Thank you for talking with me this morning. Dominion needs to install a new tower in the wetland because of two
constraints. The existing tower on the opposite side of the highway from the substation cannot support the line angle into
the substation so a new structure is required to connect the transmission line to the substation (when the original
application was submitted, it was thought that the existing structure could be used). Secondly, there is not enough room
between the new substation fence and Battleboro Road to place a new structure outside of the wetland.
Please let me know if you have any additional questions!
Anna Stuart
Anna Stuart Lambert
Angler Environmental, a RES Company
804.729.8984
From: Anna Lambert [mailto:alambert(c,,anglerenvironmental.com]
Sent: Friday, January 27, 2017 9:58 AM
To: Dailey, Samantha J CIV USARMY CESAW (US) <Samantha.J.Dailey�,usace.armymil>
Cc: Burdette, Jennifer a <Jennifer.Burdetteg ncdenr.gov>; Amanda M Mayhew (VirginiaPower - 6)
<Amanda.M.Mae hew wdom.com>; Thad Loucks, P.W.S., P.W.D.<tloucks(c&anglerenvironmental.com>
Subject: SAW -2015-01994, DWR4-15-1279: Hathaway Project Permit Mod
Good morning,
Attached, please find a Permit Modification Request for the Hathaway Switching Station Project. The permittee is
planning to add a new tower outside of the switching station resulting in one additional PEM wetland impact. If you have
any questions or need additional information to process this request, please let me know.
Have a great weekend!
Anna Stuart
Anna Stuart Lambert
Environmental Specialist
Angler Environmental, a RES Company
D: 804.729.8984 10: 804.353.6017