Loading...
HomeMy WebLinkAbout20091224 Ver 1_Maps_20080610 m See Sheet 1-A For Index of Sheets STATE OF NORTH CAROLINA WA= RA1{TAO MT ~qRe ~ 86~9gR •c• B-3611 i m •4'•.. t'1x I DIVISION OF HIGHWAYS ~ / / RA'R A°lN1 RFROLII~ Ip~ryV YY 33162.1.1 BRSTP-99 3 PE BEA UFOR T COUNTY Belli M LOCATION: BRIDGE NO. 77 OVER PANTEGO CREEK ON NC 99 54 h TYPE OF WORK. GRADING, DRAINAGE, PAVING AND STRUCTURE U PR - ax r! ~ A t O t 4wo 4 ` .v» t ~I VICINITY MAP m rl BEGIN STATE PROJECT B-3611 Z END STATE PROJECT B-3611 j ffi -L- STJ4.11 + 50 n -L- STA. 71+94.49 :2: - 0 s ho 5 - of ~1 ~~pGE NO. 77 _ Pa ! O 264 BASS o ~ r o oaLLE GHEE al~0 L , PAS 4 ~ ~ ~ i' I TOWN OF BELHAVEN " I3+1001`SPI:BTJ<Jk" THERE IS NO CONTROL OF ACCESS ON THIS PROJECT I amr uaa x°pc . _SD A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPALITY OF BELHAVEN ~ WEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD c -101 HYDRA EMTCS ENGLi(HER DMSION OF ffiGHWAYS GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in "a Office Of.. } DIVISION OF HIGHWAYS STATE OF NORM cAaoLnvA 1000 elrcA Ridge Dr„ lT°LJfA NC, 27610 50 25 0 50 100 ADT 2007 = 5950 LENGTH ROADWAY TIP PROJECT B-3611 = 0.520 Miles F ADT 2030 = 9600 LENGTH STRUCTURE TIP PROJECT B-3611 = 0.625 Miles 'TA RE 5p=mcA17OAw D PLANS DHV = 10 % rs 5,0 25 50 100 D = 60 % TOTAL LENGTH TIP PROJECT B-3611 = 1.145 Miles JUGJTT OF WAY DATE: JIMMY GOODNIGHT PE Tuxe T = 9 % ° JANUARY 16 2009 'x'' mmram ROADWAY DESIGN ° c 11111 , c o":2 _ PROFILE (HORIZONTAL) BNGIlOBR ° ° ° oz V = 5040 MPH ow 10 5 0 10 20 L927I2VG DATE: Mark Huse Y ° TTST 6 DUAL 3 Y a o= JANUARY 19, 2010 rte" >a L~ FUNC, CLASS = COLLECTOR N L~ PROFILE (VERTICAL) PA JA SZWUTUR& STA7= WWWAY D91= 8hKi0VB89 8-36n -B N Note: Not to Scale m *SU.E. = Sxat a Utility Engineering STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS WATER: BOUNDARIES AND PROPERTY,- RAILROADS.' Water Manhole State Line Standard Gouge # Water Meter o [$X 7RANSPoRIATgM RR Signal Milepost E,0 35 Water Valve County Una - - - Switch EXISTING STRUCTURES,' Water Hydrant .0 Township Line - - swna+ RR Abandoned - - - MAJOR: Recorded U43 Wafer Line City Una RR Dismantled Bridge, Tunnel or Box Culvert C-NC Designated lbG Water Line (S.U.E.*) A/G water Bridge Wing Wall, Head Wall and End Wall - [ONC WW Above Ground Water Line Property Line RIGHT OF WAY MINOR: Existing Iron Pin EP Baseline Control Point Head and End Wall cow- coca N: Property Comer 4( Property Existing Right of Way Marker Pipe Culvert N Satellite Dish Y Monument ~ Existing Right of Way Line - Footbridge N Pedestal Parcel/Sequence Number @ Proposed Right of Way Line Drainage Box: Catch Basin, DI or JB ?