' F R O N T S E T B A C K 10' SIDE SETBACK 1 0 ' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 30' REAR SETBACK 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 3 0' R E A R S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K BH-11 INV.=94.34' 60' SCALE 0 30' DRC KEL 07/01/16 07/01/16 1"=30' 0000-000 8 12 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION E&SC PLAN (SUBSTATION) SITE, GRADING, DRAINAGE AND PHASE II LIMITS OF DISTURBANCE LIMITS OF CLEARING NO. SPEC. KEY SYMBOL TITLE TO TOPSOILINGTO TP TP PS PERMANENT SEEDINGPS M M MULCHING RECP TD TD RECP SF SSB SKIMMER SEDIMENT BASIN DW DWB BZ BZ BUFFER ZONE CRS STABILIZATION CONSTRUCTION ROAD CD CHECK DAM PB POROUS BAFFLES NC6.05 NC6.11 NC6.14 NC6.17 RM3.15 BERM TEMPORARY DIVERSION RM3.22 RM3.3 (SILT) FENCE TEMPORARY SEDIMENT RM3.25 DEWATERING BAG RM3.8a NC6.04 NC6.64 RM3.23 & PROTECTION TREE PRESERVATION NC6.74 NC6.80 CONTROLLED PRODUCTS ROLLED EROSION PROTECTION CULVERT OUTLET CONTROL LEGEND - NORTH CAROLINA EROSION AND SEDIMENTATION COP RM3.12 EROSION MATTING CHANNEL STABILIZATION W/ CSEM MATCHLINE SHEET 9 M A T C H L I N E S H E E T 9 **FOR PROPOSED CONDITIONS LEGENDS SEE SHEET 9 PROPOSED CONDITIONS LEGEND CRS INSPECTION AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY. A BMP CERTIFICATION MUST BE SUBMITTED PRIOR TO FINAL8. AND ISSUANCE OF A CERTIFICATE OF OCCUPANCY. BE SUBMITTED AND APPROVED PRIOR TO FINAL INSPECTION A STORM DRAINAGE AS-BUILT INCLUDING THE BMP MUST7. A CERTIFICATE OF OCCUPANCY. EXECUTED PRIOR TO FINAL INSPECTION AND ISSUANCE OF A BMP OPERATIONS & MAINTENANCE AGREEMENT MUST BE6. SECURITY, JOHN BLACK (804) 257-4933. POWER PRIOR TO ACCESSING SWM FACILITY. CALL DOMINION 48 HOUR NOTICE MUST BE GIVEN TO DOMINION VIRGINIA5. OF ENGINEERING DETAILS. RM DENOTES CITY OF ROCKY MOUNT DEPARTMENT4. AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. ENVIRONMENT AND NATURAL RESOURCES (DENR) EROSION NC DENOTES THE NORTH CAROLINA DEPARTMENT OF3. PROPOSED SUBSTATION FENCE IS SUBJECT TO CHANGE. ALL INTERNAL SUBSTATION EQUIPMENT LAYOUT WITHIN THE 2. REFER TO SHEET 2 FOR EXISTING CONDITIONS LEGEND.1. NOTES: Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 24' X 70'CONTROL ENCLOSURE 7 1 . 6 ' 3 . 4 ' 1 4 ' 1 4 ' 1 4 ' 1 4 ' 14' 14' 14' 14.0' 14' 13.0' 61.0' 189.0'127.0' BASELINE N 14°09'55" E BASELINE N 14°09'55" E A 1 2 1 2 A GATE PROP. GATE PROP. GATE PROP. G 118 B 108 SWM FACILITY C 8 10 A 108 SYSTEM EAST UNDERDRAIN H 118 SYSTEM EAST UNDERDRAIN SOUTH LATERAL FOR I 118 SYSTEM WEST UNDERDRAIN J 118 SYSTEM WEST UNDERDRAIN SOUTH LATERAL FOR K 118 CULVERTS DOUBLE 48" 1 128 2 128 ROAD (TYP.) EQUIPMENT ACCESS 3 128 4 128 DITCH #1 M 118 4 128 5 128 5 128 B A S E L I N E N 7 5 ° 5 0 ' 0 5 " W 5 128 INTERCEPTOR TRENCH PIPE WITH STONE 12" DIA. PERFORATED HDPE 5 128 INTERCEPTOR TRENCH PIPE WITH STONE 12" DIA. PERFORATED HDPE 6 128 SECTION (TYP.) 18" FLARED END 7 128 HEADWALL (TYP.) 18" CONCRETE 8 128 9 128 10 128 (TYP.) WITH RING & COVER PRECAST MANHOLE 11 128 WINGWALLS (TYP) HEADWALL WITH DOUBLE 7 8 . 9 ' 2 4 . 1 ' 2 8 . 0 ' 2 7 . 0 ' 2 7 . 0 ' 1 4 . 8 ' 1 0 0 . 2 ' ENVIRONMENTAL MITIGATION PLANS BY ANGLER HATHAWAY SWITCHING STATION STREAM REFER TO SHEETS E1 THROUGH E9 FOR EASEMENT PROPOSED SWM 18" HPDE 18" HPDE 18" HPDE 18" HPDE 127°02'37" 165°28'46" 157°30'00" 45° 45° 1 2 " P E R F . H D P E DBL. 48" PIPE 12 1 2 " P E R F . H D P E 1 2 " P E R F . H D P E 1 2 " P E R F . H D P E 90° 11 32.5'R 90° 3 10 4 2 1 5 9 13 14 6 8 7 (TYP.) 55'R A RIP RAP 1.5 TONS OF CLASS 55'R (TYP.) 55'R (TYP.) 55'R 55'R A RIP RAP 1.5 TONS OF CLASS BARREL INFORMATION RISER, SPILLWAY & SEE SHEET 10 FOR EASEMENT PROPOSED SWM (SEE NOTE 5) EASEMENT 20' SWM ACCESS (SEE NOTE 5) EASEMENT 20' SWM ACCESS EASEMENT PROPOSED SWM F1 108CHANNEL LOW FLOW 1 8 12 SWM FACILITY 7 5 . 0 ' 1 5 8 . 0 ' 1 4 2 . 0 ' D 8 10 SWM SUMP 214.0' 189.0' 90° A RIP RAP OF CLASS 22.5 TONS (TYP.) 12' SECURITY FENCE (TYP.) 8' SECURITY FENCE 1 128(TYP.) 12' SECURITY FENCE A RIP RAP OF CLASS 38.0 TONS (TYP.) 245 LF STRUCTURAL FILL ACCESS ROAD WITH 253 LF GUTTER (TYP.) 30" CURB & 59 LF (FLUME) DITCH #2 90° 90° EASEMENT PROPOSED SWM 95 9 5 9 9 1 0 0 1 0 0 1 0 0 1 0 0 9 6 10 0 1 0 0 1 0 1 1 0 2 1 0 3 105 110 100 9 5 9 5 1 0 4 9 9 9 4 9 9 9 9 9 8 98 1.1 % 1.1% 1. 1 % 1 . 1 % 0.8% 0.8% x TC 101.19' TC 99.19' x x PG 97.50' x FL 98.34' FL 97.25' x x PG 99.98' x PG 99.72' x PG 104.55' x PG 103.85' x PG 103.08' x PG 103.08' 1.0%x PG 103.47' 1. 1 % x PG 103.08' x PG 102.66' TC 101.02' x 9 5 9 5 98 97 93 9 2 9 3 94 PS PS PS PS PS PS PS PS PS PS PS TO M TO M TO M TO M TO M TO M TO M TO M TD RECP CSEM CSEM TD RECP DIVERSION CLEANWATER DIVERSION CLEANWATER TD RECP DIVERSION CLEANWATER CD #2 B Z B Z RECP RECP RECP RECP RECP TD TD TD TD TD RECP TD RECP TD RECP TD RECP TD RECP TD RECP TD RECP TD TD RECP T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P RECPTD RECPTD R E C PT D CLEARING LIMITS OF TP CLEARING LIMITS OF TP RECP SSB PB PB PB CD CRS CRS CLEARING LIMITS OF TP CLEARING LIMITS OF TP CD CD CD COP COP COP COP B Z BZ BZ BZ BZ CRSBZBZ BZ BZ BZ BZ BZ BZ BZ B Z B Z B Z BZ B Z B Z B Z B Z BZ BZ B Z BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ B Z B Z B Z B Z B Z B Z B Z BZ BZ BZ BZ BZ G S S S S S D I T C H D I T C H D I T C HDIT C H ST RE A M S T R E A M STREAM STREAM DITCH S T R EAM 4 8 0. 2 4' ( T IE ) N 3 9 ° 5 4' 4 3 " E 9 8 . 8 2' G MON. FD. MC/B IPF 1/2" IPF 1/2" IPF PINCHED IPF IPF (ON LINE) POST P P N C P V B 6 5 /0 1 7 2 6 P P N C P W B 0 7 P P 3 1 6 F 7 /0 1 7 2 6 /W B 1 6 PP WD34 1 2 " R C P 2 4 " R C P 0.47' WEST OF LINE 0.16' WEST OF LINE 1.54' DECK EAST OF LINE PP WA88 EX F EX G EX I EX J N 4 5 ° 3 7' 0 5 " E 1 1 2 6. 2 9' D IRT ROAD INV.=105.29' INV.=106.72' INV.