Loading...
HomeMy WebLinkAboutNC0004961_Submittal Required by Permit Condition A_2017030315 DUKE ENERGYe February 27, 2017 Mr. Jeffrey O. Poupart, Section Chief Water Quality Permitting Section North Carolina Division of Water Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Submittal Required by Permit Condition A.(16) Riverbend Station NPDES Permit NC0004961 Gaston County Dear Mr. Poupart: Duke Energy Riverbend Station 175 Steam Plant Rd MAC? _ F "";'/ Watp,i Quality Pem 4iv' g Section Pursuant to Part 1, Condition A.(16) of the subject permit Duke Energy is required to 1) determine if jurisdictional seeps identified in the permit as outfalls 101, 103, 104, 106,107, 109, 110, 11 and 112 meet the applicable water quality standards set forth in 15A NCAC 28.200; and 2) demonstrate that non -jurisdictional seeps Identified as outfalls 105 and 108 will not cause violation of water quality standards in the receiving stream. The determination of each of these items is required within 90 days of the effective date of the permit. Outfall 102 is exempt from condition A.(16) pursuant to Special Order by Consent No. S16-005. This submittal fulfills the requirements of condition A.(16) of the subject permit. Only three of the above named outfalls had measurable flow so that representative samples could be collected. The outfalls with measured flow were outfall 102, outfall 104 and outfall 108. This is due in large part to the activities undertaken by Duke Energy and authorized by the Department of Environmental Quality to lower the water levels in the ash basin in an effort to mitigate seepage and begin the process of closure. A summary of sampling results obtained in December 2016, January 2017 and February 2017 is provided with this submittal. These results confirm that outfalls 104 and 108 meet the water quality standards. Outfall 102 exceeds the water quality standard for hardness. The hardness in outfall 102 is most likely a result of inputs from natural sources, given that the water in the ash basin does not exceed the hardness standard. As referenced above, outfall 102 is not subject to Condition A.16 under the Special Order by Consent. Outfall 102 meets the interim hardness limits set fort in the Special Order by Consent. Duke Energy has agreed to address water quality in outfall 102 actor ing to the terms and schedule set out in the Special Order by Consent for Riverbend. As required by the permit, Duke Energy will conduct monitoring for the parameters specified in permit conditions A.(21.), A.(22.), A.(23.), A.(24.), A.(25.), A.(26.), A.(27.), A.(28.), A.(29.), A.(30.), A.(31.) and A.(32.), as modified by the Special Order on Consent. If you have any questions, please contact Brad Loveland at brad.loveland@duke-energy.com or 704-609- 5637. "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sincerely, Tim Hill General Manager CCP Regional Operations and Maintenance Riverbend Cc: Richard Baker(Duke Energy) Brad Loveland (Duke Energy) Rick Massey(Duke Energy) Shannon Langley—Mail Code NC-15 Wes Bell—MRO 610 East Center Avenue,Suite 310 Mooresville, NC 28115 Riverbend Steam Station - Permit Conditions A.(16) Demonstation O� mm Via. ,�y�c Q? 110 . as �c w V0 _ Units Std:Units m' L/L nL Lm mL u uL /L u/L r - NIL ` r5L` -�n /L 'mk CCaCO3 e Cunhos/cmm/L ApplicableISA NUC 28Standards__ 6.09.0 12.0_ _ ,_ ,1.0. 10.0 25:0' 250.0' °250�.0� �_ 500.0 � 100.0_; OUTFALL 101 12/9/2016 No Sample Collected (No Flow) OUTFALL 101 1/16/2017 No Sample Collected (No Flow) OUTFALL 101 2/1/2017 No Sample Collected (No Flow) OUTFALL 102 12/9/2016 7.0 <5 <5 <0.1 0.679 0.029 0.028 0.888 <0.005 <1 <1 <1 <1 <1 1.24 <1 1 6.5 61 4.9 170 121 10.4 277 OUTFALL 102 1/16/2017 6.5 <5 <5 <0.1 1.24 0.038 0.373 1.32 0.01 <1 <1 <1 1.4 <1 1.93 <1 4.1 68 5.4 170 113 12.1 270.2 OUTFALL 102 2/1/2017 7.0 <5 <5 <0.1 1.08 0.035 0.534 0.989 0.007 <1 <1 <1 <1 <1 1.19 <1 4 64 4.7 180 109 13 251.5 OUTFALL 103 12/9/2016 No Sample Collected (No Flow) OUTFALL 103 1/16/2017 No Sample Collected (No Flow) OUTFALL 103 2/1/2017 No Sample Collected (No Flow) OUTFALL 104 12/9/2016 No Sample Collected (No Flow) OUTFALL 104 1/16/2017 No Sample Collected (No Flow) OUTFALL 104 2/1/2017 6.7 1 13 1 <5 1 <0.1 2.45 0.045 1.31 0.726 0.007 <1 <1 <1 <1 <1 4.13 <1 0.36 46 5.1 110 60.1 15.8 162.5 OUTFALL 105 12/9/2016 No Sample Collected (No Flow) OUTFALL 105 1/16/2017 No Sam le Collected (No Flow) OUTFALL 105 2/1/2017 No Sample Collected (No Flow) OUTFALL 106 12/9/2016 No Sample Collected (No Flow) OUTFALL 106 1/16/2017 No Sample Collected (No Flow) OUTFALL 106 2/1/2017 No Sample Collected (No Flow) OUTFALL 107 12/9/2016 No Sample Collected (No Flow) OUTFALL 107 1/16/2017 No Sample Collected (No Flow) OUTFALL 107 2/1/2017 No Sample Collected (No Flow) OUTFALL 108 12/9/2016 7.0 <5 <0.1 1.12 0.017 2.25 0.025 <0.005 <1 <1 <1 <1 <1 <1 <1 <0.1 0.91 2.5 27.7 8.3 85.1 OUTFALL 108 12/13/2016 <5 78 OUTFALL 108 1/16/2017 6.1 <5 <5 <0.1 0.967 0.016 1.87 0.046 <0.005 <1 <1 <1 <1 <1 <1 <1 <0.1 0.91 _ 2 63 23.7 1 11.8 43.3 OUTFALL 108 2/1/2017 7.1 <5 <5 <0.1 0.876 0.015 2.19 0.036 <0.005 <1 <1 <1 <1 <1 <1 <1 0.15 1.4 2.3 89 21.7 13.3 69.5 OUTFALL 109 12/9/2016 No Sample Collected (No Flow) OUTFALL 109 1/16/2017 No Sample Collected (No Flow) OUTFALL 109 2/1/2017 No Sample Collected (No Flow) OUTFALL 110 12/9/2016 No Sample Collected (No Flow) OUTFALL 110 1/16/2017 No Sample Collected (No Flow) OUTFALL 110 2/1/2017 No Sample Collected (No Flow) OUTFALL 111 12/9/2016 No Sample Collected (No Flow) OUTFALL 111 1/16/2017 No Sample Collected (No Flow) OUTFALL 111 2/1/2017 No Sam le Collected (No Flow) 11 OUTFALL 112 12/9/2016 No Sample Collected (No Flow) OUTFALL 112 1/16/2017 No Sample Collected (No Flow) OUTFALL 112 2/1/2017 No Sample Collected (No Flow) *Total Hardness requirement is 200mg/I in accordance with Special Order of Consent #EMC SOC WQ S16-005