-a N Tower Existing Fence Line -X-x-X- Proposed Right of Way Line with Proposed Woven Wire Fence a Iron Pin and Cap Marker Paved Ditch Gutter U~ N Cable Hand Hole Proposed Chain link Fence a Proposed Right of Way Line with Storm Sewer Manhole Os Recorded U43 N Cable Concrete or Granite Marker Storm Sewer ° Designated USG N Cable (S.U.E.') Proposed Barbed Wire Fence a Existing Control of Access Existing Wetland Boundary Recorded USG Fiber Optic Cable Proposed Control of Access U2ZLE IES.° Designated UAG Fiber Optic Cable (S.U.E.'~- - - - F°- - - Proposed Wetland Boundary Existing Easement Line --E-- POWER; Existing Endangered Animal Boundary Proposed Temporary Construction Easement - E Existing Power Pole GAS: Existing Endangered Plant Boundary Proposed Temporary Drainage Easement- -roe- Proposed Power Pole b Gas Vahro 0 BUILDINGS AND OTHER GULYUBE.- Proposed Permanent Drainage Easement- -PDE- Existing Joint Use Pole + Gas Meter Gas Pump Vent or UG Tank Cap o Proposed Permanent Utility Easement -PuE- Proposed Joint Use Pole Recorded UG Gas Line Sign S Power Manhole 0 Designated 111113 Gas Line (S.U.E.') o ROADS AND RELATED FFATUMS.° Well - Existing Edge of Pavement Power Line Tower ® Above Ground Gas Line A r -°w Small Mine Power Transformer 0 Foundation ~ Existing Curb ~ Proposed Slope Stakes Cut UIG Power Cable Hand Hale ® SANITARY SEWER: Area Outline 0 r H-Frame Pole e e Sanitary Sewer Manhole Cemetery ~ Proposed Slope Stakes Fill - - - - - - - ~--~-n Proposed Wheel Chair Ramp © Recorded UkG Power Line ° Sanitary Sewer Cleanout p Building u Designated UG Power Line (S.U.E.*) UIG Sanitary Sewer Una u School Proposed Wheel Chair Ramp Curb Cut - (ED Above Ground Sanitary Sewer A/- 5mI,ary sewer Church Curb Cut for Future Wheel Chair Romp - cr TELEPHONE: Recorded SS Forced Main Line FW- • Existing Metal Guardrail Dam Existing Telephone Pole Designated SS Forced Main Line (S.U.E.*) - ----,a---- Proposed Guardrail T T Proposed Telephone Pole n n HYDROLOGY Existing Cable Guideroil n Stream or Body of Water - - - n n n Proposed Cable Guideroil n Telephone Manhole 0 MISCELLANEOUS: Hydra, Pool or Reservoir - Telephone Booth ID Utility Pole Equality Symbol 0 Jurisdictional Stream L ® Telephone Pedestal M Utility Pole with Base p Pavement Removal Buffer Zone 1 -Q 1 - Telephone Cell Tower i Utility Located Object p Buffer Zone 2 -st 2- VEGETATION.