HomeMy WebLinkAbout20170220 Ver 1_Bridge 379 on SR 2715 Guilford Co - NWP 14 - SAW-2017-00367_20170306Carpenter,Kristi
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
Nikki and Jerry,
Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil>
Monday, March 06, 2017 4:10 PM
Parker, Jerry A; Thomson, Nicole J
Wanucha, Dave; Harmon, Beth; Mills, James M; Corbett, Cindy M CIV USARMY CESAW (US);
Carpenter,Kristi; Browning, Kimberly D CIV USARMY CESAW (US)
Bridge 379 on SR 2715, Guilford Co - NWP 14 - SAW-2017-00367
2017-00367 NWP 14.pdf; NWP14_3-23.pdf
Follow up
Completed
I have attached the Nationwide Permit 14 verification including Special Conditions and terms and conditions for the
above referenced project to this email. Please note the Compensatory Mitigation requirement. Please let me know if
you have any questions or would like a hard copy mailed to you.
Sincerely,
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.