=94.11' SS2 E E1 G E WIRE GUY WIRE GUY T R E S P A S S I N G S I G N N O IPF EAST OF LINE 0.46' FENCE EAST OF LINE 0.37' DI R T R O A D E N D 116.2 117.2117.2 114.8 115.8 116.0 115.9 115.8 115.3 116.8 118.8 118.6 117.7 113.4 114.4 114.5 114.6 114.4 113.7 112.7 113.9 113.6 113.5 111.8 111.5 109.9 108.6 109.8 111.5 113.9 115.7 114.2 111.2 109.6 110.6 113.1 109.4 108.3 108.0 107.9 108.1 107.8 108.9 110.6 113.6 117.1 117.8 121.4 121.8 121.6 121.3 120.9 120.2 121.2 119.0 118.0 119.9 120.5 121.5 122.0 122.5 123.5 123.0 122.5 121.5 122.6 123.2 123.5 124.5 124.5 123.7 122.7 125.8 125.5 125.2 124.9 125.5 124.8 124.1 125.1 124.5 125.3 125.9 125.0 124.9 122.1 123.0 120.4 120.8 123.3 118.6 118.2 114.3 115.5 118.8 114.0 118.1 113.8 111.6 111.9 112.0 115.6 117.5 113.1 111.9 110.8 110.5 109.5 106.6 107.0 106.2 105.0 105.5 104.5 103.4 105.4 105.5 105.8 106.0 107.4 105.3 105.2 104.6 104.6 104.1 103.0 106.5 106.9 105.7 103.6 102.9 100.8 101.3 107.7 110.2 109.3 107.0 108.0 106.1 106.9 105.3 104.3 105.6 104.6 103.7 103.3 102.9 101.9 101.9 101.1 99.5 99.7 107.9 108.5 110.3 110.4 109.7 108.3 108.4 105.9 106.6 111.6 112.4 114.9 116.6 117.8 116.6 114.8 114.2 112.4 109.5 108.5 109.5 110.9 112.1 113.9 107.8 109.0 111.9 112.6 113.3 113.2 115.2 120.3 122.8 117.6 115.9 112.7 113.9 112.1 111.6 111.4 107.9 110.4 114.6 112.1 110.8 110.8 101.2 101.2 101.9 102.1 101.8 105.7 110.3 104.6 104.6 100.9 101.0 100.7 100.1 100.2 109.5 108.5 106.7 103.9 106.1 100.1 99.6 99.0 98.3 97.8 97.6 100.0 101.4 102.5 107.9 103.9 101.4 101.9 101.3 98.2 106.4 108.0 108.4 107.8 99.8 109.1 105.6 103.2 98.9 99.6 99.3 100.3 101.7 101.8 96.3 95.6 95.1 99.4 100.8 103.0 100.9 94.9 98.6 98.6 99.0 99.7 98.5 105.3 104.7 104.6 104.7 104.6 104.7 104.6 104.1 103.4 102.6 102.6 102.2 101.7 101.0 100.3 101.9 101.9 102.5 103.4 103.7 104.2 104.3 104.0 104.0 104.1 104.1 104.4 103.5 103.3 103.5 103.5 103.5 103.6 103.5 103.4 102.2 103.0 102.2 102.1 102.8 102.8 102.8 102.7 103.0 102.7 101.5 101.6 102.0 102.1 102.4 102.1 101.8 99.6 99.2 99.1 100.1 101.6 100.6 105.7 106.0 106.3 108.6 108.9108.4 108.3 107.7 108.6 108.9 107.1 107.8 109.8 111.5 111.9 111.9 111.7 111.9 111.5 112.5 111.8 111.8 111.4 110.8 109.5 108.8 109.3 109.2 109.9 110.0 110.0 110.4 110.5 110.5 110.4 111.9 111.8 112.2 111.9 111.5 111.7 112.8 111.8 112.3 108.3 105.8 105.6 105.5 105.2 104.5 103.8 103.0 101.5 100.7 101.4 102.1 103.0 102.5 102.5 101.1 100.2 100.0 99.3 99.0 99.0 99.2 100.5 100.6 103.5 103.9 103.2 104.1 104.6 105.2 104.5 104.6 105.3 106.2 104.7 104.6 106.0 104.3 107.6 107.7 110.0 110.8 110.0 110.7 103.4 106.8 110.3 101.8 100.7 99.7 99.1 99.9 100.4 110.8 110.5 110.8 # 2058/07 # 2056/324 ELECTRIC TOWER IRF F E N C E EAST OF LINE 0.46' FENCE WOODS (TYP.) EDGE OF 6'-12' TALL PINE CUTOVER EX K INV.=102.19 DIRT ROAD END D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D D I R T /G R A V E L R O A D 97.0 97.0 96.7 S T E E L S T R U C T U R E 8 0 /0 8 EX H E1 0 1 7 2 6 /V B 9 8 P P 3 1 5 T A 3 1 6 RC #3 RC #4 RC #1 ZONED: A-1 P.B. 16, PG. 574 (PARCEL A) D.B. 2520, PG. 570 (TRACT FIVE, PARCEL 1 & 2) PARCEL ID: 020042 "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. GINGER C. MAYNARD ISAAC SMITH, JR. & GINGER C. MAYNARD ISAAC SMITH, JR. & "TRACT FIVE" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT EIGHT) PARCEL ID: 037306 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. "TRACT TWO" TITLE COMMITMENT ZONED: A-1 D.B. 2520, PG. 570 (TRACT THREE, IN PART) PARCEL ID: 018274 OR 35.14 ACRES TOTAL AREA 1,530,606 S.F. GINGER C. MAYNARD ISAAC SMITH, JR. & PARCEL TWO" "TRACT FOUR TITLE COMMITMENT # 2 0 5 8 /0 7 # 2 0 5 6 /3 2 3 E L E C T R I C T O W E R L A R G E P IN E T R E E L IN E 6'-12' TALL CUTOVER PINE L A R G E P I N E T R E E L I N E L A R G E P I N E T R E E L I N E AREA AND SWAMPY THICK BRIARS CUTOVER MAINLY WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF WOODS (TYP.) EDGE OF P L P L P L M Y R T L E W . T H O M A S A L B E R T C . T H O M A S & P .B . 4 , P G . 1 5 4 L O T S 3 9 & 4 0 D .B . 1 5 2 7 , P G . 4 2 0 P A R C E L I D : 0 1 7 0 0 0 C H E R Y L T . S E M P L E R O B E R T M . S E M P L E & P .B . 4 , P G . 1 5 4 L O T S 3 4 & 3 5 D .B . 9 8 8 , P G . 7 1 P A R C E L I D : 0 1 9 7 1 8MAR Y E L L E N B E N S O N P .B . 1 1 , P G . 4 4 L O T 2 2 D .B . 2 2 1 1 , P G . 4 2 3 P A R C E L I D : 0 1 8 7 8 6 T H O M A S P . B E N S O N , J R . P .B . 1 1 , P G . 4 4 L O T 2 3 D .B . 2 2 3 2 , P G . 2 3 9 P A R C E L I D : 0 1 6 9 5 5 K A T H Y A . D E B E R R Y L A R R Y T . D E B E R R Y & L O T 2 4 - P .B . 1 1 , P G . 4 4 D .B . 1 2 6 1 , P G . 3 6 0 P A R C E L I D : 0 1 9 6 7 0 V I N S O N , J R . N E L S O N P A I G E L O T 4 2 - P .B . 4 , P G . 1 5 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 7 P .B . 4 , P G . 1 5 L O T 4 3 D .B . 1 1 9 3 , P G . 1 8 9 P A R C E L I D : 0 1 9 8 4 2 V I N S O N , J R . N E L S O N P A I G E GINGER C. MAYNARD D.B. 2520, PG. 570 PARCEL ID: 019856 "SUBDIVISION" HILLSIDE ZONED: R-10 P.B. 11, PG. 44 P.B. 4, PG. 154 BH-9 BH-3 BH-10 1 2 5 1 2 5 125 125 120 12 0 1 2 0 1 2 0 1 2 0 115 1 1 5 115 1 1 5 1 1 5 115 115 115 1 1 5 115 1 1 0 1 1 0 1 1 0 110 1 1 0 110 110 110 110 1 1 0 1 1 0 1 1 0 110 110 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 1 0 5 10 5 105 1 0 5 105 105 1 0 5 105 105 1051 0 5 105 105 105 100 100 100 100 100 100 100 1 0 0 100 1 0 0 100 1 0 0 9 5 #2 RC (TYP.) WOODS EDGE OF 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 1 5 ' S I D E S E T B A C K 3 0' R E A R S E T B A C K 5 0' F R O N T S E T B A C K 3 0' R E A R S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K 1 5 ' S I D E S E T B A C K 5 0' F R O N T S E T B A C K AREA SWAMPY EX Q P EX A S P H A L T A S P H A L T D R I V E PATCH ASPHALT 24" PINE (2) 36" OAK MYRTLE 12" CRAPE M Y R T L E 1 2 " C R A P E 8" PEAR S S S O EX PP WCO1 LANDSCAPING VAULT C O N C . 