- UAG Telephone Cable Hand Hole ® Utility Traffic Signal Box Flow Arrow Single Tree Q Recorded UIG Telephone Cable Utility Unknown WG Line -M - Disappearing Stream - Single Shrub © Designated UIG Telephone Cable (S.U.E!)- WG Tank; Water, Gas, Oil Spring Hedge Recorded USG Telephone Conduit A13 Tank; Water, Gas, Oil 0 Wetland Woods Line Designated UG Telephone Conduit(S.U.E`)- LPG Test Hole (S.U.E.*) m Proposed Lateral, Tail, Head Ditch Orchard t? Q Q Recorded UG Fiber Optics Cable , I° Abandoned According to Utility Records - AATUR False Sump m Vineyard Nneyara Designated IJAO Fiber Optics Coble (S.U.E,")- ----,F°--- End of Information E.O.I. i P PROJECT REFERENCE N0, SX!!T N0. ` 8-3611 Z PAVEMENT SCHEDULE ROADWAY DESON PAVEMENT DESIGN (PREUNINARY PAVEAIEAT DESIGN) ENGINE!! BNOMEER C1 PROP APPROX. 1.1/8' ASPHALT CONCRETE SURFACE COURSE, TYPE 80 60, 4 SURVEY fE ESISTING 4 SURVEY INCOMPLE E PLANS AT AN AVERAGE RATE OF 188 LBO. PER 60. YD. m rear USS FOR /w nwUMMON C7 C2 PRELIMIN RY PLANS C2 PROP APPROX. S' ASPHALT CONCRETE SURFACE COURSE, TYPE $0.68, C2 D2 Di m Nar v34 ro cvNSrum OWE AT AN AVERAGE RATE OF 188 LBS. PER 80. YD. IN EAH OF TWO LAYERS. E2 POINT 2 C3 E2 PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE TYPE 80.50 02 DT E2 112 LOS. YD. PER I C3 PAT AN LACEDA NRLAYERSTNOTFLESS THAN 1E1/2" OR DEPT2H'TO BE IN DEPTH. ` 2.5' I U2.5' D1 PRO/ APPROX. 8.1/2 " ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I10.OB, 3' ASN' MIN. 3' AT AN AVERAGE RATE OF 006 LBO. PER E0. YO. MIN. 3' 2.5' 5' ALAN. PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I.0.06, MIN. ALAN. MIN. 3' Detail Showing Method of Wedging . . PER 1' EPTH. D2 IN LAYERSRNOT LEESS THAN12-1/4" INPERDEPTH90. GREATEROTHAN 4' INSDEPTH. Detail Showing Method Of Wedging E1 PROP. APPROX. 4' ASPHALT CONCRETE BASE COURSE, TYPE 625.0. AT AN AVERAGE RATE OF 460 LBO. PER 60. YD PROP, VAR. DEPTH ASPHALT CONCRETE SASE COURSE, TYPE 925.0. AT AN E2 AVERAGE RATE OF 114 LIB. PER AS. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 8.1/2" IN DEPTH. PROP. B" AGGREGATE BASE COURSE AR. VAR. 11l-121 W-12' AR. T EARTH MATERIAL. C POINT EXISTS PES U EXISTING PAVEMENT. 