HomeMy WebLinkAboutNC0004987_Authorization to Construct_20161024 i
{T f
f: North Carolina Depa! Iment of Naturae
07- Resources &C_ om-nuntty Developrn.ent
James-B. H.:11I; Jr., Gr�vern,,, Lei.,. Sec.,eiary +
DIVISION OF ENVIRONMENTAL MANAGEMENT
February 1, 1980
:lr. S. B. Hager, Chief Engineer
Civil Environmental Division I
Duke Power Company
Electrical Center
P; 0. Box 33189
Charlotte, NC 2`8.242
Subject: Permit No. NCOn;-)4987
Authorization to Construct
Duke Power Company
Stage 1 Ash Storage Basin Modifications
Marshall Steam Plant
Catawba County
Dear i,lr. Hager:
Final plans and specifications for the subject project have been reviewed
i
and found to be satisfactory. Authorization is hereby granted for the construction
of modifications to the existing ash storage basin at the Marshall Steam Plant,
consisting of the following: (1) extending the existing south basin dike i
1600 feet north to form a secondary ash basin and raising the existing south
basin ash dike to elevation 801; (2) construction of a primary ash tower in 1
the south, basin, a secondary ash tower in the new ,proposed north basin, and a
saddle dike between the primary tower and new proposed secondary ash basin; -
rota (3) the sealing of the existing south basin ash tower.
This is a Class I Wastewater Treatment Plant and the operator in -respon-
sible charge must hold a valid Grade I Certificate.
This Authorization to Construct shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with the conditions
1
and limitations specified in Permit No. NC0004987.
Also, enclosed is a copy of WPC Form #50 "Cost of Wastewater Treatment Works. "
This form is to be completed and returned to this office within thirty (30) days
after the project is completed.
i
P a B,,. -- ,,,
I
IL---- __- - -- ------------- -- - ---- --- - --- ----- ----- --- - - ----— - -- ----------