4 ' W O O D F E N C E H A T H A W A Y S T (U .S . R O U T E 3 0 1 ) 6 0 0 ' ± T O E A S T L I N E O F F O PP 01726 C O N C . 4 ' W O O D F E N C E PP 01726 F R O M C O U N T Y G I S P L A N S U N D E R G R O U N D W A T E R L I N E T A K E N ( 6 0' P U B L I C R/ W ) INV.=94.34' (6 0 ' P U B L I C R /W ) B U R R O W S S T R E E T C R E P E M Y R T L E S T R E E T 100' SCALE 0 50' DRC KEL 07/01/16 07/01/16 1"=50' 0000-000 9 12 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION PHASE II E&SC PLAN (BORROW AREA) SITE, GRADING, DRAINAGE AND LIMITS OF DISTURBANCE NO. SPEC. KEY SYMBOL TITLE TO TOPSOILINGTO TP TP CE PS PERMANENT SEEDINGPS M M MULCHING RECP TD TD RECP SF SSB SKIMMER SEDIMENT BASIN BZ BZ BUFFER ZONE CRS STABILIZATION CONSTRUCTION ROAD PB POROUS BAFFLES NC6.05 RM3.17 NC6.11 ENTRANCE GRAVEL CONSTRUCTION NC6.14 NC6.17 RM3.15 BERM TEMPORARY DIVERSION RM3.22 RM3.3 (SILT) FENCE TEMPORARY SEDIMENT NC6.04 NC6.64 RM3.23 & PROTECTION TREE PRESERVATION NC6.74 NC6.80 CONTROLLED PRODUCTS ROLLED EROSION PROTECTION CULVERT OUTLET COP LSNC6.40 LEVEL SPREADER RM3.16 PIP PIPE INLET PROTECTION CONTROL LEGEND - NORTH CAROLINA EROSION AND SEDIMENTATION DEVICES AND STRUCTURES. UPON FINAL AUTHORIZATION FROM THE ENVIRONMENTAL INSPECTOR, REMOVE ALL REMAINING E&S 11. SHOWN ON SHEET 3. MANAGEMENT BASIN. AREAS DISTURBED SHALL BE PERMANENTLY STABLIZED PER E&S MEASURES TRAP AND RESTORE GRADES TO THE PROPOSED ELEVATIONS OF THE PERMANENT STORMWATER THE PERMANENT SWM CONTROL STRUCTURE. CONTRACTOR SHALL CLEAN ALL SEDIMENT FROM THE SEDIMENT BASIN #2 TO A PERMANENT STORMWATER DETENTION POND INCLUDING CONSTRUCTING UPON APPROVAL FROM THE ENVIRONMENTAL INSPECTOR, CONVERT THE TEMPORARY SKIMMER 10. PERMANENT SEEDING TO ALL GRADED AREAS NOT STABILIZED BY STONE. AFTER SITE IS GRADED, INSTALL 4" NCDOT NO.57 COARSE AGGREGATE SITE STONE AND APPLY 9. ELECTRICAL SUBSTATION PLANS PROVIDED UNDER SEPARATE COVER. STRUCTURAL FOUNDATIONS, GROUNDING GRID, OR ELECTRICAL APPURTENANCES AS REQUIRED BY THE CONSTRUCT INTERNAL ACCESS ROADS PER SHEET 8 AND DETAIL 2 ON SHEET 12, ALONG WITH ANY 8. SITE GRADING IS STABALIZED WITH STONE. BASIN. THE ORIFICE WITHIN THE STORMWATER DETENTION POND SHALL REMAIN PLUGGED UNTIL THE PERFORM FINAL SITE GRADING, CONSTRUCT DITCH #1, CURB & GUTTER, AND STORMWATER DETENTION 7. RECONFIGURE SKIMMER SEDIMENT BASIN #2 TO GRADING SHOWN ON SHEET 8.6. BUILD UP SUBSTATION PAD TO FINAL GRADE ONCE RELOCATED STREAM IS IN PLACE.5. TO BE USED IN THE CONSTRUCTION OF THE SWITCHING STATION PAD. BEGIN GRADING OPERATIONS IN BORROW AREA PER SHEET 9 TO ACCUMULATE STRUCTURAL FILL 4. THE E&S INSPECTOR, CONNECT RELOCATED STREAM TO EXISTING STREAM. ONCE MAJORITY OF STREAM RELOCATION IS COMPLETE AND STABILIZED TO THE SATISFACTION OF 3. INSTALL PHASE 2 EROSION AND SEDIMENT CONTROL MEASURES PER PLANS.2. PLANS. MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES FROM PHASE I ABOVE AS INDICATED ON THE 1. PHASE I E&SC SEQUENCE OF CONSTRUCTION MATCHLINE SHEET 8 M A T C H L I N E S H E E T 8 DETAIL & SECTION IDENTIFICATION DETAIL NUMBER SEQUENTIAL DETAIL IS SHOWN SHEET ON WHICH PROPOSED CONDITIONS LEGEND SYMBOL DESCRIPTION BASED COURSE NCDOT NO. ABC COMPACTED AGGREGATE SITE STONE NCDOT NO. 57 COARSE EXISTING STREAM EXISTING WETLANDS PROPOSED SUBSTATION SECURITY FENCE 1 2 128 128 2 128 11 128 30" CURB & GUTTER 110 1 107 x PG 98.9'PROPOSED SPOT ELEVATION 12 1 DIRECTION PROPOSED GRADE PERCENTAGE AND 1.1% BH-5 PROPOSED SOIL BORING LOCATION PROPOSED MAJOR CONTOUR (5-FOOT INTERVAL) PROPOSED MINOR CONTOUR (1-FOOT INTERVAL) PROPOSED MAJOR CONTOUR (BY OTHERS) PROPOSED MINOR CONTOUR (BY OTHERS) 95 93 PROPOSED SWM ACCESS EASEMENT CRS 1 9 9AEXTENSION PAVEMENT BURROWS STREET BE REQUIRED. KEPT CLEAN AT ALL TIMES. IF NOT A WASHING STATION WILL ALL STREETS AND ROADS ADJACENT TO THIS PROJECT WILL BE8. CERTIFICATE OF OCCUPANCY. MOUNT PRIOR TO FINAL INSPECTION AND ISSUANCE OF MUST BE INSPECTED AND APPROVED BY THE CITY OF ROCKY ALL AREAS DISTURBED WITHIN BURROWS STREET RIGHT OF WAY7. DETAIL. REFER TO SHEET 4 FOR CONSTRUCTION ROAD STABILIZATION6. SECURITY, JOHN BLACK (804) 257-4933. POWER PRIOR TO ACCESS SWM FACILITY. CALL DOMINION 48 HOUR NOTICE MUST BE GIVEN TO DOMINION VIRGINIA5. FILL ON THE SWITCHING STATION PAD SITE. INDICATED ON THIS PLAN AS NEEDED TO USE AS STRUCTURAL EXCAVATE BORROW AREA WITHIN LIMITS OF DISTURBANCE 4. ON THIS SHEET. IN THE TOPSOIL STOCKPILE LOCATED WILL BE PLACED TOPSOIL CLEARED FROM SUBSTATION AND BORROW AREAS 3. OF ENGINEERING DETAILS. RM DENOTES CITY OF ROCKY MOUNT DEPARTMENT AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. ENVIRONMENT AND NATURAL RESOURCES (DENR) EROSION NC DENOTES THE NORTH CAROLINA DEPARTMENT OF2. REFER TO SHEET 2 FOR EXISTING CONDITIONS LEGEND.1. NOTES: SEE SHEET 11 STORM SEWER, UNDERDRAIN OR CULVERT A N D C R O S S S E C T I O N S S T R E E T E X T E N S I O N P L A N S , P R O F I L E S , D E T A I L S S E E S H E E T S 9 A A N D 9 B F O R B U R R O W S Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval B U R R O W S S T R E E T E X T E N S I O N (TYP.) ACCESS ROAD3 9 12 14' 1 2 3 128 8 128 WINGWALLS (TYP) HEADWALL WITH DOUBLE 11 L 9 15 1 2 " H P D E 13 55'R (SEE NOTE 5) EASEMENT 20' SWM ACCESS CULVERT (SEE NOTE 5) ACCESS EASEMENT 20' & VAR. WIDTH SWM A RIP RAP OF CLASS 2.3 TONS (FLUME) DITCH #4 128 4 128 4 (FLUME) DITCH #3 15+79 15+00 14+00 1 3 + 0 0 1 2 + 0 0 1 1 + 0 0 1 0 + 0 0 (SEE SHEET 9A) PRIVATE ENTRANCE SEE SHEET 9A CURB EXTENSION PS PS PS PS PS PS PS TD RECP DIVERSION CLEANWATER CD T D RECP CD CRS CRS COP T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P TD RECP TD RECP TD RECP