Loading...
HomeMy WebLinkAbout20160612 Ver 2_401 Application_20170317Montalvo, Sheri A From: Montalvo, Sheri A Sent: Thursday, March 09, 2017 10:39 AM To: anna.reusche@timmons.com Subject: Bailey's landing Phase IV Attachments: Agent Authorization Form.pdf Importance: High Follow Up Flag: Follow up Flag Status: Flagged Anna, received the PCN for the above. I do not see an agent auth form for your signature. Can you please email me that? Also, with the total stream impacts of 164 it will require the $570 fee. I will apply the check#83093 of $240, but we will need another check cut for the remaining $330. If you need me to send a letter regarding this I can. Just figured email would be faster for you0 Thanks! Sheri Montalvo Administrative Assistant 401 & Buffer Permitting Branch Division of Water Resources North Carolina Department of Environmental Quality 919-807-6303 (office) 919 807-6494 (fax) sheri.montalvo(c)ncdenr.gov Physical: 512 N. Salisbury St., Ste 942-D, Raleigh, NC 27604 Mailing: 1617 Mail Service Center, Raleigh, NC 27699-1617 3� j5. ."' Nothinq Conipares, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. TIMMONS GROUP Check Date: 3/9/2017 Invoice Number I Date Voucher Amount Discounts 030917-37338 3/9/2017 1000000124233 $330.00 NCDWR 401 Permitting Branch TOTAL $330.00 Ooeratina Account 4 2304 [s�[95 D MAR 1 ► 2017 p [ @[���� a7ER RESO .CES ;r 1i :� 2017 Previous 83106 Net Amount Environmental Consultants, *�( '''613 • I'h.�i+r..9 i'�: 3 -it. Y,�.Nr • I ..�. - 71'� IM1,1`1 ...m PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: �����-�''~'�i S&EC Pro.iect # M.5 -WA Date: The Department of the Arany U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: Field Office: I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff, as my agent, to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC, as my agent, to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions.This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel Index Number(s) (PIN): bTM 1(p6"5' 11 p4$,;z 15,2 "f40 Site Address: t'OR5 T1gq!1 ,. an Rd pC, I "Et GJt �SBttr l�t� City, County, State: 4itt �� It ri��� h1 C, t iti�t�1,� W� t�'l C �5011tIk, W e pi r PROPERTY OWNER INFORMATION: Property Owncr (please print) Date Property Oi We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Environmental Consultants, 8112 1 .dl, of y<11,e Rand, rate lna, 164,01, AC 2761 i • Pht,nt, ;910 Rir 1..uu'l- IIm PROPERTY OWNER CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: a�\��{ `�-a'''�i 1" S&EC Project # �� . Date: The Department of the Army U.S. Army Corps of Engineers, Wilmington District GSI Darlington Avenue Wilmington, NC 28403 Aitti: Field Office: I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff, as my agent, to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC, as my agent, to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions.This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION Parcel Index Number(s) (PIN): M4 rtV55" 11 t4 8;Z /,56- 4f,3 L4X'21 5a X40 ;?a Site Address: 50a 5 _rN(YI 7,r' -,t on Ga D L- 1'� City, County, State: k0t.Lk Wa, J\i C. cj't ��, ,wry AIC. j(»tGt t1, in?C ft At PROPERTY OWNER WFORMATION• ,Y1lti4tv(iY"+(j Property Owner (please print) Property _J&Z Date We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Environmental Consultants, :LII ^_ I"111"A \cgrer lw"d, `+intr HA, Ralti�lt, At; ^_?(.li • Ph�,ne_ 1010 'sI(, 1tN) PROPERTY OWNER CERTIFICATIONq/ AGENT ACITHORIZATION Project Name. Description: Zit\f'� S-�'`�'�i Ir��y S&EC Project 9 1 J • WA Date: The Department of the Army U.S. Army Corps of Engineers. Wilmington District 69 Darlington Avenue Wilmington, NC 38403 Attn: Field Office: I, the undersigned, a duly authorized owner of record of the property/properties identified herein, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff, as my agent, to enter upon the property herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC, as my agent, to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions.This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel Index Numbers) (PIN): blM 156-4f,3 �'2 ! 5a Rf-10 Site Address: 5toa 5 "wli r On 0 © (.u,Lt UJI ite(f' � City, County, State: tt l t &tC_ �li�t�t.tt LQ&r --i A1C. IRIJt+.11, (44,,4 Aj PROPERTY OWNER INFORMATION: Property Owner (please print) Date f Property Oi We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. Ms. Tasha Alexander US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Dear Ms. Alexander and Ms. Higgins: 5410 Trinity Parkway Suite 102 Raleigh, NC 27607 March 06, 2017 �o1�J� P 919.866.4951 F 919.859.5663 www.timmons.com Ms. Karen Higgins NC Dept. of Environmental Quality 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, North Carolina 27604 Re: Bailey's Landing Phase IV NWP 29 PCN Application Modification USACE Action ID #2016-01314 DWR #16-0612 Tryon Road, Raleigh Wake County, North Carolina On behalf of Kirkpatrick and Associates, LLC, Timmons Group is requesting a modification to the Nationwide Permit #29 and the General Water Quality Certification issued September 8, 2016 and August 9, 2016 respectively (Action ID #2016-01314; DWR #16-0612). Bailey's Landing Subdivision Phase IV is a 23.13 acre proposed 13 lot subdivision with single-family detached dwellings with associated infrastructure (e.g., roads and utilities) located off Tryon Road, Raleigh, Wake County (Latitude: 35.7427-N Longitude: -78.7258-W). This application has been modified to include realignment of the primary site access road. The impacts will occur from the roadway and infrastructure construction and stormwater outlet devices. Revised proposed project impacts consist of 0.154 acres of permanent wetland impacts, 126 linear feet of permanent stream impacts, and 38 linear feet of temporary stream impacts. Additionally, the project will include 5,945 square feet of permanent zone 1 stream buffer impacts, 1,200 square feet of temporary zone 1 stream buffer impacts, 3,793 square feet of permanent zone 2 stream buffer impacts, and 800 square feet of temporary zone 2 buffer impacts. As a result of these changes, mitigation will be required for impacts to the wetlands. No mitigation will be required for impacts to the streams or stream buffers. Please refer to attached PCN, supporting materials and plans for details describing the proposed impacts. If you have any questions, please do not hesitate to contact me: (919-866-4500; anna.reusche@timmons.com). D rv!.;rZ 0 2017 CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES Sincerely, Timmons Group Anna Reusche, PWS Project Manager Enclosures: 1. Revised Pre -Construction Notification Form 2. DWR Buffer Approval Letter 3. USACE Permit (Action ID #2016-01314) 4. DWR Permit (#16-0612) 5. Mitigation Acceptance Letter 6. Revised Impact Maps 7. Revised Construction Drawings 2 1 P a g e ENCLOSURE1 REVISED PRE -CONSTRUCTION NOTIFICATION (PCN) FORM oaoF W ArE9OG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑x Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 29 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No 1d. Type(s) of approval sought from the DWQ (check all that apply): 0 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑x No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑x Yes ❑ No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑x No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Bailey's Landing Phase IV 2b. County: Wake 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: Bailey's Landing Estates, Phase IV 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Kirkpatrick & Associates, LLC 3b. Deed Book and Page No. 015296,00929;015324,02316 3c. Responsible Party (for LLC if applicable): Matt Kirkpatrick @ 14A D 3d. Street address: 3715 Bridgeton Park Drive UU 3e. City, state, zip: Raleigh, NC, 27612 3f. Telephone no.: 919-235-8304 DEQ -WATER R ESOU _CES 3g. Fax no.: 401 & BUFFER PERMITTING 3h. Email address: mattkCa reliant-partners.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Anna Reusche 5b. Business name (if applicable): Timmons Group 5c. Street address: 5410 Trinity Road, Suite 102 5d. City, state, zip: Raleigh, NC, 27607 5e. Telephone no.: 919-866-4500; 919-816-7745 5f. Fax no.: 919-859-5663 5g. Email address: anna.reusche@timmons.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0782163357;0782152470;0782155093 1 b. Site coordinates (in decimal degrees): Latitude: 35.7427 Longitude: -78.7258 1 c. Property size: 23.13 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Swift Creek (Yates Mill Pond) 2b. Water Quality Classification of nearest receiving water: WS -III, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing conditions on the site consist of forested land over a majority of the property. The land use in the near vicinity is agricultural and residential developments. 3b. List the total estimated acreage of all existing wetlands on the property: 1,4 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,255 3d. Explain the purpose of the proposed project: The purpose of the project is to construct a 13 lot subdivision, including roadway and utility infrastructure. 3e. Describe the overall project in detail, including the type of equipment to be used: Equipment typical for road construction and grading (track hoes, bulldozers, dump trucks, etc.) will be used to construct the project. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑X Yes ❑ No ❑ Unknown Comments: Stream and Wetland Determinations 4b. If the Corps made the jurisdictional determination, what type of determination was made? 0 Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Steven Ball, S&EC Agency/Consultant Company: S&EC Other: David Shaeffer, USACE 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Stream Determination Letter (NBRRO# 14-293) August 27, 2014. S&EC staff met with David Shaeffer, USACE on September 18, 2014 and gave verbal approval of wetland delineation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? x❑Yes ❑ No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. James Graham, NCDWR issued a riparian buffer determination letter on August 27, 2014 (NBRRO# 14-293). Danny Smith, NCDWR issued General Water Quality Certification #3890 on August 9, 2016 (DWR #16-0612). Tasha Alexander, USACE issued a NWP 29 on September 8, 2016 (Action ID# 2016-01314). 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑x No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑x Wetlands ❑x Streams —tributaries ❑x Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill, Grading Bottomland Hardwood Forest Yes Corps 0.138 W2 P Fill, Grading Bottomland Hardwood Forest Yes Corps 0.016 W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 0.154 2h. Comments: WI: Permanent impact from fill required for site road construction (Wi) and entrance construction (W2). See Impact Map Sheet 4 of 4. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert & Fill Stream A PER Corps 3.0 126 S2 T Rip -Rap Stream A PER Corps 3.0 18 S3 T Temp. Access Crossing Stream B PER Corps 4.0 20 S4 - Choose one S5 - Choose one S6 - Choose one - 3h. Total stream and tributary impacts 164 3i. Comments: S1 and S2 are associated with the primary site road construction. S3 is a temporary stream crossing for a temporary access road. See Impact Map Sheet 2 of 4. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑X Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number - Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet 61 P Road Crossing Stream A No 5,945 3,629 B2 T Temporary road crossing Stream B No 1,200 800 B3 P Rip -Rap for BMP Stream A No 164 B4 - Yes/No B5 Yes/No B6 T Yes/No 6h. Total Buffer Impacts: 7,145 4,593 6i. Comments: See Impact Map Sheets 2 of 4 and 3 of 4. Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stream and stream buffer crossing avoidance was impractical due to the location of the jurisdictional features on the property. All crossings will be made perpendicular to streams in order to minimize impacts. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All disturbed areas will be bound by silt fence and tree protection fence before construction begins. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑x Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ FAI Corps 2c. If yes, which mitigation option will be used for this project? ❑Q Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Resource Environmental Solutions, LLC 3b. Credits Purchased (attach receipt and letter) Type: Riparian wetland Type: Choose one Type: Choose one Quantity: 0.31 Ac. Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes ❑x No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑x Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. All stormwater is being stored and treated via two Dry Detention ponds per BMP manual, hence no level ❑ Yesx❑ No spreader is required. Overflows are discharged into rip -rap dissipater pads prior to discharging to buffers. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 18.43 % 2b. Does this project require a Stormwater Management Plan? ❑x Yes ❑ No 2c. If this project DOES NOT -require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: All stormwater is being stored and treated via two Dry Detention Ponds. See sheet C4.0 of Construction Documents for Erosion Control Plan. 2e. Who will be responsible for the review of the Stormwater Management Plan? Wake County 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Wake County ❑ Phase II 3b. Which of the following locally -implemented stormwater management programs ❑x NSW ❑ USMP apply (check all that apply): ❑x Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been El Yes ❑x No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): E] Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑x No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑x Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑x Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval E] Yes E] No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes x❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes x❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This single-family resident subdivision is not likely to spur cumulative impacts. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. All wastewater generated within the subdivision will be serviced by on-site septic systems for each home. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑x Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? The Northern long-eared bat was listed as Threatened in Wake County on 4/2/15. This project involves the removal of trees (see site plan for details). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑x No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Essential Fish Habitat (EFH) Mapper www. habitat.noaa.gov/protection/efh/ehfmapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Mapper 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑x Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The FEMA 100 -year floodplain is mapped on the site, but no permanent structures, roadways, or grading will occur within the FEMA -designated 100 -year floodplain. 8c. What source(s) did you use to make the floodplain determination? Wake County iMAPS FEMA Flood Layer Anna Reusche � 03-01-2017 Applicant/Agent's Printed Name Apolicant/Agent's ignature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 ENCLOSURE2 DWR BUFFER APPROVAL LETTER A& NCDENR. North. -Carolina Department of Environment and':Natural Resources Pat McCrory John E, :Skvarla, III' Governor Secretary Aagust427, 2014 S&EC David Gainey -8412,Fafls•ofdie•Neuse Suite 104 , Raleigh; &C'176 i.5' Subject: Surface Water, De'termination NBRRO#•14-293 Wake -County Deterrrunation Type: - Buffer Mail Isolated or LIP Cafl ry ® Neuse (15A NGAc.'2B .6233) ;Strip©. .Soil. ,Survey ❑ Ta-r-Pa-nlicoa(15A NCAC;26.0259) , ❑Ephemeral/Intel mittenVPerenrnal iQetermination X ❑ fs6lated 1'I,Wetland D'etermihation ❑ Jordan, (,1.5A NCAC 2B 0267). X Prdject Name: Location/Directions: A • Subject Stream: 134ileys1Landing Site Property is, located at the -south side of Tryon.Road approximately %4 mile west of intersection with Dillard f& U•t'to Swift Creek Determination Date: August 1'S, 2014- - F :S(aff: James. Gi-ahani- -eature%Flag 'Nob Subject To Buffer's' Subject_ To Buffers ENP*Start@' ;Strip©. .Soil. ,Survey USG$ Topo A. X X X B, X _ _ 1P X D X P 3C _ X 'E X._ E X F )e _ E X Pond I X X&, fresept I X• !E/UP,- EphetneraM[ntertnittent/Perennial ni NoCarblina NaWa!!y North,'Carolina Division of Water, Resources 1628 Mail Service Center Raleigh, NC•27699-1628 Phone(9f9) 791-4206 Internet www ncwaterau_aldy.om Location '3800 Barrett Dhve Raleigh, NC 27609 Fax (919) 788-7.159 An Equal OpportuntlylAffirmative Action,Empbyer- 50/oRecycledllO%.Post.Consumer Paper Baileys; Landing,Site, Wake County August 27„ 2014 Page Z of.2= Explanation: The featu e(s) listed above -has or have been,located otttlie.Soil Survey," of Wake County,; North Carolina•or-thb most•recent copy ofthe USGS'Topographic=map;at a-1,24,000 scale. Each'featureiharis checked, "Not Subjbci" has been determined not tobe:a stream or,is,not present:onthe property_ Feattires thaf a"re checked "Subject" have beehJocate&on the property, and,possess charadeinsticsAliat qualify'it to be -a Weam_ There -may be othevstreams,4o4ted' on your,property tha[,do not show updori the maps referenced above'but;rstillemay be 'considbred.jarisdictional accordirig to the US Army Corps'of Engineers and/or -to the.Division of Water Resources (DWR)• This, onAite•deterniination shall expire five.(5),years from,the,Aate,of thisIetter. Landowners,or affected parties,that dispute a,deferinioation made by'the. DWR or Delegated,Local Authority may request a determi6ation'by the �Di"rect!)K Aniappeal i;equest,mu"st be �made-within "sixty (60) dhys.6f'date of this fetter- de,from, the date the affected party (including downstream and/of adjacenf owners), is;potified of this letter. A _'request' for a determination by -the -Mector.-shall be,refer"red.to the+Director;in writing_!c%o Karen.Hig_g_ ins, DWR.WeBSCaPe Unit, 1650 MAil,Service Center, Raleigh, NC' 27699. 'This•deiermihation `is final,aad binding'unless, as detailed•above, yowask,,fora hearing or appeal within!sixty, (60) days. The owner/future.owners §hould notify,the Division of Watek Resourees• (including any',other Local, State, and Federal.Agencies) of ibis decision concerning.any future'coerespondencesii'egardiirg•the subject ptoperty'(s(ated above). This project.may'require a Section 404/491 Permit,for the proposed -activity,. Any inquiries should be directed,to-the Divisidn.of Water'•Resources (Central Office) at,(919j-807=6300, and, the U$ Ai-my'Corp,of Engineers' (Italeigh'Regulatory'Field.Office) at.(919)-5544884. If'you have -questions regarding this determination, please feel.free to contact James.Grahamiat,(919)179.1.-4256 Water Qu4rity;Section ,Raleigh Regional' Office cc! RRO/SWP File Copy ,M NCDWR JRG 08082014 i AL AL A w Feature E Ephemeral n. Not Subject to buffers Feature A Perennial x Subject to Buffers • Feature C Perennial A A Subject to Buffers Feature B Perennial M. Subject to BuffersTILAL a` ,+t^s • 4W « r r ' Feature F Ephemeral Not Subject to Buffers« Feat*D Perennial 4 Subject to Buffers 6 kr , I! o PP,- 7ipp, It -1 ENCLOSURE3 USACE PERMIT (ACTION ID #2016-01314) RMY CPS OF U.S. ALM O ON DISTRICT GNERS COPY Action ID. 2016-01314 County: Wake U.S.G.S. Quad: NC -Lake Wheeler GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Kirkpatrick & Associates, LLC / Matt Kirkpatrick Address: 3715 l3rldatonParkDrive Raleigh, NC 27612 Telephone Number: 919-235-8304 Nearest Town: Raleigh Nearest Waterway: UT to Swift Creek Coordinates: 35.74270 N. -78.72580:w River Basin/ HUC: Neuse / 03020201 Location description: The project is'located off Tryon Road, Ralciah, Wake County, North Carolina. Description of projects area and activity: This verification authorizes impacts to.156 l,P of unnamed tri6 All wetland Impacts are permanent. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number or Nationwide Permit Number: 29 SEE ATTACHED RGP or NWP GENERAL, REGIONAL AND SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated July 22, 2016. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide/regional authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide/regional permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide/regional permit. If the nationwide/regional permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide/regional permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide/regional permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide/regional permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions.regar_ding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Tasha Alexand r 91 -554: $4, ext. 35 or tasha l.alexander@usace.army.mil. Corps Regulatory Official: W, A Date: September. 8,.20.16 Tasha Alexander Expiration Date of Verification: March 18, 2017 Determination of Jurisdiction: A. ® Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. ❑ There are waters of the US and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. ❑ The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID: SAW - Basis for Determination: Based on information submitted by the applicant, the project area appears to exhibit criteria for waters of the U.S. as defined in 33 CFR 328, the JD Guidebook (i.e. Rapanos Guidance), the 1987 Wetland Delineation Manual, and the Regional Supplement to the 1987 Manual: Eastern Piedmont and Mountains v2.0. The approximate boundaries of potential waters of the U.S. are depicted on the updated map dated June 11, 2015 labeled Sketch Map with reflagging numbers, Bailey's Landing Site, Wake Co., NC. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B and C above). This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address within not applicable. **It is not necessary to it an RF form t he Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Tasha.Aiexan er Issue Date of JD: $0Am 12016 Expiration Date of JD: N/A The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://regu(atory.tisacestu-v6..dci . &-,- jwtf"n M. ask n 2016-01314 SPECIAL CONDITIONS Please be advised that if additional impacts to waters of the U.S., either on this property or on/adjacent to this property and associated with this projectlactivity, are proposed at a later date, those impacts will be combined with the current impacts to waters of the U.S. and will be reviewed cumulatively. Generally, compensatory mitigation will be required if individual or cumulative (i.e., past and present) losses or degradation of waters of the U.S. are greater than 150 linear feet of perennial or intermittent stream channel and/or 0.1 acre of wetland. Additionally, cumulative impacts that result in the loss or degradation of greater than 300 linear feet of perennial or intermittent* stream channel, and/or 0.5 acre of wetland, will be processed under an Individual Permit. This verification of the use of the Nationwide Permit Program for this project does not imply that this office will necessarily approve any future proposal to impact waters of the U.S. on this property and/or associated with this project/activity. * The District Commander has the ability to waive the 300 linear foot limit for intermittent streams on a case-by- case basis. All requests for waiver must be in writing and shall include rationale for the request. Action ID Number: 2016-01314 County: Wake Permittee: Kirkpatrick & Associates, LLC / Matt Kirkpatrick Date Verification Issued: September 8, 2016 Project Manager: Tasha Alexander Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn.: CESAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Applicant: Kirkpatrick & Associates, LLC / Matt File Number: SAW -2016-01314 Kirkpatrick Date: September 8, 2016 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Pennit or Letter of ennission A PROFFERED PERMIT`(Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E ate-- � .,...