08 08 ORIGINAL GROUND \ \ 3'l 1N VARIABLE DEPTH ASPHALT PAVEMENT (BEE STANDARD WEDGING DETAIL) _ T ' 3 \ \ \ J ORIGINAL GROUND SEE X-SECTIONS NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE. SEE X-SECTIONS TYPICAL SECTION NO.1 -L- USE TYPICAL SECTION NO.1 AS FOLLOWS: -L- STA. 11+50 TO 13+00 -L-STA. 71+00 TO 71+94.49 10' 6' 12' 12' 12' 11' W/GR 11' WiGR ORIGINAL GROUND FOPS FOPS C VARIABLE C POINT SEE X-SECTIONS OB 02 01 08, ORIGINAL GROUND 4;1 611 - - - - - - 6;1 T Di El U 9-W. Di E1 T 3rl JORIGINAL GROUND 2 VARIABLE SEE X-SECTIONS TYPICAL SECTION NO.2 09GINAL GROUND 4- USE TYPICAL SECTION NO.2 AS FOLLOWS: -L- STA. 13+00 TO 19+00 -L- STA. 63+50 TO 71+00 1 6' 12' 12' 12' 11' WiGR 11' W/GR ORIGINAL GROUND FOPS FOPS VARIABLE - ~ POINT SEE X-SECTIONS ?7 08 "02 04 08 ORIGINAL GROUND 4.1 6:1 ° 6;T T DI V1' 3T ORIGINAL GROUND a E1 TYPICAL SECTION NO.3 VARIABLE SEE X-SECTIONS aGINAL GROUND o~ ~v USE TYPICAL SECTION NO.3 AS FOLLOWS: 4, STA. 19 + 00 To 6 + 50 (BEG. 4-STA. 60+00 (END BRIDGE)TO BRIDGE) PROJECT REFERENCE NO. :Neer ND. N 8-36/1 2-A ROADWAY DESIGN PAVDAENT DEIGN ENGINEER ENGINat INCOMPLE E PLANS W NOT M FOR /i ACQU64 M DETOUR PRELIMIN RY PLANS • ~ W NOT UN COMrRUL OX 32' 3' 11' 11' ' 12' 12' 11' W/GR 11' W/GR PAVEMENT SCHEDULE C1 8" Was POW Cl -ORAOL *VARIABIE BICYCLE SAFE RAILS `05 02 02 08, USE TYPICAL SECTION NO.4 AS FOLLOWS: 3,.1 3Q REQUIRED 6 N -DET- STA. 22+99.63 TO 31+64.60 C2 3' so-so T 11" Al 1 TYPICAL SECTION ON STRUCTURE 03 VAR. DEPTH 49.31 *VARIABLE SUPER ELEVATION TYPICAL SECTION N0.4 SEE PLANS 01 E•I/9' X19.03 D2 VAR. DEPTH I19.05 E1 4' R96.B E2 VAR. DEPTH B23.13 1' ABC rk 4- /-DET- T EARTH MATERIAL. 1' i' ' it' WiGR III W/GR U IXCITlNG PAVEMENT. r / FDPS FDPS 7I~ w WEDGING x~E~cloNS - 11-02 - u? - - _ - ORIGINAL v- F ~S ORIGINAL GROUND V~ SEE, ' r Zo c 01 E1 1 1Y8~ . ORIGINAL GROUND VAR. WIDTH EARTH SHOULDER ' VAR. WIDTH EARTH SHOULDER - - - - ULTIMATE -Lr TEMPLATE TEMPORARY DETOUR TEMPLATE DURING PHASE CONSTRUCTION DETAIL OF GRADING AND PAVING LIMITS OF TEMPORARY DETOUR USE FROM -DET- STA. 15+25 TO 22+98.63 I C TJ d V U m m1 f/ m" o° i o/ 00 r~ Qo ~o Ni REVISIONS 29-MAY-2008 09:39 r:\roadwa \ ro \b3611-detail_s2-b.dgn 8/17/99 MATCHUNE -DIET- StA 25+00 I I" 1 Ir 1 I I~ 1 I PC .25 ,1 93851 1 1 F I Irl ~ ~ j~l ' ~ I I" ° 1 lr ' I I I 1 1 F' ~ I li 1 1 a~'~ 1 1 I r 1 1 l I I l F K~ I I~ 1 Il I Ir ~ 1 ' j I~ g~~ 1 Ir R ~ 1 I F' '"I I Qff y> ' Il I I Ir ~~y 1 i ~ ~ I G 2 IF I I I 0 I I l l~ A ~ ~ I I l 11 Fr ~I 1 Il v IT I. `I ~ I ' l I r l sro,6,~ ~ ~ y ~I IH I Ir ~ '0~P.op I m 1~.