HomeMy WebLinkAbout20170260 Ver 1_17BP 12 R 43 WetlandpermitSummary_final_20170306WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS an Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 12+42 -L- LT Pipe Extension 0.003 22 Rip Rap Bank 1 12+42 -L- LT Stabilization 0.001 10 2 12+g5 -L- RT Pi e Extension 0.005 20 Rip Rap Bank 2 12+95 -L- RT Stabilization 0.002 10 Temporary 2 12+g5 -L- RT Dewatering 224 Existing End Bent 3 14+42 -L- Removal <0.01 40 3 14+42 -L- Deck Drain Pad 0.0006 4 TOTALS: 0.00 0.00 0.00 0.00 0.00 0.012 <0.01 66 264 0 Revised 3/31I05