�. E4TI N e o oi�°'- glide fiesx our�rt ts�a ` op ons regard'ng�:an adma �s ati apnea o ath b a elects on nfo 13 e av ,o @o ,gu a oris: a :3.CFiR X331. ,. 'i `I A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the pen -nit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the pen -nit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under- the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. f .+..t � ... x�'$�`t •�!'�'_•`,,,}+,., :.:rt r, t ,^'�_P x+i.^i r1�*,#.�!"•5"�•`-�"iiM'"S�v�f�S+�.'��N-'iYS=-�'F."t�,'�i'�' 2.1 tSECTION IIS=; RE VEST FOR APPEAL� or OBJECTIONS. TO,AN,INITIAUR OFFEREDIPERMITC%91� � 'y x REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative yrrecord. }_ . CONTACT FOR... U)✓STI`ON5,OR If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Attn.: Mr. Jason Steele, Administrative Appeal Review Officer Tasha Alexander CESAD-PDO 919-554-4884 U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunitto participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn.: Tasha Alexander, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and approved Jru-isdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 ATTACHMENT A PRELIMINARY JURISDICTIONAL DETERMINATION FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PRELIMINARY JURISDICTIONAL DETERMINATION (JD): ` r'y z'(0 B. NAME AND ADDRESS OF PERSON REQUESTING PRELIMINARY JD: Justin Milstein, Timmons Group, 5410 Trinity Road, Suite 102, Raleigh, NC 27607 919-8664508; jusd6.milstein@timmons.com C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District Office, Bailey's Landing Phase V .C'_ S5 IQ C--7 — � Iy D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: 5051 & 0 Tryon Road, 2318 Bailey Manor Drive; Tryon Road - East of Leanne Ct and West of Bailey Manor Dr (USE THE ATTACHED TABLE TO DOCUMENT MULTIPLE WATERBODIES AT DIFFERENT SITES) State: NC County/parish/borough: wake City Raleigh Center coordinates of site (lat/long in degree decimal format): Lat. 35.7427 °N; Long. -78.7258 ow. Universal Transverse Mercator: 17S 705657.63 E 3958080.39 N Name of nearest waterbody: UT to Swift Creek (Yates Mill Pond) Identify (estimate) amount of waters in the review area Non -wetland waters: 2477 linear feet: 3-6 width (ft) and/or . acres. Cowardin Class: Streambed Stream Flow: Intermittent & Perennial Wetlands: 1.74 acres. Cowardin Class: Palustrine Forested Wetland Name of any water bodies on the site that have been identified as Section 10 waters: Tidal: Non -Tidal: E. VIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Office (Desk) Determination. Date: Gy 4� Field Determination. Date(s): /S T-->rv'.G% SUPPORTING DATA. Data reviewed for preliminary JD (check all that apply - checked items should be included in case file and, where checked and requested, appropriately reference sources below): Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: wetland Sketch Map Data sheets prepared/submitted by or on behalf of the app consultant. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. ❑ Data sheets prepared by the Corps Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: F] USGS NHD data USGS 8 and 12 digit HUC maps QU.S. Geological Survey map(s). Cite scale & quad name: Lake Wheeler USDA Natural Resources Conservation Service Soil Survey. Citation: Wake County Soil Survey, Map Sheet No. 67 ❑ National wetlands inventory map(s). Cite"name: 0 State/Local wetland inventory map(s):. ❑✓ FEMA/FIRM maps: Wake County GIs 0 100 -year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ❑ Photographs: 0 Aerial (Name & Date): or ❑ Other (Name & Date):- Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): 2 1. The Corps of Engineers believes that there may be jurisdictional waters of the United States on the subject site, and the permit applicant or other affected party who requested this preliminary JD is hereby advised of his or her option to request and obtain an approved jurisdictional determination (JD) for that site. Nevertheless, the permit applicant or other person who requested this preliminary JD has declined to exercise the option to obtain an approved JD in this instance and at this time. 2. In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre -construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an approved JD for the activity, the permit applicant is hereby made aware of the following: (1) the permit applicant has elected to seek a permit authorization based on a preliminary JD, which does not make an official determination of jurisdictional waters; (2) that the applicant has the option to request an approved JD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an approved JD could possibly result in less compensatory mitigation being required or different special conditions; (3) that the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) that the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) that undertaking any activity in reliance upon the subject permit authorization without requesting an approved JD constitutes the applicant's acceptance of the use of the preliminary JD, but that either form of JD will be processed as soon as is practicable; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a preliminary JD constitutes agreement that all wetlands and other water bodies on the site affected in any way by that activity are jurisdictional waters of the United States, and precludes any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an approved JD or a preliminary JD, that JD will be processed as soon as is practicable. Further, an approved JD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331, and that in any administrative appeal, jurisdictional issues can be raised (see 33 C.F.R. 331.5(a)(2)). If, during that administrative appeal, it becomes necessary to make an official determination whether CWA jurisdiction exists over a site, or to provide an official delineation of jurisdictional waters on the site, the Corps will provide an approved JD to accomplish that result, as soon as is practicable. 3 This preliminary JD finds that there "may be"waters of the United States on the subject project site, and identifies all aquatic features on the site that could be affected by the proposed activity, based on the following information: Signalu and d'aWOf f eg f ory Project Manager (REQUIRED) 4 "*.dbyA.0.- Justin M. Milstein5 r.- Dab:101dG0.R71l1GN -0IVG' Signature and date of person requesting preliminary JD (REQUIRED, unless obtaining the signature is impracticable) Aquatic Resources Table Bailey's Landing Subdivision Phase V Tryon Road Wake County Estimated amount Class of of aquatic Site Number Latitude Longitude Cowardin Class aquatic resource resource in review area Section Stream A 35.7469°N -78.7259°W Perennial Streambed 1279 LF 404 Section Stream B 35.7449` N -78.7264' W Perennial Streambed 483 LF 404 Section404 Stream C 35.7448" N -78.7250' W Intermittent Streambed 25 LF Section Stream D 35.7449°N -78.7241*W Perennial Streambed 256 LF 404 Stream E 35.7404°N -78.7237'W Perennial Streambed 289 LF Section 404 Stream F 35.7403"N -78.7237'W Perennial Streambed 145 LF Section 404 Palustrine Forested Section Wetland A 35.7467' N -78.72620 W 0.33 acres Wetland 404 Palustrine Forested Section Wetland B 35.7454' N -78.7253' W 1.39 acres Wetland 404 Palustrine Forested Section Wetland C 35.74490 N -78.72620 W 0.02 acres Wetland 404 � , r!Y �+i J' a 7�v'� :`L•i\ �..,,a.. � �t(� ` -. i� � .� 4 •;f�'•l, r �I tty �. � ''�dR-.,�')' ai1 � � .'0 '". x ♦a'.: a t' L .} +� � �'�• �✓^Y � N t{ i �J i' x y; . se . t• �•�' j �.r/t 1 s' � 1,.jaM�s _Z`+ V �r' try' �`a �^�.1 � i r � i:l�'i - ,��;f /(.i,'y'.1 .�7 '-'+11;r�4 ws. (tya.. � �!. � f�,'i �`! s � �t,` ti, •: .£�� LXt l� Aa; It 1111 �tj t��s±ts t� i J; .. 'll 1 L ��'c.♦ , `M 1. 6 Y.L � '• � 1. � t' • . �}� ��i4 IN �/ ,S, Kt - ♦ �"l i..,;\L.aVFi 3 t�d' �'OTr �tL,'•��+,,t c ZN -t!I .tu s a ,• r' �'� ...... y � ~'� � , Is :.• .... . e, r L �' r ,1f••' r R'ii ti . • to s Co ` � Lia e ; ..tr t . j. ,�; Z�,,L. • t `� ;, c', L-` .,L 'r • . ht •O/ • /-� /•.s�i j�iL 1t ti- �t i Yom...+• � t,s .r •\P ...'".. �fii •� � , .. a' . - -' t,�:': f ill Y � F Z t,= r �•. L3 Fc aO"`itl� t dJA'y, r - _'� " t •...wM~"w�' 1'. s" S ��, r i ;yQ�l!,L,.((���t t1,jr �i •L/� Cti '^f rp'r� t , tt=tie to Legend Jurisdictional Wetland ..; t �'t i�... •c r+^-••�^r•-�•.��'\ s���1��,� i at � �i s4�( .� �y� t�b�.,t .i � 4,'' ' S 1'S'.r•"'rr M »Tw 1 4+ 1 j.. � t {j/ 1 i � , �. t •..J! y'L`i•^ �i+� ,r�`.,4 •! 13i i,+t�tt.j 4.. r i i aa_.(+�✓ i `•-•."•- - `♦s 1; j ° 1i��'�tx1[: r a, ° `aa L:pa' `` Yy - :.=r'C"f+-•-_+t.,J J C•.�.�` t C �_� t1 ;` { . _...lea iLL1 ., .:iw` b . JYS]?J .aal i� ` �}f,1s♦sYt ,14sProject Area Streams +-.t+. ~�`.:. ,"'�.2'µ�+c�;�•�4i�; t,t{'Tit t •t..+���, � t0 �•,'.i♦�:'it�t� y;,, � . �., -, " : �t a♦� � , Important Perennial ^• � t!� ; ; � � �.: � �i. e4 S��t� 4�;siil.. `,l s i tii r' t 4 Unimportant Intermittent �� •-.:,. .(:.T R ''� r •t� `• � r••+ � t�.�� #'l �jt�f\I.�i4srRti�♦a;tit;tt`a;ti ..i� a.+i. at�ja' "!. �g��if t (� ,z �.-t.,,,,.'t .,, t y ;t f•i { t ! � a �s . 1 ` i•� �i� l.i • I ySr " Ss �"• ' a 't It { •t t♦ � .�i �j lf1tw yyt� ji;�"Sl�:r�L �e r• r } (\y7�{, L{'t �' t1 1 r ,,•! i/W •GC /• !. • +t�j y i..t +i ! - L ' NX111k f��ti{�. t, , 5 >:'�. ��-.• �._._.._.--, i1 •�}�t�.`�,}•'''ta}2 V'.+' 'y ���7�N�,•; �t `t+�f't 1••4, .moi... L��''a p�• _.. ."`. `Y `r! 15{' �i .r r`+'•` ,,.�. f i li.l y` ,� L k''. ; } .41"Yti. i '; j t��..,•` :Rw,�„••...��.�• } t � �t ' �� �3 � � '.• :�� �, t. a o a, '--�,,,•�� .t� �d .. � �/ �� ,ati. .\\a C4 ' I� •^� i��w}�,1�5`,��jN". ,vL .1. J., Me.. f �t � ♦ •�r�w'�.•...»,,�? 1� ►�� ti.i.� [_' ..- ' ','�'}• t1t�. a..F. �,' + 1 t1�N". �_��"i. i` �L �y""7 � ��� ii.'i � .. �..•-"'� %;/!y Lam-• �•.a. �♦-'..,, �''� } " "�, r .. +-. ., a, i' .P ' • ,� , s _*: L, i'a\♦ a `.� „t••.. w ^-v.''• � c t' i • ' ' " j$•}A/ Y r , f ,•\' s 'y'`' �`a�ti••i ,`�'- i''1 a. t d°'� S- t?�`�I `i �'+s I '.i ' t 1 1 '' � z^* �• ;•{�.`1±�1,�" ��ggq{{{��i���i; a ;p. •5x� , �. ' za ii. f ; � ` + t � ,tit ltx •♦ `-` -y-^� .,$ ..t i .. `st♦t `•',"•v. ♦ `♦. �•1r,\i�y{ ,�tt T�' ia•�,}"C 4 /1 i Y• i i ""'i.l ♦. ..• jt i, t . t S.E ., +S \'\-11t{i'jli st `�`Lr; '.✓ �Y it r 2ta �„n a L j'.� \, �1. �. ....-.-..r -... _.. �.. �; i R .• t 1 s 1'`��ii � L , Y` LyK7�`i a t 'y 1+ ; a 1 6,)�•� y � yta� t. 1 . > t}i j� �!!i tFFE S t Y i y`�, };. ♦� i S : a ,'i ..� _ - -` - '' ,; ♦ t y y: �! S t%''1;4� \x t =tr j 1 �' i a t t' { a ., .` 4 .•. .. -•z R '�+J r ��[�/, -r ��. � jj// jfQt'i�p, Y j ��3 • > ....t L •��aj` 'y �/•� •-w ^W . r + F - sd• � J(�(i4 1� 4(1 Y•�" w at 1i 1 i i J i'�"tt�.�it�lri t w i• t, e • c•y " r}' w•i'• t L Lt r Y Cf : i .L-7c�ryy «�• ''~ .��f{ fr �y..rl"�r"` f �yy��y��� ,t.. �, ��a.r��, �`., .. ^,:� �t\�� � L, t`\, .yit'•, ~ 1';a`t " "';Y�Ay�i wS.�• ' !iR ♦ a^ •�•'yi.- ..,�r�•,.r`,'Si`v} tR '�. �. r ¢1 N,' ,1 ', ...� .,.� . ''Yf • t i i .i�.l�' r._d .i t �r•�1"r'�•G/"T..'i,�. � �' : �•.�`%+` , �-+:ii � J•c.>'4��t".•. ..`�., ?: '�4 s � .t. ; � i` •��, t S& EC ENCLOSURE DWR PERMIT (#16-0612) WaterResources ENVIRONMENTAL QUALITY August 9, 2016 Kirkpatrick & Associates, LLC Attn: Matt Kirkpatrick 3715 Bridgeton Park Dr. Raleigh, NC 27612 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR #16-0612 Wake County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS AUTHORIZATION CERTIFICATE PER THE NEUSE RIVER BASIN RIPARIAN BUFFER PROTECTION RULES (15A NCAC 02B.0233) WITH ADDITIONAL CONDITIONS Bailey's Landing Phase IV Dear Mr. Kirkpatrick: You have our approval for the impacts listed below for the purpose described in your application dated July 20, 2016 and received by the Division of Water Resources (Division) on July 22, 2016. These impacts are covered by the attached Water Quality General Certification Number 3890 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 29 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification and Buffer Rules are met., No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B .0233(8)) Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdcnr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Bailey's Landing Ph. IV DWR #16-0612 401 AND BUFFER APPROVAL Page 2 of 4 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Wetland 0.058 (acres) 0 (acres) Road Wetland 0.009 _ (acres) 0 (acres) Entrance Monument Stream 126 (linear feet) 10 (linear feet) Culvert Stream 0 (linear feet) 20 (linear feet) Temporary Access Buffers - Zone 1 0 (square feet) 1,200 (square feet)_ Temporary Access Buffers —Zone 2 0 (square feet) 800 (square feet) Temporary Access Buffers — Zone 1 6,582 (square feet) 0 (square feet) Road Buffers — Zone 2 3,790 (square feet) 0 (square feet.) Road Buffers —Zone 1 164 (square feet) 0 (square feet) BMP Rip -Rap Buffers — Zone 2 0 (square feet) 0 (square feet) BMP Rip -Rap 2. Diffuse Flow.Plan: Submittal of a'Local Government Approval Required Because the stormwater management plan (SMP) approved by Wake County is being used to meet diffuse flow requirements on this project, you are required to submit one copy of the approved SMP, including plan details on full-sized plan sheets, with proof of Wake County's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Unit (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification occur. The SMP may not be modified without prior written authorization from the Wake County. If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [15A NCAC 02B .0233 (5)]' 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of Bailey's Landing Ph. IV DWR #16-0612 401 AND BUFFER APPROVAL Page 3 of 4 sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501 and .0502] 4. Protective Fencne The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall. be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15 NCAC 02H .0500. [15A NCAC 02H .0506 (b)(2) and (c)(2) and 15A NCAC 02H.0507 (c)] 5. This approval is for the purpose and design described in your application. The plans and specifications_for this project are incorporated by reference as part of the Certification and Buffer Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 6. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification and Buffer Authorization can be contested as provided in Articles 3 and 4 of General Statute 1508 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at htto//w'ww.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within thirty (30) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending by First Class Mail !f sending via delivery service via the US Postal Service: (e.g. UPS, FedEx): Office of Administrative Hearings 6714 Mail Service Center. Raleigh, NC 27699-6714 Baileys Landing Ph. IV DWR #16-0612 401 AND BUFFER APPROVAL Page 4 of 4 Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Please send one (1) copy of the petition to DWR: If sending by First Class Mail via the US Postal Service: Karen Higgins NC DEN R-DWR-401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (e.g. UPS, FedEx): Karen Higgins NC DENR-DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This letter completes the review of the Division under section 401 of the Clean Water Act and the Neuse Riparian Buffer Rules as described in.15A NCAC.02B .0233. Please contact Cherri . Smith at 919-791-4251 Si ere Danny Smi h you have any questions or concerns. Supervisor, Water Quality Regional Operations Section Enclosure: GC 3890 cc: U.S. Army Corps of Engineers; Raleigh Regulatory Field Office; 3331 Heritage Trade Dr., Ste. 105; Wake Forest, NC 27597 Justin Milstein; Timmons Group; 5410 Trinity Rd., Ste. 102; Raleigh, NC 27607 DWR RRO 401/Riparian Buffer file DWR 401 & Buffer Permitting Unit ENCLOSURE5 MITIGATION ACCEPTANCE LETTER fires EBX-Neuse I, LLC Stream and Wetland Banks Statement of Availability March 1, 2017 U.S. Army Corps of Engineers Tasha Alexander Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: Bailey's Landing Phase IV This document confirms that Kirkpatrick & Associates, LLC (Applicant) for the Bailey's Landing Phase IV (Project) has expressed an interest to utilize 0.31 Riparian Wetland Mitigation Credits from the EBX-Neuse sponsored Neu -Con Wetland & Stream Umbrella Mitigation Bank, specifically 0.31 wetland credits from the Arrington Bridge III Site, all in the Neuse HUC 03 02020 1. As the official Bank Sponsor, EBX-Neuse I, LLC, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 919-209-1052. Best Regards, C4,,, h &,Z, - Cara S. Conder Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 ENCLOSURE6 REVISED IMPACT MAPS I 1 �m mm m� =z -mm 517\37338 -Impact maps.awg I Hlottea on suizu i t a:vo mwi I oy 1 unuury Owanudydl m D z m z U) m D / lel II m n tnm`� O� Gl-I -- —i TTT T T4, T�TT� TTTT�T _ �T,�TTT T T T T T rr. T T �TT�.T T �T +TT�T TT 41T TT T T�T TTT TTTTTTTTTST T. TTTTT4- 4- T 4, -&--^ f 4,4 T TT TTS 41 41 T TTTTTT�T�TTTT � 4,-TTT T414 TT 4 T�-TTTT*.rTTTTTTTT 4. It. T TTTTT*TTT4T. + TTTT�TTTTTTT't+* TT T4T* T +4TTTTTTTTTT TTT TTTTTTTTTTTTTTTTTTTT T TTTTTTTTTTTTTTTTT +".4, 4' �T 41 4. TT�T� TTTTT TTT�TTTTTTTTTTTT*4.4- TTTTTTTTTT�T�TT4T4, m 4.� T �TTs�TTTTTTTTTTT� T'T.TTT�. *TT4,4 T +TTTT z 4-T T 41 T .� T T T T T ^. TTT T 4. m z m W - \ v / =0OO 70 D m D > D C� rr4 --� 1111 1 111 I ilil i noo 1\ ,I 1 \t TIMMONS GROUP. 0 0000 0 O z YOUR VISION ACHIEVED THROUGH OURS. z O i m c m m X THIS DRAWING PREPARED AT THE RALEIGH OFFICE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com = BAILEY'S LANDING m DATE REVISION DESCRIPTION W - � G �� n ti t ts[ Revision O m �l w II 3 3 41 Y g N y RALEIGH -WAKE COUNTY -NORTH CAROLINA T i W o o S a S m nm m °j OVERALL IMPACTS LOCATION MAP m m ` m A These plane aM asaocialed datamenle ere Ina eaclpeive property of TIMMONS GROUP enn may -1 Ue -—.d in vfiole pr In Den aM anal nal ee aeed f- -d —d to ronaM<Ibn. b— eM/er cenetriclbn MCNIrw vMnea! IM e---ift- ceneenl at TIMMONS GROUP. ny' A n y A z Z 2 m A Z Z 7 D A Z O O m N o >> m m N z > m N Z A A A y A c C A -Zi A Z > 0 0 O O > m O > r Z H O Z Z Z Z Z .� Z N i1 m m m m m m 9 > m O 0o D N 0 n m p > 9 O > > H > ->I I,A M z ° z o v -- 0 T T V: 0 A A 0 0 0 D T �I 'Nil O n Or O { > > > OO O -Zi 2 Z --� 1111 1 111 I ilil i noo 1\ ,I 1 \t TIMMONS GROUP. 0 0000 0 O z YOUR VISION ACHIEVED THROUGH OURS. z O i m c m m X THIS DRAWING PREPARED AT THE RALEIGH OFFICE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com = BAILEY'S LANDING m DATE REVISION DESCRIPTION W - � G �� n ti t ts[ Revision O m �l w II 3 3 41 Y g N y RALEIGH -WAKE COUNTY -NORTH CAROLINA T i W o o S a S m nm m °j OVERALL IMPACTS LOCATION MAP m m ` m A These plane aM asaocialed datamenle ere Ina eaclpeive property of TIMMONS GROUP enn may -1 Ue -—.d in vfiole pr In Den aM anal nal ee aeed f- -d —d to ronaM<Ibn. b— eM/er cenetriclbn MCNIrw vMnea! IM e---ift- ceneenl at TIMMONS GROUP. E FEMA 100 YR FLOODPLAIN fj I Lu LL` I LL N I --D W m Z m Z ^ E " E z� = 3 t W O I w 0 I N < v a w W Q L(A I, W W Z ' LL u. m zoos a S t7w 2 W N a� 15' RNV / l 20 PROPOSED r 15' PAVEMENT / DISSIPATOR PAD — IASSIPRAP \ \ a °' Z ° RNV �R 181 x 36'W x.7�TH. ` \ NEUSE BUFFER (ZONE 2) I PROPERT LINE I CONSTRUCTION ACCESS PATH t N DATE oznBiv NEUSE BUFFER 1 �Jl/� �� 1 O IJ (ZONE 1) \ ol oo lo` �, Q1 4a 4 44 Q a 4 4 D ,NN 8Y SWARTZFAGER DESIGNED BY Md B. AMB / / �► 44 4 44 4 44 4 4 4 4 4 4 4 4 a 201 4 ` 4 • \ 4 4 a4 4 44 44 4 a4 44 •• DNEOCED By CLR 4 ICLR I • 8. MCLAMB SSE I • PER PLAN i PROPO 84 LF OF Is\ 1 • 48" R 2.38% • � W/ H `LI CENTERLINE OF EAM B / I s \ CREEK BANK d,J ' CREEK BANK CENTERLINE 0'F -STREAM A . \ NEUSE BUFFER (ZONE 1) / FEMA 100 YR I I I ( Q \ \ FLOODPLAIN Ur M N \ z0 \\ Lu u CLw o NEUSE BUFFER (ZONE 2) - I LL a I m Z LL 7 W z Q N _ \ W O I t� Z ul NO �I z dS ri WJ //1 0 b \ Zui Z umL �3m <a E STREAM / BUFFER IMPACT #1 STREAM / BUFFER IMPACT #2 E L PERMANENT TEMPORARY TEMPORARY m ® ZONE 1 IMPACT: 5,945 SF °v°v°v° ZONE 1 IMPACT: 1,200 SF n ® ZONE 2 IMPACT: 3,629 SF ®ZONE 2 IMPACT: 800 SF SCALE 1"=30' STREAM IMPACT: 126 LF STREAM IMPACT: 18 LF STREAM IMPACT: 20 LF 37338 2 OF 4 N i 2 0 30' 60' RAI UZt3 I C n an M E T D n A w M- cn n D Nr O m �_ NAD 69 IF N O .A J O NlOtteO on 31//LUl t 5:43 AM I DY I IRIOtTty JwartzT89ef l � J I' M M n z / Im A / V / / z �p z �m / x D OT / Z IT! mm / Om rk` / zc / me T _ 4 z m c zca m IT! c v m m \� T 'Mm OD j -< vcn �c zm �• TIMMONS G••• •• THIS DRAWING PREPARED AT THE • •• YOUR VISION ACHIEVED THROUGH OURS. RALEIGH OFFICE 919. Trinity Road, Suite 33 1 Raleigh, NC 27607 ons. TEL 919.866.4951 FA% 919.833.8124 www.timmons.com BAILEY'S LANDING m N DATE REVISION DESCRIPTION a g s° I 1s[ Revision lT = W c RALEIGH - WAKE COUNTY - NORTH CAROLINA' a P BUFFER 3 IMPACT MAP 2 TNN pYM ef! eeeeeleNe Eaoumend en pw excWn pmpeny of TIMMONS GROUP eM nay m ee mp—d in M 1, or n Pen — -halnot W — bf-fry PM— Mfel .1. w.1va—, b. Nmled to eem mtian, WdNV, AM f eonetfuotbn SWIM vA1MN Me exom a w fth—M of TMMONS OROUP. • 2± I C •' Ell WE ';�', ' ��. 1 � .� •�/ Irl VAR 'l OW Lolls 'M. IG'LI■■■11'!■%■/I�'i�!!■\. G ' ��y�,ii .elli■■■ Iisl©'.r'�■i:■■■�IIIIl1■■■11. � � .1111■■■ �.�--- ��:., �C■■ciG�E;■■I■■■C:■■■\'C■:VIII■■Is:■Ii!\�..�_ I■`■�I■11\i►l■I■ m■■■■ / G■■■■Ialwa■1■ ii ■■■[■ i■ \■ IC iG■/CG.r.i■■■I[■■■■ ■C",■■■■■■i■■■1 `` .■■■■.�.a: •�■!■■►�■■■■■i► �, \■■■■N■■■\ \■I■■l1■=if'■I■■L■■■■■_►.1111■■■■�■■■■►.■■■■�I■' i■i■■ Il.r!■�■\■■/��li■V■■■■■i1■■■■\■■■■I ■� �■ ICI■■►�■■■■i.ull■■■C� ■■■■►�■■■■iii �■■IBJ■■\\■!■■■■; /►\�i\:■■■►■■■■■i '\■!%ID■■■ IF, i■■■■■%■■I■I■■%■■■I■►■■■■■J■■■t \■■/i■s\►' ��►\■■\■■■�" ��1�■rte' �` I■■■■■\■■L'■\\■■11■►`■■■■■\■■■1 V\"VI■■■■ INMilo no 10 In ■►ice■■■■.L■■■■c��■■■■••_�■■■�:+ - - • - • .:. • `�I■ I■■\`!■■■rIi!I■■■■\►1■■■■\`■■■■■► ��` i■■!■■/■11111■■/J■■II■■■■■■■/■■1'' • . • 44 ��!'���IJ��,�■��■■�:�t�'I��I�f%111 • • � ,:--�� I�[�i�I��C�ili��li!i-�►..?�.:zir�ir'ii •_- t -. . �9 ■■■■110N0■■►I:!i74rirG `�■■■■lid\■■■ 4"' '' 1■■a■� m `■■■Illi■\\■■■■■■1� -'201 ■■re■■►•�, �■A,■■■ PAVEMENT ■■■■gat . 1ow • PROP&D 3036" • CP 11' 1 1 .•iii•, .•r :iiioi• . 1 1 ENCLOSURE7 REVISED CONSTRUCTION DRAWINGS BAILEY'S LANDING - PHASE 4 CONSTRUCTION DOCUMENTS LOT -BY -LOT SUBDIVISION 2318 BAILEY MANOR DRIVE RALEIGH, NORTH CAROLINA INDEX COVER ... ..... ...... _ _ CVR EXISTING CONDITIONS C1.0 SITE PLAN ..... C2.0 GRADING AND DRAINAGE PLAN . ..... _ C3.0 EROSION CONTROL PLAN. . . C4.0 ROAD A -PLAN &PROFILE C5.0 ROAD A/B - PLAN & PROFILE— _ _ _ _ _ _ _ C5.1 EROSION CONTROL NOTES & DETAILS ... C6.1 s m S)y , EROSION CONTROL NOTES & DETAILS C6.2 f s - t � GENERAL SITE NOTES & DETAILS.. C6.3 GENERAL SITE NOTES & DETAILS. . ... C6.4 VICINITY MAP 1 " = 1000' RELIANT PARTNERS, LLC OWNER/DEVELOPER 3700 NATIONAL DRIVE, SUITE 211 RALEIGH, NC 27612 ZONED: R -40W PIN # 0782-16-3357,0782-15-5093, 0782-15-2470, 0782-16-7214 PART, 0782-16-0795 PART TOTAL ACRES (PHASE 4):22.42 NUMBER OF LOTS: 13 AVERAGE LOT SIZE: 57,546 SF L wv�ww.Lsc8lLcrp 'a e CAl?o'I" EVS%pMt. ice: SEAL �t E� 02,21,2017 E E a; goo 3 A u o o sw° 0 3a33 0 000? N N 0 o _ DAW 05/24/16 a R LLLLAlZ RNQ-A •• BE FICIAME • -E-ED BY 7. CHANDLER • • SGLE PER PLAN • • C F 5 D n W $ Ln O Q Z z a ~ = O � a� a s o 0 z E - LL o►- Lu W �oU zz= Lu u J Q U Y Q li W > �zz Q30 _3"U w =„ E U I^ V / < F _s Oo W V J so Q m -s a s :o Ea` Ys X, C AROIC f,, g� zn ,rp 034374 N\ % • 02/21/2017 4 N, E . E di ........... 'iv -4, f X 8 if N C, CJ < A uSS 0.0 ij i A 4— — C, 7 -Z: N N. N N, r TfR SUPPLY N,, LREIS V�. J, VVAtW$HED BUFFER CJ "lee 1-4 1 - SA,,I5 01� R, /x(10OBANK) UJSTfIR. 00 Yli \ /y�, __-- .. % �x k k: /,"S c z— XA N,✓ Hill 4.415 RIVER N, -�J�PUAINUMI --�RIPARIANWFFER i% "1101 L- �-,Eo TIF N . . ..... ....... !2 DAM IRS14EDBUFFER 05124116 E EZ '1100'FROM BANKS % I0Q-lNiIt6SERi f -•a3/.NN if 7. RIPARLANao"Fe \N Rci I, I DESIGNED By --2 ASSOCil • B. MCLAMB id "TW SUPPLII� CT WATFRSHEGALIFFEFi .�IH BUFFEW . . . ! , NWII-Ill BANK) J. CHANDLER -43T F I—K, fr Sli �-X f PER PLAN k-,-- NN mF- I ILI If it i, REMOVE GUARD RAIL AT PROPOSED El -I Ig REPLACE N, CUR —.i J, H N, \,, \1 WITH MANHOLE COVER. f < • N \1 LLJ FIFER JI r 4301 FROM �qMf}..