R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D R E C P T D PIP COP EXISTING CONTOURS GRADING TO MATCH CONSTRUCTION ROAD INFORMATION AND GRADING SKIMMER BASIN DESIGN SEE SHEETS 4 AND 7 FOR STOKPILE GRADING SEE SHEET 7 FOR T P T P T P T P T P T P T P T P T P T P T P T P T P T P T P BZ BZ BZ BZ BZ B Z B Z B Z B Z B Z BZ B Z B Z B Z B Z BZ BZ BZ B Z BZ BZ BZ BZ BZ BZ BZ BZ B Z BZ BZ BZ BZ BZ B Z B Z BZ BZ BZ B Z B Z BZ BZ BZ BZ BZ BZ B Z BZ BZ B Z BZ BZ CRS NOTE 6 SEE CWO LS CLEARING LIMITS OF T P TP CRS M CE LS M M M M SSB #1 CRS TP TP SF CRS LS B Z BZ B Z BZ BZ TO TO TO TO TO SF SF 1 0 0 1 0 0 9 6 115 1 2 0 125 1 2 0 1 1 5 1 1 0 1 0 3 98 1 0 5 1 1 2 1 1 2 1 1 2 1 1 4 1 1 5 1 1 5 1 1 0 1 1 0 1 1 0 1 5 ' S I D E S E T B A C K S F O 60' SCALE 0 30' CMC KEL 07/01/16 07/01/16 0000-000 AS NOTED 9A 12 PLAN CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION PROFILE AND DETAILS BURROWS STREET EXTENSION PLAN, - (NTS) ROCKY MOUNT ROAD DETAIL DETAIL1 - 2 (NTS) ROCKY MOUNT ROLL-TYPE CURB DETAIL DETAIL 8" NCDOT NO. ABC AGGREGATE BASE 3" MIX TYPE B-25.0B BASE COURSE 2" MIX TYPE S-12.5D SURFACE COURSE 9A9A N 3 9 ° 5 4 ' 4 3 " E 9 8 . 8 2 ' MON. FD. MC/B IPF 1/2" PP NCPWB07 PP 316F7/01726/WB16 0.47' WEST OF LINE 0.16' WEST OF LINE (60' PUBLIC R/W) IRF DIRT/GRAVEL ROAD 01726/VB98 PP 315TA316 RC #3 L A R G E P I N E T R E E L I N E P L P.B. 4, PG. 15 LOT 43 D.B. 1193, PG. 189 PARCEL ID: 019842 VINSON, JR. NELSON PAIGE BURROWS STREET C R E P E M Y R T L E S T R E E T P EX A S P H A L T ASPHALT DRIVE PATCH ASPHALT 24" PINE (2) 36" OAK MYRTLE 12" CRAPE 8" PEAR PP WCO1 LANDSCAPING VAULT 4' WOOD FENCE H A T H A W A Y S T ( U . S . R O U T E 3 0 1 ) 6 0 0 ' ± T O E A S T L I N E O F PP 01726 CONC. PP 01726 F R O M C O U N T Y G I S P L A N S U N D E R G R O U N D W A T E R L I N E T A K E N ( 6 0 ' P U B L I C R / W ) GINGER C. MAYNARD D.B. 2520, PG. 570 PARCEL ID: 019856 CONC. -9A 3 (NTS) ROCKY MOUNT 36" VALLEY GUTTER DETAIL DETAIL 0.50% 0.30% 3 . 67% S T A . 1 0 + 0 0 . 0 0 M Y R T L E S T R E E T C E N T E R L I N E C R E P E E L E V . = 1 1 2 . 2 5 ' P V I S T A . 1 0 + 8 9 . 4 3 EXISTING GROUND STA. 13+48.13 RIGHT-OF-WAY END OF PROPOSED E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) DISTANCE (FEET) 96 102 108 114 120 96 102 108 114 120 1 1 1 . 9 6 1 1 2 . 0 1 1 1 2 . 2 2 1 1 2 . 0 1 1 1 1 . 6 7 1 1 1 . 4 6 1 1 1 . 5 6 1 1 1 . 4 8 1 1 1 . 6 1 1 1 2 . 0 7 1 1 2 . 0 9 1 1 2 . 0 0 1 1 1 . 5 9 1 1 0 . 7 3 1 0 9 . 5 3 1 0 8 . 3 8 1 0 7 . 2 0 1 0 6 . 1 5 1 0 5 . 1 4 1 0 4 . 3 5 1 0 4 . 8 4 10+00 10+50 11+10 11+70 12+30 12+90 13+50 14+10 14+70 15+30 15+79 1 1 2 . 2 0 1 1 2 . 1 8 1 1 2 . 0 9 1 1 2 . 0 0 1 1 1 . 9 1 1 1 1 . 8 2 1 1 1 . 7 3 1 1 1 . 6 4 1 1 1 . 5 5 1 1 1 . 5 1 1 1 0 . 4 1 1 1 1 . 3 9 1 1 0 . 7 0 STA. 10+66.00, ELEV = 112.13' MYRTLE STREET AT TIE TO EXISTING CREPE PROPOSED CONDITIONS LEGEND SYMBOL DESCRIPTION 1 9AEXTENSION PAVEMENT BURROWS STREET 110 107 PROPOSED MAJOR CONTOUR (5-FOOT INTERVAL) PROPOSED MINOR CONTOUR (1-FOOT INTERVAL) DETAIL & SECTION IDENTIFICATION DETAIL NUMBER SEQUENTIAL DETAIL IS SHOWN SHEET ON WHICH 12 1 PROPOSED SWM ACCESS EASEMENT 9A 9A 9A 24" ROLL-TYPE CURB & GUTTER 2 PVI ELEV. = 111.43'' PVI STA. = 13+60.23 50' V.C. 13+41.00, ELEV = 111.48' EXTENSION STREET AT STA. END BURROWS STREET STA. 13+88.23, ELEV = 110.41' END PROPOSED FINISHED GRADE PROP. DOMINION ACCESS ROAD (PRIVATE) 12 4 (FLUME) DITCH #4 9A 12 4 9A (FLUME) DITCH #3 11+00 112 12+00 BURROWS STREET EXTENSION 13+00 14+00 112 112 114 9A A 9A (SCALE 1"=30') BURROWS STREET EXTENSION PLAN 9A B 9A (SCALE HOR. 1"=30', VER. 1"=6') BURROWS STREET EXTENSION PROFILE 12'0 60'0 30' HORIZONTAL SCALE VERTICAL SCALE 6' 9A 9A 2 CURB (TYP.) 24" ROLL-TYPE 9A 2 9A STATIONS 12+50 AND 12+75 GUTTER) - SEE SHEET 9B, SECTION 24" ROLL-TYPE CURB (DRY 9A 9A 3 GUTTER (TYP.) 36" VALLEY FINISHED GRADE TO PROPOSED ADJUST VALVES FINISHED GRADE TO PROPOSED ADJUST MANHOLE SPREADER LEVEL PROPOSED SPREADER LEVEL PROPOSED ELEV = 111.65' STA. 12+87.11, INTERSECTION HAMMERHEAD STA. 10+66.00 CONSTRUCTION BEGIN BURROWS STREET AT STA. 13+41.00 CONSTRUCTION END BURROWS STREET STA. 12+87.11 INTERSECTION HAMMERHEAD 2 3 ' (SEE NOTE 5) RIGHT-OF-WAY PROPOSED R40' R40' R25' 23' DEMOLISH ASPHALT SURFACE COURSE ENTRANCE 2" MIX TYPE S-12.5D STA. 11+77.33 INTERSECTION ENTRANCE FINISHED GRADE PROPOSED ELEV = 111.98' STA. 11+77.33, INTERSECTION ENTRANCE C/L PROJECT ACCEPTANCE. RIGHT-OF-WAY. THIS STATEMENT IS TO BE INCLUDED ON FINAL PLAT PRIOR TO CITY OF ROCKY MOUNT MAINTENANCE, INCLUDING STORMWATER, ENDS AT PUBLIC 7. SURFACE COURSE AS INDICATED ON THE PLAN. DEMOLISH EXISTING ASPHALT PAD AND REPLACE WITH 2" MIX TYPE S-12D 6. OF CURB. DEAD-END OF BURROWS STREET IS SET 7.5 FEET BEHIND THE PROPOSED BACK ACCEPTANCE. PROPOSED RIGHT-OF-WAY, ENCOMPASSING THE HAMMERHEAD AND IS TO BE DEDICATED ON A RECORDED FINAL PLAT PRIOR TO PROJECT PROPOSED PUBLIC RIGHT-OF-WAY EMCOMPASSING HAMMERHEAD AND DEAD END 5. SEE PROFILE B (THIS SHEET) FOR PROFILE ELEVATIONS AND GRADES.4. REFER TO SHEET 9 FOR PHASE II EROSION AND SEDIMENT CONTROL PLAN.3. REFER TO SHEET 7 FOR PHASE I EROSION AND SEDIMENT CONTROL PLAN.2. REFER TO SHEET 9B FOR CRITICAL SPOT ELEVATIONS AND CROSS SECTIONS.1. NOTES: SEE NOTE 8 -9A 4 (NTS) HATHAWAY ROAD (RTE. 301) BURROWS STREET TO TYPICAL SECTION CROSS SLOPE EXISTING SAWCUT GROUND EXISTING MOUNT VALLEY GUTTER. SEE DETAIL 3 ON SHEET 9A. NOTE: AT ALL ENTRANCES, INSTALL CITY OF ROCKY 1' REPLACEMENT PAVEMENT CROSS SLOPE EXISTING PAVEMENT EXISTING (SEE NOTE 6) CONNECTION PRIVATE ENTRANCE (SEE NOTE 10) EXISTING OAK TREE (SEE NOTE 9) GRADE TO DRAIN SHIFTING THE ALIGNMENT TO THE SOUTHWEST. TO EITHER ADJUST TIE-IN GRADES, TRIM TREE LIMBS OR POSSIBLY EVEN THAT THE 36" OAK CAN BE SAVED, ADJUSTMENTS WILL BE MADE