HomeMy WebLinkAbout20061342 Ver 1_Bishop Rd Mitigation Plan_20070716 if July 16, 1007 Surplus Asset Confirmation Meeting NCDENR - DWQ and EEP NCDOT - PDEA Baker Engineering ABC Site, Beaufort County, Tar-Pamlico 03020104, Division 2 EEP is in the process of closing out site after five years of monitoring done by DOT and EEP. According to draft close out summary information, site is expected to close with 2,375 feet of stream enhancement II, 101.63 acres nonriparian restoration, 9.24 acres of nonriparian creation, and 27.57 acres nonriparian preservation. Ballance Farm, Currituck County, Pasquotank 03010205, Division 1 There is one additional debit against this site that was not included on DOT's February 2004 debit ledger. A debit in the amount of 0.68 acres was required for TIP B-2536. The error was .discovered by NCDCM during a check of CAMA permits issued to DOT. DOT requested that EEP adjust the final DOT debit ledger thus resulted in a new transferred balance for this project of 27.57. The site was monitored and closed out by DOT. I was aware that NCDCM had some issues with the coastal marsh creation of this site and had requested a wetland delineation to determine the actual amount of acres. Need to obtain documentation that outlines what the final coastal marsh .creation amount should be for the site. .Bishop Road, Hyde County, Tar-Pamlico 03020104, Division 1 ap Site was advertised for construction; however, the cost proposals submitted were well over the engineer's estimate. EEP had the consultant re-do the design to cut out some of the grading activities in an effort to lower the cost to construct. The new amounts currently being advertised are: 1.2 acres riparian restoration 61.6 acres riparian preservation 58.2 acres nonriparian restoration 38.6 acres nonriparian enhancement 320.4 acres nonriparian preservation 2.8 acres coastal marsh restoration 189.6 acres coastal marsh preservation Total Acres 672.40 Total Credits 62.2 restoration 133.62 restoration equiv. Brock Site, Jones County, Neuse 03020204, Division 2 Site started at DOT as potential of 2,565 feet of stream restoration. Mitigation Team File sheet shows 2,200 feet stream enhancement. Uncertain as to which amount is the correct amount. I found some reference to potential multiple property owners but in the end, there is only one property owner that an easement was purchased. DOT had one debit against this site of 969 feet for TIP R-2539.