__\ ``j �,t �\ •i 1\ :I i I.' I 't ♦j O < -23 0 (N u Al Z Qq ca- 4 %0 �A I% N, 0 0 M, IN, N, \', , -1 U -I U'A RCPS REMOVE (2) =3(r Ot. 0 L 2 it, -Iw Mel v pQRG N, bl, I - --f \� I "'N'= AND EX MANHOLE tcj 1i i-MlY �j LLJ nii U IS i.0 i j, -j u W- u '11 N R EX 24RCP N �Nk ByFFR, • 3: Z X N, f im, -j V) < N— N, ymi ul X E, N, R u Lu 0 Lu % .{ ! 1+'\��...! N \,�f, I !IE 1 i:'; �I ,.. \ =1 rv.�1 ;' ' i ; •\ 4 (: [' i i 1 i 'j I� Yi % i �\ \♦ !'.� _ O Z J V I C� o u o. 4 LEGEND 1j! \ti• 10,ODO SF =MAXIMUM IMPERVIOUS ALLOWED < -4 C, Y, — . WETLAND AREA j HATCH AREA DENOTES FLOOD HAZARD SOIL ,i?`anJJ j t N,fir J/ ADJUSTED WITH TOPO A. Ni BUFFER (ZONE 1) ER GVN 4 FEMA 100 YEAR FLOOD PLAIN UNITS r 7-- ........... . .. 100'NEUSE RIVER RIPARIAN BUFFER J.. I SCALE I =100 r37338 0 loo 20C EIT L L WATER SUPPLY WATERSHED BUFFER CROSSING SITE DATANOT ES: a+a•ea BAR DRIVEWAY CROSSING THAT ACCESS SINGLE -GAMILY DWELLINGS, PROVIDED. - INITIAL SUBDIVISION SIZE - 23.13 AC 1 007,543 S F ( - -) - PRESENT LAND USE IS VACANT, WOODED AND FALLOW -STREETS WILL HAVE A 50RAN Os' gtis/ti. '•'. THE USE OF SINGLE DRIVEWAYS FOR MULTIPLE LOTS MAY BE NECESSARY. - ACREAGE RECOMBINED TO EASTERN TRACT = 0.93 AC (40,333 SF) . ALL RADII AT STREET INTERSECTIONS ARE 25'. SE4L 1. NO ALTERNATIVE TO THEIR LOCATION IN THE BUFFER (INCLUDING OPPORTUNITY FOR SHARED DRIVEWAYS) EXISTS. - ACREAGE ADDED TO SITE FROM EASTERN TRACT = 0.19 AC (8,089 SF) . ALL STREETS WILL BE PUBLIC AND CONSTRUCTED TO NORTH CAROLINA DEPARTMENT OF '_ 034374 7 2. BUFFER DISTURBANCE IS NO MORE THAN 60 FEET WIDE j11: NO MORE THAN 6,000 SQUARE FEET IN AREA - TOTAL TRACT SIZE = 2239 AC (975,299 S.FJ OPEN SPACE PROVIDED = 3.32 AC SF.) TRANSPORTATION STANDARDS A^ • L a 3. BUFFER DISTURBANCE IS AT AN ANGLE AS CLOSE TO 90 DEGREES AS POSSIBLE AND NOT THAN 60 DEGREES). -TOTAL (144,736 NUMBER OF LOTS = 13 - WgTER SYSTEM WILL CONSIST OF INDIVIDUAL WELLS. 9 ;fry Com' O WINS ! �`•_ '+r.A•"•-•-••' 4. THE DRIVEWAY CROSSES THE BUFFER ( LESS 5. SIDE SLOPES DO NOT EXCEED A 2:1 (HORIZONTAL TO VERTICAL) RATIO (BRIDGING AND/OR RETAINING WALLS MAY BE USED TO - - AVERAGE LOT SIZE - 1.32 AC (57,546 S.F.) SEWER SYSTEM WILL CONSIST OF INDIVIDUAL SEPTIC SYSTEMS. _ ALL WAKE COUNTY EROSION CONTROL MEASURES WALL BE COMPLIED WITH DURING cV MEET THIS AND THE DISTURBANCE WIDTH STANDARD). - LINEAR FEET OF STREET =2,482 L.F. CONSTRUCTION. 1, 6. ALL CULVERTS ARE DESIGNED AND CONSTRUCTED FOR THE 25 -YEAR STORM EVENT OR AS OTHERWISE REQUIRED BY WAKE COUNTY ENVIRONMENTAL SERVICES. - MAILBOX KIOSK IMPERVIOUS = 0.06 AC (2,614 SF) - IMPERVIOUS IN STREET = 1.25 AC (54,450 S.F.) -ALL FEDERAL FLOOD WIZARD REGULATIONS WILL BE COMPLIED WITH DURING CONSTRUCTION. 02/21/2017 ROAD CROSSING (PUBLIC OR PRIVATE ROADS), PROVIDED: - IMPERVIOUS IN LOTS = 2.98 AC (130,000 S.F.)(MAX. 10,000 S.F.A.OT) - MINIMUM LOT SIZE'' 0.919 AC (40,010 S.F.) _ ALL STATE AND LOCAL GOVERNMENT APPROVALS SHALL BE SUBMITTED TO THE SUBDIVISION OFFICE BEFORE FINAL PLAT APPROVAL. 1. NO ALTERNATIVE TO THEIR LOCATION IN THE BUFFER EXISTS. Ravx 3s - AREA OF STREETS = 2 91 AC (126,945 S.F.) - TOTAL IMPERVIOUS AREA=4.29 AC (187,064 S F.) - TOPO PERFORMED BY TIMMONS GROUP. - CONTOUR INTERVAL IS Z. E n 8 2BUFFER DISTURBANCE DOES NOT EXTEND BEYOND THE REQUIRED RIGHT -0F -WAY OR EASEMENT WI TH OR IN NO CASE IS MORE X IMPERVIOUS = 19.21% MINIMUM _ DRAINAGE EASEMENTS SHALL BE PROVIDED FOR ALL AREAS DRAINING 4 ACRES OR 4 LOTS c E "" - THAN 90 FEET MADE. 3. BUFFER DISTURBANCE IS NO MORE THAN 9,000 SQUARE FEET IN AREA ... ,..... r A'ER + - - "" ' - LOT WIDTH = 110' - PIN a 0782-18-3357, 0782-155093, 0782-152470, 0782-16-7214 PART, AND SHALL BE SHOWN ON THE CONSTRUCTION DRAWINGS AND ON THE FINAL PLAT, AFTER SUCH AREAS CAN BE DETERMINED AND HAVE BEEN FIELD VERIFIED. ^' 4. THE ROAD CROSBES THE BUFFER AT AN ANGLE AS CLOSE TO 90 DEGREES AS POSSIBLE (AND NOT LESS THAN 60 DEGREES). 5. SIDE SLOPES DO NOT EXCEED A 2:1 HORIZONTAL TO VERTICAL RATIO (BRIDGING AND/OR RETAINING WALLS MAYBE USED TO t sc6.st6WERPAYE A6PNALr 0782-16-0795 PART - ZONING = RAGW - BOUNDARY INFORMATION TAKEN FROM SUVERY DONE BY TIMMONS GROUP. & a W W rr MEET TW S AN THE WIOTH STANDARD). secnaN Aa - TOTAL. DISTURBED AREA =6.0 AC. - NO LOT SHALL HAVE DIRECT ACCESS TO TRYON ROAD. 1. E 2 DISTURBANCE - THE HOMEOWNERS ASSOCIATION WILL BE RESPONSIBLE FOR MAINTENANCE OF THE OPEN x S. ALL CULVERTS ARE DESIGNED AND CONSTRUCTED FOR THE 25 -YEAR STORM EVENT OR AS OTHERWISE REQUIRED BY WAKE SYMMETRICAL CUL-DE-SAC SPACES IN THIS DEVELOPMENT. COUNTY ENVIRONMENTAL SERVICES. WITH NO CURB AND GUTTER NTS STORMWATER CONTROL AND MANAGEMENT - PROTECTED TREES TO BE LOCATED AT TIME OF CONSTRUCTION PLANS AND AVOIDED OR REPLACED PER WAKE COUNTY UDO. o ,^ > m G W W W IMPERVIOUS CALCULATIONS - NITROGEN REDUCTION CALCULATIONS WILL BE APPROVED AND BUY DOWN RECEIPT OBTAINED IF NECESSARY PRIOR TO CONSTRUCTION. a Yjt W NOTE: IMPERVIOUS AREA PER LOTTO BE LIMITED TO 10,000 S F. THIS AMOUNT U BE 70 STRINGENTLY ' OPEN SPACE TO BE DEEDED TO HOMEOWNERS ASSOCIATION. "PROPERTY LIES WITHIN THE SWIFT CREEK WATERSHED- o o W 14 1A LIMITS OF F.E.M.A 100 YEAR FLOOD HAZARD AREA BASED ON F.E.M.A. COMMUNITY PANEL a 3720078200 J ENFORCED INTO PERPETUITY. WAKE COUNTY TOOL V21 WAS USED FOR ALL STORMWATER CALCULATIONS. - ROADS AND INTERSECTIONS TO COMPLY HATH ALL NCOOT REQUIREMENTS. -APPROVAL AND A TREE SURVEY IS REQUIRED PRIOR TO ANY ACTIVITY AND/OR _ - 1^ W > F R W E W F DATED MAY 2, 2006. CONSTRUCTION IN THE TREE AND VEGETATION PROTECTION AREA 2 � O 2 � O 2 O ..___ _ ..._ __'_..! ,f t r... . y . .• f .. fr _ J • t i , -� r ... fr,; '."if; _ ••l i AREA REMOVED FROM: __ _ I ( !rte �" W M �i i :.J JS .ilf J .ar - SITE AND RECOMBINED n.� : I rJJ' r� .Jr, l-J1_Jr J' �� v.r.._ Jr'J' __'• 7 ! _ _r_�,,; v.Jr".�r{ccJ Jr^T. �J�-_ ' ... mac: •i Y-_� r: •'; °; ,\ `\ TO EASTERN TRACT j //) '\ rr^Y `r".',r: ���� I>fi vfn o ..- - *� I ,rJ'.-J �Y' rr.v.'(F�r1.r, :; :::...-.Y..._ •'" _ .._ - i ::''r,::: �JIK>/±%r'F :'S.. W It •: tt !r �: aa. / PIN: 0782-164686 �.-- / ' �,, r �'::,J'�r _,-.+ _: f"''' ,r .rr fi' PPLO .:-r;::.J Jr,: Jr:'" r _ .r*•Y.aJ.-Y . f ` i SFr ` 1 ,J •t?:. i?S AREA=40.333-," •tt'v 2 u 22 ti > o> � iQ:. 'r .Y rr / I / f• !_ J~'?. Y..� rr ::.f '[EYiSF3W;,�:/fFZR"' _•xr. r r._ t wt. 01E• .idaBs �/r \ J J- .1.xJ_- f _ _ _ *t .� T �'.�Jf !• 7100' @INK t°. ! _J Y,Y;!' ';A; _ 7 • t•� �• - F.= =`ZOF:E7 4 l / r% ' \ %�.Y i-�';-�i J:'JI_ _ .�'�_F~-� ��i _ '..r�.,- - ':l ., J'r� � � .f .ai "r f J' 'FEMA `!;'. Z W y you W y W �[ _�'Jr 100 YEAR -_- , �,,,-,r.T��.�rr�;-�rYr'�_ - .Al v.AxALwlst =\ r FLOOD PLAIN LIMIT qty y y r• LOrIEC RR MF /-RIPARI�WFR'�f:.-Ff+y'�.IT ;"fr��rr✓y J' r' • v� =��'.-�5-� •� \ BUILDERS I; �. - "-' t`t? \ 0 o 3 0000 3 3 _ ,1 t ,, _` ..•._. iR Y'/ BALLET'S UI•dMNG wN. D7T_.I.' ' r•:;.. "(i50 ff�DMBAIKJ- 'rrf .rrr",r,%X.`" rrY:?ff. r ,- 1 r.., .; 1.:xJ �. rrf.fr .._ /,- f \ FIDA D.G. .�\ :0 RR ARE�REDDM6 TOf,:_JJ-, Jr�' f f %Jx. Irl yr. :•S `.r.✓ -_---._ _. ._. .._._ _. _" ._ ..� __._. _ wN 0782-xax .fes _ , �<' _ __.. _ _ t T r` J ii ;?i? qq RECORDED PLAT BM 2014 - 1839 \_- .-- - _ _ Zor4ED: RR / r.F FROM EASI;ERN TRAL'T 1r`YfY:J..:_ :F '. _ "_ _ /R QRA E- ` PIN: 0782-1 ''/' "' J+- ,rr :S f •'-% / �" ' 8G-LDIN6 '; �� ��� W _ r rvavrvti o •"..tn. n av TO BE VACATED PRIOR TO r'v r / �. }}rr" .r t BUILDSRs: AREA 8.08911 SF r J' 'fir ='�: � r � _ f = A f �I SETBACK �\ s y__ ..PER- �r CONSTRUCTION PLAN APPROVAL C. nr msi: 5,: 20 MAN ______�_ F _.. • 200' WATER SUPPLY zOr4ED R= n JA Jr". - . rr y r r, _ _ J;: �' •r ;/ r< :f CONS7.AND ;-•1h::+ �" ¢ E;: WATERSHED BUFFER OPEN SPACE ' f ; '�^ �� OS/I4/16 w� tlx PROPOSED USE rr %� N �fr.r T^- .rr,Y r/r MAINTENANCE ,} (100' FROM BANK) CONSERVATION OF EASEMENT 4( I :, ` I oy DRAwx ar •••B t 100' NEUSE RIVER NATURAL AREAS 1 # Ic RIPARIAN BUFFER ? (SO FROM BANK) r#F (69,191 SF)4o.1000 ifc Ott' iGRNPATwCKa �J- '-� r fr'J f;= .+ 1' ,_ J Jr :rr !' _-�•••,, _-�r1f 1 O / •• \ t• ` ' I '_�%%.J.rf ,xa�v �1yr�rrJ. �'�-fs.`'IT r _J} �Jf' �"_'i�L3I0' fr` -� i J• wr+ on,v..f'fl, ~ WATER �\ j'• rrys'IEx?1.ff' -{JfY ._ ` -.._.._._ �- Opp ,ZDNEDRJN SUPPL i''t.'l?,, , ta.i:• .SUPPLY R G SQ� J. DOOLEY DESIGNED BY CAMB... M [ECD ByWTER 1. CXANOLER s�'�f✓R�JY �;': •.-f..f ,F,��Jr��JEy^M yfT r�Jf h:k:;==Jaft t [+t tEv!><:w t` ip1' t? :, & '-jr. ,� jj�� ! a- r />rr �'W J�f ffr {��'J- {•t�om f.rI Jf ,f.rrrr _ a+" :.. /7WATERSHED BUFFER ' 741 •PM WATERSHED BUFFER (FROM(30' FROM BANK) BANK) +� wif'1..�Y•� yly :! T -1:•`.:f }F fF BI'Y�ba"Z Y.�l'J (' ,717-. f !r Y..'••� / '� O ( I * 11 * • • • SG <I'!.9'fi2 �, `�;•rj4rw _ ,r� J/ ---_ EY 'rr�FEMA 10D YEAR OPEN SPACE ' •+ ". rrz•:1-u -- -r'*_ i _ Fl(E f{'~�~ PROPOSED USE: I 1 - -7",-FLOOD PLAIN LIMIT `/ t40,475r I •� �..plM�t ;�,Jff _ ar \ r.:i •.S_ CONSERVATION OF ;•,�. ': •x. fS.�S.T ' PER PLAN :"1 .;. ' '1..4 _'i C •�-- \ -r r f aF.y' NATURAL AREAS �.1LSE R25' .803 D. � R (58 sFl ?: • '�1 � % t ? • .: i c Oar � � _ / \ _____ BUILDING \ 20'WSW5 '.�Qf �... . , - 0-..r___ R30' SETBACK \\ BUILDING tl C .4.� A N1 � SETBACK - • />`" `-T- - �� \\ __ ,g -\ I •,: `:t ?•�19 i.: Jti4'C -�f �� '/,rJ<r 1 �/ :� �' /(1 / .i I'l.: Gf`_ + •'• :tt �• JJ/I'�"�� � '•r•�=..� YSS \ �� ,4$ l � � �U�� � _ `-__.�'_ 1 - -=-L �• '•i==_ `�'•a/ �Jr r•., ___ v 1 �y _ __-._�. �- SETBACK %•/7 w 2tz 1 24 20WSWS 1 1 O mu-1100,­KWATER 10 X 70' SIGHT ' TRIANGLE BUILDING BOUNDARY •.:.E _ lJ' / 1 III I III 0 � u > •, ? - SETBACK EL 112.78 0.753 a { � /\�O���j; + >'1�TN +•? •i?j ._./.. V W SB TREE,t ,p L/C SUPPLY2TTREE VEGETATION IYII7 PIIV /a�1 VEGETATION AND Ly WATERSHED PROTECTION TON AND 0.0210 IA V10.00 0 (�DA ZONE IOIIIOIOI�IIO 40,0= 4t.m4 (30 FROM BANK) !44^. Tt F. / ? :'• :i;: Ec?�: 3114'., WATER SUPRY /8T -� --_-J I YwTER54fD i - zPROTECTION aWFE."S" 0 r� Q u.. U 44J ___"_ rr_s•.t., 100 YRBACKWiER / i25 iki.:` tit :rauLoca BOUNDARY ra. • t re>:' :Sa:rt ._..-_ 0 a _" 1}IRONS scxArz OPEN SPACE \ A:.g:•t r:. r_gp,r. 742, _ _._ _ __ _ 1 I,i1 EL 416.47 N.F yx^T.: ,--'a fir,.:: e,+. y' :1 �,� tt ., wH 07az-1so76s Pf�00SED USE * eREGORr x.a *:xes r - 7wcro.*-•E x^,•r2rc ! s::x.' .. ' uz _ ter I :CONSERVATION OF JACRUEIIFE A.6EMA6TER , ! H'F Hv x:'rr25 TREE VEGETATION AND(n d YICTOPoA NEBERPPJOE 1 , F.. Z v w.``I ~PROPOSED SIGN NATURAL AREAS wM 0782-t80>13tAGWELYJhOL IL5. a S1ti:ri'OFI! GEATO PROTECTION ZONEULU i 3t• 100 VR BACKWATER OOREEta C.fkWx 1 5�{�-'--` LorSD: R.4wr nc!ur3TA c 6uR.vE: iE wN. o; s2-15ass1 w;4: D7z2-tso351 "=.'F I `\ Z LLl 7 F L ZZZ EASEMENT (16.712 w7r o7�-I y?!•+ •l�,l�r�_ \ BOUNDARY IOIaED:RSON 1 RN:D7i-t5di5t ZO.IEDR- l ZONED:Ri } . EL 413.04 IOP:ED Rom 1 _ ' �✓ __--.- - __ --.`\ •\ 100' NEUSE RIVER �t1 tisy U '� .v' 4 '•r- RIPARIAN BUFFER •' -i:; - SUWSWSBUFFER /L6ANlaDAWDLWT41 ;; IN. WB2.056125 -_�__- z LU Z 3 Q ' .-. ` ZONED: RJGW i _- �,, O u U) Lu F } o a 0 O W � u H4 LEGEND 9e PoGErT aF Ar MINIMUM BUILDING SETBACKS 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED 10• PAVEMENT - FRONT AND CORNER = 30' e a s I -SIDE = 15' WETLAND AREA ryQry� 1 W a I WPEiL FT. SFBSA I OWFLOOD HAZARD SOIL F1. TIER: � HATCH AREA DENOTES r'PER� 4o- •.� ^�o�k9� ,•PER .......:::.:'.:,:::.: .::.:,..... ADJUSTED WITH TOO 1' MATT H. KIRKPATRICK CCIM a c4Bc ' KIRKPATRICK AND /ASSOCIATES, LLC WT _ _ _ 3700 NATIONAL DRIVE, SUITE 211 NOTE: NEUSE BUFFER (ZONE 1) ce GVN - FILL RALEIGH, NC 27612 BEFORE ACQUIRING A BUILDING PERMIT FOR LOTS MARKED HATH AN THE BUILDER MAY NEED TO OBTAIN A FLOOD CE USE BUILDERS PERMIT R SIDE,,T t smart FROM WAKE COUNTY ENVIRONMENTAL SERVICES HAZARDAREA X FEMA 100 YEAR FLOOD PLAIN LIMITS ENGINEER ARCHITECT AND/OR SURVEYOR APPROPRIATE) MUST S J TYPICAL cross sEcnaa (AS REcodP4Era>ED ROAD cOFaa:cTloTE -TRACT IS LOCATED IN THE RURAL - NON CRITICAL r CERTIFY THAT ALL FLOOD HAZARD REQUIREMENTS ARE MET. THERE Nrs sroP caFminox AREA OF THE SHAFT CREEK LAND MANAGEMENT SHALL BE NO FILING OR THE ERECTION OF PERMANENT STRUCTURES IN 100' NEUSE RIVER RIPARIAN BUFFERTOB Pte" SCALD= V=100' THE AREAS OF WAKE COUNTY FLOOD HAZARD SOILS OR FEDERAL xo. 37338 EMERGENCY MANAGEMENT AGENCY (FEMA) 100 YEAR FLOOD ZONES UNTIL A FLOOD STUDY IS APPROVED BY WAKE COUNTY AND/OR F.E.MA OPEN $p(aGE D 100' 200' SHEETNO. C2.0 STORM DRAINAGE DESIGN DESIGN STORM: STORM DRAINAGE DESIGN Bailey's Landing 25 YEAR ...'ry, bel,_ n. ' 7 v / A 4ce2: s• 49,n!3 at /•:: utE-4tac� , 1 ! 1 ' S,.D i 1 41.Br4C I j j i /j :I n hF• CRBNEC BJFF_R 1 i i 1 : / fir* r hD :3TFR®L1 BA'J`,) !✓ ENERGY DISSIPATOR DESIGN DESIGN STORM: ENERGY DISSIPATOR DESIGN 10 YEAR 423.80 V : i LOCATION I 1 LOCATION ;"f4Yr .� :�, {{�i i i • tri PES DISCHARGE , - '^ q - i t.._-_ --�- PIPE DESIGNOUTLET I @ OIc14 PIPE SIZE (In.) SLOPE VELOCITY (FPS) DISSIPATOR 050 Pipe ID INLET TWE C 1 (Inl11TI A (AC) CA PIPE 0 (051 SI nJ Q LEITH IW IN INV OUT Pipe A3 31.44 36 3.97% 445 12'x24',24- 13 - .. Pipe 8 63.79 48 2.38% 5.08 18x361N• ­ _o Pipe Pipe C SA2 18 1.88% 3.12 8116118- 6 PrpeD 1944 30 4.78% 3.98 12124x24' 13' Pipe B WHeaMA111 Headwall 0.40 4.01 39.77 15.91 63.79 48.00 84. D0 409.00 407.00 Pipe 4.74 18 8.50% 2.68 8'x16116- 6 PipeC WFES Flared 0.40 4.01 7.M 1.38 5.52 18.00 80.00 412.50 41100 OM nlgn Pled Al 8.90 15 40D% 7.25 6110'x18• 6 Pipe DWFES Fland 0.40 4.01 1212 4.85 19.44 30.00 136.00 408.50 40200 CUe1enl-ron Patti W2 3.80 18 1.00% 115 6170118' 6 Pipe E WFES Flared 0.45 B.D4 1 31 0.59 4.74 IBRO 100.00 410.50 402 00 t /� l • -FOR PIPE B. USE NCOOT STANDARD DRAWING 838.01 Y j , /• 3 ,f' .tr r _ ��� I � J -JI 1 i 1 t : j \\ rrJ i' '\• I ; j I i r J �'t,rfJ � ,r .fr - r rf{ rf "; .}r- X':X-_::'..::::::::.._ j .� J:J';_ lJ f fr�•-_:f r}J >r;J i __ •, �, � • . , __. _..---..__....._ -_ ! i ~ J .r;Y _ eyY-___r!iri.rl.ri_'.f. % ":rr3- .;�_:r. J7}_''''�,: ,:', �_'f• �' r r,r ..,..-,_� I �JJ#. r�.r r,: _%�r: ,.�.'r .' .ri'. ^_'r:::::f;J.:. �_'rrr •.q,.,r•.�'� ":.rJ'. ~J'.;i_'�,r ' ' • !, j � � /%Jr-��!�j---�'~6rf'r� 'YJ' �-. Y ;. Y �Pr�'�'it_' 't'~'"r % r.Y �'�f r sY -� r �J"Jr- J1"s'2 -i ' i ,':• ,..F •.i ``���^r.: 'J'Ifr:,-'y XX .tom �.+r:,+ v�.�r~f::r�r--,'.. rel1..~ RKS•1 LEGaa % ../: \ :'!- " ,r7•a. Y!t•= ' - ^ 11-"+=. � \ .I if ,r - - r��.-_- �:, Yr„^>�"• �,),Y""'S tr Y% _ _.Yr.Y �. �JiY ' Y�.� _ :Y~: :':'''};,1.tr %':�--�,%~ f � ��__-_ •:tS C '•~ ,Jrr�; Y /� �•!_'�f..r , __ ~! J :� . \`• uv r:lrrrG!x} �\. \JyrJ-.:. rr r.r r�%'f .r'.='.'f :.'.;: fr_:.r r,...,;:17.J__. .. r= :="K:::� _- t,'.�1z+ - } Eli ,nLx:s:: a FEL4A tv YE.AR G J J> > mss 1 ~ J : r -r j ./ • : f'�- - :E KL•ALEi, :.:iru tE:E `\ '='J'•-.%"'r'�r.�,.a,�'^T-.rf Yf:f'.-_. h i : Ftr•o?s ;.te3,1T - ~ :.:• l \ =LOOD PL.:IN LIM`:T-,` �,.+ ce!':,r,r Kq _'.. r_'srrl rrf �.. , '::rr. :.✓'•;Y �� J J'IY :EL�a J'__J:•,fyJ 4 tr'sv-.. ,r' r r'.. _ �/1 .,�.' .r�Y,f . O._...._.::.YnJ itr PA r r�"J. _ : r~ ~ Yr f/:r!r:f •'.rrr , .1v% J_S: r, 'J ,l Z:!EO 6<Lft ~J .rJ•r r i r :tl , :k- ::: '. t•:: .._ • - R \ Jr• J _ .• I . � J� r 'J',J1' rr+",r: , i Msr;x-au:. .T='a:� \,,Ifi'fr=rrr'y';:Jfr.r`r''r,::JJJJ:'.i%r,frr'r ;. ::f. .'i��' kl. _. �.. ./'4 ,T•;.J: J''-y'r PR \ Nr \ J JJ �I �Jf'1'•1 S'� J �TI J � 1�� � .>•"__ _ ` :\. '�•,1 r� �.,. � " % K>X M ,li'. '• �` L / ''.rkCE-.>: X:. ♦ Jt:r:f.Y,.1 �r f"r' .Y.f:��,J rr'!J'.r'r-�fY .rY~�yy'] Yt 'l{' r.l �. •,� `- i � �j, rUPP_ WATERSHED SUFFER �.' ,r _ 'I v 1.x1: r_. .:;�_ .1.�rr, X.:'Xr ''SX.,.Y.rf��JJ7 ffrl.rJ:�r'~:�~,�fX Y,,tr':r- (,,'�J'' ~ ,f• fJ �OH Y T -: Y ! PIPE-EOUTLET •�'•4i',."�:.{. _ ny �• �T.F PROTECTION ti£" SERVER\ ErJ ,_ =1.: �"`_ y:��=;rr::.rf' __ xff=_:€r'�'-,��r'+,rr'•y,'J'2�^- ":i1-' rr -':`" :(� i�, (��* ,';1 RIPARIA 8L•'FcER : 1\ dJ' : r,+f - :•', ~ ,•F \? (50 FROM nr..+.\t i\ I.y. .:+' .lrr!"�' ��._.X:'r•t_. %.J'r�,}^{,'�J_;rJf�-.�'_r r,��rr vr.: r- f-� ;.7F,�� i ,.r':.`• :4r of t/ 'f 3+,P- <u ,;t •d �'/ 1: '� A'..i xJSTEs uc / � � 1 S L;, '•' � �' �' `:-` � � 1' ,'t '� � ,\ \ P,,N D:�-x-IFa6 -- - r',: _:Y YrJff�=1r �r'�.fr ~J ��f, _. _J�r' .r' __ ��`r�_��•:.f- �'� ,�s; I. .^' -` _ __---_--- 1'S•. t . .\ \ xrl.� R -AT!' i „ ,. ._ r r . �. rL ::*7f';;;{.Jr ' r�•' .i if� rr r rr, _'' r, �;,r ;�y.�-_-'•-� ' �.- 4,:r,� :J� � s,•/�,:� ~,� �•✓ / 1 •,tt �`\ \ \\ ! ,rt. J'F' =.;, �'_ X J 1f J`r''jf Jr~ frJ'�rxJ �:: J A i' •F ',,.. . \ _ sr" -L _ v,',•�,Cf.! f'11 f rl� -3C' ViA?ER SUPPLY -..J , f 1 E i • ,?' R `d� .. tN' / f ii YY TEi: SJ%P"( EC BUFFER %.. _ f `, r :S'.aT0S.-T FR' B�lfr_ i =ROM Bf V!O f rS7 FRC:6 BGt ,} '�%t 1'::; .�` •\\ �+Y���*'J`r+,•� fw. 1� •:r..11'..r��,:�?i,F�f rrrr+' J� �,Jr?i?rJr�',rff���''^�r r,�yr!, - / �3 y r1 ./'' �� �%� i,•I . wax'..' JY,r~..fr: .FMA MFM (EAR PIPE-D"OUTLET It R✓'" Y J* r-L�,Y t 1� r, r rr rs ' rr: f r'•' rr, x`t, :Y1 � Sf3K .E -a--' \ i s= '! J/ { ytr>�r,e. 1 J JF ll f 1 J" r!- .,JC : �rJOD PLAIN UAMT '��\ . �' 1 L \ ;tties•. _r I � ,, _� �--• y, 1\ 1 �1'X.rr'.' PROTECTION t l \ �y '7 ei��1,Tr���. �.s.. tFr�r -:r. Y��r f�Y fr.'• ter, �:f, _��:i ' `;4en:s�y;C: _ _ _ _ � _ � \ � "� • •li' s.:s •1 � t ;1 . � rt r� `:"ar y I ''�� r J � .r,:. � ry~.;. fl• r'a r ;.1 r _�r�;rf�u, 'svep�i. _ - � _ _ _ _ PIPE D, I 7 , '� I �_~� � t : £ �t• : i � %� �:.�-K y ,�+ , n: f'+�Ji � - :s�, ,:; � ,I�E,� 1 I, 3: '1 T Ifj �° /� nt_•^ �t _„ K=(r'z'+•:;7 `.+`�.F`-:�; r 2, . �.. - :�.Jrr' rr.'; -fir_ rrJr�-` yi.� - _ 's- ,!p �.is rte' � �` } PIPEE i P "s' , BOON. <+`J :.f ,., .�••"i �-tr: ,xf - t _:.\- ..�,�� o, %' �. f -`� rLfr=,:4r5r:3'�i' r r i.� _ BACKWATER 5: •t5.V2'-L�_ ,. Ts.: it - :,,(�^� � -rf�f :.•: r ~_ ._ _ ,_. - f ;�.I,T- FI 100 YR Y EL`w�u56 � f 1' ,;,a 7,.. �.1=.::.�__-b->,._ `.\\�a� �u�• <c. EXISTING CB TO BE 1i i,4 1. \, t/ ..'- 1P�F,q-j'.HEADWBLL ,__.... _ .. {S ' -_� _ r ' I 4-., Y ~�R...f'r. CONVERTED TOATRAFFlC T•x }1 [ _: gT9L1TLET�W. PIPE -B'OUTLET =:n 1 PROTECT e�' •:' • YPIPE C i a BEARING JUNCTION BOX y = QN. 1� j ia.9y-F'r j rte• _ WITH MANHOLE +:1500 _ _ _ _:rF ::. jt�;. I I i 1'97 PUBLIC Hr:u NCDOT STD OVWG 840.34 T 4 _ \ y„ e.`� °� ,'t! ' 1 I i ! �; PROPS J ,Fr •�;v = = 7 1 `/* :;" l_i �S i <. erJ rt Ilj 6, .' Yi f i,J � l , f )<.: ' SU:. LY •O" EG RO >a �' e 5 -"_ ...'ry, bel,_ n. ' 7 v / A 4ce2: s• 49,n!3 at /•:: utE-4tac� , 1 ! 1 ' S,.D i 1 41.Br4C I j j i /j :I n hF• CRBNEC BJFF_R 1 i i 1 : / fir* r hD :3TFR®L1 BA'J`,) !✓ .� µa G,y /ipe 423.80 V : i I i I 1 r1 1' ;"f4Yr .� :�, {{�i i i • tri PES Al ..:; 3'E i , - '^ q - i t.._-_ --�- I I '_ I t j 1 { /, ✓ ;t` iS T ::•: ":, ea:.tn s.A 411.71 4.00% \\ \ 1� rsg I 'w' Pipe F _ _--..i / / i% J / i SSSS v •___...-.,J i re.:.rc P.. m: ,,. WTtGIE SCH:T! 415.16 1.00% PIPE :c,4 ju.,r'E- :, 2-•; r:s.:+.ti• CB -1 - CB -2 _ / 14r i__.-__tar.�7'.r _.�-.�_ s' LOrErr R-CnN ce O DRECORY :.a f/c JP "Y Ma BrVSg ..<.. .- 1 r:r15', / / 1.21' 1' 1 iiSi 100 YR BACKWATER Y.:'..^.::1D1HE F•IH: o.'x.-:Ii4.W t •\ I CLarFEV.:?,} }RJMEL W.a I , NF.• 7; ;.. i MY..HAE: £.SCiyV4KR1 L. OEA?(AI RQMLG D. YICTGRV. WF_9ER PROF •.�" s..' BOUNDARY -- '-'�-._ -zPeD:Fwd 100 YR BACKWATER : 6'.ROEI:' ctGUN "' 'x+ aa-a:aai: -wwsTA c.IEm.4:r� 5 afr Pp+: D7a_:S ba:T /e / 5" \ EL 116.47 _ _ �.��_ BOUNDARY EL 413.04 7AK ?Jt.Y PI'S OP32.t-a:,St 106 ND. % t 2D. RiTV zOhf'0. R-bN / 37338 ;€ _ SHEET. aE C3.I ^ x `i{i ,,... NEUSE RIVER •'.. )1'�il ,, 1:1� r a �I 1t ✓.,,-. ` �_I P.MPARIN4 &r. ­ER it t. gElT�' '1 //bl.S%,N�BDn:TO r. of • _ _ � __ -------- , ::- ;:� i __ _ STREAM CROSSING CONSTRUCTION SEOUENCE 1. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED, AND APPROACH TO A MINIMUM. 2. INSTALL A TEMPORARY ROCK DAMN UPSTREAM AND DOWNSTREAM. USING CUSS B RIPRAP (050=13-) ON THE FRONT AND /57 STONE ALONG THE BACK TO MAKE THE DAMN IMPERMEABLE. 1 HAVE PUMP N PLACE FOR FLOWING STREAM TO PUMP WATER MGM UPSTREAM DAMN PASS THE DOWNSTREAM DAMN TO DIVERT FLOW MOM STREAM CROSSING WRING CONSTRUCTM. 4. WRING CONSTRUCTION ON NORMAL FLOW THERE WILL BE SEEPAGE AND A SEDIMENT BAG ON A STONE BED, SHALL BE USED TO PUMP SEEPAGE TO A SEDIMENT BASIN ONLY IF NEEDED WRING COIISTRUCnON. 5. BEGIN CLEARING AND GRUBBING. MAINTAIN PUMP AROUND AS NEEDED. ROUGH CRADE CROSSING - 6 . INSTALL FILTER CLOTH AS NECESSARY. 7. INSTALL PIPE CULVERTS AND BACKFILL PROPERLY. B.INSTAL DISSIPATOR PADS AT PPE OUTLETS 9. INSTALL PROTECTIVE GROUND COVERS TO PROVIDE PERMANENT EROSION PROTECTION AND IMPROVE VISUAL QUALITY, BUT NOT INTERFERE MM DRIVER LINE OF SIGHT FROM INE ROADWAY. 10. STABILRE ALL DISTURBED AREAS BEFORE DIVERTING WATER THROUGH STREAM CROSSING. 11. UPON COMPLETION OF CROSSING NTH AREA STABILIZED, THE UPSTREAM AND DOWNSTREAM DAM MAYBE REMOVED. 12.REMOVE PUMP AROUND AND SEDIMENT BAG PUMP IF IN USE. IS PUMP AROUND DETAIL IS LOCATED ON SHEET C-13. 14. ENSURE MAT PERMANENT MEASURES NEEDED TO CONTROL EROSION FROM ROAD WATER RUNOFF (MUM AS RIPRAP AND PAVED CHANNELS, PAVED FLMM OR RIPRAP OUTLET PROTECDON) MEET ALL CONSTRUCTION REQUIREMENTS FOR THOSE PRACTICES STREAM CROSSING PIPE B 111=50' ST'RtUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION CS -1 425,88 10.92' Cub Inlet CB -2 423.80 10.63' Cub Inlet CB -3 423.80 10.89' Cub Inlet EX -CB 425.95 11.38' Storm Junction Bax FES -1 416.92 71T Flared End Section LEGEND 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED PIPE 8 DIAFROM WETLANOAREA UPSTREAM INVERT HATCH AREA DENOTES FLOOD HAZARD SOIL ' ADJUSTEDIMTH TOPO FEST - CB -2 NEUSE BLUFFER (ZONE 1) ;fes FEMA 100 YEAR FLOOD PLAIN LIMITS Pipe A2 36 CB -2 -CB -3 100 NEI BE RIVER RIPARIAN BUFFER EB OVN SCALE 1'=100' Me 0 160' 200' CAQ ?O f Ofv.SSio�.: 9.e :y : _ D3437 �.374 c c 02/21/2017 $o ^ E wC�Q FF w� m z 0 00 �pom OU VU U b N u > Q�a� '" uwi uWiuwi ro o L^ O 2 Ul ~ m Ul F W£ E Ras $,a � Ky�y••� K ~ WWW iO Q Qw 7 e'or 333 0 bbbr� w NNNry Q O C -•.i rN vi DATE 05/24/16 n DRAWN 8Y J. DOOLEY • DESIGNED BY • B. MCLAMB • CHECKED BY J. CHANDLER • • SCILLE • PER PIAN • • • STORM PIPE TABLE PIPE 8 DIAFROM FROM -TO UPSTREAM INVERT DOWNSTREAM INVERT SLOPE LENGTH DESCRIPTION Pipe Al 24' FEST - CB -2 414.50 414.31 0.57% 33.11 LF 24 inch Concrete Pipe Pipe A2 36 CB -2 -CB -3 414.11 413,11 4.OD% 25.00 LF 36 Inch Convete Pipe Pipe A3 36 CE -3 - 41291 411.71 4.00% 30.00 LF 36 inch Conmete Pipe Pipe F 3r - CB -1 415.57 415.16 1.00% 40.94 LF 30 inch Comate Pipe Pipe G 1 30- CB -1 - CB -2 414.06 414.31 1 1.00% 1 64,77 LF 1 30 t.h Conuete Pipe EB OVN SCALE 1'=100' Me 0 160' 200' CAQ ?O f Ofv.SSio�.: 9.e :y : _ D3437 �.374 c c 02/21/2017 $o ^ E wC�Q FF w� m z 0 00 �pom OU VU U b N u > Q�a� '" uwi uWiuwi ro o L^ O 2 Ul ~ m Ul F W£ E Ras $,a � Ky�y••� K ~ WWW iO Q Qw 7 e'or 333 0 bbbr� w NNNry Q O C -•.i rN vi DATE 05/24/16 n DRAWN 8Y J. DOOLEY • DESIGNED BY • B. MCLAMB • CHECKED BY J. CHANDLER • • SCILLE • PER PIAN • • • 5 N O W I a Z .4 Z QQ vd g �Uc =5 O aLJw d P § Z I s u 3 w z Z Z w z z z a U I � HO QU ILI � a t z �O zaZ yip = gWz Q R Q U ae ce O g $ O Z J u 5o Qfi p§Ep z'a 5 afr s� 106 ND. % t 37338 ;€ SHEET. aE C3.I ^ x GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, .._ PIN TitYD 0.'J '. SWALES, DITCHES 7 DAYS NONE AND SLOPES C t • HIGH QUALITY Volume A{ •''t:5 ; •. WATER(HOW)ZONE 7 DAYS NONE (D z I 10 FROM: BANK) IF SLOPES ARE 10 OR LESS IN SLOPES STEEPER 7 DAYS LENGTH AND ARE NOT STEEPER THAN 3:1 (50' FROM BFNK)-� THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 :11 . 7 -DAYS FOR SLOPES GREATER OR FLATTER 14 DAYS THAN 50 FEET IN LENGTH ALL OTHER AREAS 12+00 NONE WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 MATTING OR EQUI AND HOW ZONES) -EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMI TTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPUANCE IMPRACTICAL." - (SECTION II. 13(2)(b)) NOTE 1' AREAS WILL BE STABILIZED PER THE GROUND STABILIZATION CHART AFTER ANY GRADING. NOTE 2. ALL BASINS SHOULD BE CLEANED AFTER ANY RAIN EVENT THAT EXCEEDS 1' IN 24 HOURS. NOTE 3. SEDIMENT BASINS WALL BE INSTALLED WHERE STORM DRAINAGE PIPE IS LOCATED. I.E. PIPES WILL BE LEFT SHORT AND EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN STABILIZED. SLOPE STABILIZATION REQUIREMENTS 3:1 AND FLATTER -GRASS 3:1 TO 2'1 SLOPE --ADAPTIVE PLANTS (SHRUBS AND VINES) 2'.1 TO 1.5.1 RIP RAP STEEPER THAN 15 TO 1 -RETAINING WALL NOTE 4. MAXIMUM IMPERVIOUS AREA SQUARE FOOTAGE ON EACH INDIVIDUAL LOT WILL BE STRINGENTLY ENFORCED WITH NO EXCEPTIONS INTO PERPETUITY. NOTE 5: ONCE SITE HAS BEEN STABILIZED AND PRIOR TO ISSUANCE OF CERTIFICATE OF COMPIETION. SITE WILL BE EVALUATED TO ENSURE THAT DIFFUSE FLOW HAS BEEN OBTAINED BEFORE STORMWATER ENTERS BUFFERS. IF DIFFUSE FLOW HAS NOT BEEN ACHIEVED, THEN LEVEL SPREADERS MUST BE INSTALLED AS PER PIAN. DISTURBED AREA -6.00 AC. (CLR) INDICATES THE LIMITS OF ULTIMATE DISTURBANCE FOR HOPKINS TRACE - PHASE Z SEDIMENT BASIN REMOVAL I) REMOVE BASINS ONLY AFTER SITE IS STABILIZED AND WITH PERMISSION FROM WAKE COUNTY ENGINEER. 