IN THE FIELD TO BE REMOVED. IF, DURING THE PRE-CONSTRUCTION MEETING, IT IS DETERMINED STREET ALIGNMENT, IT IS ANTICIPATED THAT THE EXISTING 36" OAK WILL NEED MEETING. BASED UPON THE CURRENT RIGHT-OF-WAY & EXISTING BURROWS CONSTRUCTION OF BURROWS STREET EXTENSION TO SET A PRE-CONSTRUCTION CONTACT DONALD PERRY WITH CITY OF ROCKY MOUNT PRIOR TO 10. STREET AND BURROWS STREET EXTENSION. POSITIVE DRAINAGE FOR RESIDENCE AT INTERSECTION OF CREPE MYRTLE GRADE TO DRAIN AND ADJUST TOP OF CURB IN FIELD AS NEEDED TO MAINTAIN 9. AND CITY ENGINEER PRIOR TO INSTALLATION OF CURB & GUTTER. AT (252)972-1121 TO SET UP A MEETING BETWEEN DOMINION, THE CONTRACTOR STREET INTERSECTION. CONTACT DONALD PERRY WITH CITY OF ROCKY MOUNT LINEAR FEET TO THE NORTHWEST OF THE BURROWS STREET/CREPE MYRTLE INSTALL 36" VALLEY GUTTER AT ENTRANCE LOCATED APPROXIMATELY 150 SECTION. PRIOR TO CONSTRUCTION, DETERMINE WHETHER IT IS APPROPRIATE TO REFER TO DETAILS 2 & 4 ON THIS SHEET FOR ROLL TYPE CURB AND TYPICAL EXISTING STORM INLET AT THE SOUTHWEST CORNER OF THIS INTERSECTION. HATHAWAY RADIAL RETURN INTERSECTION AND GRADE TO DRAIN INTO THE (U.S. ROUTE 301). CURB & GUTTER SHALL TERMINATE AT THE BURROWS ST. & EDGE OF BURROWS STREET FROM STA. 10+89.43 TOWARD HATHAWAY STREET 24" ROLL TYPE CURB AND GUTTER TO BE INSTALLED ALONG THE SOUTHERN 8. 20± FT. 9A 9A 4 13.5'13.5' 6.5'6.5' 27' B/C TO B/C 60.0' & VAR. R/W PER DETAIL) STREET (SAW-CUT EDGE OF PAVEMENT ALONG BURROWS STREET TO HATHAWAY ROLL-TYPE CURB Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 20' SCALE 0 10' CMC KEL 07/01/16 07/01/16 0000-000 1"=10' E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 12+25 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 12+00 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 11+75 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 11+50 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) CL E L E V A T I O N ( F E E T ) 11+25 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 11+00 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 10+89 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 10+75 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 10+66 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V = 1 1 2 . 3 6 9 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 2 . 2 3 4 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 9 7 4 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 2 . 2 1 4 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 9 8 4 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 2 3 4 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 2 . 3 6 9 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 2 9 4 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 2 . 1 5 9 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 8 9 9 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 2 . 1 3 9 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 9 0 9 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 1 5 9 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 2 . 2 9 4 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 2 1 9 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 2 . 0 8 4 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 8 3 4 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 2 . 0 6 4 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 8 2 4 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 0 8 4 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 2 . 2 1 9 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 1 4 4 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 2 . 0 0 9 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 7 4 9 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 9 8 9 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 7 5 9 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 0 0 9 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 2 . 1 4 4 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 0 6 9 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 1 . 9 3 4 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 6 8 4 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 9 1 4 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 6 7 4 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 9 3 4 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 2 . 0 6 9 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 1 . 9 9 4 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 1 . 8 5 9 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 6 0 9 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 8 3 9 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 6 0 9 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 8 5 9 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 9 9 4 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 4 3 5 O F F S E T = - 2 1 . 2 0 0 E L E V = 1 1 2 . 1 3 0 O F F S E T = 0 . 0 0 0 E L E V = 1 1 2 . 0 1 6 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 2 7 6 O F F S E T = - 1 6 . 1 7 8 E L E V = 1 1 2 . 1 7 0 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 9 4 0 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 2 . 0 1 0 O F F S E T = - 1 1 . 5 0 1 E L E V = 1 1 2 . 2 5 0 O F F S E T = 0 . 0 0 0 E L E V = 1 1 2 . 0 1 0 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 7 5 1 O F F S E T = 2 0 . 9 7 4 E L E V = 1 1 2 . 3 5 8 O F F S E T = - 2 8 . 6 4 2 E L E V = 1 1 1 . 7 9 5 O F F S E T = 2 1 . 8 1 8 E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W E X . R O W 9B 12 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION CROSS SECTIONS BURROWS STREET EXTENSION 61.73 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 60.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 60.