Loading...
HomeMy WebLinkAbout20071814 Ver 1_Approval Letter_20071221o?o? w H rF9QG o `ql: *-,? pyl t ( 3.0p'1 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality December 21, 2007 DWQ# 07-1814 Stanly County Mr. Miller Baker Engineering NY, Inc. 1447 S Tryon Street, Suite 200 Charlotte, NC 28203 Subject: Big Cedar Creek Stream Restoration APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Miller: You have our approval, in accordance with the attached conditions and those listed below, to impact 11,064 linear feet (If) of stream to in order to conduct the stream restoration/enhancement project in Stanly County, as described in your application received by the Division of Water Quality (DWQ) on October 26, 2007. After reviewing your application, we have determined that this project is covered by Water Quality General Certification Number 3626, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands/regcert.htmi). The General Certification allows you to use Nationwide Permit Number 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions: The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. 2. Monitoring: A general site inspection shall be conducted at least semiannually. An annual report shall be submitted to DWQ once the proposed analysis is completed (Section 7.1- 7.3). Benthic monitoring shall also be included in the stream performance analysis as proposed in the application. 3. Existing stream substrate (where practicable) shall be utilized as "seed" material for the new channel. 4 Continuing Compliance. The applicant (Baker Engineer NY, Inc.) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state and federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure One compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Carolina NAM1711y North Carolina Division of Water Quality 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone (704) 663-1699 Customer Service Internet: ncwaterqulaity.org FAX (704) 663-6040 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503, and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act. and shall also become conditions of the 404 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663- 1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721. Sincerely, for Coleen H. Sullins Attachments: Certificate of Completion cc: Army Corps of Engineers, Asheville Ian McMillan, Wetlands Unit MRO, Land Quality Central Files File Copy Christine Miller, Baker Engineering