2) REMOVE TARP AND ALL NON DIRT AND/OR ROCK MATERIAL 3) USE BACKHOE TO FILL IN AND LEVEL BACK TO NATURAL GROUND ELEVATION. 4) SEED AND STRAW APPROPRIATELY. 5) INSTALL CHANNELS AND EXTEND PIPE IF REQUIRED. N'F j ��P, /lRI(LEO+IE J gaLDER^a INC. j 'Pit: D 82j&0:65 / - . ZONED'�AR Name STA TEMPORARY CONSTRUCTION D. C tIF` , Vii;'}•;i: 111"c4 KI`.IB-cP,LY S.IAPIERP� ,,'. .._ PIN TitYD 0.'J '. From ZOrzERT !I('n, INC. , C t • S.F. Volume A{ •''t:5 ; •. 2CO' V:ATER SUPPLY vi t L, WATERSHED BUFFER (D z I 10 FROM: BANK) emifonmental inspector and obtain a Certificate of Compliance10,000_SF^,^; 6 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade�.'+...TD 100' NEUSE RIVER x i•t` Lttt RIPARIAN BUFFER ;L`ll (50' FROM BFNK)-� 0.18 065 :11 . 0.85 2.OD% UNREINFORCED it 10+35 NOTE 1' AREAS WILL BE STABILIZED PER THE GROUND STABILIZATION CHART AFTER ANY GRADING. NOTE 2. ALL BASINS SHOULD BE CLEANED AFTER ANY RAIN EVENT THAT EXCEEDS 1' IN 24 HOURS. NOTE 3. SEDIMENT BASINS WALL BE INSTALLED WHERE STORM DRAINAGE PIPE IS LOCATED. I.E. PIPES WILL BE LEFT SHORT AND EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN STABILIZED. SLOPE STABILIZATION REQUIREMENTS 3:1 AND FLATTER -GRASS 3:1 TO 2'1 SLOPE --ADAPTIVE PLANTS (SHRUBS AND VINES) 2'.1 TO 1.5.1 RIP RAP STEEPER THAN 15 TO 1 -RETAINING WALL NOTE 4. MAXIMUM IMPERVIOUS AREA SQUARE FOOTAGE ON EACH INDIVIDUAL LOT WILL BE STRINGENTLY ENFORCED WITH NO EXCEPTIONS INTO PERPETUITY. NOTE 5: ONCE SITE HAS BEEN STABILIZED AND PRIOR TO ISSUANCE OF CERTIFICATE OF COMPIETION. SITE WILL BE EVALUATED TO ENSURE THAT DIFFUSE FLOW HAS BEEN OBTAINED BEFORE STORMWATER ENTERS BUFFERS. IF DIFFUSE FLOW HAS NOT BEEN ACHIEVED, THEN LEVEL SPREADERS MUST BE INSTALLED AS PER PIAN. DISTURBED AREA -6.00 AC. (CLR) INDICATES THE LIMITS OF ULTIMATE DISTURBANCE FOR HOPKINS TRACE - PHASE Z SEDIMENT BASIN REMOVAL I) REMOVE BASINS ONLY AFTER SITE IS STABILIZED AND WITH PERMISSION FROM WAKE COUNTY ENGINEER. 2) REMOVE TARP AND ALL NON DIRT AND/OR ROCK MATERIAL 3) USE BACKHOE TO FILL IN AND LEVEL BACK TO NATURAL GROUND ELEVATION. 4) SEED AND STRAW APPROPRIATELY. 5) INSTALL CHANNELS AND EXTEND PIPE IF REQUIRED. N'F j ��P, /lRI(LEO+IE J gaLDER^a INC. j 'Pit: D 82j&0:65 / - . ZONED'�AR Name STA TEMPORARY CONSTRUCTION D. C I 010(ds) Slope Matting Type P 2. Install erosion control measures based on the approved erosion control plan From To !I('n, INC. , C t • S.F. Volume 7 Offsets LEGEND orifice 3. Call Charles Phillips at 919-7968769 for on site inspection by " (D z =MAXIMUM IMPERVIOUS ALLOWED emifonmental inspector and obtain a Certificate of Compliance10,000_SF^,^; 6 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade�.'+...TD 1L•'- AREA LT 10.35 12+00 0.18 065 7.28 0.85 2.OD% UNREINFORCED RT 10+35 12+00 6.70 040 7.28 19.51 2.0096 5750 MATTING OR EQUI LT 12+00 15+22 0.12 0.65 7.28 0.57 2.10% UNREINFORCED RT 12+00 15+22 L51 0.40 7.28 4.40 2.10% UNREINFORCED LT 15+22 18+76 0.13 0.65 7.28 0.62 6.80% UNREINFORCED RT 15+22 18+76 6.25 0.40 7.28 18.20 6.80% PRIM MATTING OR EQUI LT 18+76 26+45 0.4 0.65 7.28 1.89 1.60% UNREINFORCED RT 18+76 26+45 3.44 0.40 7.28 10.02 1.60% UNREINFORCED LT 26+05 30+44 0.27 0.65 7.28 1.28 5.40% UNREINFORCED RT 26+45 30+44 11.76 0.40 7.28 34.25 5.40% P550 MATTING OR EQUI LT 30.44 32+88 0.20 065 7.28 0.95 3.60% UNREINFORCED RT 3D+44 32+88 0.78 0.40 7.28 2.27 3.60% UNREINFORCED 2 Offsets LT 10+00 11+34 0.53 0.45 7.28 1.74 3.00% UNREINFORCED RT 10+00 11+34 0.36 OAS 7.28 1.18 3.00% UNREINFORCED TEMPORARY CONSTRUCTION 1. Schedule a precanz6uclon conference with the Environmental Engineer ENTRANCE , •}/ tbF I„ SL".iJERS I:IC. P 2. Install erosion control measures based on the approved erosion control plan t Basin Ba !I('n, INC. , C t • S.F. Volume 3 LEGEND orifice 3. Call Charles Phillips at 919-7968769 for on site inspection by " (D z =MAXIMUM IMPERVIOUS ALLOWED emifonmental inspector and obtain a Certificate of Compliance10,000_SF^,^; 6 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade�.'+...TD 1L•'- AREA Z :EO Ra r , !YF \ KiR<PATRJC .4 ASSOCIATES LLC P: +.OrLI-164555 \ zoNED R-NCN - _ A _ r TEMPORARY STREAM J GRAVEL STRUCTKN4 CROS 11G. SEE DETAIL 7 CON y ENTRANC - E 50X30' ��. ••. A ,- ---20'TEMPORARY f Ili . �1•• CONSTRl1CTION g : �+' ✓ � �. �... fir,-:._ ' e>s; J ` EASEMENT L C. '• � . ; � d+ ., ..:-1"f .t,T'r1r. 7";"s�:' �r'- .IIJr�r'X ,� • i,>F 't:.ti5t. 4,. .;f�6r� J '��'�'"i"�rji{[..v .rr_�.. f�� // SILT FENCE 6 OUTLET(TYP) - 1}T 0550 MATTAG .... _ _ GRAVEL ' } ' ` OR EQUIVALENT I ;,r P550 TTING z t. '•i` ,` NF LIMBS OF J OR EQUIVALENT CONSTRUCTION 1 i1° 'S a+l; RONADc.M DISTURBANCE ENTRANCE 507(30 til rrl MiARGIE SCNAT2 1 •' ill i!L •. G ZO+IER-1QY * GREGOP.Y J.6 ••a i. `A.i : I JACOLELIEA SEAIASTER PIN: 0782-1"1)93 R-4DAI i - WAKE COUNTY CONSTRUCTION SEQUENCE TEMPORARY CONSTRUCTION 1. Schedule a precanz6uclon conference with the Environmental Engineer ENTRANCE w--I,--:r- f a Chades Phillips 91&7968769. Obtain a land disturbing permit -w- U.101EDI.RBANCE P 2. Install erosion control measures based on the approved erosion control plan CHECK DAM Basin Ba Clear only as necessaryto install these devices. Install permanent risers for Dry Da IAc) C = diversions, berms and basins immedately after construction. S.F. Volume 3 LEGEND orifice 3. Call Charles Phillips at 919-7968769 for on site inspection by " (D z =MAXIMUM IMPERVIOUS ALLOWED emifonmental inspector and obtain a Certificate of Compliance10,000_SF^,^; 6 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade�.'+...TD 1L•'- AREA 9 5. Install storm sesver(T shovm) and protect inlets v4th Nock and gravel Idl HATCH AREA DENOTES FLOOD HAZARD SOIL inlet controls sedment traps or other approved measures m shown on etheq Begin constructing building etc size (int) ADJUSTED WATH TOPO w z U £ t 6. Stabilize sae as areas are brought up to finish grade with vegetation, 3 � U z O g paving, ditch Wrings, etc Seed and mulch denuded areas per ground �� ! NEUSE BUFFER (ZONE 1) R stabilization time frames >_ O SKIMMER BASIN 1 i 7. When consWwon is complete and all areas are stabilized completely, r.: ;r,,';:' �.: �. fI1. FEMA 100 YEAR FLOOD PLAIN LIMITS ? call Chades PhiniM at 919-7968769 for an inspection by the 15,081 27,414 environmentalengineeT. 4 2.5 9 cc 100' NEUSE RIVER RIPARIAN BUFFER 8. If site is approved, remove temporary diversions, sift fencing, sediment P basins, etc and seed out or stabile any resulting bare areas All dimensions) remaining permanent erosion control devices (such as velocity dssipators) :5 5 should be installed now Remove skimmers from sedment basms to convert temporary skimmer basins into permenant so -ter control measures. "S" 961r48t3 (comic 37338 g 9. when vegetation has become estadished, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-6769. Obtain a SKIMMER BASIN Certificate of Completion. 4.30 0.42 I ! i 1B/gIN.81 'Y.s>!",+...s ,_f�f,•'- .✓'30' ER SUPPER EDD '�•'•'?-��=..r.rJ:-,r..�tJ,rr,J/r. :rJ;::/je;.r ,. � 4ppe.eAA WATERSHBUFFER F'[ •i:�5't (30'FROM BANIG ; J i.f FEMA ION YEAR I �i AN LIMIT SKI J _r rH t - k 7. f ,.!' � -r-" "t� .__,. ..'r'� � •�'�_ -+t � � ,CIJ�_' � MA7T1 CHECK PS 50 NCa - w t� tt r *TURBAMCE i t iDAM (TYP) it OR EQUIVALENT, r rs1 ( i O02;-,� ` :h013Y 1f' , �� v, •,.G7: al 1. 1L �: ' '; I1 1. °J :p,. A '.�.E�:1. ry• r / II )li ;' �1 J I L 1:CT 141' ------------ : 1 A { s; --} } 1 uz __ __. __ L_J 1 '' 121' MF i �. •1` DOE,, EE. 0VGEdJN I MICHAEL W.4 I MILTMEL 5.45fWaIpNL DEATON7 RONAIDD.4VICTOPoA N£BERPmCE j i Put: O>8?-i52Xlei THMYSTAC.SURNii E RIKD71 _154,580 j MN:07S2-150351 •'• \ i ZOHEO;R+D.V i PiK D75'-'150)51 I ZONED'P.JDN ZONED: R-1ON TCO' NEUSE RIVER RIPARIAN BUFFER I 7 r+F \ i j N /SUSAL 4 DAWD L YMT ( 1 RK 07R2 BteS ` ' ZOFIFD: R�ae7 EROSION CONTROL LEGEND TEMPORARY CONSTRUCTION ENTRANCE w--I,--:r- SILT FENCE -w- U.101EDI.RBANCE Skimmer CHECK DAM Basin Ba DIST. AREA Da IAc) C 025 S.F. Volume Basin Dimensions Skimmer orifice Weir(R) (D z O� �`L' LLwz Required Idl = size lint size (int) O w z U £ �z J O 3 � U z O g � /78,9(r,77 (mimic (n CzU g S ~ >_ O SKIMMER BASIN 1 2-30 15.23 0.42 34.7 15,081 27,414 detention pond 4 2.5 35 cc dimensions) :5 "S" 961r48t3 (comic 37338 g SHEE.o � SKIMMER BASIN 2.79 4.30 0.42 9.8 4,258 7,740 detention pond 3 1.25 10 dimensions) 1B/gIN.81 'Y.s>!",+...s ,_f�f,•'- .✓'30' ER SUPPER EDD '�•'•'?-��=..r.rJ:-,r..�tJ,rr,J/r. :rJ;::/je;.r ,. � 4ppe.eAA WATERSHBUFFER F'[ •i:�5't (30'FROM BANIG ; J i.f FEMA ION YEAR I �i AN LIMIT SKI J _r rH t - k 7. f ,.!' � -r-" "t� .__,. ..'r'� � •�'�_ -+t � � ,CIJ�_' � MA7T1 CHECK PS 50 NCa - w t� tt r *TURBAMCE i t iDAM (TYP) it OR EQUIVALENT, r rs1 ( i O02;-,� ` :h013Y 1f' , �� v, •,.G7: al 1. 1L �: ' '; I1 1. °J :p,. A '.�.E�:1. ry• r / II )li ;' �1 J I L 1:CT 141' ------------ : 1 A { s; --} } 1 uz __ __. __ L_J 1 '' 121' MF i �. •1` DOE,, EE. 0VGEdJN I MICHAEL W.4 I MILTMEL 5.45fWaIpNL DEATON7 RONAIDD.4VICTOPoA N£BERPmCE j i Put: O>8?-i52Xlei THMYSTAC.SURNii E RIKD71 _154,580 j MN:07S2-150351 •'• \ i ZOHEO;R+D.V i PiK D75'-'150)51 I ZONED'P.JDN ZONED: R-1ON TCO' NEUSE RIVER RIPARIAN BUFFER I 7 r+F \ i j N /SUSAL 4 DAWD L YMT ( 1 RK 07R2 BteS ` ' ZOFIFD: R�ae7 EROSION CONTROL LEGEND TEMPORARY CONSTRUCTION ENTRANCE w--I,--:r- SILT FENCE -w- U.101EDI.RBANCE A CHECK DAM ® PIPE INLET PROTECTION f F 'p.4 �.. �U7f* 1 '7 TL.E� / I al' � / 50 WATER SUPPLY 1 ' a l •1WATE50' OMB K) { I �' • % tl :�, (50' FROM BANK! ?'/'jt//, �'��✓�����,,�a/�A / �,* Ili :%its. �" �"y �"'• - �/, ,:�v � s t ,i nEc - .s11 i� FA 50• PUB'JC RNV zJ: PROPSED ROAD L-2 30 WATER SUPPLY WATERSHED BUFFER (30' FROM BANK( as si F.10 c TEMPORARY STREAM CROSSING ' I TEMPORARY STREAM CROSSING CONSTRUCTION SEQUENCE 1. NSTA11 EROSION CONTROL MEASURES ON SATE PER PIANS ( z KEEP CLEARVIG AND EXCAVATION OF TIE S- RANKS AND REO. AND AFPROACH TO A MIVA M. j 3. BEGIN CIFARINO AND GRUBBING. MANTAIN PUMP AROUND AS NEEDED. ROUGN GRADE CROSSING i 4. INSTALL FILTER CLOTI AS NECESSARY. I 5. INSTALL PIPE CULVERTS AND BACKFILL PROPERLY PER TEMPORARY CROSSING DETAL 1 !� 6. NSTALL PROTECTV E ORIXIM COVERS TO PROVIDE TEMPORARY EROSION PROTECT j IJj 1. STABILIZE ALL DISTURBED AR EAS. a. ONCETEMPORARYCROSSNGISNOLONGERNEEDED,AREATORERESTOREOTOPRE4TEVELOMa T CONDITIONS. L _ - T ---' - ] 1 _ 1 LIMITS OF DISTURBANCE = 6 ACRESwool., 4 TEMPORARY STREAM CROSSING I"=50' EB OVN SCALE 1"=100' 0 100 200' +0N'"CARO =0� JFbv52tip��'S e 1a SEAL �` - f 093{37437 1 - i9,y'fA'gfnei' F,� Asa''•...« �v+n -7 02/21/2017 0 Vyy�IU Vyy Q Q�QQ o' 333 CbV)V)n :°NNNN DATE OS124116 0 DRAWN BY J. DOOLEY B. MCLAMB Cilrfi :D 6Y J. CHANDLER SCALE PER PLAN D Ln LU Z0Ln < _ 8 i.D n 2°z �" aUg. OZ 1 o J a (D z O� �`L' LLwz U oz = j O U O w z U £ �z J O 3 � U z O g � U) (n CzU g S ~ >_ O LLl g; K �U £p p= o° <Rl cc :5 "S" 37338 g SHEE.o � C4.0 1] i :�: i'' PIPE A -3 -HEADWALL •`\i1,r, AT OUTLET 't •iii'.% ipe A3 ,1 t `:104 7_r _ / - - _ S_0'P(JB2JeyplgV. - _ ll 'AVEh1ENT" _ - 1 i t 'it Poe i 4i G '•��-�- =c Al :, 1ii 5 1, ._ ". -.-'__ •---'_.� ' • i• i FES - I illi 11 ''. I7�1`; N/F ca- 11U 1 ' RONALD C. & MARGIE SCHATZ ca 1" 1 • . O ,� /� DETENTION POND 92 /' _ - "- - �" tel, •'/ SCAL C: - i 034374 'B1 f'1•CINF3r' •�` 02/21/2017 E •' ; i.'s tii JACQUELINE A. SEAMSTER .�? Y _ _ ti.S 1 -�J� viii 25YEAR 1':; t ZONED: R -40W ENERGY DISSIPATOR DESIGN 1ES-1 1 416.92 777 STORM DRAINAGE DESIGN 36 inch Concrete Pipe Pipe A3 36- C 412.91 411.71 4.00% �1 LOCATION DISCHARGE 30- PIPE DESIGN OUTLET@ a(.M1 PIPE 050 30 inch Concrete Pipe Pipe G 3a' 1 C13-1 -CS-2 1 414.96 414.31 1 1.00% (FPS) On.) (FPS) 30 inch Concrete Pipe g -- - - - - -r _ I (INh� PIPE LENGTH Pipe A3 31.14 36 3.97% 4.45 77x24',24' 1T Pipe ID INLET TYPE - �Y m Oz V uu IB 2.38% 5.08 18,36'Y21' 1T _ (HOPE) PIPE R 78 7.88% 3.72 BY16t78^ E ROADA-PLAN VIEW Pipe 8 WHm&,,M Headwall 0.40 4.07 39.77 15. it 61.79 48.00 64.00 409.00 107. Wz 30 4.78% 3.96 17,24'x24^ tT 50* RIW, 29 PAVEMENT I S OQOO .......... I X -EX _.__._._..._-.. GC-.._._ WE GRACE__ H11ili PTS, TA�5+0760 -- - - I-- _ _ O I , OU 11 0 \ W O W; WIOV W W PVI STA=15458.36 -- 4 i N PVI EUEV =430.89 A.D.0.11% ' .B - - r --- Y - -.- » .-........._._ K. 20.7...- -I- 7 _.._.---.---- : ..... f f_-_ _-:---_ .._ _.- _111G TA - 2llf[ASAD e� \ •. I I � Do01 an >,� •: � �• I I ¢ Q .`NNN � ` � : -�--s'aLi T-_ --. o fro. o _ _--- OU UU - m e.=.36.7 0 DATE ca 1" 1 11 ' l;ti,, PIN: 0782-16-0795 N/F GREGORY J. & t '• .i - : ZONEDR4000 10.97 •' ; i.'s tii JACQUELINE A. SEAMSTER DESIGN STORM: 1 ti.S 1 PIN: 0782-16-0393 viii 25YEAR 1':; t ZONED: R -40W ENERGY DISSIPATOR DESIGN 1ES-1 1 416.92 777 'FOR PIPE B, USE NCOOT STANDARD DRAWING 838.01 LOW POINT STA = 12415.58 LOW POINT ELEV = 423.01 PVI STA = 11477.93 PVI ELEV - 420.95 AD. = 7.61% 435: 430 425 !20 R t 6 !15 j 410 N J °p 405 9-00 1G400 11400 12.00 L 50 RIGHT OF WAY R 2(Y PAVEMENT B 0. tD�1D -1M'PERFT. SFB.SA I-pER� 6 'UBC w � CIlT FlLL RESIDE- STREETS TYPx-CROSS SECTION ws EB OVN VERTICAL SCALE 1^ = 5' SCALE 1-=50' 0 50 100 STORM STRUCTURE TABLE Bailey's Landing TOP STRUCTURE HEIGHT ENERGY DISSIPATOR DESIGN CB -1 425.88 10.97 STORM DRAINAGE DESIGN CB -2 423.80 10.63' DESIGN STORM: 10 YEAR 423.80 10.89' DESIGN STORM: 25YEAR 426.95 11.38' ENERGY DISSIPATOR DESIGN 1ES-1 1 416.92 777 STORM DRAINAGE DESIGN 36 inch Concrete Pipe Pipe A3 36- LOCATION 412.91 411.71 4.00% �1 LOCATION DISCHARGE 30- PIPE DESIGN OUTLET@ a(.M1 PIPE SIZE SLOPE VELOCITY DISSIPATOR 050 30 inch Concrete Pipe Pipe G 3a' 1 C13-1 -CS-2 1 414.96 414.31 1 1.00% (FPS) On.) (FPS) 30 inch Concrete Pipe g -- - - - - -r _ I (INh� PIPE LENGTH Pipe A3 31.14 36 3.97% 4.45 77x24',24' 1T Pipe ID INLET TYPE C A (AC) C•A O (c1e1 SIZE On.) tRl INV IN INV OUT Pipe B 63.78 IB 2.38% 5.08 18,36'Y21' 1T (HOPE) Pipe 5.52 78 7.88% 3.72 BY16t78^ E ROADA-PLAN VIEW Pipe 8 WHm&,,M Headwall 0.40 4.07 39.77 15. it 61.79 48.00 64.00 409.00 107. Poe D IS." 30 4.78% 3.96 17,24'x24^ tT 50* RIW, 29 PAVEMENT 'FOR PIPE B, USE NCOOT STANDARD DRAWING 838.01 LOW POINT STA = 12415.58 LOW POINT ELEV = 423.01 PVI STA = 11477.93 PVI ELEV - 420.95 AD. = 7.61% 435: 430 425 !20 R t 6 !15 j 410 N J °p 405 9-00 1G400 11400 12.00 L 50 RIGHT OF WAY R 2(Y PAVEMENT B 0. tD�1D -1M'PERFT. SFB.SA I-pER� 6 'UBC w � CIlT FlLL RESIDE- STREETS TYPx-CROSS SECTION ws EB OVN VERTICAL SCALE 1^ = 5' SCALE 1-=50' 0 50 100 STORM STRUCTURE TABLE STRUCTURE 0 TOP STRUCTURE HEIGHT DESCRIPTION CB -1 425.88 10.97 Curb Inlet CB -2 423.80 10.63' Curbinlet CS -3 423.80 10.89' Curb Indet EX -CB 426.95 11.38' Sto m Junaion Box 1ES-1 1 416.92 777 Flared End Section D- BY J. DOOLEY • STORM PIPE TABLE LOW POINT STA = 18427.12 B. MCLAMS PIPER DIA FROM -TO UPSTREAM INVERT DOWNSTREAM INVERT SLOPE LENGTH DESCRIPTION Pipe A7 24' FES -1 - C&2 414.50 414.31 0.57% 33.11 LF 24 inch CDnaete Pipe Pipe A2 36^ C&2 -CS -3 414.11 413.11 4.00% 25.00 LF 36 inch Concrete Pipe Pipe A3 36- CS -3 - 412.91 411.71 4.00% 30.00 LF 36 inch Concrete Pipe Pipe F 30- -CB-1 415.57 415.16 1.00% 40.94 LF 30 inch Concrete Pipe Pipe G 3a' 1 C13-1 -CS-2 1 414.96 414.31 1 1.00% 64.77 LF 1 30 inch Concrete Pipe D- BY J. DOOLEY • DESIGNED BY LOW POINT STA = 18427.12 B. MCLAMS • CNEMD BY J. CHANDLER • • LOW POINT ELEV =416.60 • PER PLAN .--- ................... _..... ....... ...... _...--_ - r < W FJL E IS71NG- 23' RN9�TA.D-a !..... 11_ ... - I 0 LU to I K:20. 7 z s U ...--r--- Q ..I. _......_.__.._..........:..............._._.._. ,._._..._......._....__..:_._....._. .......... .. 240' VC -.__..... z Zzag= - -- - w ---t-- " ---- ��Q a zu U).a g -- - - - - -r _ - s : > J u11-4 �! OZ I f' - l 700 N0. 373. W g f i is f I S .......... I X -EX _.__._._..._-.. GC-.._._ WE GRACE__ H11ili PTS, TA�5+0760 -- - - I-- _ _ I , - '. PVI STA=15458.36 -- 4 i N PVI EUEV =430.89 A.D.0.11% ' .B - - r --- Y - -.- » .-........._._ K. 20.7...- -I- 7 _.._.---.---- : ..... f f_-_ _-:---_ .._ _.- _111G TA - 2llf[ASAD e� - i .-- - I I T-_ --. I �---•--- _ _--- OU UU - m e.=.36.7 m w 13400 14400 15400 16+00 17400 18400 19+00 20400 21000 ROAD A- PROFILE VIEW Sa RM! 20' PAVEMENT 22400 23400 24400 I05/24/16 0 D- BY J. DOOLEY • DESIGNED BY • B. MCLAMS • CNEMD BY J. CHANDLER • • SCALE • PER PLAN � = Q C W FJL E CL D0 V N W � = Q C W FJL E CL 0 Z 0 LU to �0a z wz z s U I.. q Q Jau W z Zzag= U0 ��Q zu U).a g I - aW O s : > J u11-4 �! OZ W l 700 N0. 373. W g SXFET NO. �$ C5.0 r - 1 I � � CE• 2L0. I l I I i I � PVI STA. 3b 9. S I e i ,PVI ELEV • 411.34 B 0 w Y O 0 z — 1 !1 O � O / a m8, PVI SiA•1awo00 RALEIGH OFFICE 5410 Trinity RoeE, Suite 107 1 Raleigh, NC 27607 0 \t C) IT N H '•\, \ z `l' T e t\ t�4 \ �y \ Ytiy' I; uF yep: iR.i a:"i ain.,aANi•g CG! ^ m o A 2016 \\•\1C\\t vi ;of o^ v '\; •!� � I 1 1 I p ib5 Z a COMMENTS REVISED TOTAL SITE AREAS 1 1 ♦, \ k� 1 I l I \ 5D PPUBLI AVEME IT,. I I 1 f + 1 I 1 I I ! I I I 1 I I .55 b ZVI ELEV • 428.91 _ N 02-21-2017 N n N O m N O 0Zwm m o , �\ `•�.,,\` o � � � i m , i N B 0 w Y O 0 z — 1 !1 O � O / a m8, • RALEIGH OFFICE 5410 Trinity RoeE, Suite 107 1 Raleigh, NC 27607 0 \t C) IT N CJl O '•\, \ z `l' T e t\ t�4 \ GATE \ Ytiy' I; uF yep: ^ m o A 2016 \\•\1C\\t vi ;of o^ v '\; •!� � I 1 1 I p ib5 1 1 II , 1 +1 \ i i 1l t1-15-1016 COMMENTS REVISED TOTAL SITE AREAS 1 1 ♦, \ k� 1 I l I \ 5D PPUBLI AVEME IT,. I I 1 f + 1 I 1 I I ! I I I 1 I I \ \ _ I I I f I f, 02-21-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS TIMMONS GROUP NORTH CAROLINA LICENSE NO. C-1652 BAILEY'S LANDING - PHASE 4 w c W CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA ROAD A PLAN AND PROFILE TMHgenee-eaocYlM —11— the -111N, WeForly of TIMMONS GROW a-meynot ae -—d In pen IW 11%11 W —0dIl not NI eM NIP"w-boevef• indwN1. W not I_ --. alElMw. ender cenMr„ellen—f. xi 1Men m--eo d of nMMGNS GROUP. Y z THIS DRAWING PREPARED AT THE 0m GS� � O / a m8, • RALEIGH OFFICE 5410 Trinity RoeE, Suite 107 1 Raleigh, NC 27607 A Ij"I O z O `l' T e t\ t�4 GATE \ Ytiy' I; uF yep: ^ m o A 2016 \\•\1C\\t vi ;of o^ v '\; •!� � D o 2 ib5 = rte„ 1l t1-15-1016 COMMENTS REVISED TOTAL SITE AREAS Vl ♦, \ k� w I \ 5D PPUBLI AVEME IT,. TIMMONS GROUP NORTH CAROLINA LICENSE NO. C-1652 BAILEY'S LANDING - PHASE 4 w c W CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA ROAD A PLAN AND PROFILE TMHgenee-eaocYlM —11— the -111N, WeForly of TIMMONS GROW a-meynot ae -—d In pen IW 11%11 W —0dIl not NI eM NIP"w-boevef• indwN1. W not I_ --. alElMw. ender cenMr„ellen—f. xi 1Men m--eo d of nMMGNS GROUP. • • THIS DRAWING PREPARED AT THE es••`..°eeeee \ •• YOUR VISION ACHIEVED THROUGH OURS. RALEIGH OFFICE 5410 Trinity RoeE, Suite 107 1 Raleigh, NC 27607 ` `,•11 I 61 TEL 919.0.66.4951 FA% 919.633.24 wwwAlmmons.rom `l' T e t\ t�4 GATE REVISION DESCRIPTION Ytiy' I; uF yep: ^ m o 2016 WAKE COUNTY ENVIRONMENTAL SERVICES ;of o^ v '\; •!� v D o 2 ib5 = rte„ 1l t1-15-1016 COMMENTS REVISED TOTAL SITE AREAS Vl ♦, S w I \ \♦i • + $ \ \ m m 02-21-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS 0Zwm 11,E , �\ `•�.,,\` o � � � i AL .11m'm Z , i N •-- ��1 1 \ m- t I 1 , I fl i rl C \,L I oM Lt In '�♦ ...._ .-,_ ...._ - o — -` — _.., x1 � 11111• L ........ , e IV Vii "` {r1y • • THIS DRAWING PREPARED AT THE es••`..°eeeee • •• YOUR VISION ACHIEVED THROUGH OURS. RALEIGH OFFICE 5410 Trinity RoeE, Suite 107 1 Raleigh, NC 27607 as NO s� �+- ✓ .•• .p % •e ARS., 61 TEL 919.0.66.4951 FA% 919.633.24 wwwAlmmons.rom `l' T e t\ t�4 GATE REVISION DESCRIPTION Ytiy' I; uF yep: ^ m o 2016 WAKE COUNTY ENVIRONMENTAL SERVICES ;of o^ v '\; •!� v D o 2 ib5 = rte„ 1l t1-15-1016 COMMENTS REVISED TOTAL SITE AREAS p i,�CB l��••••�•V�'o.` S w 12-12-1016SERVICESCOMMENTS o ,r>rll»NV •y°•i 2 $ m m 02-21-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS TOP ELEVATION OF STMMWATER STORE__— /5 WASHED IMAX. EXISTING SLOPE EXISTING p ROADWAY /1 RIP–RAP VARIES I EXISTING SLOPES 1 SIDE VIEW / 50' MIN. BUT -ENT TO KEEP IIID■■ ■ ■ ■ ■ ■■■■■■.'lull %1'1, SED ENT ON SITE 2-3' STONE TO BE USED' 25' OR WIDTH OF (SURGE STONE OR RAILROAD .- PROPOSED STREET, . BALLAST)... '. fr •sx RAf1 8 WHWCHHEVER IS ,IIIA[ B GREATER. NOTES: PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH MAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE. THEN THE TIRES OF THE VEHICLES MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. 3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD DR SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE MU_ REWIRE PERIODIC REMOVAL OF SEDIMENT -LADEN STORE AND REPLACEMENT WITH FRESH STONE. VARIES °pNCR i PLAN VIEW HEIGHT h WIDTH DETERMINED BY EKISTING TOPOGRAPHY AND SEDIMENT STORAGE REQUIRED. OV -1, KEY RIP RAP INTO ME DASA 35' MIN. 1S• IMV. NEW CONSTRUCIKIN FOR ST481LIZATOJ. EXISTING ROADWAY I KEYED RIP RAP 12' MIN. �#5 WASHED STONE 6- U.N. FRONT VIEW EBD"G G+WNo FABRIC UNDER STONE STEP SEQUENCE NOTE: REMOVE PREVENT DAMAGE A TO CH N FROM BEHIND CROSS SECTION CHECK DANS TO PREVENT EDTH 10 CHANNEL VEGETATION, ROW SHOULD BE uA1NTNNED THROUGH TME DAY. AK OUNT STANDARD CHECK DAM STANDARD CONSTRUCTION ENTRANCE Sr[¢ rE of HAX.— ua, \ Tr NOTES: 1. REMOVE SEDIMENT WHEN HALF OF STORE OUTLET IS COVERED. 2. REPLACE STORE AS NEEDED TO ENSURE DEWATERING. aunt WW[ rENC[ MD wnowAAE CWTH raTER F. 1. iEBEEE or, U SECTION VIEW COUN _ STANDARD SILT FENCE OUTLET NOTE: 1. USE SALT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE 90 I L STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC FILL SLOPE x. A 6- MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE SCREEN ACCESSIBLE THRDUGH DOOR FLEXIBLE (RADIATOR OUTLET END: CONNECTION TO OUTLET PIPE OR RISER lQ.,= ANa P .tr> MP SECTIL HRtsEC TIMTTHRU WE1[EIRVEIR F "IN FREEBOARD OR OF BERN IMFLFpy BAFFLES (STB) MERGENCY STR 7URE m SPILLWAY Y 1` y\ ELEVATION DE ATM NO ZONE DISSIPATER PAD RIP RAP INLET SHALL BE CNP OUTLET PIPE PROTECTED (AS NEEDED) CROSS SECTION FROM EROSION WITH RIP AP. TARP, MATTING OR EWIVALENT. WBASH SIHOIAD BE CLEANED PUT WREN CMAQTY REACHES M ELEVATRN RCPRESENTUIG THAT THE BASH 6 1- 2) THE 1— USED TO PROTECT MIRE WER SHALL BE THE Wit. SPE— THE U CM of M TAF SHALL BE .— TO AVM(ABLE SUPPLY. F NULEPLE IMPS ARE TO BE USED. THEN IMPS 9MLL BE OKRLAPPED AT U:ABI 13'. THE UPSTREAu 12' TMF SHALL OVERLAP THE DONNSTBEAu TMP. THE TMF SHALL BE 50 NL HEAVY DUTY SAKI TARPAUUNS OR EOVIvu£Ni fat M.V. IKSISTANN(X. 3) PROVIDE A .11— OF THREE PMEUS BAPnES TO EVENY DISTRIBUTE fLOA' AMM THE BASK. REDIIOUO TURBUADME. A) BAfRE uAIERIAL uv5i BE SFWRCD AT D2 BDiTOu AND MOPS USWO STAPLE OR BY 1RENCHND AS FOR A MLT fCNCE S) uDST 0<'HE SEDIMENT WLL AC—LATE R ME FIRST BAY. SO THIS SNWW BE BEADLY AVAILABLE Fat uAUTEIA.- 6) EVION THE XTOR 1) POND SHALL -1 BE CCONVEa— rice S—TE. USE ux�iAPPaTOVEO BVU[xWNaWE� u CNpkIR.1FN d0u mE ICP of STANDARD SKIMMER BASIN rt.AIN YLEW NOTE 1. L - THE LENGTH OF THE RIPRAP APRON. 2. d - 1.5 TRIES THE MAXIMUM STONE DIAMETER BUT NOT LESS MAN 6- (INCHES). _ 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE LSH "STALLED BETWEEN ME RIPRAP AND SOIL FOUNDATION. d L FILTER FABRIC SECTION'A-A• STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL BARREL PIPE LONGER THAN SHOWN, STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES' 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT MIEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ORE–HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY. 3. PROVIDE PAINT MARK ON RISER AT 12' HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. A. INSTALL ALL COMPONENTS OF PWD EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY, ETC. (UNLESS NOTED) PRIOR TO BEDNING CLEARING OPERATIONS FAIRCLEIMSIOMMER OR APPROVED EQUAL DIAMETER: PER PLAN INSTALL PVC TEE HATH SCREW TYPE PLUG ONCE SKIMMER IS REMOVED AND P-0 HID LONGER OPERATES AS A TEMPOfARY SEDIMENT BASIN FLEXIBLE PIPE PRNMRYWATER QUALITY ORIFICE INVERT PVC MAIN DIAMETER: SEE PLAN INSTALL (1RIFKE IN BOTTOM OF PVC TEE H ONCE SKIMMER IS REMOVED AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN Ir DM. CDR. Pus RC RI CUT IN HLF AHD PUCE AGAINST RISER -BACKFILL WITH M57 STONE (Ir DEEP) SKINNER BASIN TIE4 TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1. Schedule a piewnstruchon conference with the EnNronmental Engineer Charles Phillips 919-796-8769. Obtain a land disturbing pernVL 2. Install erosion control measures based on the approved erosion control plan Gear only Be, necessary to instant these devices. Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to riser per detail. Seed temporary diversions, berms and basins immediately alter construction. 3. Call Charles Phillips at 919-7964769 for on site inspection by environmental inspector and obtain a Certificate of Compliance. 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade S. Install storm sever(if shovm) and protect inlets With block and gravel inlet controls, sediment baps or other approved measures as shown on the plan. Begin constructing budding, etc. 6. Stabilize site as areas are brought up to finish grade With Vegetation, paving, ouch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and an areas Bre staNized completely, cab Charles Phillips at 919-7964769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to sto-Water use prior to completing any related Work. If site 6 approved, remove temporary diversions. sin fencing, sediment basins, etc., and seed out or stabi¢e any resultingbare areas. Ant remaining permanent erosion control devices (such as velocity disMpatars) should be installed rbw. Remove skimmers from sediment basins to convert temporary slammer basins into permenant stormwdter control measures. 9. When vegetation has became established. call for final site inspection by Environmental Inspector, Charles Phillips at 919-7964769. Obtain a CerlKcate of Completion. =0 •.0 6SS��M s.� SEAL 031979 �T 02/21/2011 §I?§§ o°u a LD 0 31233 bbbN. O N ry O N Q-�ibl'VV N z 0 N DATE 05/24/16 0 DRAWN BY J. OOOLEY • DESIGNED BY • B. MCLAMB • CHECKED BY 1. CHANDLER • • SOLE PER PLAN O INV) `^ ato Ua W Z 0UJI(' En Z 7 W L U t- 4 J Z 7 JQ _j U (n cl' } OW z J H a C6.1 IIID■■ ■ ■ ■ ■ ■■■■■■.'lull =TI�1- n=r_d-Ti-ii-ii�1-'II=4=ii=Ti='n=Ti='n=4=f"G=n=n=n=n=n fr •sx RAf1 8 L 7F :� b T=f fi=il "L='a' ,IIIA[ B nII1l'11lllal �_Il�ll ��PIB'I NOTE: 1. USE SALT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE 90 I L STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC FILL SLOPE x. A 6- MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE SCREEN ACCESSIBLE THRDUGH DOOR FLEXIBLE (RADIATOR OUTLET END: CONNECTION TO OUTLET PIPE OR RISER lQ.,= ANa P .tr> MP SECTIL HRtsEC TIMTTHRU WE1[EIRVEIR F "IN FREEBOARD OR OF BERN IMFLFpy BAFFLES (STB) MERGENCY STR 7URE m SPILLWAY Y 1` y\ ELEVATION DE ATM NO ZONE DISSIPATER PAD RIP RAP INLET SHALL BE CNP OUTLET PIPE PROTECTED (AS NEEDED) CROSS SECTION FROM EROSION WITH RIP AP. TARP, MATTING OR EWIVALENT. WBASH SIHOIAD BE CLEANED PUT WREN CMAQTY REACHES M ELEVATRN RCPRESENTUIG THAT THE BASH 6 1- 2) THE 1— USED TO PROTECT MIRE WER SHALL BE THE Wit. SPE— THE U CM of M TAF SHALL BE .— TO AVM(ABLE SUPPLY. F NULEPLE IMPS ARE TO BE USED. THEN IMPS 9MLL BE OKRLAPPED AT U:ABI 13'. THE UPSTREAu 12' TMF SHALL OVERLAP THE DONNSTBEAu TMP. THE TMF SHALL BE 50 NL HEAVY DUTY SAKI TARPAUUNS OR EOVIvu£Ni fat M.V. IKSISTANN(X. 3) PROVIDE A .11— OF THREE PMEUS BAPnES TO EVENY DISTRIBUTE fLOA' AMM THE BASK. REDIIOUO TURBUADME. A) BAfRE uAIERIAL uv5i BE SFWRCD AT D2 BDiTOu AND MOPS USWO STAPLE OR BY 1RENCHND AS FOR A MLT fCNCE S) uDST 0<'HE SEDIMENT WLL AC—LATE R ME FIRST BAY. SO THIS SNWW BE BEADLY AVAILABLE Fat uAUTEIA.- 6) EVION THE XTOR 1) POND SHALL -1 BE CCONVEa— rice S—TE. USE ux�iAPPaTOVEO BVU[xWNaWE� u CNpkIR.1FN d0u mE ICP of STANDARD SKIMMER BASIN rt.AIN YLEW NOTE 1. L - THE LENGTH OF THE RIPRAP APRON. 2. d - 1.5 TRIES THE MAXIMUM STONE DIAMETER BUT NOT LESS MAN 6- (INCHES). _ 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE LSH "STALLED BETWEEN ME RIPRAP AND SOIL FOUNDATION. d L FILTER FABRIC SECTION'A-A• STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL BARREL PIPE LONGER THAN SHOWN, STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES' 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT MIEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ORE–HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY. 3. PROVIDE PAINT MARK ON RISER AT 12' HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. A. INSTALL ALL COMPONENTS OF PWD EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY, ETC. (UNLESS NOTED) PRIOR TO BEDNING CLEARING OPERATIONS FAIRCLEIMSIOMMER OR APPROVED EQUAL DIAMETER: PER PLAN INSTALL PVC TEE HATH SCREW TYPE PLUG ONCE SKIMMER IS REMOVED AND P-0 HID LONGER OPERATES AS A TEMPOfARY SEDIMENT BASIN FLEXIBLE PIPE PRNMRYWATER QUALITY ORIFICE INVERT PVC MAIN DIAMETER: SEE PLAN INSTALL (1RIFKE IN BOTTOM OF PVC TEE H ONCE SKIMMER IS REMOVED AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN Ir DM. CDR. Pus RC RI CUT IN HLF AHD PUCE AGAINST RISER -BACKFILL WITH M57 STONE (Ir DEEP) SKINNER BASIN TIE4 TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1. Schedule a piewnstruchon conference with the EnNronmental Engineer Charles Phillips 919-796-8769. Obtain a land disturbing pernVL 2. Install erosion control measures based on the approved erosion control plan Gear only Be, necessary to instant these devices. Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to riser per detail. Seed temporary diversions, berms and basins immediately alter construction. 3. Call Charles Phillips at 919-7964769 for on site inspection by environmental inspector and obtain a Certificate of Compliance. 4. Begin clearing and grubbing. Maintain devices as needed. Rough grade S. Install storm sever(if shovm) and protect inlets With block and gravel inlet controls, sediment baps or other approved measures as shown on the plan. Begin constructing budding, etc. 6. Stabilize site as areas are brought up to finish grade With Vegetation, paving, ouch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and an areas Bre staNized completely, cab Charles Phillips at 919-7964769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to sto-Water use prior to completing any related Work. If site 6 approved, remove temporary diversions. sin fencing, sediment basins, etc., and seed out or stabi¢e any resultingbare areas. Ant remaining permanent erosion control devices (such as velocity disMpatars) should be installed rbw. Remove skimmers from sediment basins to convert temporary slammer basins into permenant stormwdter control measures. 9. When vegetation has became established. call for final site inspection by Environmental Inspector, Charles Phillips at 919-7964769. Obtain a CerlKcate of Completion. =0 •.0 6SS��M s.� SEAL 031979 �T 02/21/2011 §I?§§ o°u a LD 0 31233 bbbN. O N ry O N Q-�ibl'VV N z 0 N DATE 05/24/16 0 DRAWN BY J. OOOLEY • DESIGNED BY • B. MCLAMB • CHECKED BY 1. CHANDLER • • SOLE PER PLAN O INV) `^ ato Ua W Z 0UJI(' En Z 7 W L U t- 4 J Z 7 JQ _j U (n cl' } OW z J H a C6.1 . °qVL sCARp�'4, 13 JR ESS/OHS 9•' lF. - - - - -:� SEAL - 053374 - CHANNEL CHANNEL INSTALLATION (3 c�j SEEDING SCHEDULE (REVISED. I -1 -BEI SHOULDERS, SIDE DITCHES, SLOPES (MAX 3:1) 09 FEE C; •'�•D L �c����rrR�.• A 1. L - ME LEMON OF THE RWRAP APRON. e - 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT AIVIEWLESS MAN 6' (NCHES). 3. INA WELL-DEFINED CHANNEL EXTEND ME APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" (INCHES) ABOVE ME MAXIMUM TAILWATER DEPTH OR TO ME TOP OF ME BANK WIUCHEVER IS LESS. ' I 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE__ INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. �i PIPE / It \ 1 Y (1S cm) O ,' AMERICAN '�� % ,S-� / (1OI•••0R GREEN - /--L->_'= EROSION CONTROL Products - - 4- --= - 1 / I 1 (TO CHID Cuaronteed SOLUTIONS _ __ - = -- - - - -- / I1 O 14649 HIGHWAY 41 NORTH '- -- - -- - --- _ _ - -=- -_= -� - ) 2'-s" EVANSVILLE, IN x7725 - ---- _ __ ___ _ _ _-- .I - 5 M - 723 M) 800.772-2040 _ _ - _ _ _ _ _ __ _ _ - -- -- a reeacom -- - - ---- 9 -- - - '-- __ __ - _- _ - - _ I (IOM - 1 M)'"'.'.'" - - - -" DATE TYPE PIµ1NG RATE _ LOS/ACRE MD, AM 15 -YAR 1 TALL FESCUE 300 IBS/ACRE l ABRUZZI RYE 35 185/ACRE YAR 1 -ANI IS TALL RSCF JOD LBS/ACREAPR 15 - AN W R41ED COMMON BERWDAGRASS 25 IBS/AWE(18TH) AA I -MIG 15 TAIL FESCUE AND 120 LBS/ACRENORTH ^•BROW"C" MUET M IBS/ACRE SUD•'N HiBgOS JO IBS/AtltE SLOPES (}:1 TO 2:1) MAR I - JUN 1 SEMA LESPEDEZA (SCARFED) 50 LBS/ACRE N (YAR 1 -APR 15) ADD TALL FESCUE 130185/ACRE YAR 1 - JAN 3D OR ADD WEE LOLEGRASS 10 LBS ACRE (yAB 1 _JUN b) OR A00 IAn1E0 COM10N BEIRMNAGRA55 25185/SLOE AN 1 -SEP i ^'TALL FESCUE AND 120185 ACRE •••BROMIiOP MILLET 35LBS/ACRE •^OR SDR ­SWAN HYBRIDS OS 0185 CRE INSALEPM6CARFFD i LBB ACRE SEP 1 - MAX 1 AND T 1L FESCUE AND IML FESCUE 120185 ACRE (MOV 1 - YAR 1) ADD ABRUZZI RYE 25 LBS/ACRE ✓wA4.�1 w•4� 02/21/2017 c V p'V m c z aaX - I- z� -19 O U U O UI y Z ¢ OT - W F A, 2 � 1 2 IU It E2. U U1 Q tiF 2 Q W i 2 W O °N � VI 2 W ;(i� I-, U I0 W H 2 W F 2 O Ik O i O w u - FILTER SECT(ON'A-A' FABRIC O O CONSULT CONSERVATION ENGINEER OR SOL CONSERVATION SERWCE FOR ADDITIMM INFORMATION CONCERNING OMER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. ME ABOVE VEGETATION RATES 1. PREPARE SOL BEFORE INSTALLING ROLLED EROSION CDNIRO PRODUCTS (RECP's), INCLUDING AVIV NECESSARY MPLFERTILIZER.ANDTN OF LIME. FERTZER, D SEED. ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHERSEEDING RATE COMBINATIONS ARE POSSIBLE. NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT ME TOP OF THE CHANNEL BY ANCHORING THE RECP's IN A 6' (15 CM) DEEP % 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" b CM) OF RECP's ••TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR S DEARED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY E%TENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP s WITH A ROW OF SIAPLES/STAKES APPROXIMATELY 12" (30 CN APART IN THE BOTTOM OF THE FRENCH. BACKFRL AND CONAPCT THE TRENCH AFTER STAPUNG. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12 (30 CM) PORTION DF COVER TO GROW OVER 12' IN XEIMT BEFORE MOWING. OMERIMSE ACRfM BACK OVER SEED AND CP',. O SOL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW ON STAPLES/STAKES SPACED APPROXIMATELY 12" (b CM) FESCUE MAY BE SHADED OUT. ACROSS THE WIDTH OF THE RECP's. 3. ROLL CENTER RECP's IN DRECHON OF WATER FLOW IN BOTTOM OF CHANNEL. / RECP's WILL UNROLL WIN APPROPRIATE SIDE AGAINST ME SOIL SURFACE RECP'O HOULD BE PLACEDSTAPLETHROUCH TEACH OF THAKES IN E APPROPRIATE DOTSOCORRESPMDNGS AS SHOWN NTO THE ME APE WHEN BMUST BE SECURELY USING ME DOT SYSTEMA'TENED TO STAPLES/STAKES IL SURFACE ENSTAPLE PATTERN. SEEDBED PREPARATION U W 3 b O N Q � O V IISEU VI W 3 b . o o N N N'• n U W 3 N O N ry 0 EFFECTIVE: 01/31/0 STANDARD PIPE OUTLET TO WELL-DEFINED CHANNEL UPSTREAM END OF STORM DRAIN ERGLOV DATE 05/24/16 T 1/3 PIPE DIAMETER 11 p •'p: 4. PLACE CONSECUTNW E RECP's END OVER END (SHINGLE STYLE) WIN A 4' - 6' (10 CM -15 CM) OVER. USE A DOUBLE RDW OF STAPLES STAGGERED 4' (10 CM) APART AND 4' (10 CM) ON CENTER TO SECURE RECP's. DEEP X 6" (15 CN) WIDE TRENCH. BACKFILL AND COMPACT ME TRENCH AFTER STAPLING. 5. ML LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (b CM) MART N A 6' (IS CM) AOYGEM RECP's MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 GM -11.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED. 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. W AVAILA&E, Z.) RIP ME ENTIRE AREA TO 6 INCHES DEPTH. In > eR O DRAWN BY • • • IN,6. - - - 7_- T�,� OF �• �- I --------- 3/4'E%IERIOR 7. IN MGH FLOW CHARNEL APPLICATIONS. A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES 3.) REMOVE ALL LOSE ROCK. ROOTS. AND OTHER OBSTRUCTIONS STAGGERED 4- (10 CM) APART AND 1" (10 CM) ON CENTER OVER ENTIRE WHOM OF THE CHANNEL. LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. SUPERPHOSPHATE 8. THE TERMINAL END OF THE RECP's MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6' (15 CM) DEEP % 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 4.) APPLY AGRICULTURAL LIME, FERTILIZER, AND UNIFORMLY AND NOTE: MIX WIN BOL (SEE BELOW). • IN LOOSE SOL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6- (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's. 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM INCHES J. DOOLEY DESIGNED By B. MCIAMH CHECKED BY APARTIALLY COMPLETED STORM DRAMS PLYWOOD SBE PROTECTED AT THE END OF EDAY IN ACCORDANCE ON THESE PLYWOOD INLET PROTECTION ��D[2TNLS, STEEL FENCE POST (APICAL) UPSTREAM END OF OVERFLOW STORM DRAIN A NOTE' J CRITICAL POINTS • HgR12ONTN. STAPLE SPACING SHOULD BE MTERED / B IF NECESSARY TO ALLOW STAPLES TO SECURE ME C A OVERUPS MID SEAMS ON CRITICAL POINTS ALG THE CHANNEL SURFACE B. PROTECTED WATER UNE C. CHANNEL BOTTOM/SIDE •• IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6' (15 ) MAY BE NECESSARY TO PROPERLY ANCHOR 751E REG A. DEEP. REASONABLY UNIFMM SEEDBED IS PREPARED 4 TO 6 SE SEED SE A FRESHLY PREPARED SEEDBED AND COVER AFTER SEEDING. SEED 18i1RY MIM SEEDING EQUIPMENT OR CVLTIPACK 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. B.) INSPECT ALL SEEDED MEAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN ME PUNTING SEASON. IF POSSIBLE. F STAND SHOULD BE OVER 605 DAMAGED, REESTABLISH FOLLOWING • • J. GYANOLER SDµE PER PUNA T 1/3 PIPE ORIGINAL ONE. FERTILIZER AND SEEDING RATES. . . 11 DIAMETER _ _ - - ► _ •'p: o• °'• • '• WASHED STONE FILTER ACROSS PIPE INLET 9.) CONSULT CONMERSATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION WIER PERMANENT COVER IS ESTABLISHED. •APPLY. AGRICULTURAL LIMESTONE - 1 TMS/ ACRES (3 TMS/ACRE IN CLAY SOILS) FERTILIZER - 1,000 IDs. / ACRE -10-10-10 am r y f y II ylkyl qlt 1i71I�lE i (� �) (� (� 1 HAROWNtE CLAN I I f u _ SUPERPHOSPHATE- 500 M. / ACRE -201f ANALYSIS MULCH -2 TONS / AGREE E - SMALL GRASTRAW ANOMER - ASPHALT EMULSION O 300 GALS./ ACRE M EFFECTIVE: 01/3 I/O U U U STONE FILTER INLET PROTECTION STANDARD PIPE INLET PROTECTION (PLYWOOD & STONE) 0r.4 i( w Q 7 U) J HH F - II.I '• I NOKS- 1. TEMP MY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND/OR OVERT TO A SEMMENT CONTROL MEASURE M BMP. 2. SILT SHALL BE REMOVED WHEN DITCH IS ME -HALF FULL. OITCN SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT ON COVERED BY FILL STABBI2E DIVERSION DITCH BERM WITH TEMPORARY SEEDING. MULCH NIM TAC, ARD/OR EROSION CONTROL NETTING- "1". WASTE MATERIAL-COMPACT1 SEED BMULCH AFTER VARCONSTRUCTION OF DIH I I' -II'�I (1 37 4I( eI LII � - II 2'7 ,.-r -/0' '1 : (I ..- - I2I'-�I I .. �I it 1 IE, ii;;.; ;• -•:,: ~nI 44 0'VM I 1 - 12' CROSS SECTIONAL VIEW _- - _ NOTES I. BAFFLE MATERIAL SHOULD BE SEMILED AT THE BOTTON.AND SIDES -_- - -- USING STAPIF4OR BY TRENCIUNG AS FO0.41Li FENCE. - i TATHTo THE SEOB@NT WELL ACCVMVLATE IN THE IST BAY, WHICH 318)LILD BE HEADILY.\t'ESS®L¢FOR MVNIENAIX'E0 __ 3.PILOVWE3BAFFl.F.S NSE TW/O R LESS THAN A FEET M LENGTH). MO%MEII_ 5 BAFFLESFOXDRAINAGEAREASGILEATERTiIANM .ACRESBAFFLE aH.U1BETe0OAOWpEROS10NBLANKET. TOPS OF BAFFLES SHDUID BE 20A'HNS LOWER MkN ME TOP OF THE EERMS hV SUPPORT RDPSUPPORT POST�08 TOM TO 11 INROBo7Frwero e.oealDE SUPYOIiWIE FENCE AND FABRIC BURIED IN eIEFIYOWf I9`w TRENCH . I COIR NFHE OR SM IUP- STA'..D OR SACKFRIED AND I 'TREACFIED ONTO BOTI'OAI O0. SBOE CO\RAMD I SECTION VEEW AT OPENING 0 DIAMETER OF PIPE R t1 YMICHERR IS GREATER FLTER FABRIC CAPACITY a PIPE CULVERTS TOGEMER . BINK FULL FLOW A COARSE AGGREGATE EARN AN COVERED BY 6' DEEP LARGE ANGULAR ROCK -III-III _3. -T- Tw --' = ELEVATION3 EARN FILE CARRED BY EARANGULAR ROD( COHSE AGGREGATE O 0oHOp 00o O o oo o.. 0pREVBxrsao0w0 0 O loo o O O oppooae poOep er..e eoq oV p•Voo 333} 1 ... o�e-C°Q .0oO e�o• • a0° 0pO D O o oO• °9Op °0e°OPe0OOep0. o'o.0, - n .-.. �..+....- 25' :,' Tg 25' H1EAM iH'W. ,"MINIMUM TOPOF BANK -. :_.,t.�:.'� •,.1, TOP CITIBANK ELANAN Q Z ILL! (� Zr W J Z_ U Z O Z F 0 L I rZ Z{. V5. 4z 3 O0 HH0U O Lu J U0 •.. C, Lu O of z ZPLAN O LL�°oO STANDARD TEMPORARY STREAM CROSSING I STANDARD TEMPORARY DIVERSION DITCH STANDARD BAFFLES DETAIL - EFFECTIVE: OIAI EFFF.CL(vE: UI/31/OB EFFECTIVE: OI/31/0 r37338ik F RI PkXeE on 2/21/1017 1 2:51 PM I by Bacon MclamE L4 m f g O z A rt rt y S "'I 9 p R Io s � a $ 4 0 z � F � d a 1 R 1 P 4 ! t 0 3 i off n$ Y1� � N 12 a. ° ....._ '"� ii 4V i u, 4192 OmLA 0 17) °s• Z 0 5 1 ••• THIS DRAWING PREPARED AT TNN RALEIGH OFFICE •,YOR VISION ACHIEVED THROUH ORS. SalO Trinity Road, Ste 102 I Raleigh, NC 27607TIMMONS GROUP TEL e o 919.866.9951 FAX 919.833.8129 www,h— ns.com ,•';j •• •' RkR; �,`e, NORTH CAROLINA LICENSE NO. C-1652 tea �v nem' DATE REVISION DESCRIPTION BAILEY'S LANDING PHASE 4 OB/11 2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS Dy V S"1 n O F \ I1-15-2016 REVISED TOTAL SITE AREA W $ w CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA S m o 12-z2-2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS GENERAL NOTES &DETAILS z n m m °` 02-21-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS TM1es1 pens end euocotaE tlocumenb ere IM1e enclutiva prop•M of TIMMONS GROW entl may rot Oe regoPucaC In wM1o11 or In pen eM fM1all nel be ue<p for eny pur Omaea to cemWclbn, M1laaMp. endor eonaVuctlon alakinq wpM1oul M1 eegeaf wralan cement & T—NS GROUP. L 100 YR EL 405.43 10 YR EL 404.27 ANTI -VORTEX TRASH RACK BY PLASTIC 1 YR EL 403.56 SOLUTIONS OR EQUAL SEDIMENT DEPTH INDICATOR ELEVATION EL 403.0 INSTALLAN I DRAIN IMPERMEABLE UNER `,OUTLET OF COMPACTED SOIL RISER WITH PLAS AS POND BASE SO SOLUTIONS TRA THAT LINER WILL NOT RACK (OR EQU RAISE OR LOWER OVER ORIFICE. TRA GROUNDWATER RACK TO EXPAND BASE DIMENSIONS RISER (IN.) THE TOP OF RIS DETENTION 15.23 6.81 4.68 10,834 14,727 .. - ... B'x8'x2' THICK 1.0 402.0 POND 404.0 401.0 402.0 15- RCP 50 401.0 399.5 4'X4' RCP POND )11 00 � ZZ(n`s _ EMERGENCY. W Z z 3 Z ' SPILJ_M/AV r u Q IL e $ U � � E )- _� O ELLZ s p O Z W HJU u� 9� , Fe ]OB NO, 4 37338■ SNEET NO.8 C6.4 .. / RISER i /• I1 ', I'I I DRY bETENTION 1 If OUTLET PONONI i ROTECTION -- OUTLET/ ' _. { PRO CTION:' @1 71E E I/ ------------ f. "7 L 100 YR EL 405.43 10 YR EL 404.27 ANTI -VORTEX TRASH RACK BY PLASTIC 1 YR EL 403.56 SOLUTIONS OR EQUAL SEDIMENT DEPTH INDICATOR ELEVATION EL 403.0 INSTALLAN I DRAIN IMPERMEABLE UNER DRILL ORIFICE IN OF COMPACTED SOIL RISER WITH PLAS AS POND BASE SO SOLUTIONS TRA THAT LINER WILL NOT RACK (OR EQU RAISE OR LOWER OVER ORIFICE. TRA GROUNDWATER RACK TO EXPAND BASE DIMENSIONS RISER (IN.) THE TOP OF RIS RIFICE CONCRETE RISER NO SCALE TOP OF DAM �-^- 5- --I EL 406.0 D TH ELEVATION I _ _ _ _ -EL 405.0 W 'AV ELEVATION _ ATE TRANCE (CREST) OF SPILLWAY EMERGENCY SPILLWAY DETAIL NO SCALE //\ CREST OF RISER r/NOTE: INSTALL RUBBER GASKETS ON ALL PIPE JOINTS CENTERUNE \ FOR WATERPROOFING \/ CONCRETE RISER OFDAM ENO SECTION BARREL RIPRAP OUTFALL PROTECTION BARREL INV. IN ELEVATION I 5'%5'X4 CONCRETE ANTI -SEEP COLLAR LOCATED BARREL INV. OUT ELEVATION -CONCRETE ANTI -FLOTATION SLIGHTLY DOWNSTREAM BLOCK Q BASE ELEVATION FROM CENTERUNE OF DAM SEE TABLE FOR DIMENSIONS (MINIMUM 2' FROM PIPE JOINT) BMP DRAIN 1 YR PEAK 1 YR PEAK POST -DEV REQUIRED BASIN BASIN VOLUME EMERGENCY SPILLWAY ANTI -FLOTATION ORIFICE INTO ORIFICE NUMBER RE(ACRES) PRE-DEV fLOW(CFS) FLOW(CFS) VOLUME (CF) PRONDED (CF) LENGTH (FT) BASE DIMENSIONS RISER (IN.) ELEVATION DETENTION 15.23 6.81 4.68 10,834 14,727 35 B'x8'x2' THICK 1.0 402.0 POND 11 404.0 401.0 402.0 15- RCP 50 401.0 399.5 gMP 70P OF BERM EMERGENCY SPILLWAY CREST OF RISER TOP OF RISER BOTTOM OF BASIN BARREL BARREL BARREL INVERT IN BARREL INVERT OUT RISER NUMBER ELEV. ELEV. ELEV. FOOTING ELEV. ELEV. DIAMETER (IN.) LENGTH (FT.) ELEV. ELEV. 1 4.30 DETENTION 406.0 405.0 404.0 401.0 402.0 15- RCP 50 401.0 399.5 4'X4' RCP POND )11 � ZZ(n`s _ H w W BMP SIDES AND WEIR SHALL RAVE MAXIMUM SLOPES OF 3'1 UH FLAT 1tR U1MtNSiUINS SHUVVN not nl watt tLtvr,l lury yr ehalry BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY 100 YR EL 413.34 7 10 YR EL 413_17 _- 1 YR EL 413.00 TOP OF DAM ELEVATION EMERGENCY SPILLWAY ELEVATION ANTI -VORTEX TRASH RACK BY PLASTIC SOLUTIONS OR EQUAL SEDIMENT DEPTH INDICATOR ELEVATION EL 412.0 INSTALL AN / I DRAIN IMPERMEABLE LINER DRILL ORIFICE INTO OF COMPACTED SOIL RISER WITH PLASTIC AS POND BASE SO SOLUTIONS TRASH THAT LINER WILL NOT RACK (OR EQUAL) RAISE OR LOWER OVER ORIFICE TRASH GROUNDWATER RACK TO EXPAND TO VOLUME (CF) THE TOP OF RISER. RIFICE CONCRETE RISER NO SCALE 1-- I 5 I EL 415.0 ' DEPTH \ \\ __-_--_ �.--W-.� 414.0 7' ATENTRANCE \ _ (CREST) OF SPILLWAY EMERGENCY SPILLWAY DETAIL NO SCALE CREST IO RISER // NOTE: INSTALL RUBBER GASKETS ON ALL PIPE JOINTS ELEVATION CENTERUNE \ FOR WATERPROOFING CONCRETE RISER I OF OAM\�\/� BARREL BARREL INV. IN ELEVATION CONCRETE ANTI -FLOTATION BLOCK @ BASE ELEVATION SEE TABLE FOR DIMENSIONS ANTI -SEEP COLLAR LOCATED SLIGHTLY DOWNSTREAM FROM CENTERLINE OF DAM (MINIMUM 2' FROM PIPE JOINT) OMP I DRAIN I 1 YR PEAK 1 YR PEAK POST -DEV REQUIRED BASIN BASIN VOLUME EMERGENCY SPILLWAY ANTI -FLOTATION ORIFICE INTO ORIFICE NUMBER REA(ACRES) PRE -DEV FLOW(CFS) FLOW(CFS) VOLUME (CF) PROMDED (CF) LENGTH (FT) BASE DIMENSIONS RISER (IN.) ELEVATION DETENTION 1 4.30 1.61 0.79 2,839 4,466 20BxB'x2' THICK 1.0 411.0 POND /2 x En �W /� Z V � ZZ(n`s SECTION RIPRAP OUTFALL PROTECTION BMI, I TOP OF BERM EMERGENCY SPILLWAY CREST OF RISER TOP OF RISER BOTTOM OF BASIN BARREL BARREL BARREL INVERT IN BARREL INVERT OUT RISER NUMBER ELEV. ELEV. ELEV. FOOTING ELEV. ELEV. DIAMETER (IN.) LENGTH (FT.) ELEV. ELEV. DETENTION 415.0 414.0 413.0 410.0 411.0 15' RCP 50 410.0 409.5 4'X4' RCP POND 12 x En �W /� Z V � ZZ(n`s BMP SIDES AND WEIR SHALL HAVE MAXIMUM SLOPES OF 3:1 OR FLITTER DIMENSIONS SHOWN ARE AT WEIR ELEVATION QF I -IN BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY z�'ot 6GSTdT•'9^� :R sea 0313"/4 9 fYc .�C'' 04 1 02121/2D17 E o VWUO W OI Y '0 3rc33 � orvory DATE 05/24/16 0 DRAWN 4Y 7. DOOLEY . DESIGNED BY • B. MCLAMB • CHECKED BY 7. CHANDLER • suLE • PER MAN • E V ; N lA O rW ^ V / ¢ z S ULL cedZ Z = 1 t2 W x En �W /� Z V � ZZ(n`s _ H w W Z z 3 Z �J=J u Q IL e $ U � � E )- _� O ELLZ s p O Z W HJU u� 9� p Fe ]OB NO, 4 37338■ SNEET NO.8 C6.4 ,r I BAILEY'S LANDING - PHASE 4 CONSTRUCTION DOCUMENTS I I LOT—BY—LOT SUBDIVISION 2318 BAILEY MANOR DRIVE RALEIGH, NORTH CAROLINA �= a SITlt VICINITY MAP 1" = 1000' RELIANT PARTNERS, LLC OWNER/DEVELOPER 3700 NATIONAL DRIVE, SUITE 211 RALEIGH, NC 27612 ZONED: R -40W PIN # 0782-16-3357,0782-15-5093, 0782-15-2470, 0782-16-7214 PART, 0782-16-0795 PART TOTAL ACRES (PHASE 4):22.42 NUMBER OF LOTS: 13 AVERAGE LOT SIZE: 57,546 SF COVER CVR EXISTING CONDITIONS C1.0 SITE PLAN C2.0 GRADING AND DRAINAGE PLAN C3.0 EROSION CONTROL PLAN C4.0 ROAD A - PLAN & PROFILE C5.0 ROAD A/B - PLAN & PROFILE C5.1 EROSION CONTROL NOTES & DETAILS C6.1 EROSION CONTROL NOTES & DETAILS C6.2 GENERAL SITE NOTES & DETAILS C6.3 GENERAL SITE NOTES & DETAILS C6.4 CAR %a SEAL !S e } 03A3'lA j m :.L'ti'4.nW r ?Ce 02/21/2017 u E v; wZ'a F fF woos W ~ W W W N o O Q O W ID 0 3¢33' S Q tinN•' N Ni u DAr 05/24/]6 0 DRAWN BY J. DOOLEY • DESIGNED BY • B. MCLAMB • CNECIO:D BY J. CHANDLER • • SCALE • PER PLAN • • a g ouJ ' L( V / Q Q 2 U _` 0 LL U $ C ma' uJLu o W z zZ= Lu 4 UJH V>) Jo QQV zQ W gPEqE Q U p 0Jw Z gDU U-) < P? a o D OLu V J �� Q �€ m a� Yg LG JOB NO. 37338 1 � snEEr no. a 2 CVR / / / / / / BU s 200'WA?fR SUPPLY S' ATED BUFFER /l / (100' FROM BANK) _ FEMA 100 YEAR FLOOD PLAIN LIMIT NEUSE RIVER RIPARIAN BUFFER � (50' FROM BANK) 200' WATER SUPPLY � .WATERSHED BUFFER (100' FROM BANK) 100' NEUSE RIVER RIPARIAN BUFFER (50'FROM BANK) 'JO�P` r ✓ ` 30' WATER SUPPLY - 50 WATER SUPPLY WATERSHED BUFFER WATERSHED BUFFER (30' FROM BANK) (SD' FROM BANK) - ♦ 1 / / - '' '-MA 100 YEAR 1 { i FLOOD PLAIN LIMIT REMOVE GUARD RAIL AT PROPOSED ENTRANCE. j (\ REPLACE CURB INLET WITH MANHOLE COVER. REMOVE (2)3(r RCPS / AND EX. MANHOLE J\ EX. 24' RCP - 100' NEUSE RIVER RIPARIAN BUFFER �- 30' WATER SUPPLY WATERSHED BUFFER (30' FROM BANK) LEGEND 10000 SF =MAXIMUM IMPERVIOUS ALLOWED WETLAND AREA HATCH AREA DENOTES FLOOD HAZARD SOIL ADJUSTED WITH TOPO NEUSE BUFFER (ZONE 1) £B OVN FEMA 100 YEAR FLOOD PLAIN LIMITS (1. 