Loading...
HomeMy WebLinkAbout20160149 Ver 2_Certification of Completion_20170223;� ':,. 4 7 ,p f , Environmen ta( Quatity ROY COOPER Govemor MICHAEL S. REGAN Secrefarr S. JAY ZIMMERMAN D��ecrur NCDWR Project No.:2�� �D��C�L County: '�''y � , _ , �--�, _ ------ — Applicant: �Ll�C7� Ft:-�n� �,�,5��.,� --`—"��`—`�_-1����-------. �T ----- — - Project Name: _J�v� �'Cr�--- `�'i r��Sl��l... --%t�:n_�Cru���,, �!C ��� Date of Issuance of �101 Water Qualit� Certification: ��� � ��) � - � � -- -- - Certificate of Completion Upon completion of all �tiork approved within the 401 Water Quality Certitication or applicable E3uffer Rules, and any subseyuent moditications, the applicant is required to return this certificate to ihe 401 Transportation Permittin�� Unit, North Carolina Uivision of Vb'ater Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This forn� may be returned to NCDWR by the applicant, the applicant's authorized agent. or the project engineer. It is not necessarv to send certiticates from all of these. :-a��r�•�,,,r's ('eitificulinn I, _����nr��, ��'� ��. _ , hereb}� state that. ta the best of my abilities, due care and diligence �i�as used in the observation of the construction such that the construction ��as observed to be built ti ithin substantial compliance and intent of'the �l�l Water Qualit� Certitication and E3ufter Rules, the approved plans and specitications d t er supporting terials. ' ��Z � Z i� r� Signature: � .,� � Date: _..._�.__.__ ,9�eiu's Certrficutin�r I, __ , hereb� state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certitication and Buffer Rules, the approved plans and specitications. and other supportin� materials. Signature: F.ngbreer's Certificu�ron Partial Final Date: (. , as a dul� re��istered Professional En��ineer in the State of North Carolina, havin� been authorized to observe (periodicallv, weehly, full time) the construction of the project for the Permittee herebv state that, to the best of m� abilities, due care and dili��ence �+as used in the observation of the construction such that the construction was observed to be built �iithin suhstantial compliance and intent of the 401 Water Quality Certitication and I3ut�ter Rules, the approved plans and specitications, and other supporting materials. Signature Date Ke��istration No. '�"Nnt}�ing Cc�napare� titare of Nnrth Carolina ; Em ironmental tlualrt� i',I' Slail �eniic Ccnt�r hal�i,_h- V�,rth ('urolina �?r,�x,_;i,i,