~ egpr I I~ 0) X a I ~ ~ b , ' I Ir 4k c z ` I I 5 , I I I I ~a +95 1 C I I O Pr s? 1 1~' I i v 11 r I ~ ~ tDn I ~ r 1\ I z \C r I I I- I C 1 I 0 1 ~ Z ~ \ a ~ 4 1~ ytl~ I 20 \ C pr sio 20*60,00 ~ a ~ I I r \ \ F 1 I I ~ a I Ir MEAN HIGH WATER MARK IS TRUE PROPERTY LINE 3a+~r I I r 5o. \ \ \1 ,a 1 ^ I I ,N~, z T t, M r r o \ I I 8 a l~7 o MArcWUNE -0~ STA 25+00 PROJECT REFERENCE NO. SHEET NO. 8-361/ 4 m RW EHEET NO. ROADWAY MON HYDWEEICS ENGINEER ENONE9 INCOMPLE E PLANS m Nor U aeA iw sroumT PRELIMIN RY PLANS DO NOT USE CIMMMMON + s i t C, Y i t i % 1: ~ Y i " a P/ Sto 2~~ A Ae 6'(M % + w, , D = 133'09.8' AOA L~/.830,0r 42 R 3.690.W •IP i +O s -L A. 280 + . it ' L BEGIN STATE PROM TB~11 -L- STA. 11 +50 -L-PC Sta 1640 PLAk ' 4S i' .1me " sto, + ' - 10400400 s wow* ~ N ,F-DET - POT Sta. /0+001)0 or SMl TAPER ON WANDRAIL , r my. REMOVE EXIST. ODAImW ° E - - - - - - - - - " j+~ z TIE ROR QUA~WL ________„y-____ p %ot efts TO in, + _L1~ L1_i.L1 O all N 5r35'205E --44 ]FZ - - - . . a Meedtbt tmm it +Y W w BM I y Y O N:~5Ul958.1 r' E:27DI394.1 V t (OFF BASELINE) w t ELEV=3.W' 31 -DET-- P/ Ste /84390 0 ft 6'5/'58.r(LT) D-r4!" W4MarAs T 22136 ' R - 3690(X1 L Y y y f Y ~ Y i m v v t a a m m on Qi SEE DETAIL SHEET 2-13 FOR DETOUR DESIGN SEE SHEET 9 FOR -L- PROFILE 20, N' SEE SHEET 11 FOR -DET- PROFILE PROJECT URR04CE NO. SHEET No. B-3611 5 m RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENDNEIR P1 Sto 25+52.04 p - 2g24/y548tLT1 INCOMPLE E PLANS - f 33'09p DD NM vat POq fQ ACUN6IilON ELI T /93423 2vgr PRDO NOTMBN R~YMPLA~NS R - 3690.00' ipc~o 9s eoo~ Y Y Y i Y i Y i Y I Y Y i \ Y Y Y ~Re~ i i \I Y \ Y Y Y \ i Y c4mA W i I ~y Y i \ Y i \ i Y \ (L~ i ~ v 4y Y i i WOODS Y i iAKDAR E ?,pA ETA Y i q Y 41 PEV f Y KiGRY 3 LIND E RLUMA' pt (j y ----O. •L- A. + I . ' L Y Y DDQ.ED~ % i \ i (Q i - i 6 CAMok W i 6r Y O - _ - _ - \ .na,~ iTREES W T - REMOVE EAST, auAEDEAd~=-~ - - - - - i Q hMktyWo*. cf) Lu 350 N 4r 3? OO.T - _ _ _ - z - - - - - - TYFE4R fa _ z Z - - j U COW ^ i ~ ~ - FBfU0LL01DRAU. \ Y (Cj Y - Y 'V'DODS i GRAU SSp 11E.-iffa3.96= Y .BI. -A Y Y - f , - - - - - f - - A. 51+97 . Y Y M~ M OS i GE'ARY OA ETTEFAG•N DRWJRY Dormoiny - FD ~AT i Y $ Y 404 i Y Y Y Y y De Q Y i Y Y 404 yy~ Y i 1 Y i i i i Y Y i Y Y i i Y i Y i Y Y -VET- Y Y i p- Slo 232'S6531LT1 SEE SHEET 9 FOR -L- PROFILE i o ` X 345r i Y SEE SHEETS 11 AND 12 FOR -DET- PROFILE i L * 60176' Y SEE DETAIL SHEET 2-13 FOR DETOUR DESIGN T 04.46' R 600.00' Y i Y Y Y Y - 3 t STRUCTURE ANCHOR UNITS U IN[ ANDGE + N a • 