100' NEUSE RIVER RIPARIAN BUFFER SCALE 1=100' 0 100' 200' AR C ARefeoopn ."".6 �� c ,� �of`,��ES• �4�96N a SEAL �• 0313:1 .2/21/2017 E u.9 a4'—m i FFI wogs+ 0 ax ow U U U �� 3p4N wW WW 0 Q t t 0 2iWFF C y�CK Q O UW VU 3'�z'33 o b e e n w N N H N HN N DATE � 05/24/16 0 DBAwH BY J. DOOLEY • DESIGNED BY • B. MCLAMB • CHECKED BY J. CHANDLER • SCALE PER P AN C D y. V LLJ O fV V l Lli < Q � z i OJ Us wo a<z T o U, (Dz- n > C € W zzz (' �o0 J Q U Q Z Y Ur z 3 z^ O Of J ' Ln E; B U (n a X $i 1 Lu 0 D w �7 aE V D# O _j i <�.y-� F8 W o� ;F — tlg s� Deno # fr 37338 SHEET N0.1 2 CI.0 g WATER SUPPLY WATERSHED BUFFER CROSSING DRIVEWAY CROSSING THAT ACCESS SINGLE -GAMILY DWELLINGS PROVIDED' D THE USE OF SINGLE DRIVEWAYS FOR MULTIPLE LOTS MAY BE NECESSARY. 1. NO ALTERNATIVE TO THEIR LOCATION IN THE BUFFER (INCLUDING OPPORTUNITY FOR SHARED DRIVEWAYS) EXISTS. 2. BUFFER DISTURBANCE IS NO MORE THAN 60 FEET WIDE (1); 3. BUFFER DISTURBANCE IS NO MORE THAN 6,000 SQUARE FEET IN AREA. 4. THE DRIVEWAY CROSSES THE BUFFER AT AN ANGLE AS CLOSE TO 90 DEGREES AS POSSIBLE (AND NOT LESS THAN 60 DEGREES). 5. SIDE SLOPES DO NOT EXCEED A 2:1 (HORIZONTAL 70 VERTICAL) RATIO (BRIDGING AND/OR RETAINING WALLS MAY BE USED TO MEET THIS AND THE DISTURBANCE WIDTH STANDARD). 6. ALL CULVERTS ARE DESIGNED AND CONSTRUCTED FOR THE 25 -YEAR STORM EVENT OR AS OTHERWISE REQUIRED BY WAKE COUNTY ENVIRONMENTAL SERVICES. ROAD CROSSING (PUBLIC OR PRIVATE ROADS), PROVIDED: 1. NO ALTERNATIVE TO THEIR LOCATION IN THE BUFFER EXISTS. 2BUFFER DISTURBANCE DOES NOT EXTEND BEYOND THE REQUIRED RIGHT -OF -WAV OR EASEMENT WIDTH, OR IN NO CASE IS MORE THAN 90 FEET WIDE. 3. BUFFER DISTURBANCE IS NO MORE THAN 9,000 SQUARE FEET IN AREA. 4. THE ROAD CROSSES THE BUFFER AT AN ANGLE AS CLOSE TO 90 DEGREES AS POSSIBLE (AND NOT LESS THAN 60 DEGREES). 5. SIDE SLOPES DO NOT EXCEED A 2:1 HORIZONTAL TO VERTICAL RATIO (BRIDGING AND/OR RETAINING WALLS MAY BE USED TO MEET THIS AN THE DISTURBANCE WIDTH STANDARD). 6. ALL CULVERTS ARE DESIGNED AND CONSTRUCTED FOR THE 25 -YEAR STORM EVENT OR AS OTHERWISE REQUIRED BY WAKE COUNTY ENVIRONMENTAL SERVICES. _ CL RAN � 1 B C � �ERF � i AB�J Y l I W9 SUPERPAVE ASPHALT SECTION A -A SYMMETRICAL CUL-DE-SAC WITH NO CURB AND GUTTER NTS SITE DATA - SUBDIVISION - INITIAL TRACT SIZE = 23.13 AC (1,007.643 S.F.) - ACREAGE RECOMBINED 70 EASTERN TRACT = 0.93 AC µ0,333 SF) - ACREAGE ADDED TO SITE FROM EASTERN TRACT = 0.19 AC (8,089 SF) - TOTAL TRACT SIZE = 22.39 AC (975,299 S.F.) - TOTAL OPEN SPACE PROVIDED = 3.32 AC (144,736 S.F.) - NUMBER OF LOTS = 13 - AVERAGE LOT SIZE = 1.32 AC (57.546 S.F.) - LINEAR FEET OF STREET - 2,482 L.F. - MAILBOX KIOSK IMPERVIOUS = 0.06 AC (2,614 SF) - IMPERVIOUS IN STREET = 1.25 AC (54.450 S.F.) - IMPERVIOUS IN LOTS = 2.98 AC (130,000 S.F.XMAX. 10,000 S.F./LOT) - MINIMUM LOT SIZE = 0.919 AC (40.010 S.F.) AREA OF STREETS = 2.91 AC (126,945 S.F.) - TOTAL IMPERVIOUS AREA = 4.29 AC (187,064 S.F.) • % IMPERVIOUS = 19.21% - MINIMUM LOT WIDTH = 110' - PIN 1110782-16-3357. 0782-15-5093, 0782-16-2470, 0782-16-7214 PART, 0782-164795 PART -ZONING = R -40W - TOTAL DISTURBED AREA = 6.0 AC. STORMWATER CONTROL AND MANAGEMENT IMPERVIOUS CALCULATIONS NOTE: IMPERVIOUS AREA PER LOT TO BE LIMITED TO 10,000 S.F. THIS LIMITS OF F.E.M.A 100 YEAR FLOOD HAZARD AREA BASED ON AMOUNT TO BE TO STRINGENTLY ENFORCED INTO PERPETUITY. F.E.M.A. COMMUNITY PANEL # 3720078200 J WAKE COUNTY TOOL V2.1 WAS USED FOR ALL STORMWA7ER DATED MAY 2.200& CALCULATIONS. AREA REMOVED FROM / /r SITE AND RECOMBINED / TO EASTERN TRACT / PIN: 0782-16-4686 _ 200' WA?fR SUPPLY / AREA 40,333 SF ' WATIP4SHED BUFFER / (100' FROM BANK) / FEMA 100 YEAR / z FLOOD PLAIN LIMIT -� 100' NEUSE RIVER ..-.. RIPARIAN BUFFER (50' FROM BANK) --,� NOTES: - PRESENT LAND USE IS VACANT, WOODED AND FALLOW. - STREETS WILL HAVE A SO- RAN. - ALL RADII A7 STREET INTERSECTIONS ARE 25'. - ALL STREETS WILL BE PUBLIC AND CONSTRUCTED TO NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS. WATER SYSTEM WILL CONSIST OF INDIVIDUAL WELLS. - SEWER SYSTEM WILL CONSIST OF INDIVIDUAL SEPTIC SYSTEMS. ALL WAKE COUNTY EROSION CONTROL MEASURES WILL BE COMPLIED WITH DURING CONSTRUCTION. -ALL FEDERAL FLOOD HAZARD REGULATIONS WILL BE COMPLIED WITH DURING CONSTRUCTION. - ALL STATE AND LOCAL GOVERNMENT APPROVALS SHALL BE SUBMITTED TO THE SUBDIVISION OFFICE BEFORE FINAL PLAT APPROVAL. - TOPO PERFORMED BY TIMMONS GROUP. - CONTOUR INTERVAL IS 7. - DRAINAGE EASEMENTS SHALL BE PROVIDED FOR ALL AREAS DRAINING 4 ACRES OR 4 LOTS AND SHALL BE SHOWN ON THE CONSTRUCTION DRAWINGS AND ON THE FINAL PLAT, AFTER SUCH AREAS CAN BE DETERMINED AND HAVE BEEN FIELD VERIFIED. - BOUNDARY INFORMATION TAKEN FROM SUVERY DONE BY TIMMONS GROUP. - NO LOT SHALL HAVE DIRECT ACCESS TO TRYON ROAD. THE HOMEOWNERS ASSOCIATION WILL BE RESPONSIBLE FOR MAINTENANCE OF THE OPEN SPACES IN THIS DEVELOPMENT. - PROTECTED TREES TO BE LOCATED AT TIME OF CONSTRUCTION PLANS AND AVOIDED OR REPLACED PER WAKE COUNTY LIDO. - NITROGEN REDUCTION CALCULATIONS WILL BE APPROVED AND BUY DOWN RECEIPT OBTAINED IF NECESSARY PRIOR TO CONSTRUCTION. - OPEN SPACE TO BE DEEDED TO HOMEOWNERS ASSOCIATION. PROPERTY LIES WITHIN THE SWIFT CREEK WATERSHED. - ROADS AND INTERSECTIONS TO COMPLY WITH ALL NCDOT REQUIREMENTS. - APPROVAL AND A TREE SURVEY IS REQUIRED PRIOR TO ANY ACTIVITY AND/OR CONSTRUCTION IN THE TREE AND VEGETATION PROTECTION AREA. pAr - AREA RECOMBINED TO ✓ NOTE i SITE AND REMOVED RECORDED PLAT BM 2014 - 1839 FROM EASTERN TRACT / / 20'WSW PIN: 0782-164686 ` _ TO BE VACATED PRIOR TO % / - �UILDIR6 / AREA= 8,1389.11 SF - \ _ CONSTRUCTION PLAN APPROVAL - 20'PERMANENT SETBACK - 200' WATER SUPPLY OPEN SPACE / / % CONST. AND ( u \ WATERSHED BUFFER / - \ (100' FROM BANK) PROPOSED USE: .� / .� / y MAINTENANCE ^' CONSERVATION OF * - / L EASEMENT 4� 100 NEUSE RIVER ` ! ) / �/ - NATURAL AREAS RIPARIAN BUFFER (50'FROM BANK) \ Kv (BB,191 SF) ! \1 �y4,�.4SyES 1 -/ `�. 13 * 4o.10oa /G�;rG �\ A.T68a I j �,�p "'• I.G. Klo IN ✓ O /� i a� usPs EASEMENT 30' WATER SUPPLY - - J� R SIC N a0. 50' WATER SUPPLY DETENTION WATERSHED BUFFER / N7 WATERSHED BUFFER (50' FROM BANK) (30' FROM BANK) t_ PonD:n � : � P R36- T -.`,•fit' ,1- i - / i OPEN SPACE * ` 3 / 11 * 1 1 • y / FEMA 100 YEAR PERMANENT COfIST �" FLOOD PLAIN LIMIT PROPOSED USE: -- `� AND MAINTENALJCE ,-R25' CONSERVATION AS -7 \ �az5a EASEMENT / (58,803 SF) AL 20 WSW MFFE=3942 I 20' WSWS i R30'/ g BUILDING BUILDING � � t- �\ SETBACK ��/ DETEN� O \ POND _ ,ns. 244o,uma �. .. zo' I BUILDING _ I P1 ` Be J �' - V • _ ( SETBACK z 212 10'X 70' SIGHT \ -- 20' WSWS IF I ( O �' m U x-100 YR BACKWATER 25 TRIANGLE 1�s6'� 1 * BUILDING I I o - I I I a'�> BOUNDARY 58.214 n ¢ o EL. 412.76 SETBACK �Ao - o o o x� VEGE7AT ON AND 3 50'PUBL/C' 2 * (N 3 I I O INI I O4B.3ss a yl /. '` 25' TREE VEGETATION AND ' 5 I a."oa I WATERSHED BUFFER PROTECTION ZONE -' 4 4o,oz1 ar 19.013a 4o a9a 41 eTA a I o PROTECTION ZONE Y MFFE .415,41• I ( I I V :' ,�/ _ (30' FROM BANK) 'fl' RUINING 9ETBACKI I / � ' I - --_ ( � I I WATER SUPPLY � I / 100 YR BACKWATER 190' - _ - - IWATERSHED BOUNDARY , EL 418-47 OPEN SPACE � �' _ ,az' PROPOSED USE * Y +4z I GJ 1a2' CONSERVATION OF rci 1 :,_I+ i, PROPOSED SIGN NATURAL AREAS n I ' 25' TREE VEGETATION AND EASEMENT - (16,742 SF) , , 100 YR BACKWATER I Ke PROTECTION ZONE BOUNDARY J EL. 41104 DNIc1, 4111 j 100' NEUSE RIVER RIPARIAN BUFFER 50' WSWS BUFFER 'I - RECOMMENDED ROAD CONNECTION STOP CONDITION MINIMUM BUILDING SETBACKS - FRONT AND CORNER = 30' SIDE = 16 REAR = 30' OWNER' MATT H. KIRKPATRICK, CCIM KIRKPATRICK AND ASSOCIATES, LLC 3700 NATIONAL DRIVE, SUITE 211 RALEIGH. NC 27612 NOTE: 'TRACT IS LOCATED IN THE RURAL - NON CRITICAL AREA OF THE SWIFT CREEK LAND MANAGEMENT PLAN' NOTE: BEFORE ACQUIRING A BUILDING PERMIT FOR LOTS MARKED WITH AN', THE BUILDER MAY NEED TO OBTAIN A FLOOD HAZARD AREA USE PERMIT FROM WAKE COUNTY ENVIRONMENTAL SERVICES. THE BUILDER'S ENGINEER, ARCHITECT AND/OR SURVEYOR (AS APPROPRIATE) MUST CERTIFY THAT ALL FLOOD HAZARD REQUIREMENTS ARE MET. THERE SHALL BE NO FILING OR THE ERECTION OF PERMANENT STRUCTURES IN THE AREAS OF WAKE COUNTY FLOOD HAZARD SOILS OR FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) 100 YEAR FLOOD ZONES UNTIL A FLOOD STUDY IS APPROVED BY WAKE COUNTY AND/OR F.E.M.A. LEGEND 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED WETLAND AREA HATCH AREA DENOTES FLOOD HAZARD SOIL ADJUSTED WITH TOPO j NEUSE BUFFER (ZONE 1) - - FEMA 100 YEAR FLOOD PLAIN LIMITS 100' NEUSE RIVER RIPARIAN BUFFER OPEN SPACE SCALE 1-=100' 0 100' £8 CtN o�k-tx CAleoz r.S�SIp�Sy.. SEAL C: 034374 �1l a,4fi+A� ✓02/21/2017 •• • 0 05124116 DRAWN BY 1. DOOLEY DESIGNED BY B. MCLAMB CHECKED BY 1. CHANDLER SCALE PER PLAN a. W RIGHT OF WAY s D B, 2(Y PAVEMENT S, N 0LU a ta�ta QZ J ~ IMPER FT rsFe SA amg R r 1. PE RFT LL,I 0Z7z / �'I C) } W � 1' .. WCABC.:.;. i 1� x� Q Z arr Q 3 FILL Q x 8g w RESIDENTIAL STREETS U r^ V / < LLJ "F TYPICAL CROSS SECTION > a Es NTS a a O°-�V RECOMMENDED ROAD CONNECTION STOP CONDITION MINIMUM BUILDING SETBACKS - FRONT AND CORNER = 30' SIDE = 16 REAR = 30' OWNER' MATT H. KIRKPATRICK, CCIM KIRKPATRICK AND ASSOCIATES, LLC 3700 NATIONAL DRIVE, SUITE 211 RALEIGH. NC 27612 NOTE: 'TRACT IS LOCATED IN THE RURAL - NON CRITICAL AREA OF THE SWIFT CREEK LAND MANAGEMENT PLAN' NOTE: BEFORE ACQUIRING A BUILDING PERMIT FOR LOTS MARKED WITH AN', THE BUILDER MAY NEED TO OBTAIN A FLOOD HAZARD AREA USE PERMIT FROM WAKE COUNTY ENVIRONMENTAL SERVICES. THE BUILDER'S ENGINEER, ARCHITECT AND/OR SURVEYOR (AS APPROPRIATE) MUST CERTIFY THAT ALL FLOOD HAZARD REQUIREMENTS ARE MET. THERE SHALL BE NO FILING OR THE ERECTION OF PERMANENT STRUCTURES IN THE AREAS OF WAKE COUNTY FLOOD HAZARD SOILS OR FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) 100 YEAR FLOOD ZONES UNTIL A FLOOD STUDY IS APPROVED BY WAKE COUNTY AND/OR F.E.M.A. LEGEND 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED WETLAND AREA HATCH AREA DENOTES FLOOD HAZARD SOIL ADJUSTED WITH TOPO j NEUSE BUFFER (ZONE 1) - - FEMA 100 YEAR FLOOD PLAIN LIMITS 100' NEUSE RIVER RIPARIAN BUFFER OPEN SPACE SCALE 1-=100' 0 100' £8 CtN o�k-tx CAleoz r.S�SIp�Sy.. SEAL C: 034374 �1l a,4fi+A� ✓02/21/2017 •• • 0 05124116 DRAWN BY 1. DOOLEY DESIGNED BY B. MCLAMB CHECKED BY 1. CHANDLER SCALE PER PLAN a. s D N 0LU / QZ J ~ = O amg ° Z mwa I - LL,I 0Z7z / �'I C) } W � W Z z 0 C) > - Q Z Y Z3Z; Q 3 J Q x 8g w J g D U r^ V / < LLJ "F = Z > a Es W a a O°-�V Q� Ns MM W _F qE L ;F De ND x 37338 m� SHEET NO. _ p C2.0 s E STORM DRAINAGE DESIGN DESIGN STORM: STORM DRAINAGE DESIGN Bailees landing 25YEAR 425.88 10.97 Curb inlet Q v J4 SEAL !t 423.80 034379 - ENERGY DISSIPATOR DESIGN DESIGN STORM: ENERGY DISSIPATOR DESIGN 10 YEAR r 02/21/2017 E NLOCATION 426.95 11.38' DISCHARGE FES -1 u E 777' PIPE DESIGN DESIGNED BY MCLAMB Dc1NOn) PIPE SIZEVELOCITY SLOPE (FPS) DISSIPATOR 080 ID INLET TYPE I (In/hr)31.44 C A (AC) C•A O (CIS) SIZE pn.) i^m INV IN INV OUT:010CA 36 inch Concrete Pipe 38 3.97% 445 17x24124" 13"Pipe 63.79 48 2.38% 5.08 18'x36x24" 13" 5.52 78 1.88% 3.12 Bkt6k18" 6`Pipe W VI 30 4.78% 3.96 17x24k24" 13"Pipe 8 w/Headwall Headwall 040 4.01 3977 15.91 6379 4800 8100 4091X) 407001944 z 18 8.50% 2.68 8)KI&OI"6'Pi C w/FES Flared 040 4.01 344 1.38 552 18.00 80.00 41250 411 00C74 #1 8.90 15 4.00% 7.25 6"(rxl8" 6- PipeD wIFES Flared 0.40 4.01 12.12 4.85 1944 30.00 136.00 40850 402.00al Detention POIM #2 3.80 18 1.00°.b 2.15 8'x10Y 18" 8` WFES Flared 0.45 8.04 1.31 0.59 4.74 18.00 100.00 410.50 402. "FOR PIPE B. USE NCDOT STANDARD DRAWING 838.01 EXISTING CB TO BE CONVERTED TO A TRAFFIC BEARING JUNCTION BOX WITH MANHOLE NCDOT STD DWG 840.34 BOUNDARY . 100 YR BACKWATER EL. 41647 BOUNDARY EL. 413.04 ' S� a e'EF STREAM CROSSING CONSTRUCTION SEOUENCE 1. KEEP CL ARIN AN xCAVAT10N OF THE STREAM BANKS AND BED AND APPROACH T A EE E G D E 0 MINIMUM. :. INSTALL A TEMPORARY ROCK DAMN UPSTREAM AND DOWNSTREAM USING CLASS B RIPRAP (050=13") ON THE FRONT AND #57 STONE ALONG THE BACK TO MAKE THE DAMN IMPERMEABLE 3. HAVE PUMP IN PLACE FOR FLOWING STREAM i0 PUMP WATER FROM UPSTREAM DAMN PASS THE OWN N TREAM DAMN TO DIVERT FLOW FROM STREAM CROSSING DURING CONSTRUCTION p s o 4. DVRING ED. SHALL BE ON NORMAL FLOW THERE WILL BE SEEPAGE AND A SEDIMENT ED ON A STONE BED. SHALL BE USED TO PUMP SEEPAGE TO P SEDIMENT BASIN ONLY IF NEEDED DURING CONSTRUCTION. 5. BEGIN CLEARING AND GRUBBING, MAINTAIN PUMP AROUND AS NEEDED. ROUGH GRADE CROSSING. 6. INSTALL FILTER CLOTH AS NECESSARY. 7. INSTALL PIPE CULVERTS AND BACKFILL PROPERLY. 8. INSTALL PROTECTIVE ROTECTOR PADS AT PIPE OUTLETS NST STALL PROTECT VE GROUND COVERS TO PROVIDE PERMANENT EROSION PROTECTION AND IMPROVE NSUAL DUALITY BUT NOT INTERFERE WITH DRIVER LINE OF SIGHT FROM THE ROADWAY. 10 STABILIZE ALL DISTURBED AREAS BEFORE NG WATER THROUGH STREAM CROSSING, 111 UPON COMPLETION OF CROSSING WITH AREAA STABILIZED, THE UPSTREAM AND DOWNSTREAM DAM MAYBE REMOVED 12. REMOVE PUMP AROUND AND SEDIMENT BAG PUMP IF IN USE 13 PUMP AROUND DETAIL IS LOCATED 019 SHEET C-13. 14. ENSURE THAT PERMANENT MEASURES NEEDED TO CONTROL EROSION FROM ROAD WATER RUNOFF (SUCH AS RIPRAP AND PAVED CHANNELS, PAVED FLUMES. OR RIPRAP OUTLET PROTECTION) MEET ALL CONSTRUCTION REQUIREMENTS FOR THOSE PRACTCES. LEGEND i/ 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED 1 t STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION "VK �ARoa,,6o 425.88 10.97 Curb inlet Q v J4 SEAL !t 423.80 034379 - Curb inlet c My�ia m r 02/21/2017 E EX -CB 426.95 11.38' .. /! FES -1 u E 777' Flared End Section DESIGNED BY MCLAMB 36' • •B. CHECKED BY J. CHANDLER 41 .11 3 • .00 F 25 L • • 0 36" CB -3 - PER PLAN i^m 4.00% 30.00 LF 36 inch Concrete Pipe Pipe F 'M -'(n N U i UU SS 415.16 . 3 Q�'26LL W p� W VI W VI CB -1 - C&2 1 414.96 414.31 1.00% 64.77 LF � �m w iaii W ID LP Or v , z �( Z o I m =l <a v d U - .._..-___._ .�. - .._. - j J J In BOUNDARY . 100 YR BACKWATER EL. 41647 BOUNDARY EL. 413.04 ' S� a e'EF STREAM CROSSING CONSTRUCTION SEOUENCE 1. KEEP CL ARIN AN xCAVAT10N OF THE STREAM BANKS AND BED AND APPROACH T A EE E G D E 0 MINIMUM. :. INSTALL A TEMPORARY ROCK DAMN UPSTREAM AND DOWNSTREAM USING CLASS B RIPRAP (050=13") ON THE FRONT AND #57 STONE ALONG THE BACK TO MAKE THE DAMN IMPERMEABLE 3. HAVE PUMP IN PLACE FOR FLOWING STREAM i0 PUMP WATER FROM UPSTREAM DAMN PASS THE OWN N TREAM DAMN TO DIVERT FLOW FROM STREAM CROSSING DURING CONSTRUCTION p s o 4. DVRING ED. SHALL BE ON NORMAL FLOW THERE WILL BE SEEPAGE AND A SEDIMENT ED ON A STONE BED. SHALL BE USED TO PUMP SEEPAGE TO P SEDIMENT BASIN ONLY IF NEEDED DURING CONSTRUCTION. 5. BEGIN CLEARING AND GRUBBING, MAINTAIN PUMP AROUND AS NEEDED. ROUGH GRADE CROSSING. 6. INSTALL FILTER CLOTH AS NECESSARY. 7. INSTALL PIPE CULVERTS AND BACKFILL PROPERLY. 8. INSTALL PROTECTIVE ROTECTOR PADS AT PIPE OUTLETS NST STALL PROTECT VE GROUND COVERS TO PROVIDE PERMANENT EROSION PROTECTION AND IMPROVE NSUAL DUALITY BUT NOT INTERFERE WITH DRIVER LINE OF SIGHT FROM THE ROADWAY. 10 STABILIZE ALL DISTURBED AREAS BEFORE NG WATER THROUGH STREAM CROSSING, 111 UPON COMPLETION OF CROSSING WITH AREAA STABILIZED, THE UPSTREAM AND DOWNSTREAM DAM MAYBE REMOVED 12. REMOVE PUMP AROUND AND SEDIMENT BAG PUMP IF IN USE 13 PUMP AROUND DETAIL IS LOCATED 019 SHEET C-13. 14. ENSURE THAT PERMANENT MEASURES NEEDED TO CONTROL EROSION FROM ROAD WATER RUNOFF (SUCH AS RIPRAP AND PAVED CHANNELS, PAVED FLUMES. OR RIPRAP OUTLET PROTECTION) MEET ALL CONSTRUCTION REQUIREMENTS FOR THOSE PRACTCES. LEGEND i/ 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED 1 t STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION CB -1 425.88 10.97 Curb inlet CB -2 423.80 10.63' Curb inlet CB -3 423.80 10.88' Curb Inlet EX -CB 426.95 11.38' Storm Junction Box FES -1 416.92 777' Flared End Section WETLAND AREA HATCH AREA DENOTES FLOOD HAZARD SOIL ` ADJUSTED WITH TOPO NEUSE BUFFER (ZONE 1) FEMA too YEAR FLOOD PLAIN LIMITS 100' NEUSE RIVER RIPARIAN BUFFER STREAM CROSSING PIPE B 111=50' Oz J�C7 D QM o W a 6g £9 OVN s # o 08 NC SCALE 1'=1oo' 37338 ' 0 100' 200' SHEET No. a C3.0 L7 '0 x 333 STORM PIPE TABLE 0 > 0000 w N •-� N N ti N N .+ SLOPE < Z O O n N 0 FES -1 - CB -2 O DATE 05/24/]6 DRAWN BY J. DOOLEY 33.11 LF 24 inch Concrete Pipe DESIGNED BY MCLAMB 36' • •B. CHECKED BY J. CHANDLER 41 .11 3 • .00 F 25 L • • SCALE 36" CB -3 - PER PLAN 411.71 4.00% 30.00 LF 36 inch Concrete Pipe Pipe F 30" _CB -1 415.57 415.16 • 40.94 LF 30 inch Concrete Pipe Pipe G 30" CB -1 - C&2 1 414.96 414.31 1.00% 64.77 LF 30 inch Concrete Pipe W ID LP Or v , z �( Z o I m =l <a v d U w Z1 ( 8 w0 LF) � /n z V Y Z z w z z Q U J H.I : o Q U p ° ° Q Y p U) < oar=UB �LL-zB U �U � � Q F m6 Oz J�C7 D QM o W a 6g £9 OVN s # o 08 NC SCALE 1'=1oo' 37338 ' 0 100' 200' SHEET No. a C3.0 STORM PIPE TABLE PIPE DIA FROM -TO UPSTREAM IDOWNSTREAM INVERT INVERT SLOPE LENGTH DESCRIPTION Pipe Al 24" FES -1 - CB -2 414.50 414.31 0.57% 33.11 LF 24 inch Concrete Pipe PiA2 Pe 36' CB -2 - CB -3 414.11 41 .11 3 4.00 % .00 F 25 L 36 inch P' Concrete Pipe Pipe A3 36" CB -3 - 412.91 411.71 4.00% 30.00 LF 36 inch Concrete Pipe Pipe F 30" _CB -1 415.57 415.16 1.00% 40.94 LF 30 inch Concrete Pipe Pipe G 30" CB -1 - C&2 1 414.96 414.31 1.00% 64.77 LF 30 inch Concrete Pipe Oz J�C7 D QM o W a 6g £9 OVN s # o 08 NC SCALE 1'=1oo' 37338 ' 0 100' 200' SHEET No. a C3.0 GROUND STABILIZATION SITE AREA STABILIZATION j STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, Clear only as necessary to install these devices, Install permanent nears for Dry � Z a aU SWALES, DITCHES 7 DAYS NONE AND SLOPES 3. Call Charles Phillips at 919-796-8769 for on site Inspection by zZ� HIGH QUALITY 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED aeraro WATER(HOW)ZONE 7 DAYS NONE SLOPES STEEPER HATCH AREA DENOTES FLOOD HAZARD SOIL IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER C, Basin THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 stabilization time frames 7 -DAYS FOR SLOPES GREATER OR FLATTER 14 DAYS THAN 50 FEET IN LENGTH ALL OTHER AREASNONE Skimmer Skimmer WITH SLOPES 14 DAYS (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 STA AND HOW ZONES) 'EXCEPTIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICAL.- - (SECTION ILB(2pb)) NOTE 1: Icy a t.al lulu El -OJty W - Linin, r-luteutio11 o 1. Schedule agin precenstruc0on wnference with the Environmental Engineer i n Chanes Phillips 919-796-8769. Obtain a land disturbing permit. --e--K- F2. Install erosion control measures based on the approved erosion control plan -:..- Clear only as necessary to install these devices, Install permanent nears for Dry � Z a aU SEDIMENT BASIN DESIGN LEGEND 3. Call Charles Phillips at 919-796-8769 for on site Inspection by zZ� environmental inspector and obtain a Certificate of Compliance. 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED aeraro AREAS WILL BE STABILIZED PER THE GROUND STABILIZATION CHART AFTER ANY GRADING. Street Name Q = 0 8a inlet controls, sediment traps a other approved measures as shown on HATCH AREA DENOTES FLOOD HAZARD SOIL the plan. Begin constructing building, etc. e ADJUSTED WITH TOPO 6. Stabilize site as areas are brought up to finish grade with vegetation, Ce= U- LU Ez C, Basin DIST. AREA NEUSE ( ) 1ch stabilization time frames OE a S.F. Volume call Charles Phillips at 919-796.8769 for an inspection by the Skimmer Skimmer c 4®usl Q co °�N CAR 0, e,. ---- 100' NEUSE RIVER RIPARIAN BUFFER 8. If site is approved, remove temporary diversions, silt fencing, sediment STA basins, etc., and seed out or stabilize any resutiing bare areas. All Da C I Q30(cts) Slope Mattin Type 8 e 9. When vegetation has become established, call for final site inspection by D. AI.) C 025 Required (d) Basin Dimensions size (in)°AOfpfT'hS70^• orifice Weir (ft) 4' .••""ti NOTE 2: ALL BASINS SHOULD BE CLEANED AFTER ANY RAIN EVENT THAT EXCEEDS From To size (in) ��} Y 178'x90k3'(mimic 1' IN 24 HOURS. Road 1 Offsets .ate SEAL j 03437) e NOTE 3: LT 10+35 12+00 0.18 0.65 7.28 0.85 2.00% UNREINFORCED SKIMMER BASIN 2.30 15.23 0.42 34.7 15,081 27,414 detention pond 4 2.5 35 SEDIMENT BASINS WILL BE INSTALLED WHERE STORM DRAINAGE PIPE IS LOCATED. I.E. RT 10+35 12+00 6.70 0.40 7.18 39.51 2.00% 5150 MATTING OR EQUIVALENT dimensions) t 948N3' (mimic 8k PIPES WILL BE LEFT SHORT AND EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN STABILIZED. LT 12+00 15+22 0.12 0.65 7.28 0.57 2.10% UNREINFORCED SKIMMER BASIN 2.79 4.30 0.42 9.8 4,258 7,740 detention pond 3 1.25 30 SLOPE STABILIZATION REQUIREMENTS RT 12+00 15+22 1.51 0,40 7,28 4.40 2.10% UNREINFORCED dimensions) 3:1 AND FLATTER -GRASS 02/21/2017 Ff"" 31 TO 21 SLOPE -ADAPTIVE PLANTS (SHRUBS AND VINES) LT 15+22 18+76 0.13 0,65 7,28 0.62 6.80% UNREINFORCED 2:1 TO 1.5:1 -RIP RAP RT 15+22 18+76 6.25 0.40 7.28 18.20 6.80% P550 MATTING OR EQUIVALENT STEEPER THAN 1.5 TO 1 -RETAINING WALL ` E NOTE 4: -/ MAXIMUM IMPERVIOUS AREA SQUARE FOOTAGE ON EACH INDIVIDUAL LOT WILL BE LT 38+76 26+45 0.4 0.65 7.28 1.89 1.6096 UNREINFORCED STRINGENTLY ENFORCED WITH NO EXCEPTIONS INTO PERPETUITY. RT 18+76 26+45 3.44 0.40 7.28 10.02 1.60% UNREINFORCED / E NOTE 5: ONCE SITE HAS BEEN STABILIZED AND PRIOR TO ISSUANCE OF CERTIFICATE OF r 2 COMPIETION: SITE WILL BE EVALUATED TO ENSURE THAT DIFFUSE FLOW HAS BEEN LT 26+45 30+44 0.27 0.65 7.28 1.28 5.4096 UNREINFORCED / --;,�� r is 2 F yys� F OBTAINED BEFORE STORMWATER ENTERS BUFFERS. IF DIFFUSE FLOW HAS NOT BEEN RT 26+45 30+44 11.76 0.40 7.28 34.25 5.40% PI MATTING OR EQUIVALENT /. u F ACHIEVED, THEN LEVEL SPREADERS MUST BE INSTALLED AS PER PLAN. a LL mv V U DISTURBED LT 30+44 32+88 0.20 0.65 7.28 0.95 3.60% UNREINFORCED - ` b�� n Oo^ -' m O a W W W AREA -6.00 AC. RT 30+44 32+88 0.76 0.40 7.28 2.27 3.60°.6 UNREINFORCED - r'' `. ,r- on i W B V U U (CLR) INDICATES THE LIMITS OF ULTIMATE DISTURBANCE FOR HOPKINS TRACE - PHASE 2. f LL o y y y Road 2 Offsets / ///i Q SEDIMENT BASIN REMOVAL 1) REMOVE BASINS ONLY AFTER SITE IS STABILIZED AND WITH PERMISSION FROM LT 10+00 11+34 0.53 0.45 7,28 1.74 3.00% UNREINFORCED L c WAKE COUNTY ENGINEER. RT 10+00 11+34 0.36 0.45 7.28 1.18 3.00% UNREINFORCED 2) REMOVE TARP AND ALL NON DIRT AND/OR ROCK MATERIAL. w 2 z 2 2 o " 3) USE BACKHOE TO FILL IN AND LEVEL BACK TO NATURAL GROUND ELEVATION. 4) SEED AND STRAW APPROPRIATELY. - F w- r / -. W❑ 5) INSTALL CHANNELS AND EXTEND PIPE IF REQUIRED.t r }i��rt' '� W vi W W -� " 24C 'k un,,:v,:; ,,. ;. tit>ISi4fSFiFD.SLrFFkR %'_ o O W O O x.✓ 1 DOE, 5 k L ... _ at}4t Nk4 S RIVER - yr Vit'' > � � t BUFh`ER _-. _ _ .., 4 ;�h S•01 - / 'iS0 fKQM BRNIS: J' _: � , ' ,:,'." ?T ,+ - > N N N N Y s. a b,'? l/": y , %-.,.,.', DATE :EL i u�,c„ a� _ / - r*•"'.` � 05124/16 �Z..• ,. DRAWN BY V 7 AN JIFEk J;- �. �. - Q. -SILT FENCE r J. DOOLEY IROM:. BANK. 'F� - J=` -ti ; cY' OUTLET (TY'P/ RS €_ /�C�y .-^ice•- l„ DESIGNED BY 9 { \ •• B. MC(AMB j: PAS 420 V P4 IN #1 CHECKED BY y: �^ - .R4 Ek`; €"Ax«7 �. RSHEU BUE•FFR g� • / // >'*'_ - - r _ r�� iNL, ,, sr✓' .+ :M FROM BANK. _OM. 6. J. CHANDLER 2G3,Ft r, } uR. SCALE rt � N RSN �. .� ✓ � � _ , � �..-... � r� v OVP � PER PLAN TEMPORARY STREAM s ,.. GRAVEL %. CONSTRUCTION CROSSING. SEE DETAIL"xT r'-� ,. • ENTRANCE 50'X30' - - - JSKIMM BASIN BASIN#2 ti- 42s... � � � S/b 0 21rTEMPORARV CONSTRUCTION EASEMENT LIMITS OF / CHECK P550 MATTING r DISTURBANCE DAM (TVP) OR OFCLR 1 SILT FENCE d: O'yo,0 (TYP) GRAVEL / CONSTRUCTION / ENTRANCE 50'X30' -/ P550 MATTING �. OR EQUIVALENT LIMITS OF DISTURBANCE ®�- P550 MATTINGG OR EQUIVALENT WAKE COUNTY CONSTRUCTION SEQUENCE o 1. Schedule agin precenstruc0on wnference with the Environmental Engineer i n Chanes Phillips 919-796-8769. Obtain a land disturbing permit. --e--K- F2. Install erosion control measures based on the approved erosion control plan -:..- Clear only as necessary to install these devices, Install permanent nears for Dry � Z a aU - diversions. berms and basins immediately after Constroctlon =a: PIPE INLET PROTECTION LEGEND 3. Call Charles Phillips at 919-796-8769 for on site Inspection by zZ� environmental inspector and obtain a Certificate of Compliance. 