Loading...
HomeMy WebLinkAboutNC0004987_Authorization to Construct_20161024 i {T f f: North Carolina Depa! Iment of Naturae 07- Resources &C_ om-nuntty Developrn.ent James-B. H.:11I; Jr., Gr�vern,,, Lei.,. Sec.,eiary + DIVISION OF ENVIRONMENTAL MANAGEMENT February 1, 1980 :lr. S. B. Hager, Chief Engineer Civil Environmental Division I Duke Power Company Electrical Center P; 0. Box 33189 Charlotte, NC 2`8.242 Subject: Permit No. NCOn;-)4987 Authorization to Construct Duke Power Company Stage 1 Ash Storage Basin Modifications Marshall Steam Plant Catawba County Dear i,lr. Hager: Final plans and specifications for the subject project have been reviewed i and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing ash storage basin at the Marshall Steam Plant, consisting of the following: (1) extending the existing south basin dike i 1600 feet north to form a secondary ash basin and raising the existing south basin ash dike to elevation 801; (2) construction of a primary ash tower in 1 the south, basin, a secondary ash tower in the new ,proposed north basin, and a saddle dike between the primary tower and new proposed secondary ash basin; - rota (3) the sealing of the existing south basin ash tower. This is a Class I Wastewater Treatment Plant and the operator in -respon- sible charge must hold a valid Grade I Certificate. This Authorization to Construct shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions 1 and limitations specified in Permit No. NC0004987. Also, enclosed is a copy of WPC Form #50 "Cost of Wastewater Treatment Works. " This form is to be completed and returned to this office within thirty (30) days after the project is completed. i P a B,,. -- ,,, I IL---- __- - -- ------------- -- - ---- --- - --- ----- ----- --- - - ----— - -- ----------