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 60.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 60.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 2.00 ' 6.50 ' 60.00 ' 68.58 ' 8.50 '11.50 '11.46 '8.54 ' 9.50 '11.50 '16.15 '12.46 ' 6.50 '11.53 '21.17 '13.93 ' Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 20' SCALE 0 10' CMC KEL 07/01/16 07/01/16 0000-000 1"=10' E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 13+41 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 13+25 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 13+00 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 12+75 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 12+50 100 110 120 130 100 110 120 130 0 10 20 30 40 50 600-10-20-30-40-50-60 E L E V = 1 1 1 . 4 7 0 O F F S E T = - 1 3 . 0 0 0 E L E V = 1 1 1 . 5 3 0 O F F S E T = - 1 4 . 5 0 0 E L E V = 1 1 1 . 5 3 4 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 7 4 6 O F F S E T = - 1 4 . 8 8 2 E L E V = 1 1 1 . 7 6 4 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 5 2 4 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 7 8 4 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 9 1 9 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 1 . 9 9 6 O F F S E T = - 1 7 . 0 6 2 E L E V = 1 1 2 . 1 4 0 O F F S E T = - 2 3 . 9 6 2 E L E V = 1 1 2 . 3 0 7 O F F S E T = - 5 3 . 5 0 0 E L E V = 1 1 1 . 4 6 0 O F F S E T = - 1 4 . 5 0 0 E L E V = 1 1 1 . 4 0 0 O F F S E T = - 1 3 . 0 0 0 E L E V = 1 1 1 . 4 6 0 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 6 8 9 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 4 5 9 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 7 0 9 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 8 4 4 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 2 8 9 O F F S E T = - 5 3 . 5 0 0 E L E V = 1 1 1 . 3 8 0 O F F S E T = - 1 4 . 5 0 0 E L E V = 1 1 1 . 3 2 0 O F F S E T = - 1 3 . 0 0 0 E L E V = 1 1 1 . 3 8 4 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 6 1 4 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 3 8 4 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 6 3 4 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 7 6 9 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 2 . 0 0 0 O F F S E T = - 2 4 . 1 5 2 E L E V = 1 1 1 . 7 3 5 O F F S E T = - 1 6 . 6 9 6 E L E V = 1 1 1 . 3 0 0 O F F S E T = - 1 4 . 5 1 0 E L E V = 1 1 1 . 2 4 0 O F F S E T = - 1 3 . 0 0 1 E L E V = 1 1 1 . 2 9 9 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 5 3 9 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 3 0 9 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 5 5 9 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 6 9 4 O F F S E T = 2 0 . 0 0 0 E L E V = 1 1 1 . 6 3 8 O F F S E T = - 2 0 . 0 0 0 E L E V = 1 1 1 . 5 0 2 O F F S E T = - 1 3 . 5 0 0 E L E V = 1 1 1 . 2 5 2 O F F S E T = - 1 1 . 5 0 0 E L E V = 1 1 1 . 4 8 2 O F F S E T = 0 . 0 0 0 E L E V = 1 1 1 . 2 4 3 O F F S E T = 1 1 . 5 0 0 E L E V = 1 1 1 . 5 0 2 O F F S E T = 1 3 . 5 0 0 E L E V = 1 1 1 . 6 3 8 O F F S E T = 2 0 . 0 0 0 P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W P R O P . R O W CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION CROSS SECTIONS BURROWS STREET EXTENSION 9C 12 6.50 ' 2.00 ' 11.50 '11.50 '5.56 '6.90 ' 46.34 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 3.00 ' 39.00 ' 82.00 ' 82.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 3.00 ' 39.00 ' 46.00 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 3.00 ' 9.65 ' 6.50 ' 2.00 ' 11.50 '11.50 ' 3.00 ' 5.50 ' 42.00 ' Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 07/01/16 N.T.S CMC 0000-000 KEL 07/01/16 $$$$$$$$$$$SYTIME 99999 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION AND DETAILS STORMWATER MANAGEMENT PLAN, PROFILE, 1 2 3 4 EXISTING GRADE PROPOSED FINISHED GRADE 97.71'/35,103 CF100-YEAR 94.47'/31,745 CF25-YEAR 97.23'/28,526 CF10-YEAR 96.03'/14,200 CF1-YEAR STORM EVENT ELEVATIONS/STORAGE 4 3 2 1 TOP OF EMBANKMENT: 99.0' PROFILE VERTICAL SCALE (TYP) PROFILE HORIZONTAL SCALE (TYP) 0 30'60' 0 6' 1 0 + 0 0 1 1 + 0 0 1 2 + 0 0 1 3 + 0 0 13+98 1 4 + 7 9 1 4 + 0 0 1 3 + 0 0 1 2 + 0 0 11+00 10+00 9 6 . 9 4 9 8 . 1 8 9 5 . 9 3 9 4 . 2 5 9 5 . 1 1 9 9 . 1 4 9 9 . 1 4 9 9 . 2 1 9 9 . 1 4 9 9 . 8 6 9 9 . 1 4 9 6 . 1 0 9 2 . 9 0 9 6 . 3 2 9 9 . 3 6 9 7 . 2 3 9 9 . 0 0 9 2 . 3 9 9 4 . 3 9 9 4 . 0 0 9 5 . 0 6 9 4 . 0 5 W = 8' EMERGENCY SPILLWAY ELEVATION: 97.50' EXISTING GRADE PROPOSED FINISHED GRADE 2 4 " R C P C L A S S I I I P I P E 10+00 100 80 11+00 13+9813+0012+00 DISTANCE (FEET) E L E V A T I O N ( F E E T ) 80 110 100 90 11+0010+00 100 12+00 14+7914+0013+00 DISTANCE (FEET) E L E V A T I O N ( F E E T ) 90 90 110 100 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) DAM EMBANKMENT PROFILE STORMWATER DETENTION POND PROFILE ELEVATION: 97.50' EMERGENCY SPILLWAY SCALE 1"=30' 10 12 10 10 C B 10 A STORMWATER MANAGEMENT FACILITY PLAN F SWM RISER 724" ENDWALL F C B ALIGNMENT DAM EMBANKMENT POND ALIGNMENT STORMWATER DETENTION SWM RISER D - - - PROFILE VERTICAL SCALE (TYP) PROFILE HORIZONTAL SCALE (TYP) 0 30'60' 0 6' 0 30'60' SCALE 97.71'/35,103 CF100-YEAR 97.47'/31,745 CF25-YEAR 97.23'/28,526 CF10-YEAR 96.03'/14,200 CF1-YEAR STORM EVENT ELEVATIONS/STORAGE 4 3 2 1 DAM ELEVATION: 99.00' TRENCH CUT-OFF 10- 90 1210 -10 TRENCH CUT-OFF L = 13', T = 0.5' 6.0 TONS CLASS A1 RIP RAP 2 4 " E N D W A L L I N V . = 9 4 . 0 0 S T A . = 1 3 + 5 5 . 7 0 H = 3 . 2 5 ' 4 8 " R I S E R S T R U C T U R E , 1 1 E -10 D -10 1210 4 CONCRETE FLUME B T H I S S H E E T ) ( S E E P R O F I L E S T A . = 1 1 + 4 4 . 