'o i y 4- ~ p w I o~ vi m0- a aq PAVEMENT - BRIDGE RELATIONSHIP SKETCH D ~o i "ANCT REFERENCE NO. SHlRf NO. 8-3611 6 Rw tter No. ROADWAY DESIDN HYDULUCS ENOMEER ENOMRQ -L- ' INCOMPLE E PLANS DO NOT USE Volk f1 ACpUmTTON P/ Sta 25+5204 6 = 28124 54e(LT) yZ PRELIMINARY PLANS D = r33'09Z a' oo NOT USE ro CONSIllDCf10N L = r.8300r T = 393423 kW. / o R = 3b91000` s - I \ v f v p Fa P v >t & Y \1\9 PNr I+ 9 = ~j y W y t * PT Sta 34+47BI 2 to TNEf W I a 79 + N - - -L- G7 C _ N 23 KY 263E + } g7, - - SEAT ELEV.= .UTUTES (TEL & CAM CONNECTED TO,uA SOUTH OF BRIDGE ARE ABANDONED NO FENDER SYST ill 11 :il l - - - _ - -R BR7GE Q Id Iii Z -a r -x - - r Z r -a !SEE NrL ELEV.=4.21 :11 1- ' -----TA ,fNM------ N 4, E _ W 71101 23* 06,51 W - - - - EAST, OUARDRAM _Z * J J y PI_ 5+6 77= _ '"Nl * L A. a U T.90181 wr Y ~ aW A ti i g C m TJ 2 N a a i SEE SHEET 10 FOR -L- PROFILE SEE SHEETS 11 AND 12 FOR -DET- PROFILE SEE DETAIL SHEET 2-Q FOR DETOUR DESIGN oQ N~ QO ~O m s PROJECT REPERNCE NO. iHE! NO. B-3611 7 m - RAY RHEET NO. ROADWAY DENiN HYDRAUUU NONffR NONEER A INCOMPLE E PLANS M NOT use FOR /i ACOORRI@i ZZ PRELIMIN RY PLANS 9Q(1 DO NOr USE CONSTHUMON / 4s PI S/o 61+97,52 - 27 391 57Z(RT) D - 4'10' 55B' L - 4940' T - 2497-W R - 1370.00 - I P P P P P Public TnW l q~ U1 a W +4174 W N y z P W W za F W to t y I NI W O N 23'10' 263' E n O + O SEAT ELEV.=4.27' a - ° _ - _ N : V ~ N 23' 06' 52.4' E SEAT ELEV=4.32' N 20' 59' 44.5' E W Z EpS1W Rn e = BL-7 PING 40+79.00= a"tm J L- s U C~ NOTE: ALL UNDERGROUND UTILITY DATA WAS LOCATED BY TRANSFERENCE FROM DRAWN PLANS FURNISHED BY THE UTILITY OWNERS lvv? :E ~~"N4q'rox o° u PC Stn. 59+4174 *RTRUCIURE ANCHOR UNrtl m v n t a a M _11 * 04 SEE SHEET 10 FOR -L- PROFILE m, 0 PAVEMENT - BRIDGE RELATIONSHIP SKETCH ~00 REVISIONS 29-MAY-2008 09:41 r:\roadwa \ ro \b3611-rdy-psh&dgn B/17/99 .dlg a\ . 3HS 335 00+ -49 5 F O W+ r +y 11 $y maa~ I I g 1 1 I w6zz5.66N ~y~9~~ ,ZH'ZIb • 1 1 I ayd~ i ~ X01. \ \ ~ aka I :ems 111 ~\a\ k II Q o I I / / \>ox lI I + \ / I a 2 I I + I I/ 1 d I I I. / 1 1 1 1 I' - ~a 1 1 a I = I f a mm ' 1 1 i 1 ~ I I I I l~ ~I I mS^ a~ I I I I I I Z r 0 7~ 11 11 r- II I N ~3 O~~ \ m rGa+c j"LEs a m ISpBLDG r i F I ~ .r n n I` EXMT 0* 1 ^ I SHLKgI~ \ 3.SZ4b.S6S / r- _SM~.O RR \ / ~9'BOZ 3.91,L 6.565 6 P/M \ - - - - - - - - - m II F-1 LA oHJ.ba \ I I I w 8 ? I I I I o \ \ \ ~ ~t ~~o ~~v ~ I H it Os~ $O \ \ - V~P9~ ^s9 d N I~ fin O. c3 Ogg \ zN m°JA ~~¢S -ai ~ I ~ Im a I ~ Ao I m K~ ~N$ 'Z-_ ANI. I I- x a uu owLSUn a j t-- -------------•rs O O 99'b_ d0~ 1 I 1 - a a - w , f r -R S-1134 orv I I.p W ° • I ~ ~ ~ "o~l~l~~ A x Jr~oJls~ LI'0-=ANI " xoe ols a~u+~ r I or+aJ.e 11"I-AN ZL'I-=ANI ICI SI'O=ANI ZL'0-=ANI JNO - _ 0b'0=ANI m nev° rowtgF - - xxvo xol1 3YI3 ZF 5 ANI - Wvu bs.bf - \ MX J J,oi~ p. X01 NI 15H.ZF 1331/15 nron Sire 698 AW sn -'--7r- 010 z •b ZO 4 I 11 =Ao I • . 1%9$JF ow 1AIN sn 6; a DM15AI M 3 a r~-_~ -YNM ! o I I I / ZOO 4~ .H~ O- y + 2 \ ~I . I o I a I o-z P?( NAIL 'SET $ , y Zzo q e a y~I I = IIIoQN~ I ~I ~ ° - ~ I as ~06 v k-~-f-k s~ m 1_ H fig( ;1 Q{ ~Z^ a f L~ PK NAi~•ao~ m b g OI 66'b! ,nn Q$ Q ~i I I 0, Om I I ^ I II 3.Lbb0.96S t:.) b ~0 N of I a lia ~'+A I I I I 4 = Z b Z ` Z .80'5£1 ,OZ'59 pI (,I = O 1"' O I 3.LI.ZZ.565 3.LI,ZZ.SbS W a s~' °I I m P ~~n •I g o a " 3 .hi a I I< < 4~ s~ Ilj g m o k a I loG ~I II 11 fi A ~-b a~ di~ 4 G~ f:7 I\AO OI I ~ I~~ J/ ~z y m o r m P tlDRCT l6RACNC! ND. A1tlT ND. N s ROOM DOGN NYDtMUUC! lNUNEER ENGMUR INCOMPLE E PLANS W NUT USE PoE /v AcouwrnoN PRELIMIN RY PLANS DU NUT V98 OUN9TSUCIIUN PRI in -10 01A _in 10 11 12 13 14 15 16 17 18 19 20 -L- 171 w P.1.10 AT, a -in ' m M vi -70 mo 0 tttttt- 4-p 0 44444+ I±EHE oa N; r° a° 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 P ~ ROIKT A!RlBIC! N0. p1RT N0. 8-361! IO u\i ROADWAY DlNON HYDlAIN.ICI ENVNM ENDIMER it S DO NOT V58 FOR PRELIMIN S INCOMPLE ELPI-PL III till I 1 1. it, lifill y Ill till in I- till I - _in +44 -10 .1 till, 11 -l" ±Lfl -fft± :t +FH 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 ]till till I Ill lilt[ 111- I J it i I till till till 11 till litill, m It. -10 a till I 11 It 11 1 till c~ D -20 -2n vi ~D EE EEE Oi Itt- O 00 N~ r~ QO i 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 ROAgWANEERSIGN NENGINEER ttNNGGII ENGINES D I N PR I D NOPM, 1= N It Ill 11 11 It 11 .11 FF, I It Bill i it till I till Ill 1 till it I -1 n 62 63 64 65 66 67 68 69 70 71 72 73 I ,'I 1 -1. Fit I till -F- IF I 1 .11 F-11.111 IF, IF Bill I'll FF till I Ill Fill till HFEF -Dt i HRIF 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 lRD~CT RrrlRBJC! N0. A1DR N0. I'll 8-36p IZ -DET- ROADWAY DMMM MYDRAWC I lilt lNGINla BlOINQR INCOMPLE PLANS 00 NO'f IM PUR ACUUIS M PRELIMIN RY PLANS DU NQf U96 CON9'ITtUCIMN 'I III lilt #ff fill lilt lilt I I lilt lilt I I 11 lilt I I ttt 29 30 31 32 33 34 35 I II tHl Ill lilt lilt I lilt m v I t lilt[ w a m Nn m 0o m, 0 0 N0 = r~ Qo ~o m! Ni