10,000 SF =MAXIMUM IMPERVIOUS ALLOWED B 4. Be clearing and Begin g grubbing. Maintain devices as needed. Rough gratle `+, WETLAND AREA - 5. Install storm sewer(tl shown) and protect inlets with block and gravel Q = 0 8a inlet controls, sediment traps a other approved measures as shown on HATCH AREA DENOTES FLOOD HAZARD SOIL the plan. Begin constructing building, etc. e ADJUSTED WITH TOPO 6. Stabilize site as areas are brought up to finish grade with vegetation, Ce= U- LU Ez C, paving, ditch linings, etc. Seed and mulch denuded areas per ground 0 Z NEUSE ( ) 1ch stabilization time frames OE a 7. When constructionis complete and all areas are stabilized completely, FEMA 100 YEAR FLOOD PLAIN LIMITS call Charles Phillips at 919-796.8769 for an inspection by the environmental engineer. o€ ---- 100' NEUSE RIVER RIPARIAN BUFFER 8. If site is approved, remove temporary diversions, silt fencing, sediment basins, etc., and seed out or stabilize any resutiing bare areas. All z remaining permanent erosion control devices (such as velocity dissipators) should be installed now. Remove skimmers from sediment basins to convert FM temporary skimmer basins into penoenant stormwater control measures. e 9. When vegetation has become established, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-8769. Obtain a ,1, Certificate of Completion. % CLR O n F ROF'SED ROAD L -L 30 WATER BJPPLY VF 1 ERSHEL B 74 ER l '30'FROMI BANK) 100 NEJSE RIVER RF R:AN BUl�-R wF s,lsx wr *4 TEMPORARY STREAM CROSSING EROSION CONTROL LEGEND TEMPORARY CONSTRUCTION i ENTRANCE --e--K- SILT FENCE -:..- LIMIT OF DISTURBANCE � Z a aU CHECK DAM =a: PIPE INLET PROTECTION TEMPORARY STREAM CROSSING C T ONBTRUC ION SEQUENCE 1. INSTAR EROSION CONTROL MEASURES ON CON PER PLANS 2. KEEP CLEARING AND EXCAVATION OF THE STREAM BANKS AND BED, AND APPROACH TOA MINIMUM. 3. BEGIN CLEARING AND GRUBBING, MAINTNN PUMP AROUND AS NEEDED. ROUGH GRADE CROSSING. 4. INSTALL FILTER CLOTH AS NECESSARY. s. INSTNI PIPE CULVERTS AND BACKFILL PROPERLY PER TEMPORARY CROSSING DETAIL. 6. INSTNI PROTECTIVE GROUND COVERS TO PROVIDE TEMPORARY EROSION PROTECTION, 7. STABILIZE ALL DISTURBED AREAS. 6. ONCE TEMPORARY CROSSeNG IS NO LONGER NEEDEO. AREA TO BE RESTORED TO PRE -DEVELOPMENT CONDITIONS. LIMITS OF DISTURBANCE = 6 ACRES TEMPORARY STREAM CROSS/NG 1.=50' CS OVN SCALE 1'=100' IN 0 too' 200' W �$ N O w ` L Q Z o J rH U � Z a aU o =a: Z W V 1 , n Z O V zZ� U J 1--I OZ s U O aZ< Z Q = 0 8a 0 -� �" e �D Z� Ln Ce= U- LU Ez C, W a i 0 Z 1 N J~i OE a m o€ ]OB No.x FM 37338 SHEET NO. sE C4.0 11. PIPE A-3 - HEADWALL % AT OUTLET i P.Pe A3 i -CB-3 EX -CB- Pipe F-'� wpa C / I -•- 'Pipe Al i _ f / FES -1j / N/F RONALD C & / MARGIE SCHATZ CB -2- PIN 0782-16-0795 ZONED. R -40W PIPE C 22 00 I inU in PIPE R-� .( i%� I / (27O / - ROAD A- `- *oD _ ... A� ��• 1 1 z o!0 0 0 W eIm m > a \ I I O - - DATE STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION CB -1 A DRAINAGE DESIGN STORM: DRAINAGE DESIGN Bailey's Landing 25 YEAR cs-z dzaso 10,63'curb Inlet SEAL !: e i - DETENTION LOCATION U31a'.1 1 hF..=`ai POND#2 %�/�� ... 0`'`4•, PIPE DESIGN 7??' j Flared End Section I OUTLET B O (u'k) PIPE SIZE SL (In.) Plpe ID INLET TYPE 02/21/2017 PIPE CA D 1.11.)Slff pn.I (HDPE( LENGTH IN.) [WIN INV OUT Pipe A3 31.44 36 3. Pipe S 63.79 48 2. Pipe 5.52 1 18 1 1. __.. r, N z40• Vc __. in _. _... tl.l PIPE C 22 00 I inU in PIPE R-� .( i%� I / (27O / - ROAD A- `- *oD _ ... A� ��• 1 1 z o!0 0 0 W eIm m > a \ I I O - - DATE 'FOR PIPE B. USE NCDOT STANDARD DRAWING 838.01 LOW POINT STA = 12+15.58 LOW POINT ELEV = 423.01 PVI STA = 11+77.93 PVI ELEV = 420.95 A.D. = 7.61 % l 435 N/F GREGORY) & jACOUELINE A SEAMSTER PIN 0782-16-0393 ZONED R-40VV STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION CB -1 A DRAINAGE DESIGN STORM: DRAINAGE DESIGN Bailey's Landing 25 YEAR cs-z dzaso 10,63'curb Inlet ENERGY DISSIPATOR DESIGN DESIGN STORM: ENERGY DISSIPATOR DESIGN 10 YEAR LOCATION EX -CB _OCATION DISCHARGE FES -1 PIPE DESIGN 7??' j Flared End Section I OUTLET B O (u'k) PIPE SIZE SL (In.) Plpe ID INLET TYPE I Iirv11 C h A IAC) PIPE CA D 1.11.)Slff pn.I (HDPE( LENGTH IN.) [WIN INV OUT Pipe A3 31.44 36 3. Pipe S 63.79 48 2. Pipe 5.52 1 18 1 1. 'FOR PIPE B. USE NCDOT STANDARD DRAWING 838.01 LOW POINT STA = 12+15.58 LOW POINT ELEV = 423.01 PVI STA = 11+77.93 PVI ELEV = 420.95 A.D. = 7.61 % l 435 N/F GREGORY) & jACOUELINE A SEAMSTER PIN 0782-16-0393 ZONED R-40VV z 05124116 'o DRAWN BY 1. DOOLEY • DESIGNED BY • B. MCLAMB CHECKED BY 1. CHANDLER • SCALE NTS . PER PLAN STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION CB -1 425.88 10.92' Curb Inlet cs-z dzaso 10,63'curb Inlet Cs -3 423.80 ! 10.89• Curb Inlet EX -CB 426.95 1 11.38•', Storm Junction Box FES -1 416.92 7??' j Flared End Section I z 05124116 'o DRAWN BY 1. DOOLEY • DESIGNED BY • B. MCLAMB CHECKED BY 1. CHANDLER • SCALE NTS . PER PLAN 5 W, x N V LOWPOINT STA = 18+27.12 Ln Z LOW POINT ELEV = 416.60 0r.1 -1 LLI PV1 STA =1 +90.60 owU U = 5Q J E PVI ELEV=673.47 a LL. g STORM PIPE TABLE ROADA-PLANVIEW 50' R/W, 20' PAVEMENT ES GVN VERTICAL SCALE 1" = 5 SCALE I"=50' 0 50' 100' UPSTREAM INVERT DISSIPATOR DSO 1Zx24'x24' 13" 18'06N24" 13" 8)K16)(18" 6" 1Zx24•x24" 13" "16k18•' 6" 6k10k18" 6•' eximi8" 6 Pipe A2 36" CB -2 - CB -3 414.11 413.11 5 W, x N V LOWPOINT STA = 18+27.12 Ln Z LOW POINT ELEV = 416.60 0r.1 -1 LLI PV1 STA =1 +90.60 owU U = 5Q J E PVI ELEV=673.47 a LL. g STORM PIPE TABLE - PIPE K'. DIA FROM -TO UPSTREAM INVERT DOWNSTREAM INVERT -. SLOPE LENGTH DESCRIPTION Pipe Al 24" FES -1 - CB -2 414.50 414.31 0.57% 33.11 LF 24 inch Conciele Pipe Pipe A2 36" CB -2 - CB -3 414.11 413.11 1 4.00% 25.00 LF Winch Concrete Pipe Pipe A3 36" CB -3 - 412.91 411.71 C00% 30.00 LF 36 inch Concrete Pipe Pipe F 30' - CS -1 415.57 415.16 1.00% 40.94 LF 30 inch Concrete Pipe Pipe Gi 30' Cal - CB -2 414.96 414.31 1.00% 64.77 LF 30 inch Concrete Pipe 5 W, x N V LOWPOINT STA = 18+27.12 Ln Z LOW POINT ELEV = 416.60 0r.1 -1 LLI PV1 STA =1 +90.60 owU U = 5Q J E PVI ELEV=673.47 a LL. g PVI STA = 10+56,09 n Y1v - m n EXISTING GRADE 25' RIGHT A.D. = 11.50% 0 = 0 PVI ELEV =427.04 Nv K=2087 - Z 1 ~ E P 430 j m _. _...._ '-PROPOSED CENTERLINE GRADE _. Nw _._ j -� __.. r, N z40• Vc __. •_ __._ _. m _. _... tl.l • / b/ 0 a ` D EX CB -200 ` m /e w Z W 7 L Z Z TO BE CONVERTED TO 4 TRAFFIC BEARING -PROPOSED CENTERLINE GRADE `o 425 JUNCTION BOX - > > U lu Z Z Y a = / 0 x o. 420 -EXISTING \ a PIPE A CENTERLINE GRADE U zz: V / K Q F / i \ HIGH PT STA = 15+07.60 \ / \-EXISTIN ~ ` LLO 0 E 5 g o 415N� PIPE lC PIPE G / / / - �-EXISTING GRADE 25' LEFT v HIGH POINT ELEV = 428.86 \ PVI STA =15+58.36 mm- '� PVI ELEV=430.89 vm -. f / / PEC I __.. Z OD r J U a rc m A.D=-10.11% wrn PIPER- / / K=2077 w�u / / � o / HIGH PT STA = 20x45.40 Ie < o " 210'VC / \\ / i - N,v HIGHPOINT ELEV042201 mq a w PVI STA = 19+9060 14 co r \ / S {, 410 PVI ELEV-=42.166.. wui A. =3.00% ww mm K=36.87 ww A 110• VC o€ 405 n in h h om ^� vm ^m �< a oM ryv �� n� ryv hm �� in 'g V7m i� nm �� ryn �H h� ry� b0 ^m Om �m Om in w$ ^'9i `D `8 ^. }R ag SQi om �� E c Y JOB No. x 9+00 10+00 11+00 12+00 13-00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21-00 22+ 00 23+00 24+00 37338 F ROAD A - PROFILE VIEW 8 50' RNV, 20• PAVEMENT SHEET No. 0 C5.0 � E mneya_sanoingwrvuwnean�wraaas.-o.�rrcury orrg I riomw on [r[Ir[pl r >>:an am I py eranoon mttemp Oo fm i 4094 oA `n p $ 409.37 m a PVI STA =_iq+10.00 PVI ELEV = 415.01 m o m < m y y m DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, ''-PVIELEV414.81 0 424.6 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS A A Z A A p Zr�n,r�m'go 425.56 415.1. 415.10ANAroAANaeon m € H mFn I al m rn z m 423.0 z %' \ \ \ .... \ _ `-�\\. ...... .. § _- 425.5 m �� \ 426.06 z 4 \ \ w 42.4 $ (fVl =11+3.55 on 426.38 am A v �VI ELEV = 42 .91 o A o m � ti\\ SO / x CA 6 0y _.. _ �..'. f __. ..... oz _. \ G) 426456 a -j 425.8 m 427.0622 y 9 m = m 427.3 427.56 g z.+ 4276 428.06 6VCE = 428.13'. VCS = 26+57.41 418.5 $ 428.17 ' I vvxL1 < 91 4279 D TJ '.x O > ' >_D I 427.24 ISI / m � N < r+ tv m 426 .. v U 425.22 4 b" p S �O D N � �a 422.6 n m m F r m i VCE = 421.63 . VCS = 28+57 41 ----SVCS = 28-62.32 422.17 z m ',.13VCE = 421.26 H 418.1 ;..... �-, 418.75 / G 416 16A 40 � 408.7 I N x Ory D Z 0 T ♦;'i y 415.16 / I N n&t m o y ' g I I NN 4097 \ �...\ CL INTERSECTION m 415 \ 46.14 ELEV ELEV - 415.01 413.3 \ i 00 s.... -0 L. 416.03 m \ \\ EVCS=31+3.32 415.3 \. VCE 41749 418.09 1 \ \ BVCS = 31+80.97 \ BVCE=41 .57 r 4184 \ x 420.39 g t v x G 421.6< \ <D�� > N O < m1 421,71 I mti �w 0 4222 i w ..... C 31.0.. EVCE - 421.8 021.83 /g PVI STA = 33+49.15 A APVI ELEV = 4J1.34 NAN m IT r m 0 In v, N O Oo fm i 4094 oA `n vO PVI STA = 10+00.00 z $ 409.37 m a PVI STA =_iq+10.00 PVI ELEV = 415.01 m o m < m y y m DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, ''-PVIELEV414.81 oomDDmD mllml<_ 11 <bx O\\ 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS A A Z A A p Zr�n,r�m'go �0 m 415.1. 415.10ANAroAANaeon m € H mFn ^\ al m rn z m 423.0 ~ m .... \ _ `-�\\. ...... .. § _- 422.97 m �� \ n z 4 \ \ w 42.4 $ (fVl =11+3.55 on 426.38 am A v �VI ELEV = 42 .91 o A o m IT r m 0 In 091o9� 9 3 I/1 U _0 m N \ z\ 9 \ \ In \ � 1 m � \ y N � ti �j30 . ROAD 6 11, 5o, PUBLIC, ENT 20'PAVEM 3 TIMMONS GROUP NORTH CAROLINA LICENSE NO. C-1652 „= V m BAILEY'S LANDING - PHASE 4 W $ CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA .. 00 ROAD A PLAN AND PROFILE These plena and asaocbled dowmenls era be axcbsWe properly of TIMMON$ GROUP and may nol be reproduced in wlwb or In part eM strap rot be ased Id eny WRose whnlsoever. Indus limned fo cons4uclbn. bkdrw. arMlor funslruclion sbkiw wiliwul Nre nxorxs written rnnsenl M TIMMONC GROI IP m 0 0 v, N O 'm NAD 83 71 \ z n 8 11 < DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, IS -2016 OTOTAL 1242-2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS Y � F m € H O ^\ al m z o� \J \ In Th z \ n -• - 4Fg \ 1\ m m - �� - - �- ti\\ SO CA 6 0y i i % o' m a -j I y 9 m = z.+ 091o9� 9 3 I/1 U _0 m N \ z\ 9 \ \ In \ � 1 m � \ y N � ti �j30 . ROAD 6 11, 5o, PUBLIC, ENT 20'PAVEM 3 TIMMONS GROUP NORTH CAROLINA LICENSE NO. C-1652 „= V m BAILEY'S LANDING - PHASE 4 W $ CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA .. 00 ROAD A PLAN AND PROFILE These plena and asaocbled dowmenls era be axcbsWe properly of TIMMON$ GROUP and may nol be reproduced in wlwb or In part eM strap rot be ased Id eny WRose whnlsoever. Indus limned fo cons4uclbn. bkdrw. arMlor funslruclion sbkiw wiliwul Nre nxorxs written rnnsenl M TIMMONC GROI IP m 0 0 • o ��• •• • v, N O 'm NAD 83 �- \ z n 8 11 < DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, IS -2016 OTOTAL 1242-2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS Y � l ^\ z? o� Th z t e ti\\ SO • o ��• •• • v, N O I I NAD 83 �- <W O n 8 11 < DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, IS -2016 OTOTAL 1242-2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS Y � l o o� Th t e ti\\ SO CA 6 0y i i % o' m a -j • o ��• •• • YOUR VISION ACHIEVED THROUGH OURS, THIS DRAWING PREPARED AT THE RALEIGH OFFICE 5410 Trinity Road, Suite 33, (Reielgh, NC 27607 TEL 919.866.4951 'FAX 919,833,8124 www.timmons.com�,st+j mons. �aS' f.••"• 'p y [f>, �; �4 Rpnl 'q_ o �- •, v z m g S ; o n 8 N $ a DATE REVISION DESCRIPTIN 8/11 016 WAKE COUNTYENVIRONMENTAL VI OONM NTAL SERVICESOCOMMENTS_, IS -2016 OTOTAL 1242-2016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS 02-11-2017 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS TOP ELEVATION OE STORMWATER 0.5-1' #5 WASHED STONE EXISTING SLOPE #I RIP -RAPS VARIES T� �t /\KL LL II'\ I1. FRONT VIEW NOTE. REMOVE SEDIMENT ACCUMULATION FROM BEHIND CHECK DAMS TO PREVENT DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. RAP STANDARD CHECK DAM SIDE VIEW CONSTRUCTION NOTES HEIGHT & WIDTH DETERMINED F EXISTING TOPOGRAPHY AND SEDIMENT STORAGE REWIRED. KEY RIP RAP INTO ME DAM FOR STABILIZATION, EXISTING GROUND STEP SEQUENCE TEn rENCE rros sTEtt FrNCE o w T MAI ti aor« w 1111VIRE FENCC 4RGIxU M 100 HARDVMC OL T'� ' iT O SECTION VIEW PLAN VIEW 35' MIN NEW CNSTFU'.T. EXISTING ROADWAY 6- MIH. y%\/ jj FABRIC UNDER STONE Fn CROSS SECTION AKE !COUNTY "'"' "A` STANDARD CONSTRUCTION ENTRANCE NOTES' L REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. STANDARD SILT FENCE OUTLET FLEXIBLE JOIN1 (RADIATOR HOSE) OUTLET END CONNECTION TO OUTLET PIPE OR RISER rpm Nmrc<ilw 50MIN. � NOTES- �vclR ----��� BUT SUFFICIENT TO KEEP Cy T PUT SILT FENCE OR TREE PROTECTION FENCE UP TO DE SEDIMENT ON SITE A ENSURE CONSTRUCTION ENTRANCE IS USED. c�'I`°M"I'" STANDARD SKIMMER BASIN ZONE MINIMUM 10 GAVGE / INSTALLED TO SECOND ' UNE WARES —` - _. IF CONSTRUCTION ON THE SITES ARE SUCH MAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE EXISTING DISSIPATER - 2--3- STONE TO BE USED (SURGE STONE OR RAILROAD Lil 25' OR WIDTH OF PROPOSED STREET ';TONE. THEN THE TIRES OF THE VEHICLES MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. ROADWAY 'BALLAST) INLET SHALL BE PROTECTED (AS NEEDED' WHICHEVER IS 3, MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR RIPRAP, TARP, MATTING DR EQUIVALENT. FRONT VIEW GREATER. SEDIMENT FROM LEAVING CONSTRUCTION SITE ENTRANCE - WILL REWIRE PERIODIC REMOVAL OF SEDIMENT -LADEN STONE AND REPLACEMENT WITH FRESH STONE. PLAN VIEW 35' MIN NEW CNSTFU'.T. EXISTING ROADWAY 6- MIH. y%\/ jj FABRIC UNDER STONE Fn CROSS SECTION AKE !COUNTY "'"' "A` STANDARD CONSTRUCTION ENTRANCE NOTES' L REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. STANDARD SILT FENCE OUTLET FLEXIBLE JOIN1 (RADIATOR HOSE) OUTLET END CONNECTION TO OUTLET PIPE OR RISER rpm Nmrc<ilw 1' MIN FREEDDARD TDP OF BERM � BAFFLES �vclR L[acH <nlry IfY rpm Cy v. L[NCTM SECTION THRU WEIR DE •+OTE. 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC { -FILL SLOPE 1 NII A F' MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE PLAN V I L W NOTES: 1 L = THE LENGTH OF THE RIPRAP APRON. _. d = I.5 TIMES THE MAXIMUM STONE DIAMETER ELI +._ LESS THAN 6' (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE L� L INSTALLED BETWEEN THE RIPRAP AND SOL FOUNDATION PIPE a - FILTER SEC ON'A-A' FABRic STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL VENT � ,A% J)\ /� SCREEN ACCESSIBLE TH",I FLOAT BARREL PIPE LONGER THAN SHOWN. STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES'. 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY, 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4 INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY. ETC. (UNLESS NOTED) PRIOR TO BEC.INING CLEARING OPERATIONS CRAP RO $IVMIIA OR APPROVED PLAN . DIAMETER- PER RAN �\\ INSTALL PJC TEE WITH SCREW TKMOVIEG OND NCIL LONGER OKRArED \ AND POND NO RI SEDT OPERATES AS A TEMPORARY SEpIMENT BASW FLEXIBLE PRE ' T PRIMARY WATER QUALITY ORIFICE INVERT t' PVC DRAIN DIAMETER. SEE PIAN INSTALL ORRICE IN BOTTOM OF PVC TEE h ONCE SKIMMER IS REMOVED—� AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN I"DIA . COR. PLASTIC PIPE/ CUT IN HALF AND RLAGE AGAINST RISER - BACKFILL WITH NO 57 STONE (1T DEEP) SKIMMER BASIN TIE-IN TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1 Schedule a preconstruction conference with the Environmental Engineer Charles Phillips 919-796-8769 Obtain a land disturbing permit. 2. Install erosion Control measures based on the approved emsion control plan Clear only as necessary to install these devices Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to user per detail. Seed temporary diversions, berths and basins immediately after construction. 3. Call Charles Phillips at 919.791 for on site inspection by environmental inspector and obtain a Cereflrate of Compliance. 4. Begin cleanng and grubbing. Maintain devices as needed. Rough grade 5. Install storm sewer(if shown) and protect inlets with block and gravel inlet controls, sediment traps or other appmved measures as shown on the plan. Begin Constructing building, ate. 6. Stabile site as areas am brought up to finish grade With vegetation, paving, ditch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and all areas am stabilized completely, call Charles Phillips at 919-796$769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to stortnwater use prior to Completing any related work. If site is approved, remove temporary diversions, silt fencing, sediment basins, etc., and seed out or stabilize any resulting bare areas. All remaining permanent erosion control devices (such as velocity dissipators) should be installed now. Remove skimmers from sediment basins to convert temporary skimmer basins into permanent stormwater control measures. 9. When vegetation has become established, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-8769. Obtain a Certificate of Completion. 1t�T CARp�A �,Tti 7 e 4 SEAL !S 034394 7 r�A 02/21/2017 •• • 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CH' IEED BY J. CHANDLER SCALE PER PLAN Al 0rNLU Lr) Q U � Q z I In _j U) 1� W U) W O Z J O InfF- Z O U Z _O U) O W `JOB NO^ 37338 C6.1 1' MIN FREEDDARD TDP OF BERM INFLOW BAFFLES (STD) MERGENCY STRUCTURE \R ELEVATION DE ATERING A 6i DURMC NE OMSNU<T DN PHASE OF ME PROECT PERMANENI STORAIW TER 7) POND SHALL MOT BE CONVERTED FOR STORMWATER USE UNTIL APPROV£o BY EN.F c�'I`°M"I'" STANDARD SKIMMER BASIN ZONE MINIMUM 10 GAVGE / INSTALLED TO SECOND UNE WARES —` N1RE FROM TOP MINIMUM 12-1/2 GAUGE INTERMEDIATE WARES DISSIPATER Lil PAD RIF RAP INLET SHALL BE PROTECTED (AS NEEDED' CHP OUTLET PIRE- CROSS SECTION FROM EROSION WITH RIPRAP, TARP, MATTING DR EQUIVALENT. •+OTE. 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC { -FILL SLOPE 1 NII A F' MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE PLAN V I L W NOTES: 1 L = THE LENGTH OF THE RIPRAP APRON. _. d = I.5 TIMES THE MAXIMUM STONE DIAMETER ELI +._ LESS THAN 6' (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE L� L INSTALLED BETWEEN THE RIPRAP AND SOL FOUNDATION PIPE a - FILTER SEC ON'A-A' FABRic STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL VENT � ,A% J)\ /� SCREEN ACCESSIBLE TH",I FLOAT BARREL PIPE LONGER THAN SHOWN. STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES'. 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY, 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4 INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY. ETC. (UNLESS NOTED) PRIOR TO BEC.INING CLEARING OPERATIONS CRAP RO $IVMIIA OR APPROVED PLAN . DIAMETER- PER RAN �\\ INSTALL PJC TEE WITH SCREW TKMOVIEG OND NCIL LONGER OKRArED \ AND POND NO RI SEDT OPERATES AS A TEMPORARY SEpIMENT BASW FLEXIBLE PRE ' T PRIMARY WATER QUALITY ORIFICE INVERT t' PVC DRAIN DIAMETER. SEE PIAN INSTALL ORRICE IN BOTTOM OF PVC TEE h ONCE SKIMMER IS REMOVED—� AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN I"DIA . COR. PLASTIC PIPE/ CUT IN HALF AND RLAGE AGAINST RISER - BACKFILL WITH NO 57 STONE (1T DEEP) SKIMMER BASIN TIE-IN TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1 Schedule a preconstruction conference with the Environmental Engineer Charles Phillips 919-796-8769 Obtain a land disturbing permit. 2. Install erosion Control measures based on the approved emsion control plan Clear only as necessary to install these devices Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to user per detail. Seed temporary diversions, berths and basins immediately after construction. 3. Call Charles Phillips at 919.791 for on site inspection by environmental inspector and obtain a Cereflrate of Compliance. 4. Begin cleanng and grubbing. Maintain devices as needed. Rough grade 5. Install storm sewer(if shown) and protect inlets with block and gravel inlet controls, sediment traps or other appmved measures as shown on the plan. Begin Constructing building, ate. 6. Stabile site as areas am brought up to finish grade With vegetation, paving, ditch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and all areas am stabilized completely, call Charles Phillips at 919-796$769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to stortnwater use prior to Completing any related work. If site is approved, remove temporary diversions, silt fencing, sediment basins, etc., and seed out or stabilize any resulting bare areas. All remaining permanent erosion control devices (such as velocity dissipators) should be installed now. Remove skimmers from sediment basins to convert temporary skimmer basins into permanent stormwater control measures. 9. When vegetation has become established, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-8769. Obtain a Certificate of Completion. 1t�T CARp�A �,Tti 7 e 4 SEAL !S 034394 7 r�A 02/21/2017 •• • 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CH' IEED BY J. CHANDLER SCALE PER PLAN Al 0rNLU Lr) Q U � Q z I In _j U) 1� W U) W O Z J O InfF- Z O U Z _O U) O W `JOB NO^ 37338 C6.1 NOTES 1) BAS SHOULD BE CLEANED WT WHEN CMAC+TYREACHES AN EWE NATION REPRESENTING MAT THE BASIN IS HALF -FULL. z) THE TARP USED TO PROTECT THE WEE SHALL BE THE WDM —FLED THE LENGTH o' M TMP SHALL BE ACCORDING TO AVNLABLE SUPPLY IF MULTIPLE TARRS ME TO BE USED MEN TARPS SNALL BE OVERLAPPED IT LEAST } THE in UPSTREAM 1.'- TARP SMALL OVERIAP THE DOANSNEAM TMP THE TMP 5H BE OM AW E .1 SKVEf� AIIE-1 OR E—VALENT FOR UV AE95TAA1 ]) PROWDE A INAWN OE THREE POROUI BATTLES TO EVENL' MSTINBUTE F OW ACROSS THE B SIN REW TURBUL CE A) BAFFLE AIATEMAE MUST BE SECYIRED AT THE BOTTOM AND SIDES U NG s APLE 5) MOST OF THE SEGMENT — ACCUMULATE M THE FIRST BAY SO MIs SHOIAD SE PIL A 6i DURMC NE OMSNU<T DN PHASE OF ME PROECT PERMANENI STORAIW TER 7) POND SHALL MOT BE CONVERTED FOR STORMWATER USE UNTIL APPROV£o BY EN.F c�'I`°M"I'" STANDARD SKIMMER BASIN •+OTE. 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC { -FILL SLOPE 1 NII A F' MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE PLAN V I L W NOTES: 1 L = THE LENGTH OF THE RIPRAP APRON. _. d = I.5 TIMES THE MAXIMUM STONE DIAMETER ELI +._ LESS THAN 6' (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE L� L INSTALLED BETWEEN THE RIPRAP AND SOL FOUNDATION PIPE a - FILTER SEC ON'A-A' FABRic STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL VENT � ,A% J)\ /� SCREEN ACCESSIBLE TH",I FLOAT BARREL PIPE LONGER THAN SHOWN. STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES'. 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY, 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4 INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY. ETC. (UNLESS NOTED) PRIOR TO BEC.INING CLEARING OPERATIONS CRAP RO $IVMIIA OR APPROVED PLAN . DIAMETER- PER RAN �\\ INSTALL PJC TEE WITH SCREW TKMOVIEG OND NCIL LONGER OKRArED \ AND POND NO RI SEDT OPERATES AS A TEMPORARY SEpIMENT BASW FLEXIBLE PRE ' T PRIMARY WATER QUALITY ORIFICE INVERT t' PVC DRAIN DIAMETER. SEE PIAN INSTALL ORRICE IN BOTTOM OF PVC TEE h ONCE SKIMMER IS REMOVED—� AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN I"DIA . COR. PLASTIC PIPE/ CUT IN HALF AND RLAGE AGAINST RISER - BACKFILL WITH NO 57 STONE (1T DEEP) SKIMMER BASIN TIE-IN TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1 Schedule a preconstruction conference with the Environmental Engineer Charles Phillips 919-796-8769 Obtain a land disturbing permit. 2. Install erosion Control measures based on the approved emsion control plan Clear only as necessary to install these devices Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to user per detail. Seed temporary diversions, berths and basins immediately after construction. 3. Call Charles Phillips at 919.791 for on site inspection by environmental inspector and obtain a Cereflrate of Compliance. 4. Begin cleanng and grubbing. Maintain devices as needed. Rough grade 5. Install storm sewer(if shown) and protect inlets with block and gravel inlet controls, sediment traps or other appmved measures as shown on the plan. Begin Constructing building, ate. 6. Stabile site as areas am brought up to finish grade With vegetation, paving, ditch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and all areas am stabilized completely, call Charles Phillips at 919-796$769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to stortnwater use prior to Completing any related work. If site is approved, remove temporary diversions, silt fencing, sediment basins, etc., and seed out or stabilize any resulting bare areas. All remaining permanent erosion control devices (such as velocity dissipators) should be installed now. Remove skimmers from sediment basins to convert temporary skimmer basins into permanent stormwater control measures. 