6 3 7 10-TRENCH CUT-OFF E 10 10-- 1 W/ ANTI-SEEP COLLAR @ -0.96% 52.0 LF 24" RCP CLASS III PIPE TRENCH CUT-OFFF -10 TRENCH CUT-OFFF -10 TRENCH CUT-OFFF -10 - - D 10 E 10 (NTS) OF TRANSPORTATION REF.#114.07) TRASH RACK (VIRGINIA DEPARTMENT DETAIL 10 CM/SEC PERMEABILITY 12" CLAY LINER I N V . O U T = 9 4 . 0 0 8 " X 1 2 " O R I F I C E , I N V . = 9 6 . 0 5 3 " O R I F I C E , I N V . = 9 4 . 0 0 T O P = 9 7 . 2 5 S T A . = 1 3 + 0 1 . 4 1 INV. 94.00 3" RISER ORIFICE INV. 96.05 8"x12" RISER ORIFICE 10- 10- 10 F -CUT-OFF TRENCH DETAIL EMBANKMENT (ELEV. 99.0') TOP OF SWM DAM SMW OUTLET BARREL 24" RCP CLASS III (ELEV. 97.5') SWM SPILLWAY GROUND EXISTING 5' CL DAM EMBANKMENT 1 1 1 13 ' MATERIAL NATIVE SOIL BACKFILL WITH (NTS) 2 3 4 INDICATED IN THIS PLAN AND ADD SWM RISER AS REMOVE SKIMMER DEVICE IN FINAL CONFIGURATION, -7 -10 F1 CHANNEL LOW FLOW STRUCTURE SHALL BE INSTALLED FIRST AND FULLY FUNCTIONAL PRIOR TO REMOVING SKIMMER. FOR AS LONG AS PRACTICAL UNTIL SWM FACILITY IS BROUGHT TO FINAL GRADES. THE SWM RISER FAIRCLOTH SKIMMER (OR EQUIVALENT) SHOWN ON DETAIL ON SHEET 4 SHALL REMAIN IN PLACE1. NOTES: 1 10 1 10 2' 4' 2' BOTTOM GRADE SWM FACILITY 4" THICK CONC. CLASS A3 10 F1 (NTS) -LOW-FLOW CHANNEL DETAIL (NTS) SWM RISER & SUMP DETAIL DETAIL E 10- TRASH RACK TOP OF RISER 97.25 RISER 48" ØINV.=96.05 ORIFICE @ 8" X 12" PIPE SWM OUTLET EMBANKMENT SWM 3 1 3 1 SWM BASIN BOTTOM OF SUMP SWM BASIN 8" PVC PVC TEE 8" X 3" 4' 18" 10- D SWM SUMP 12' 12' -10 D SWM SUMP SEE NOTE 1 F1 10-CHANNEL LOW-FLOW FOR EMERGENCY SPILLWAY (30'L X 25'W X 0.5Th) RIP RAP TREATMENT 35 TONS CLASS A SCHEDULE 80. RISER. ALL PVC PIPE TO BE CONNECTION OF PVC PIPE TO CONNECTION. LINK SEAL ACCOMMADATE A LINKSEAL A CIRCULAR OPENING TO SWM RISER WALL THROUGH 8" PVC PIPE TO PENETRATE NOTES: (SEE NOTE) 12" 3.000 psi CONCRETE FILL NCDOT NO. 57 STONE STRUCTURE CONCRETE RISER PRECAST (SEE NOTE) @ INV. 94.00' 8" CIRCULAR OPENING W/SCREW CAP 3" PVC PIPE RIP RAP TREATMENT 35 TONS CLASS A MIN. 3'-6" THIS SHEET SEE NOTE 1 ON SKIMMER TEMPORARY Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 95 9 5 9 9 1 0 0 9 5 9 5 9 9 9 4 9 9 9 9 9 8 98 D I T C H WOODED GRASS/SHRUBS MOUNT CITY OF ROCKY " C I T Y O F R O C K Y M O U N T "BH-1 BH-5 100 95 9 5 I N S W A M P Y A R E A S T R E A M C H A N N E L 18" HPDE 18" HPDE 12 1 2 " P E R F . H D P E 11 32.5'R 4 9 8 (TYP.) 55'R 07/01/16 N.T.S CMC 0000-000 KEL 07/01/16 $$$$$$$$$$$SYTIME 99999 GRADE EXISTING STREAM EXISTING 12 10 11 11 11 1111 EXISTING GRADE PROPOSED FINISHED GRADE 1 0 1 . 1 3 1 0 1 . 8 2 1 0 0 . 3 3 9 5 . 0 0 9 9 . 4 4 9 6 . 9 8 9 7 . 2 9 9 7 . 3 8 1 0 2 . 4 2 9 6 . 5 8 9 7 . 4 1 1 0 0 . 2 6 9 8 . 0 0 9 4 . 6 4 9 7 . 3 4 9 8 . 3 3 1 0 1 . 3 5 9 6 . 9 1 1 0 0 . 5 8 1 0 1 . 0 3 1 0 3 . 0 0 9 6 . 9 6 1 0 2 . 6 9 1 0 1 . 0 1 1 0 1 . 9 4 1 0 3 . 3 6 1 0 6 . 5 6 1 0 2 . 4 4 9 8 . 7 1 1 0 1 . 3 3 1 0 1 . 1 7 1 0 1 . 8 1 1 0 1 . 0 4 9 8 . 6 2 1 0 1 . 6 8 9 4 . 0 0 9 9 . 9 5 1 0 4 . 2 8 1 0 1 . 4 3 1 0 2 . 5 5 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION SEWER PROFILES OPEN CHANNEL, CULVERT & STORM 11+0010+00 100 12+00 14+5014+0013+00 85 DISTANCE (FEET) E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 85 110 100 90 11+0010+00 100 11+55 90 DISTANCE (FEET) E L E V A T I O N ( F E E T ) 90 110 100 E L E V A T I O N ( F E E T ) 10+00 100 90 E L E V A T I O N ( F E E T ) 11+4311+00 DISTANCE (FEET) E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) 110 100 90 E L E V A T I O N ( F E E T ) 12+0011+0010+00 14+5014+0013+00 100 90 DISTANCE (FEET) 100 90 110 80 110 100 11+0610+00 100 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) DISTANCE (FEET) 90 80 EXISTING GRADE EXISTING GRADE EXISTING GRADE GRADE PROPOSED FINISHED GRADE PROPOSED FINISHED GRADE PROPOSED FINISHED G H I J K 11 L CULVERT 15 PROFILE DOUBLE CULVERTS 13-14 PROFILE (STR. 5 THROUGH STR. 3) EAST UNDERDRAIN- SOUTH LATERAL PROFILE (STR. 1 THROUGH STR. 4) EAST UNDERDRAIN SYSTEM PROFILE (STR. 6 THROUGH STR. 9) WEST UNDERDRAIN SYSTEM PROFILE (STR. 10 THROUGH STR. 8) WEST UNDERDRAIN- SOUTH LATERAL PROFILE 12 6 11 12 11 110 - - -- PROFILE VERTICAL SCALE (TYP) PROFILE HORIZONTAL SCALE (TYP) 0 30'60' 0 6' - I N V . O U T = 9 6 . 6 7 I N V . I N = 9 6 . 7 7 ( F R O M S T R . # 7 ) I N V . I N = 9 7 . 1 7 ( F R O M S T R . # 1 0 ) T O P = 1 0 0 . 2 7 S T A . = 1 3 + 0 8 . 7 0 S T O R M S T R . # 8 (TYP.) W/RING AND COVER PRECAST MANHOLE 1112 9 11 152.5 LF 12" HDPE @ -1.15% 122.2 LF 18" HDPE @ -0.75% 150.2 LF 18" HDPE @ -0.80% 150.2 LF 18" HDPE @ -0.87% 122.2 LF 18" HDPE @ -1.47% 140.6 LF 12" HDPE @ -1.17% @ -0.50% 2-55.5 LF 48" HDPE140.6 LF 12" PERF. HDPE @ -1.11% 152.5 LF 12" PERF. HDPE @ -1.30% 12 5 TRENCH STONE INTERCEPTOR HDPE PIPE WITH 12" PERFORATED 11 M A N H O L E W / R I N G & C O V E R S T O R M S T R . # 2 I N V . O U T = 9 8 . 9 5 I N V . I N = 9 9 . 4 5 H = 3 . 5 0 ' T O P = 1 0 2 . 4 5 S T A . = 1 1 + 4 2 . 6 5 12 10 (TYP.) W/RING AND COVER PRECAST MANHOLE 1112 9 11 M A N H O L E W / R I N G & C O V E R S T O R M S T R . # 3 I N V . O U T = 9 7 . 5 5 I N V . I N = 9 8 . 1 5 ( F R O M S T R . # 5 ) I N V . I N = 9 7 . 6 5 ( F R O M S T R . # 2 ) H = 3 . 5 0 ' T O P = 1 0 1 . 0 5 S T A . = 1 2 + 9 6 . 7 9 S T O R M S T R . # 4 I N V . = 9 5 . 7 5 S T A . = 1 4 + 2 2 . 6 5 11 (TYP.) END SECTION FLARED S T O R M S T R . # 5 12 10 (TYP.) W/RING AND COVER PRECAST MANHOLE 11 12 8 11 S T O R M S T R . # 3 I N V . O U T = 9 7 . 5 5 I N V . I N = 9 7 . 6 5 ( F R O M S T R . # 2 ) I N V . I N = 9 8 . 1 5 ( F R O M S T R . # 5 ) T O P = 1 0 1 . 0 5 S T A . = 1 1 + 4 2 . 5 9 TRENCH STONE INTERCEPTOR HDPE PIPE WITH 12" PERFORATED 12 5 11 S T O R M S T R . # 1 3 I N V . I N B = 9 4 . 0 8 I N V . I N A = 9 6 . 0 8 S T A 1 0 + 2 5 . 0 0 GRADE FINISHED PROP. S T O R M S T R . # 1 4 I N V . O U T B = 9 3 . 8 I N V . O U T A = 9 5 . 