HomeMy WebLinkAboutSite Visit 3-25NC0084514—Raleigh-Durham International Airport
Site Visit —Wednesday March 25 9 am
Topics to be covered during the site visit
• Identify wastewaters and stormwater discharges so that we can better structure the permit
to address stormwater and wastewater outfalls
• Washwaters — what activities/processes generate washwaters, how often are they
generated, constituents
• Non -contact cooling waters —where are they generated and discharged
• How are the oil/water separators used, sources of wastewater, discharge
• Vehicle and aircraft washing — where is the activity performed, what is in the runoff
Areas of interest
• Fuel storage
• ADF storage
• Oil/water separators
• Vehicle maintenance/washing areas
7
s
003
G ' C
f
AMe
C , •.; q
rQ Q Cly
ea 001 _ _,, a, 017
r
R " 015
} 007 014
IL 11
1.
• _ .� � 004-
_-
ti
RDU
• Out Falls
SWPPP MAP
Storm Water Polution Prevention Plan
with Drainage Basins
RALEIGH -DURHAM INTERNATIONAL AIRPORT
q: /current-projerrs/drainagebasins/snppp_map_operations.mrd
printed: march 2003
I