9. When vegetation has become established, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-8769. Obtain a Certificate of Completion. 1t�T CARp�A �,Tti 7 e 4 SEAL !S 034394 7 r�A 02/21/2017 •• • 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CH' IEED BY J. CHANDLER SCALE PER PLAN Al 0rNLU Lr) Q U � Q z I In _j U) 1� W U) W O Z J O InfF- Z O U Z _O U) O W `JOB NO^ 37338 C6.1 8'-0- MAXIMUM in SILT FENCE FABRIC MINIMUM 10 GAVGE / INSTALLED TO SECOND UNE WARES —` N1RE FROM TOP MINIMUM 12-1/2 GAUGE INTERMEDIATE WARES Lil GRADE 3 TIMES II r 7� FRONT VIEW •+OTE. 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO PROVIDE STORAGE VOLUME FOR THE NEXT RAIN AND TO REMOVE PRESSURE ON THE SILT FENCE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC { -FILL SLOPE 1 NII A F' MINIMUM COVER OVER SKIRT ANCHOR SKIRT AS DIRECTED BY ENGINEER SIDE VIEW STANDARD TEMPORARY SILT FENCE PLAN V I L W NOTES: 1 L = THE LENGTH OF THE RIPRAP APRON. _. d = I.5 TIMES THE MAXIMUM STONE DIAMETER ELI +._ LESS THAN 6' (INCHES). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE L� L INSTALLED BETWEEN THE RIPRAP AND SOL FOUNDATION PIPE a - FILTER SEC ON'A-A' FABRic STANDARD PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL VENT � ,A% J)\ /� SCREEN ACCESSIBLE TH",I FLOAT BARREL PIPE LONGER THAN SHOWN. STANDARD SKIMMER DETAIL TEMPORARY SEDIMENT BASIN NOTES'. 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. 2. CLEAN OR REPLACE STONE FILTER WHEN DEVICE NO LONGER DRAINS PROPERLY, 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4 INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY. ETC. (UNLESS NOTED) PRIOR TO BEC.INING CLEARING OPERATIONS CRAP RO $IVMIIA OR APPROVED PLAN . DIAMETER- PER RAN �\\ INSTALL PJC TEE WITH SCREW TKMOVIEG OND NCIL LONGER OKRArED \ AND POND NO RI SEDT OPERATES AS A TEMPORARY SEpIMENT BASW FLEXIBLE PRE ' T PRIMARY WATER QUALITY ORIFICE INVERT t' PVC DRAIN DIAMETER. SEE PIAN INSTALL ORRICE IN BOTTOM OF PVC TEE h ONCE SKIMMER IS REMOVED—� AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN I"DIA . COR. PLASTIC PIPE/ CUT IN HALF AND RLAGE AGAINST RISER - BACKFILL WITH NO 57 STONE (1T DEEP) SKIMMER BASIN TIE-IN TO DRY DETENTION RISER WAKE COUNTY CONSTRUCTION SEQUENCE 1 Schedule a preconstruction conference with the Environmental Engineer Charles Phillips 919-796-8769 Obtain a land disturbing permit. 2. Install erosion Control measures based on the approved emsion control plan Clear only as necessary to install these devices Install permanent risers for Dry Detention Ponds #1 and #2 and attach skimmer to user per detail. Seed temporary diversions, berths and basins immediately after construction. 3. Call Charles Phillips at 919.791 for on site inspection by environmental inspector and obtain a Cereflrate of Compliance. 4. Begin cleanng and grubbing. Maintain devices as needed. Rough grade 5. Install storm sewer(if shown) and protect inlets with block and gravel inlet controls, sediment traps or other appmved measures as shown on the plan. Begin Constructing building, ate. 6. Stabile site as areas am brought up to finish grade With vegetation, paving, ditch linings, etc. Seed and mulch denuded areas per ground stabilization time frames 7. When construction is complete and all areas am stabilized completely, call Charles Phillips at 919-796$769 for an inspection by the environmental engineer. 8. Wake County must grant permission to convert the sediment basin over to stortnwater use prior to Completing any related work. If site is approved, remove temporary diversions, silt fencing, sediment basins, etc., and seed out or stabilize any resulting bare areas. All remaining permanent erosion control devices (such as velocity dissipators) should be installed now. Remove skimmers from sediment basins to convert temporary skimmer basins into permanent stormwater control measures. 9. When vegetation has become established, call for final site inspection by Environmental Inspector, Charles Phillips at 919-796-8769. Obtain a Certificate of Completion. 1t�T CARp�A �,Tti 7 e 4 SEAL !S 034394 7 r�A 02/21/2017 •• • 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CH' IEED BY J. CHANDLER SCALE PER PLAN Al 0rNLU Lr) Q U � Q z I In _j U) 1� W U) W O Z J O InfF- Z O U Z _O U) O W `JOB NO^ 37338 C6.1 i NOTES: I L - THE LENGTH OF THE RIPRAP APRON. 2 a- 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS MAN 6" (INCHES). 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' (INCHES) ABOVE ME MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE II� SII BANK, WHICHEVER IS LESS 4 . . A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION ;PIPE as _ L SECI70N'A-A' FFILTEP ABRIC STANDARD PIPE OUTLET TO WELL-DEFINED CHANNEL UPSTREAM END OF STORM DRAIN OVERFLOW, A • • T PIER DIA 11 DIAMETER D A A P a o BURY BOTTOM T� �_• OF PLYWOOD I I 1 -------- 3/4" EXTERIOR ALL PARTIALLY COMPLETED STORM DRAINS PLYWOOD SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WITH THESE PLYWOOD INLET PROTECTION DETAILS. rSTEEL FENCE POST I (TYPICAL) WASHED STONE FILTEY ACROSS PIPE INLET - UPSTREAM END OF STORM DRAIN rti rti rti () �) if �) ( () HARE U U U STONE FILTER INLET PROTECTION STANDARD PIPE INLET PROTECTION (PLYWOOD & STONE) NOTES: F W 1 T T 2 TEMPORARY DIVERSION DITCH TO TC USED TO INTERCEPTLO AND OR DIVERT 0 A SEDIMENT CONTROL MEASURE OR BMP 2. SILT SHALL BE REMOVED WHEN DITCH IS ONE-HALF FULL. / 3. DITCH $HALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY /ILL. 4. STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING. MULCH WITH TAC. AND/OR EROSION CONTROL NETTING. CROSS SECTIONAL VIEW WA K "7 STANDARD TEMPORARY DIVERSION DITCH I . PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF UME. FERTILIZER, AND SEED, NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN 2 BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECP's IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY' 12" (30 CMI OF RECP's EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH, ANCHOR THE RECPs WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) APART IN THE BOTTOM OF THE TRENCH BACKFILL AND COMAPCT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE RECR'5 3 ROLL CENTER RECP's IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM`, STAPLES/STARES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE RECP's END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CMI APART AND 4" (10 CM) ON CENTER TO SECURE RECP',. 5. FULL LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) APART IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6, ADJACENT RECP's MUST BE OVERLAPPED APPROXIMATELY 2" - 5' (5 CM -12.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4- (10 CM) APART AND 4` (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL ENO OF THE RECP's MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6• (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: • 1N LOOSE SOIL CONDITIONS. THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6' (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's NOTE: A7 CRITICAL PORTS • HORIZONTAL STAPLE SPACING SHOULD BE ALTERED B IF NECESSARYTO ALLOW STAPLES TO SECURE THE A. OVEREATS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE i� C. CHANNEL BOTTOM/SIDE IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE NAIV SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 m) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's, SEEDING SCHEDULE 1 2' MIN. EARTH FILL COVERED 8t 1I— OR 12" WHICHEVER IS — WASTE MATE IAL -COMPACT. SIDE DITCHES, SLOPES (MAX 11) VAR TYPE SEED h MULCH AFTER CONSTRUCTION OF DITCH E iAll FESCUE 300 LBS/ACRE _ 10' TALL FESCUE 300 LBS/ACRE \ k ABRUZZI RYE 25 LBS/ALAE MAR I - OR 15 TALL FESCUE 300 LBS/ACRE OR 15 - AM 30 HULLED COMMON BERMWA(RASS 25 LBS/ACRE AIL I - AUG 15 TAU FESCUE AND 120 LBS/ACRE O ° o° 0 p O O O p O °p O o o C ° ° _ I = I I- 1- f III V ( I I IN VAR- �J \ P 0' - 2' -i - i I -I 11- 30 LBS/ACRE -1 11 1 111 I 1 I FULLCULVERTSFLOW TOGETHER =BANK FULL ROW 1,1 I- III -1— III 77 II-III 11 I 1I— 12" -I I 1=1 IL=I I L=1 I1='' p0°G CROSS SECTIONAL VIEW WA K "7 STANDARD TEMPORARY DIVERSION DITCH I . PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION OF UME. FERTILIZER, AND SEED, NOTE: WHEN USING CELL -O -SEED DO NOT SEED PREPARED AREA. CELL -O -SEED MUST BE INSTALLED WITH PAPER SIDE DOWN 2 BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECP's IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY' 12" (30 CMI OF RECP's EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH, ANCHOR THE RECPs WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) APART IN THE BOTTOM OF THE TRENCH BACKFILL AND COMAPCT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE RECR'5 3 ROLL CENTER RECP's IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM`, STAPLES/STARES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE RECP's END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CMI APART AND 4" (10 CM) ON CENTER TO SECURE RECP',. 5. FULL LENGTH EDGE OF RECP's AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12' (30 CM) APART IN A 6' (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6, ADJACENT RECP's MUST BE OVERLAPPED APPROXIMATELY 2" - 5' (5 CM -12.5 CM) (DEPENDING ON RECP's TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4- (10 CM) APART AND 4` (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL ENO OF THE RECP's MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6• (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: • 1N LOOSE SOIL CONDITIONS. THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6' (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's NOTE: A7 CRITICAL PORTS • HORIZONTAL STAPLE SPACING SHOULD BE ALTERED B IF NECESSARYTO ALLOW STAPLES TO SECURE THE A. OVEREATS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE i� C. CHANNEL BOTTOM/SIDE IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE NAIV SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 m) MAY BE NECESSARY TO PROPERLY ANCHOR THE RECP's, SLOPES (3.1 TO 2, 1) MAR 1 - AIN I SERKYA LESPEDEZA (SCARFED) 50 LBS/ACRE A (MAR I OR 15) ADD TALL FESCUE 120 LBS/ACRE (MAP t - AIN 30) OR ADD MEEPING LOVEGRASS 10 LBS/ACRE (YAR 1 -AIN 30) OR ADD HULLED COMMON BERMUDAMASS 25 LBS/ACRE .UN I - SEP 1 •••TALL FESCUE AND 120 LBS/ACRE •'•BRONNTOP MILLET 35 LBS/ACRE ^•CN SORGHUM -SUDAN HYBRIDS 30 LBS/ACRE SEP 1 - MM 1 SERICEA LEMMA (UWARIED-UNSCMRFED) 70 LBS/ACRE AM TALL FESCUE 120 IBS/ACRE (NOV I - MAR 1) ADD ABRUZZI RYE 25 LBS/ACRE CONSULT CONSERVATION ENGINEER OR SOL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ••' TEN PORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. SEEDBED PREPARATION 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH, 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. SUPERPHOSPHATE 4.) APPLY AGRICULTURAL LIME. FERTILIZER, AND UNIFORMLY AND MIX WITH SOIL (SEE BELOW). 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED. FIRM INCHES DEEP. REASONABLY UNIFORM SEEDBED 15 PREPARED 4 TO 6 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER AFTER SEEDING. SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULMACK 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED. REESTABLISH FOLLOWING ORIGINAL LIME. FERTILIZER AND SEEDING RATES. 9 ) CONSULT CONVERSATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED • APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ACRE IN CLAY SOLS) FERTILIZER - 1,000 16s. / ACRE -10-10-10 SUPERPHOSPHATE- 500 HUI> / ACRE -209 ANALYSIS MULCH -2 TONS / ACRE - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION 0 3GO GALS./ ACRE SEEDING SCHEDULE COARSE AGGREGATE EARTH FILL COVERED 8t (REMSED. OR 12" WHICHEVER IS — SHOULDERS, SIDE DITCHES, SLOPES (MAX 11) DAZE TYPE PLANRNG RATE AUG IS - .1 I iAll FESCUE 300 LBS/ACRE NOV I - MAR I TALL FESCUE 300 LBS/ACRE Sl'PPORT \YIRF k ABRUZZI RYE 25 LBS/ALAE MAR I - OR 15 TALL FESCUE 300 LBS/ACRE OR 15 - AM 30 HULLED COMMON BERMWA(RASS 25 LBS/ACRE AIL I - AUG 15 TAU FESCUE AND 120 LBS/ACRE O ° o° 0 p O O O p O °p O o o C ° ° •"OROYMTOP MILLET 35 LBS/ACRE •"OR SORGUUM-SUDAN HYBRIDS 30 LBS/ACRE SLOPES (3.1 TO 2, 1) MAR 1 - AIN I SERKYA LESPEDEZA (SCARFED) 50 LBS/ACRE A (MAR I OR 15) ADD TALL FESCUE 120 LBS/ACRE (MAP t - AIN 30) OR ADD MEEPING LOVEGRASS 10 LBS/ACRE (YAR 1 -AIN 30) OR ADD HULLED COMMON BERMUDAMASS 25 LBS/ACRE .UN I - SEP 1 •••TALL FESCUE AND 120 LBS/ACRE •'•BRONNTOP MILLET 35 LBS/ACRE ^•CN SORGHUM -SUDAN HYBRIDS 30 LBS/ACRE SEP 1 - MM 1 SERICEA LEMMA (UWARIED-UNSCMRFED) 70 LBS/ACRE AM TALL FESCUE 120 IBS/ACRE (NOV I - MAR 1) ADD ABRUZZI RYE 25 LBS/ACRE CONSULT CONSERVATION ENGINEER OR SOL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ••' TEN PORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROW OVER 12" IN HEIGHT BEFORE MOWING, OTHERWISE FESCUE MAY BE SHADED OUT. SEEDBED PREPARATION 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH, 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. SUPERPHOSPHATE 4.) APPLY AGRICULTURAL LIME. FERTILIZER, AND UNIFORMLY AND MIX WITH SOIL (SEE BELOW). 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED. FIRM INCHES DEEP. REASONABLY UNIFORM SEEDBED 15 PREPARED 4 TO 6 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER AFTER SEEDING. SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULMACK 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED. REESTABLISH FOLLOWING ORIGINAL LIME. FERTILIZER AND SEEDING RATES. 9 ) CONSULT CONVERSATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED • APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ACRE IN CLAY SOLS) FERTILIZER - 1,000 16s. / ACRE -10-10-10 SUPERPHOSPHATE- 500 HUI> / ACRE -209 ANALYSIS MULCH -2 TONS / ACRE - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION 0 3GO GALS./ ACRE uCARpl"," •"'�o�� essro ti 9``� •R SEAL fi 034974 t S�e= IN4ir: tea: bt�( 02/21/2017 •• • DATE 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CHECKED BY 1. CHANDLER SCALE PER PLAN J W � O � .z g W O z 0 z c =° O ° VI O I --I In 91 w 37 NO^ 37338 C6.2 1/2 DIAMETER OF PIPE COARSE AGGREGATE EARTH FILL COVERED 8t OR 12" WHICHEVER IS — 6" DEEP LARGE ANGULAR ROCK GREATER F NOTES: 1. UL. BE AND SIDES FILTER FABRIC D USING SMATFSOR BY TRENCHINOD SFDATTHFENCE, CUMULAT FOR KILTIN PIE V. USING STAPLES DI E T WILL ACCUMULATEIN PIE ISEBAY, 2. MOSTOF THESEDIMENTDIMEADILY Sl'PPORT \YIRF ° _ ACCESSIBLE EE PWHI ROVIDE 3 BAFFLE READILY ACCESSIBLE. FOR MAINTENANCE O. 3 N IF FEET IN LENGTIiI. PROVIDE. I—I I EI I I I I(—) I 5BFF FOR DILS M AR GREATER THAN RAFFLES HALL BE MGrM COIR ERMION.RTHANIRAI'RF.S. 4. BAFFLE SHALL FENCE AND FABRIC' S SHOULD E2INC`OSIONBER'DIA. 5. TOPS OF BAFFLES SHOULD BE 21NOTE5 LOWER lT1AN TILE TOP OF THE BL•RMS 6. INSPECT BAFFLES FOR REPAIR ONCE. A WEEK AND AFTER EACH RAINFALL O ° o° 0 p O O O p O °p O o o C ° ° BURIED IN TRENCH CAPACITY O PIPE ST—MOST FULLCULVERTSFLOW TOGETHER =BANK FULL ROW Flow ELEVATIONI p0°G 6-X6• TRENCH, BACKFILLED AND � EARTH FILL COVERED E R1' � LARGE ANGULAR ROCK COARSE AGGREGATE uCARpl"," •"'�o�� essro ti 9``� •R SEAL fi 034974 t S�e= IN4ir: tea: bt�( 02/21/2017 •• • DATE 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CHECKED BY 1. CHANDLER SCALE PER PLAN J W � O � .z g W O z 0 z c =° O ° VI O I --I In 91 w 37 NO^ 37338 C6.2 ,I CROSS SECTION SUPPORT ROPE SUPPORT POST O O°000u B mg °po°pC°o°p p�p0 pp o°o0°o eOO° TOWIRE TO PR EVENT SA(A',I 4'INTRO BOTTOM STAKI-.TO OR SIDE. p p Oo o p°O° OOp ° O o °o °p ° O° 0 0OO Sl'PPORT \YIRF o° O o Op p Oo 0 0 G p OP ° O o p 0° O p p° °0 0 0 p °000 p00 OJ oOo °OO G°Opp Opp °°Oc FENCE AND FABRIC' O ° o° 0 p O O O p O °p O o o C ° ° BURIED IN TRENCH 0 po° ° c o o p op° OO c D"o, p p p op OO°o O�c O°C°o 00o ST—MOST O°o O O p �°ao0 O o 00 000000 00 ° Qioo Go 0p i p0°G 6-X6• TRENCH, BACKFILLED AND COIR MF SH OR SIMILAK STAPLED OR TRENCHED UNTO BOTTOM OR SIDE. COMPA(TTT) SECTION VIEW AT OPENING 25 STREAM CHANNEL 25'- MINIMUM MINIMUM TOP OF BANK { TOP OF RANI. or PLAN WAKE : STANDARD BAFFLES DETAIL " SSTANDARD TEMPORARY STREAM CROSSING uCARpl"," •"'�o�� essro ti 9``� •R SEAL fi 034974 t S�e= IN4ir: tea: bt�( 02/21/2017 •• • DATE 05/24/16 DRAWN BY J. DOOLEY DESIGNED BY B. MCLAMB CHECKED BY 1. CHANDLER SCALE PER PLAN J W � O � .z g W O z 0 z c =° O ° VI O I --I In 91 w 37 NO^ 37338 C6.2 R1102\37338-B.�b) _LxMirgIDWG\SF CD%37338C6 02-NTDT.Mq 11`— —W17 1254 PM i Ey Bra — MCLamp Jill I I o A � if 6 E C T r � i Jill o Amo= mA vt,2CN n N m'fiu.�n oI a T N 3! IN 4 2 14 y _ I TIMMONS G ••• •• THIS DRAWING P102 1 Ral AT THE RALEIGH OFFICE • VOUIi VISION ACHIEVED THROUGH OURS.• 5410 6'6"4"'Road, Suite 33.1 Raleigh, NC 27607 mons.• TE1919.866A951FA%919.833.8124 www.timmons.com LICNI r (— DATE REVISION DESCRIPTION ��\a t (� w BAILEY'S LANDING - PHASE 4 a M = m 3 p 08/II/I016 _WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS $ 11-1 5-20161 REVISED TOTAL SITE AREA ti o W CITY OF RALEIGH WAKE COUNTY NORTH CAROLINA S S p o �" X01 12-1I-7016 WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS _ o D GENERAL NOTES & DETAILS 2 z a °i _ 02-21-2017 _ WAKE COUNTY ENVIRONMENTAL SERVICES COMMENTS _ Tpese pone 8M aesoudeB Bxomenb xe 8re eetluane WopeM o1 TIMMON3 GROUP xM maY wrepGROU41n vfide a In pat aM aMN npl M ueW b xry W/pose e4�eleoever. rticluana. pd rrol IImBeE to conelrudron. pUNng, eMla conapuction etaki.q xipiout Me aepreee dlen ooneed d TIMMOIMNS GROUP. I, PROTECTION r i — \ EMERGANGN­7 SPILkWAY ` ; / / I 4'X4' II / RISER ) I I I I I l l i / DRY ' OUTLET DTENTIO POND#iN I / )TECTION @ PIPE D OUTLLEY I J PRO*CTION 1 @,P7E E 1 y / Zx% - — X11 •., /� /,�� DRY DETENTION a/ PONDTLE PROTECTION .s @ PIPE C I / / 100 YF EL 405.43 i YP EL 404.2__ I YR EL 403.56 r CONTRACTOR' /ORIFICE CONCRETE RISER NO SCALE TOP OF DAM r— 5 .END SECTION ELEVATION EL 406 C EMERGENCY SPILLWAY ELEVATION r; _ ` EL 40S G - 1 � Q� SOLUTIONS TRASH O h / RACK (OR EQUAL), LENGTH (FT) \; \\ ANTI -VORTEX TRASH RACK BY PLASTIC GROUNDWATER SOLUTIONS OR EQUAL SEE TABLE FOR DIMENSIONS �'�`"- CREST OF RISER THE TOP OF RISER.( JOINT) 1.0 ELEVATION �— CENTERLINE\ / 1 411.0 \- CONCRETE RISER OF DAM !� , SEDIMENT DEPTH INDICATOR ELEVATIONEL POND p2 / 4010 BARREL INV. IN ELEVATION 1 FX5'X5' CONCRETE ANTI -SEEP COLLAR LOCATED INSTALL AN ' .END SECTION IMPERMEABLE LINERDRILL ORIFICE INTO OF COMPACTED SOIL RISER WITH PLASTIC ORIFICE INTO AS POND BASE SO SOLUTIONS TRASH REA(ACRES)�PRE-DEV FLOW(CFS) FLOW(CFSI THAT LINER WILL NOT RACK (OR EQUAL), LENGTH (FT) RAISE OR LOWER I OVER ORIFICE. TRASH SLIGHTLY DOWNSTREAM GROUNDWATER RACKTOEXPANDTOI SEE TABLE FOR DIMENSIONS (MINIMUM 2' FROM PIPE THE TOP OF RISER.( JOINT) DEPTH AT ENTRANCE (CREST) OF SPILLWAY EMERGENCY SPILLWAY DETAIL NO SCALE NOTE'. INSTALL RUBBER GASKETS ON ALL PPE JOINTS FOR WATERPROOFING BMF .END SECTION BARREL BASIN VOLUME EMERGENCY SPILLWAY �RIPRAP OUTFALL ORIFICE INTO / PROTECTION Zj REA(ACRES)�PRE-DEV FLOW(CFS) FLOW(CFSI BARREL INV. IN ELEVATION 5'X5X5-CONCRETE LENGTH (FT) \ ANTI -SEEP COLLAR LOCATED BARREL INV. OUT ELEVATION ' — CONCRETE ANTI -FLOTATION SLIGHTLY DOWNSTREAM BLOCK @ BASE ELEVATION FROM CENTERLINE OF DAM SEE TABLE FOR DIMENSIONS (MINIMUM 2' FROM PIPE 35 JOINT) BMF DRAIN = P PEAU ri YR PEAF POST -DE/ REQUIRED BASIN BASIN VOLUME EMERGENCY SPILLWAY ANTI -FLOTATION ORIFICE INTO ORIFICE NUMBER REA(ACRES)�PRE-DEV FLOW(CFS) FLOW(CFSI VOLUME (CF7 PROVIDED (,-_F) LENGTH (FT) BASE DIMENSIONS RISER (IN.) ELEVATION DETENTION 15.23 1 5.81 468 10.834 14,727 35 8'Y8'x2' THICK 1.0 402.0 POND #1 1 411.0 \- 410.0 1 �RIPRAP OUTFALL POND p2 BMP TOP OF BERM EMERGENCE' SPILLWAY CREST OF RISER TOP OF RISER BOTTOM OF BASIN BARREL BARREL BARREL INVERT IN BARREL INVERT OUT RISER NUMBER ELEV. ELEV. ELEV FOOTING ELEV ELEV. DIAMETER nN; LENGTH (FT.) ELEv ELEV. THE TOP OF RISER. DETENTION 40EC 405.0 404.0 4010 402,0 _" RCP 50 4010 3995 /-END SECTION POND #1 1 411.0 \- 410.0 1 �RIPRAP OUTFALL POND p2 BMP SIDES AND WEIR SHALL HAVE MAXIMUM SLOPES OF 3'1 OR FLATTER DIMENSIONS SHOWN ARE AT WEIR ELEVATION OF BASIN BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY -— / TOP OF DAM ELEVATION � EL 415.0 EMERGENCY SPILLWAY ELEVATION �j ��'�\ �� �� EL 414.0 _V_100 YR EL 413.34 .�f V 10 IF EL 413.17 ANTI -VORTEX TRASH 1-YP E 41 3 00- _ RACK BY PLASTIC SOLUTIONS OR EQUAL SEDIMENT DEPTH INDICATOR ELEVATION EL 412 0 CONTRACTOR TO/ INSTALL AN / /�\'--- IMPERMEABLE LINER DRILL ORIFICE INTO OF COMPACTED SOIL RISER WITH PLASTIC AS POND BASE SO SOLUTIONS TRASH THAT LINER WILL NOT RACK (OR EQUAL) RAISE OR LOWER OVER ORIFICE, TRASH GROUNDWATER RACK TO EXPAND TO O-jING EV THE TOP OF RISER. ORIFICE CONCRETE RISER NO SCALE DEPTH ,j:' i - IN - AT ENTRANCE (CREST) OF SPILLWAY EMERGENCY SPILLWAY DETAIL NO SCALE BMF DF AIN YR DEAF I ?P PEAT! FOST DEV. R O.IIRED BASIN BASIN VOLUME EMERGENCY SPILLWAY ANTI -FLOTATION ORIF✓JE INT,- ORIFICE NUMBER AREA ACRE ,;PRL -DEV FLOK'FS)i FLOW(CFS)VOLUME (CFI PROVIDED (CF) LENGTH (FT) BASE DIMENSIONS 1 RISER (IN_1 ELEVATION 1 -� t ( DETENTION a a0 1 61 C 79 1 2.839 4,a66 20 8 x8'.2 THI,n LO 4' _C, I T 1 I BMP TOP OF BERM EMERGENCY SPILLWAY CREST OF RISER TSP OF ER BOTTOM OF BASIN CREST OF RISER \ /�\!`� " NOTE INSTALL RUBBER GASKETS ON ALL PIPE JOINTS ELEVATION 1_1[� �— /' CENTERLINE / ;/ V FOR WATERPROOFING CONCRETE RISER OF DAM O-jING EV I ELEV. DIAMETER (IN z LENGTH (FT_) ELEV_ LGA DETENTION 415.0 414.0 /-END SECTION BARREL 1 411.0 \- 410.0 409.5 �RIPRAP OUTFALL POND p2 PROTECTION BARREL INV. IN ELEVATION 1 FX5'X5' CONCRETE ANTI -SEEP COLLAR LOCATED BARREL INV. OUT ELEVATION CONCRETE ANTI -FLOTATION SLIGHTLY DOWNSTREAM BLOCK @ BASE ELEVATION FROM CENTERLINE OF DAM SEE TABLE FOR DIMENSIONS (MINIMUM 2' FROM PIPE JOINT) BMF DF AIN YR DEAF I ?P PEAT! FOST DEV. R O.IIRED BASIN BASIN VOLUME EMERGENCY SPILLWAY ANTI -FLOTATION ORIF✓JE INT,- ORIFICE NUMBER AREA ACRE ,;PRL -DEV FLOK'FS)i FLOW(CFS)VOLUME (CFI PROVIDED (CF) LENGTH (FT) BASE DIMENSIONS 1 RISER (IN_1 ELEVATION 1 -� t ( DETENTION a a0 1 61 C 79 1 2.839 4,a66 20 8 x8'.2 THI,n LO 4' _C, I T 1 I BMP BMP SIDES AND WEIR SHALL HAVE MAXIMUM SLOPES OF 3.1 u FLAT It. DIMENSIONS SHOWN ARE AT WEIR ELEVATION OF BA51N BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY CAP O 4F.SS o.� ij py SEAL 031377 02/21/2017 E E Fc v ; 2 2 wua'X F Fi a� m F i2 z O O O wOo,^h O y � m LL N � VWi IW/1 p O Zg G� t W 0 2 K 2 2I � O Q O O vi 20=2; j O p 0 01 O U W U Vi 0 3�33I i ❑ YO �O �O 1 � 0000� N N N N H 0 GATE 05/24/]6 0 DRAWN BY J. DOOLEY • DESIGNED BY •B. MC(AMB • CHECKED BY J. CHANDLER • • SCALE • PER PLAN 0 Lmu N V) a S N E O J d u z Z U 8 LU I Ui o W (1'j Z (D o6 F U z z In a H p W a 0"~ Wp a �Y J z J m o g;<1; Z`y am J 8. LLJ LL w E; 0 � a I W V OZ J1-4 NcI1 co OB 37333 8 SHEET N0. s C6.4 TOP OF BERM EMERGENCY SPILLWAY CREST OF RISER TSP OF ER BOTTOM OF BASIN BARREL BARREL BARREL IN VERT IN EARR LIN VERT OU7 PISEF NJMBER ELEV ELEV ELEV. O-jING EV I ELEV. DIAMETER (IN z LENGTH (FT_) ELEV_ LGA DETENTION 415.0 414.0 4130 410.0 1 411.0 15" RCP 50 410.0 409.5 4X4' RCP POND p2 BMP SIDES AND WEIR SHALL HAVE MAXIMUM SLOPES OF 3.1 u FLAT It. DIMENSIONS SHOWN ARE AT WEIR ELEVATION OF BA51N BASIN VOLUMES PROVIDED ARE BASED ON AVAILABLE VOLUME AT THE PRINCIPAL SPILLWAY CAP O 4F.SS o.� ij py SEAL 031377 02/21/2017 E E Fc v ; 2 2 wua'X F Fi a� m F i2 z O O O wOo,^h O y � m LL N � VWi IW/1 p O Zg G� t W 0 2 K 2 2I � O Q O O vi 20=2; j O p 0 01 O U W U Vi 0 3�33I i ❑ YO �O �O 1 � 0000� N N N N H 0 GATE 05/24/]6 0 DRAWN BY J. DOOLEY • DESIGNED BY •B. MC(AMB • CHECKED BY J. CHANDLER • • SCALE • PER PLAN 0 Lmu N V) a S N E O J d u z Z U 8 LU I Ui o W (1'j Z (D o6 F U z z In a H p W a 0"~ Wp a �Y J z J m o g;<1; Z`y am J 8. LLJ LL w E; 0 � a I W V OZ J1-4 NcI1 co OB 37333 8 SHEET N0. s C6.4