8 S T A 1 0 + 7 9 . 7 5 WALLS (TYP.) HEADWALL WITH WING MODIFIED DOUBLE PIPE 12 3 11 ACCESS ROAD ENVIRONMENTAL BY ANGLER MITIGATION PLAN STATION STREAM SWITCHING HATHAWAY TRENCH STONE INTERCEPTOR HDPE PIPE WITH 12" PERFORATED 12 5 11 S T O R M S T R . # 7 I N V . O U T = 9 7 . 9 7 I N V . I N = 9 8 . 4 7 H = 3 . 5 0 ' T O P = 1 0 1 . 4 7 S T A . = 1 1 + 5 4 . 5 1 1 0 4 . 9 8 1 0 3 . 8 9 1 0 4 . 9 8 1 0 2 . 7 8 DISTANCE (FEET) 90 90 100 110110 100 10+00 11+06 E L E V A T I O N ( F E E T ) E L E V A T I O N ( F E E T ) GRADE FINISHED PROP. EXISTING GRADE S T O R M S T R . # 1 5 I N V . I N = 9 3 . 5 0 S T A . = 1 0 + 2 5 . 0 0 S T O R M S T R . # 1 5 I N V . O U T = 9 3 . 0 0 S T A . = 1 0 + 8 1 . 0 0 56 LF 12" HDPE @ -0.89% TRENCH STONE INTERCEPTOR HDPE PIPE WITH 12" PERFORATED 12 5 11 S T O R M S T R . # 1 0 12 6 11 (TYP.) END SECTION FLARED S T O R M S T R . # 9 I N V . = 9 5 . 7 5 S T A . = 1 4 + 3 4 . 5 6 M A N H O L E W / R I N G & C O V E R S T O R M S T R . # 8 I N V . O U T = 9 6 . 6 7 I N V . I N = 9 7 . 1 7 ( F R O M S T R . # 1 0 ) I N V . I N = 9 6 . 7 7 ( F R O M S T R . # 7 ) H = 3 . 6 0 ' T O P = 1 0 0 . 2 7 S T A . = 1 3 + 0 8 . 7 0 12 10 (TYP.) W/RING AND COVER PRECAST MANHOLE 1112 9 11 12 9 11 FACILITY SWM FACILITY SWM 12 3 11 ACCESS ROAD I N V . = 1 0 1 . 0 6 S T A . = 1 0 + 0 0 . 0 0 1 2 " H D P E C A P S T O R M S T R . # 1 I N V . = 1 0 0 . 4 5 S T A . = 1 0 + 0 0 . 0 0 1 2 " H D P E C A P S T O R M S T R . # 6 I N V . = 9 9 . 8 0 S T A . 1 0 + 0 0 . 0 0 1 2 " H D P E C A P I N V . = 9 9 . 0 5 S T A . 1 0 + 0 0 . 0 0 1 2 " H D P E C A P 12' - K1 11 18' 14'4' -0.48% ENVIRONMENTAL BY ANGLER MITIGATION PLAN STATION STREAM SWITCHING HATHAWAY INV.=95.8' INV.=93.8' CULVERT A CULVERT B 12 3 11 ACCESS ROAD ENDWALL CREST EL.=94.3' 8 1 STREAM AT ELEV.=94.7' TIE TO PROPOSED 11- K2 11 K1 - RIP RAP OF CLASS A 38.0 TONS RIP RAP APRON RIP RAP CLASS A 38.0 TONS CULVERTS 13-14 RIP RAP APRON DETAIL 3 1 3 1 10%10% IN BACKGOUND CULVERT A IN BACKGOUND CULVERT B IN BACKGOUND HEADWALL RIP RAP CLASS A 38.0 TONS NTS 40' SECTION 94.50' AT 1.5'4.5'5.5'4.5' 11 K2 - NTS CULVERTS 13-14 RIP RAP APRON SECTION MIN. 0.75' +2.50% 1.65' SECTION 1.2' AT IN FOREGROUND PROPOSED STREAM GRADE Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval 07/01/16 N.T.S CMC 0000-000 KEL 07/01/16 $$$$$$$$$$$SYTIME 99999 CITY OF ROCKY MOUNT, NORTH CAROLINA HATHAWAY SWITCHING STATION CONSTRUCTION DETAILS 1 2 ' M A X . F F SUBSTATION GRADE F F MIN. 3.0' 7 FT 7 FT L 1FT MIN. GRADE PROPOSED D 11 A B (NTS) DITCH GEOMETRY & LINING DETAIL W *REFER TO SHEETS XX THROUGH XX FOR STREAM RESTORATION DETAILS. 3 3 1.0' MIN. 1.0' MIN.0 N/A N/A 3 3 A SLOPE SIDE B SLOPE SIDE D DITCH TABLE LININGW 0DITCH #1 DITCH ID DITCH #2 (FLUME) 3:1 FILL 3 : 1 F I L L 2%2% 6"6" GROUND EXISTING 1'1'1.5' 0.5' A N D V A R . 2 ' T O 4 . 5 ' GRADE PROPOSED 48" HDPE DR-17 CULVERT 4 12 7 12 9 12 11 12 8 12 12 12 SITE STONE COARSE AGGREGATE 4IN THICK NCDOT NO. 57 BASE COURSE (4IN LIFTS) NCDOT NO. ABC COMPACTED 6 12 1 12 2 12 3 12 5 12 10 12 '11.5" '12" '12" '10" SITE STONE COARSE AGGREGATE 4IN THICK NCDOT NO. 57 SITE STONE COARSE AGGREGATE 4IN THICK NCDOT NO. 57 - (NTS) ROCKY MOUNT CURB & GUTTER DETAIL (NTS) RING & COVER ROCKY MOUNT STANDARD DETAIL - (NTS) ROCKY MOUNT PRECAST MANHOLE DETAIL -- (NTS) (SEE DETAIL 8A FOR PIPE CONFIGURATION) NCDOT MODIFIED DOUBLE HEADWALL WITH WING WALLS DETAIL 8A 12- - (NTS) STONE INTERCEPTOR TRENCH 12" PERFORATED HDPE PIPE WITH DETAIL - (NTS) EQUIPMENT ACCESS ROAD DETAIL - (NTS) SECURITY FENCE DETAIL - STONE BACKFILL COARSE AGGREGATE NCDOT NO. 57 ACCESS ROAD C EQUIPMENT C/L - NO. ABC COMPACTED BASE COURSE 12" THICK NCDOT (NTS) ROCKY MOUNT 24" STANDARD FLARED END SECTION DETAIL - (NTS) NCDOT 18" CONCRETE HEADWALL DETAIL - 14 TO 16 FT. AS REQUIRED PROPOSED EMBANKMENT, SPECIFICATIONS DOMINION FENCE PER 12"12" (TYP)' INVERT OF PIPE 2" HDPE PIPE SDR-17 12" DIA. FABRIC GEOTEXTILE NON-WOVEN PERFORATIONS WITH 1/2" SDR 17 HDPE PIPE 12" PERFORATED HOLES (TYP) 1/2" DIA. (NTS) ENDWALL MODIFICATIONS FOR PIPE PENETRATIONS DETAIL INVERT (SOUTH HEADWALL) = 95.80' INVERT (NORTH HEADWALL) = 96.08' INVERT (SOUTH HEADWALL) = 93.80' INVERT (NORTH HEADWALL) = 94.08' CULVERT COUNTERSUNK CULVERT BYPASS GRADE 4 9 . 5 " DETAIL AND DIMENSIONS SEE DETAIL 8, THIS SHEET, FOR SPECIFIC PENETRATIONS PER THIS SKETCH HEADWALL STANDARD WITH 48" HDPE PIPE HEADWALL DIMENSIONS ARE PER THE 72" NOTES: 0 0 DITCH #3 (FLUME) DITCH #4 (FLUME) 6 6 6 6 0.5' MIN. 0.5' MIN. CONC. CONC. GEOTEXTILE FABRIC 8 OZ. WOVEN ( S E E N O T E ) SHALL BE 8 FEET. FENCE AROUND SWM FACILITY NOTE: (NTS) ACCESS ROAD DETAIL Revisions D e s c r i p t i o n N o . D a t e B y B / M C h e c k e d / A p p r . P r o j e c t N u m b e r Name Date Sheet No. Scale Revisions OF Drawing No. B/M No. Project No. PLOTTED: Cad File Name O 1 2 3 4 5 7 8 9 1O 11 12CL Approvals Approvals $USERNAME$ Cell Name B/M Assembly Designed by: Typical Drawing Information Library Location Pipe Stand Foundation Cells (Pier)Pipe Stand Foundation Cells (Spread)Foundation Cells for Other Typical Structures (Pier)(Spread) Steel Detail & Assembly P L O T T E D : $ U S E R N A M E $ $ $ $ $ $ $ $ $ $ $ $ S Y T I M E b o r d e r . d g n $$$$$$$$$$$SYTIME Professional Engineer Approval Department of Planning & Development July 6, 2016 Chris Cocker Geosyntec Consultants 9211 Arboretum pkwy suite 200 Richmond VA 23236 REF Hathaway Switching Station GP III 4th review Your plan has been approved has been approved please submit 2 sets of plans to be stamped and signed, also submit 1hard copy and 1 PDF, both under seal of storm water and sedimentation and erosion calculations. Sincerely, John Perry John Perry Construction Development Coordinator 252 972-1113